Price-Cost Schedule - Legionella Testing - corrected 4-16.xlsx

XLSX spreadsheet 28 KB Posted

Attached to
F103--Legionella Water Testing VISN 10 Medical Centers Ann Arbor, Saginaw, Detroit, Battle Creek, and Fort Wayne
Solicitation number
36C25024R0102
Issued by

About this file

This document is a Price-Cost Schedule for a federal contract opportunity related to Legionella water testing services for several VA medical centers in Michigan and Indiana. The contract will require the selected contractor to provide Legionella sample collection, analysis, and results management services for government-owned buildings where patients, residents, or visitors stay overnight. The contract period is for a base year from May 1, 2024 to April 30, 2025, with four one-year option years. Pricing is provided per testing type, including quarterly environmental validation sampling, non-routine Legionella testing, cooling tower sampling, and quarterly dental waterline testing. The total estimated contract value is $11,730. The related federal contract opportunity, Solicitation Number 36C25024R0102, is for these Legionella water testing services at VA medical centers in VISN 10.

View the file

Other files

Show all 14

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Item Detail

Item NumberSLINDescriptionContract PeriodPoP BeginPoP EndQuantityUnit of MeasureUnit PriceExtended Price
1001Provide Legionella sample collection, analysis, and results management for government-owned buildings in which patients, residents, or visitors stay overnight in accordance with the SOW. - LTC Charles S. Kettles VA Medical Center, Ann Arbor, MIYear One5/1/244/30/25
1001AAQuarterly Environmental Validation sampling required to comply with VHA Directive 1061(1).Year One5/1/244/30/25320EA$1.00$320.00
1001ABNon-Routine Legionella Testing (Resampling) performed outside of quarterly sampling - including onsite physical and chemical testing.Year One5/1/244/30/2537EA$1.00$37.00
1001ACCooling Tower sample collection, analysis, and results management.Year One5/1/244/30/2524EA$1.00$24.00
1001ADNon-Routine HPC Testing (Cooling Tower) performed outside of quarterly sampling, including onsite physical and chemical testing.Year One5/1/244/30/250EA$1.00$0.00
1001AEQuarterly Dental Waterline Heterthropic Plate Count AnalysisYear One5/1/244/30/250EA$1.00$0.00
1001AFNon-Routine HPC Testing (Dental Waterlines) performed outside of quarterly sampling.Year One5/1/244/30/250EA$1.00$0.00
1002Provide Legionella sample collection, analysis, and results management for government-owned buildings in which patients, residents, or visitors stay overnight in accordance with the SOW. - Battle Creek VA Medical Center, Battle Creek, MIYear One5/1/244/30/25
1002AAQuarterly Environmental Validation sampling required to comply with VHA Directive 1061(1).Year One5/1/244/30/25720EA$1.00$720.00
1002ABNon-Routine Legionella Testing (Resampling) performed outside of quarterly sampling - including onsite physical and chemical testing.Year One5/1/244/30/25100EA$1.00$100.00
1002ACCooling Tower sample collection, analysis, and results management.Year One5/1/244/30/258EA$1.00$8.00
1002ADNon-Routine HPC Testing (Cooling Tower) performed outside of quarterly sampling, including onsite physical and chemical testing.Year One5/1/244/30/254EA$1.00$4.00
1002AEQuarterly Dental Waterline Heterthropic Plate Count AnalysisYear One5/1/244/30/25200EA$1.00$200.00
1002AFNon-Routine HPC Testing (Dental Waterlines) performed outside of quarterly sampling.Year One5/1/244/30/250EA$1.00$0.00
1003Provide Legionella sample collection, analysis, and results management for government-owned buildings in which patients, residents, or visitors stay overnight in accordance with the SOW. - John D Dingell VA Medical Center, Detroit, MIYear One5/1/244/30/25
1003AAQuarterly Environmental Validation sampling required to comply with VHA Directive 1061(1).Year One5/1/244/30/2588EA$1.00$88.00
1003ABNon-Routine Legionella Testing (Resampling) performed outside of quarterly sampling - including onsite physical and chemical testing.Year One5/1/244/30/2540EA$1.00$40.00
1003ACCooling Tower sample collection, analysis, and results management.Year One5/1/244/30/2524EA$1.00$24.00
1003ADNon-Routine HPC Testing (Cooling Tower) performed outside of quarterly sampling, including onsite physical and chemical testing.Year One5/1/244/30/256EA$1.00$6.00
1003AEQuarterly Dental Waterline Heterthropic Plate Count AnalysisYear One5/1/244/30/250EA$1.00$0.00
1003AFNon-Routine HPC Testing (Dental Waterlines) performed outside of quarterly sampling.Year One5/1/244/30/250EA$1.00$0.00
1004Provide Legionella sample collection, analysis, and results management for government-owned buildings in which patients, residents, or visitors stay overnight in accordance with the SOW. - VA Northern Indiana Healthcare System, Fort Wayne VA Medical Center, Fort Wayne, INYear One5/1/244/30/25
1004AAQuarterly Environmental Validation sampling required to comply with VHA Directive 1061(1).Year One5/1/244/30/2580EA$1.00$80.00
1004ABNon-Routine Legionella Testing (Resampling) performed outside of quarterly sampling - including onsite physical and chemical testing.Year One5/1/244/30/2535EA$1.00$35.00
1004ACCooling Tower sample collection, analysis, and results management.Year One5/1/244/30/250EA$1.00$0.00
1004ADNon-Routine HPC Testing (Cooling Tower) performed outside of quarterly sampling, including onsite physical and chemical testing.Year One5/1/244/30/250EA$1.00$0.00
1004AEQuarterly Dental Waterline Heterthropic Plate Count AnalysisYear One5/1/244/30/25120EA$1.00$120.00
1004AFNon-Routine HPC Testing (Dental Waterlines) performed outside of quarterly sampling.Year One5/1/244/30/2524EA$1.00$24.00
1005Provide Legionella sample collection, analysis, and results management for government-owned buildings in which patients, residents, or visitors stay overnight in accordance with the SOW. - VA Northern Indiana Healthcare System, Marion VA Medical Center, Marion, INYear One5/1/244/30/25
1005AAQuarterly Environmental Validation sampling required to comply with VHA Directive 1061(1).Year One5/1/244/30/25160EA$1.00$160.00
1005ABNon-Routine Legionella Testing (Resampling) performed outside of quarterly sampling - including onsite physical and chemical testing.Year One5/1/244/30/2520EA$1.00$20.00
1005ACCooling Tower sample collection, analysis, and results management.Year One5/1/244/30/254EA$1.00$4.00
1005ADNon-Routine HPC Testing (Cooling Tower) performed outside of quarterly sampling, including onsite physical and chemical testing.Year One5/1/244/30/252EA$1.00$2.00
1005AEQuarterly Dental Waterline Heterthropic Plate Count AnalysisYear One5/1/244/30/25188EA$1.00$188.00
1005AFNon-Routine HPC Testing (Dental Waterlines) performed outside of quarterly sampling.Year One5/1/244/30/2520EA$1.00$20.00
1006Provide Legionella sample collection, analysis, and results management for government-owned buildings in which patients, residents, or visitors stay overnight in accordance with the SOW. - Aleda E Lutz VA Medical Center, Saginaw, MIYear One5/1/244/30/25
1006AAQuarterly Environmental Validation sampling required to comply with VHA Directive 1061(1).Year One5/1/244/30/2592EA$1.00$92.00
1006ABNon-Routine Legionella Testing (Resampling) performed outside of quarterly sampling - including onsite physical and chemical testing.Year One5/1/244/30/2530EA$1.00$30.00
1006ACCooling Tower sample collection, analysis, and results management.Year One5/1/244/30/250EA$1.00$0.00
1006ADNon-Routine HPC Testing (Cooling Tower) performed outside of quarterly sampling, including onsite physical and chemical testing.Year One5/1/244/30/250EA$1.00$0.00
1006AEQuarterly Dental Waterline Heterthropic Plate Count AnalysisYear One5/1/244/30/250EA$1.00$0.00
1006AFNon-Routine HPC Testing (Dental Waterlines) performed outside of quarterly sampling.Year One5/1/244/30/250EA$1.00$0.00
2001Provide Legionella sample collection, analysis, and results management for government-owned buildings in which patients, residents, or visitors stay overnight in accordance with the SOW. - LTC Charles S. Kettles VA Medical Center, Ann Arbor, MIYear Two5/1/244/30/25
2001AAQuarterly Environmental Validation sampling required to comply with VHA Directive 1061(1).Year Two5/1/244/30/25320EA$1.00$320.00
2001ABNon-Routine Legionella Testing (Resampling) performed outside of quarterly sampling - including onsite physical and chemical testing.Year Two5/1/244/30/2537EA$1.00$37.00
2001ACCooling Tower sample collection, analysis, and results management.Year Two5/1/244/30/2524EA$1.00$24.00
2001ADNon-Routine HPC Testing (Cooling Tower) performed outside of quarterly sampling, including onsite physical and chemical testing.Year Two5/1/244/30/250EA$1.00$0.00
2001AEQuarterly Dental Waterline Heterthropic Plate Count AnalysisYear Two5/1/244/30/250EA$1.00$0.00
2001AFNon-Routine HPC Testing (Dental Waterlines) performed outside of quarterly sampling.Year Two5/1/244/30/250EA$1.00$0.00
2002Provide Legionella sample collection, analysis, and results management for government-owned buildings in which patients, residents, or visitors stay overnight in accordance with the SOW. - Battle Creek VA Medical Center, Battle Creek, MIYear Two5/1/254/30/26
2002AAQuarterly Environmental Validation sampling required to comply with VHA Directive 1061(1).Year Two5/1/254/30/26720EA$1.00$720.00
2002ABNon-Routine Legionella Testing (Resampling) performed outside of quarterly sampling - including onsite physical and chemical testing.Year Two5/1/254/30/26100EA$1.00$100.00
2002ACCooling Tower sample collection, analysis, and results management.Year Two5/1/254/30/268EA$1.00$8.00
2002ADNon-Routine HPC Testing (Cooling Tower) performed outside of quarterly sampling, including onsite physical and chemical testing.Year Two5/1/254/30/264EA$1.00$4.00
2002AEQuarterly Dental Waterline Heterthropic Plate Count AnalysisYear Two5/1/254/30/26200EA$1.00$200.00
2002AFNon-Routine HPC Testing (Dental Waterlines) performed outside of quarterly sampling.Year Two5/1/254/30/260EA$1.00$0.00
2003Provide Legionella sample collection, analysis, and results management for government-owned buildings in which patients, residents, or visitors stay overnight in accordance with the SOW. - John D Dingell VA Medical Center, Detroit, MIYear Two5/1/254/30/26
2003AAQuarterly Environmental Validation sampling required to comply with VHA Directive 1061(1).Year Two5/1/254/30/2688EA$1.00$88.00
2003ABNon-Routine Legionella Testing (Resampling) performed outside of quarterly sampling - including onsite physical and chemical testing.Year Two5/1/254/30/2640EA$1.00$40.00
2003ACCooling Tower sample collection, analysis, and results management.Year Two5/1/254/30/2624EA$1.00$24.00
2003ADNon-Routine HPC Testing (Cooling Tower) performed outside of quarterly sampling, including onsite physical and chemical testing.Year Two5/1/254/30/266EA$1.00$6.00
2003AEQuarterly Dental Waterline Heterthropic Plate Count AnalysisYear Two5/1/254/30/260EA$1.00$0.00
2003AFNon-Routine HPC Testing (Dental Waterlines) performed outside of quarterly sampling.Year Two5/1/254/30/260EA$1.00$0.00
2004Provide Legionella sample collection, analysis, and results management for government-owned buildings in which patients, residents, or visitors stay overnight in accordance with the SOW. - VA Northern Indiana Healthcare System, Fort Wayne VA Medical Center, Fort Wayne, INYear Two5/1/254/30/26
2004AAQuarterly Environmental Validation sampling required to comply with VHA Directive 1061(1).Year Two5/1/254/30/2680EA$1.00$80.00
2004ABNon-Routine Legionella Testing (Resampling) performed outside of quarterly sampling - including onsite physical and chemical testing.Year Two5/1/254/30/2635EA$1.00$35.00
2004ACCooling Tower sample collection, analysis, and results management.Year Two5/1/254/30/260EA$1.00$0.00
2004ADNon-Routine HPC Testing (Cooling Tower) performed outside of quarterly sampling, including onsite physical and chemical testing.Year Two5/1/254/30/260EA$1.00$0.00
2004AEQuarterly Dental Waterline Heterthropic Plate Count AnalysisYear Two5/1/254/30/26120EA$1.00$120.00
2004AFNon-Routine HPC Testing (Dental Waterlines) performed outside of quarterly sampling.Year Two5/1/254/30/2624EA$1.00$24.00
2005Provide Legionella sample collection, analysis, and results management for government-owned buildings in which patients, residents, or visitors stay overnight in accordance with the SOW. - VA Northern Indiana Healthcare System, Marion VA Medical Center, Marion, INYear Two5/1/254/30/26
2005AAQuarterly Environmental Validation sampling required to comply with VHA Directive 1061(1).Year Two5/1/254/30/26160EA$1.00$160.00
2005ABNon-Routine Legionella Testing (Resampling) performed outside of quarterly sampling - including onsite physical and chemical testing.Year Two5/1/254/30/2620EA$1.00$20.00
2005ACCooling Tower sample collection, analysis, and results management.Year Two5/1/254/30/264EA$1.00$4.00
2005ADNon-Routine HPC Testing (Cooling Tower) performed outside of quarterly sampling, including onsite physical and chemical testing.Year Two5/1/254/30/262EA$1.00$2.00
2005AEQuarterly Dental Waterline Heterthropic Plate Count AnalysisYear Two5/1/254/30/26188EA$1.00$188.00
2005AFNon-Routine HPC Testing (Dental Waterlines) performed outside of quarterly sampling.Year Two5/1/254/30/2620EA$1.00$20.00
2006Provide Legionella sample collection, analysis, and results management for government-owned buildings in which patients, residents, or visitors stay overnight in accordance with the SOW. - Aleda E Lutz VA Medical Center, Saginaw, MIYear Two5/1/254/30/26
2006AAQuarterly Environmental Validation sampling required to comply with VHA Directive 1061(1).Year Two5/1/254/30/2692EA$1.00$92.00
2006ABNon-Routine Legionella Testing (Resampling) performed outside of quarterly sampling - including onsite physical and chemical testing.Year Two5/1/254/30/2630EA$1.00$30.00
2006ACCooling Tower sample collection, analysis, and results management.Year Two5/1/254/30/260EA$1.00$0.00
2006ADNon-Routine HPC Testing (Cooling Tower) performed outside of quarterly sampling, including onsite physical and chemical testing.Year Two5/1/254/30/260EA$1.00$0.00
2006AEQuarterly Dental Waterline Heterthropic Plate Count AnalysisYear Two5/1/254/30/260EA$1.00$0.00
2006AFNon-Routine HPC Testing (Dental Waterlines) performed outside of quarterly sampling.Year Two5/1/254/30/260EA$1.00$0.00
3001Provide Legionella sample collection, analysis, and results management for government-owned buildings in which patients, residents, or visitors stay overnight in accordance with the SOW. - LTC Charles S. Kettles VA Medical Center, Ann Arbor, MIYear Three5/1/264/30/27
3001AAQuarterly Environmental Validation sampling required to comply with VHA Directive 1061(1).Year Three5/1/264/30/27320EA$1.00$320.00
3001ABNon-Routine Legionella Testing (Resampling) performed outside of quarterly sampling - including onsite physical and chemical testing.Year Three5/1/264/30/2737EA$1.00$37.00
3001ACCooling Tower sample collection, analysis, and results management.Year Three5/1/264/30/2724EA$1.00$24.00
3001ADNon-Routine HPC Testing (Cooling Tower) performed outside of quarterly sampling, including onsite physical and chemical testing.Year Three5/1/264/30/270EA$1.00$0.00
3001AEQuarterly Dental Waterline Heterthropic Plate Count AnalysisYear Three5/1/264/30/270EA$1.00$0.00
3001AFNon-Routine HPC Testing (Dental Waterlines) performed outside of quarterly sampling.Year Three5/1/264/30/270EA$1.00$0.00
3002Provide Legionella sample collection, analysis, and results management for government-owned buildings in which patients, residents, or visitors stay overnight in accordance with the SOW. - Battle Creek VA Medical Center, Battle Creek, MIYear Three5/1/264/30/27
3002AAQuarterly Environmental Validation sampling required to comply with VHA Directive 1061(1).Year Three5/1/264/30/27720EA$1.00$720.00
3002ABNon-Routine Legionella Testing (Resampling) performed outside of quarterly sampling - including onsite physical and chemical testing.Year Three5/1/264/30/27100EA$1.00$100.00
3002ACCooling Tower sample collection, analysis, and results management.Year Three5/1/264/30/278EA$1.00$8.00
3002ADNon-Routine HPC Testing (Cooling Tower) performed outside of quarterly sampling, including onsite physical and chemical testing.Year Three5/1/264/30/274EA$1.00$4.00
3002AEQuarterly Dental Waterline Heterthropic Plate Count AnalysisYear Three5/1/264/30/27200EA$1.00$200.00
3002AFNon-Routine HPC Testing (Dental Waterlines) performed outside of quarterly sampling.Year Three5/1/264/30/270EA$1.00$0.00
3003Provide Legionella sample collection, analysis, and results management for government-owned buildings in which patients, residents, or visitors stay overnight in accordance with the SOW. - John D Dingell VA Medical Center, Detroit, MIYear Three5/1/264/30/27
3003AAQuarterly Environmental Validation sampling required to comply with VHA Directive 1061(1).Year Three5/1/264/30/2788EA$1.00$88.00
3003ABNon-Routine Legionella Testing (Resampling) performed outside of quarterly sampling - including onsite physical and chemical testing.Year Three5/1/264/30/2740EA$1.00$40.00
3003ACCooling Tower sample collection, analysis, and results management.Year Three5/1/264/30/2724EA$1.00$24.00
3003ADNon-Routine HPC Testing (Cooling Tower) performed outside of quarterly sampling, including onsite physical and chemical testing.Year Three5/1/264/30/276EA$1.00$6.00
3003AEQuarterly Dental Waterline Heterthropic Plate Count AnalysisYear Three5/1/264/30/270EA$1.00$0.00
3003AFNon-Routine HPC Testing (Dental Waterlines) performed outside of quarterly sampling.Year Three5/1/264/30/270EA$1.00$0.00
3004Provide Legionella sample collection, analysis, and results management for government-owned buildings in which patients, residents, or visitors stay overnight in accordance with the SOW. - VA Northern Indiana Healthcare System, Fort Wayne VA Medical Center, Fort Wayne, INYear Three5/1/264/30/27
3004AAQuarterly Environmental Validation sampling required to comply with VHA Directive 1061(1).Year Three5/1/264/30/2780EA$1.00$80.00
3004ABNon-Routine Legionella Testing (Resampling) performed outside of quarterly sampling - including onsite physical and chemical testing.Year Three5/1/264/30/2735EA$1.00$35.00
3004ACCooling Tower sample collection, analysis, and results management.Year Three5/1/264/30/270EA$1.00$0.00
3004ADNon-Routine HPC Testing (Cooling Tower) performed outside of quarterly sampling, including onsite physical and chemical testing.Year Three5/1/264/30/270EA$1.00$0.00
3004AEQuarterly Dental Waterline Heterthropic Plate Count AnalysisYear Three5/1/264/30/27120EA$1.00$120.00
3004AFNon-Routine HPC Testing (Dental Waterlines) performed outside of quarterly sampling.Year Three5/1/264/30/2724EA$1.00$24.00
3005Provide Legionella sample collection, analysis, and results management for government-owned buildings in which patients, residents, or visitors stay overnight in accordance with the SOW. - VA Northern Indiana Healthcare System, Marion VA Medical Center, Marion, INYear Three5/1/264/30/27
3005AAQuarterly Environmental Validation sampling required to comply with VHA Directive 1061(1).Year Three5/1/264/30/27160EA$1.00$160.00
3005ABNon-Routine Legionella Testing (Resampling) performed outside of quarterly sampling - including onsite physical and chemical testing.Year Three5/1/264/30/2720EA$1.00$20.00
3005ACCooling Tower sample collection, analysis, and results management.Year Three5/1/264/30/274EA$1.00$4.00
3005ADNon-Routine HPC Testing (Cooling Tower) performed outside of quarterly sampling, including onsite physical and chemical testing.Year Three5/1/264/30/272EA$1.00$2.00
3005AEQuarterly Dental Waterline Heterthropic Plate Count AnalysisYear Three5/1/264/30/27188EA$1.00$188.00
3005AFNon-Routine HPC Testing (Dental Waterlines) performed outside of quarterly sampling.Year Three5/1/264/30/2720EA$1.00$20.00
3006Provide Legionella sample collection, analysis, and results management for government-owned buildings in which patients, residents, or visitors stay overnight in accordance with the SOW. - Aleda E Lutz VA Medical Center, Saginaw, MIYear Three5/1/264/30/27
3006AAQuarterly Environmental Validation sampling required to comply with VHA Directive 1061(1).Year Three5/1/264/30/2792EA$1.00$92.00
3006ABNon-Routine Legionella Testing (Resampling) performed outside of quarterly sampling - including onsite physical and chemical testing.Year Three5/1/264/30/2730EA$1.00$30.00
3006ACCooling Tower sample collection, analysis, and results management.Year Three5/1/264/30/270EA$1.00$0.00
3006ADNon-Routine HPC Testing (Cooling Tower) performed outside of quarterly sampling, including onsite physical and chemical testing.Year Three5/1/264/30/270EA$1.00$0.00
3006AEQuarterly Dental Waterline Heterthropic Plate Count AnalysisYear Three5/1/264/30/270EA$1.00$0.00
3006AFNon-Routine HPC Testing (Dental Waterlines) performed outside of quarterly sampling.Year Three5/1/264/30/270EA$1.00$0.00
4001Provide Legionella sample collection, analysis, and results management for government-owned buildings in which patients, residents, or visitors stay overnight in accordance with the SOW. - LTC Charles S. Kettles VA Medical Center, Ann Arbor, MIYear Four5/1/274/30/28
4001AAQuarterly Environmental Validation sampling required to comply with VHA Directive 1061(1).Year Four5/1/274/30/28320EA$1.00$320.00
4001ABNon-Routine Legionella Testing (Resampling) performed outside of quarterly sampling - including onsite physical and chemical testing.Year Four5/1/274/30/2837EA$1.00$37.00
4001ACCooling Tower sample collection, analysis, and results management.Year Four5/1/274/30/2824EA$1.00$24.00
4001ADNon-Routine HPC Testing (Cooling Tower) performed outside of quarterly sampling, including onsite physical and chemical testing.Year Four5/1/274/30/280EA$1.00$0.00
4001AEQuarterly Dental Waterline Heterthropic Plate Count AnalysisYear Four5/1/274/30/280EA$1.00$0.00
4001AFNon-Routine HPC Testing (Dental Waterlines) performed outside of quarterly sampling.Year Four5/1/274/30/280EA$1.00$0.00
4002Provide Legionella sample collection, analysis, and results management for government-owned buildings in which patients, residents, or visitors stay overnight in accordance with the SOW. - Battle Creek VA Medical Center, Battle Creek, MIYear Four5/1/274/30/28
4002AAQuarterly Environmental Validation sampling required to comply with VHA Directive 1061(1).Year Four5/1/274/30/28720EA$1.00$720.00
4002ABNon-Routine Legionella Testing (Resampling) performed outside of quarterly sampling - including onsite physical and chemical testing.Year Four5/1/274/30/28100EA$1.00$100.00
4002ACCooling Tower sample collection, analysis, and results management.Year Four5/1/274/30/288EA$1.00$8.00
4002ADNon-Routine HPC Testing (Cooling Tower) performed outside of quarterly sampling, including onsite physical and chemical testing.Year Four5/1/274/30/284EA$1.00$4.00
4002AEQuarterly Dental Waterline Heterthropic Plate Count AnalysisYear Four5/1/274/30/28200EA$1.00$200.00
4002AFNon-Routine HPC Testing (Dental Waterlines) performed outside of quarterly sampling.Year Four5/1/274/30/280EA$1.00$0.00
4003Provide Legionella sample collection, analysis, and results management for government-owned buildings in which patients, residents, or visitors stay overnight in accordance with the SOW. - John D Dingell VA Medical Center, Detroit, MIYear Four5/1/274/30/28
4003AAQuarterly Environmental Validation sampling required to comply with VHA Directive 1061(1).Year Four5/1/274/30/2888EA$1.00$88.00
4003ABNon-Routine Legionella Testing (Resampling) performed outside of quarterly sampling - including onsite physical and chemical testing.Year Four5/1/274/30/2840EA$1.00$40.00
4003ACCooling Tower sample collection, analysis, and results management.Year Four5/1/274/30/2824EA$1.00$24.00
4003ADNon-Routine HPC Testing (Cooling Tower) performed outside of quarterly sampling, including onsite physical and chemical testing.Year Four5/1/274/30/286EA$1.00$6.00
4003AEQuarterly Dental Waterline Heterthropic Plate Count AnalysisYear Four5/1/274/30/280EA$1.00$0.00
4003AFNon-Routine HPC Testing (Dental Waterlines) performed outside of quarterly sampling.Year Four5/1/274/30/280EA$1.00$0.00
4004Provide Legionella sample collection, analysis, and results management for government-owned buildings in which patients, residents, or visitors stay overnight in accordance with the SOW. - VA Northern Indiana Healthcare System, Fort Wayne VA Medical Center, Fort Wayne, INYear Four5/1/274/30/28
4004AAQuarterly Environmental Validation sampling required to comply with VHA Directive 1061(1).Year Four5/1/274/30/2880EA$1.00$80.00
4004ABNon-Routine Legionella Testing (Resampling) performed outside of quarterly sampling - including onsite physical and chemical testing.Year Four5/1/274/30/2835EA$1.00$35.00
4004ACCooling Tower sample collection, analysis, and results management.Year Four5/1/274/30/280EA$1.00$0.00
4004ADNon-Routine HPC Testing (Cooling Tower) performed outside of quarterly sampling, including onsite physical and chemical testing.Year Four5/1/274/30/280EA$1.00$0.00
4004AEQuarterly Dental Waterline Heterthropic Plate Count AnalysisYear Four5/1/274/30/28120EA$1.00$120.00
4004AFNon-Routine HPC Testing (Dental Waterlines) performed outside of quarterly sampling.Year Four5/1/274/30/2824EA$1.00$24.00
4005Provide Legionella sample collection, analysis, and results management for government-owned buildings in which patients, residents, or visitors stay overnight in accordance with the SOW. - VA Northern Indiana Healthcare System, Marion VA Medical Center, Marion, INYear Four5/1/274/30/28
4005AAQuarterly Environmental Validation sampling required to comply with VHA Directive 1061(1).Year Four5/1/274/30/28160EA$1.00$160.00
4005ABNon-Routine Legionella Testing (Resampling) performed outside of quarterly sampling - including onsite physical and chemical testing.Year Four5/1/274/30/2820EA$1.00$20.00
4005ACCooling Tower sample collection, analysis, and results management.Year Four5/1/274/30/284EA$1.00$4.00
4005ADNon-Routine HPC Testing (Cooling Tower) performed outside of quarterly sampling, including onsite physical and chemical testing.Year Four5/1/274/30/282EA$1.00$2.00
4005AEQuarterly Dental Waterline Heterthropic Plate Count AnalysisYear Four5/1/274/30/28188EA$1.00$188.00
4005AFNon-Routine HPC Testing (Dental Waterlines) performed outside of quarterly sampling.Year Four5/1/274/30/2820EA$1.00$20.00
4006Provide Legionella sample collection, analysis, and results management for government-owned buildings in which patients, residents, or visitors stay overnight in accordance with the SOW. - Aleda E Lutz VA Medical Center, Saginaw, MIYear Four5/1/274/30/28
4006AAQuarterly Environmental Validation sampling required to comply with VHA Directive 1061(1).Year Four5/1/274/30/2892EA$1.00$92.00
4006ABNon-Routine Legionella Testing (Resampling) performed outside of quarterly sampling - including onsite physical and chemical testing.Year Four5/1/274/30/2830EA$1.00$30.00
4006ACCooling Tower sample collection, analysis, and results management.Year Four5/1/274/30/280EA$1.00$0.00
4006ADNon-Routine HPC Testing (Cooling Tower) performed outside of quarterly sampling, including onsite physical and chemical testing.Year Four5/1/274/30/280EA$1.00$0.00
4006AEQuarterly Dental Waterline Heterthropic Plate Count AnalysisYear Four5/1/274/30/280EA$1.00$0.00
4006AFNon-Routine HPC Testing (Dental Waterlines) performed outside of quarterly sampling.Year Four5/1/274/30/280EA$1.00$0.00
5001Provide Legionella sample collection, analysis, and results management for government-owned buildings in which patients, residents, or visitors stay overnight in accordance with the SOW. - LTC Charles S. Kettles VA Medical Center, Ann Arbor, MIYear Five5/1/284/30/29
5001AAQuarterly Environmental Validation sampling required to comply with VHA Directive 1061(1).Year Five5/1/284/30/29320EA$1.00$320.00
5001ABNon-Routine Legionella Testing (Resampling) performed outside of quarterly sampling - including onsite physical and chemical testing.Year Five5/1/284/30/2937EA$1.00$37.00
5001ACCooling Tower sample collection, analysis, and results management.Year Five5/1/284/30/2924EA$1.00$24.00
5001ADNon-Routine HPC Testing (Cooling Tower) performed outside of quarterly sampling, including onsite physical and chemical testing.Year Five5/1/284/30/290EA$1.00$0.00
5001AEQuarterly Dental Waterline Heterthropic Plate Count AnalysisYear Five5/1/284/30/290EA$1.00$0.00
5001AFNon-Routine HPC Testing (Dental Waterlines) performed outside of quarterly sampling.Year Five5/1/284/30/290EA$1.00$0.00
5002Provide Legionella sample collection, analysis, and results management for government-owned buildings in which patients, residents, or visitors stay overnight in accordance with the SOW. - Battle Creek VA Medical Center, Battle Creek, MIYear Five5/1/284/30/29
5002AAQuarterly Environmental Validation sampling required to comply with VHA Directive 1061(1).Year Five5/1/284/30/29720EA$1.00$720.00
5002ABNon-Routine Legionella Testing (Resampling) performed outside of quarterly sampling - including onsite physical and chemical testing.Year Five5/1/284/30/29100EA$1.00$100.00
5002ACCooling Tower sample collection, analysis, and results management.Year Five5/1/284/30/298EA$1.00$8.00
5002ADNon-Routine HPC Testing (Cooling Tower) performed outside of quarterly sampling, including onsite physical and chemical testing.Year Five5/1/284/30/294EA$1.00$4.00
5002AEQuarterly Dental Waterline Heterthropic Plate Count AnalysisYear Five5/1/284/30/29200EA$1.00$200.00
5002AFNon-Routine HPC Testing (Dental Waterlines) performed outside of quarterly sampling.Year Five5/1/284/30/290EA$1.00$0.00
5003Provide Legionella sample collection, analysis, and results management for government-owned buildings in which patients, residents, or visitors stay overnight in accordance with the SOW. - John D Dingell VA Medical Center, Detroit, MIYear Five5/1/284/30/29
5003AAQuarterly Environmental Validation sampling required to comply with VHA Directive 1061(1).Year Five5/1/284/30/2988EA$1.00$88.00
5003ABNon-Routine Legionella Testing (Resampling) performed outside of quarterly sampling - including onsite physical and chemical testing.Year Five5/1/284/30/2940EA$1.00$40.00
5003ACCooling Tower sample collection, analysis, and results management.Year Five5/1/284/30/2924EA$1.00$24.00
5003ADNon-Routine HPC Testing (Cooling Tower) performed outside of quarterly sampling, including onsite physical and chemical testing.Year Five5/1/284/30/296EA$1.00$6.00
5003AEQuarterly Dental Waterline Heterthropic Plate Count AnalysisYear Five5/1/284/30/290EA$1.00$0.00
5003AFNon-Routine HPC Testing (Dental Waterlines) performed outside of quarterly sampling.Year Five5/1/284/30/290EA$1.00$0.00
5004Provide Legionella sample collection, analysis, and results management for government-owned buildings in which patients, residents, or visitors stay overnight in accordance with the SOW. - VA Northern Indiana Healthcare System, Fort Wayne VA Medical Center, Fort Wayne, INYear Five5/1/284/30/29
5004AAQuarterly Environmental Validation sampling required to comply with VHA Directive 1061(1).Year Five5/1/284/30/2980EA$1.00$80.00
5004ABNon-Routine Legionella Testing (Resampling) performed outside of quarterly sampling - including onsite physical and chemical testing.Year Five5/1/284/30/2935EA$1.00$35.00
5004ACCooling Tower sample collection, analysis, and results management.Year Five5/1/284/30/290EA$1.00$0.00
5004ADNon-Routine HPC Testing (Cooling Tower) performed outside of quarterly sampling, including onsite physical and chemical testing.Year Five5/1/284/30/290EA$1.00$0.00
5004AEQuarterly Dental Waterline Heterthropic Plate Count AnalysisYear Five5/1/284/30/29120EA$1.00$120.00
5004AFNon-Routine HPC Testing (Dental Waterlines) performed outside of quarterly sampling.Year Five5/1/284/30/2924EA$1.00$24.00
5005Provide Legionella sample collection, analysis, and results management for government-owned buildings in which patients, residents, or visitors stay overnight in accordance with the SOW. - VA Northern Indiana Healthcare System, Marion VA Medical Center, Marion, INYear Five5/1/284/30/29
5005AAQuarterly Environmental Validation sampling required to comply with VHA Directive 1061(1).Year Five5/1/284/30/29160EA$1.00$160.00
5005ABNon-Routine Legionella Testing (Resampling) performed outside of quarterly sampling - including onsite physical and chemical testing.Year Five5/1/284/30/2920EA$1.00$20.00
5005ACCooling Tower sample collection, analysis, and results management.Year Five5/1/284/30/294EA$1.00$4.00
5005ADNon-Routine HPC Testing (Cooling Tower) performed outside of quarterly sampling, including onsite physical and chemical testing.Year Five5/1/284/30/292EA$1.00$2.00
5005AEQuarterly Dental Waterline Heterthropic Plate Count AnalysisYear Five5/1/284/30/29188EA$1.00$188.00
5005AFNon-Routine HPC Testing (Dental Waterlines) performed outside of quarterly sampling.Year Five5/1/284/30/2920EA$1.00$20.00
5006Provide Legionella sample collection, analysis, and results management for government-owned buildings in which patients, residents, or visitors stay overnight in accordance with the SOW. - Aleda E Lutz VA Medical Center, Saginaw, MIYear Five5/1/284/30/29
5006AAQuarterly Environmental Validation sampling required to comply with VHA Directive 1061(1).Year Five5/1/284/30/2992EA$1.00$92.00
5006ABNon-Routine Legionella Testing (Resampling) performed outside of quarterly sampling - including onsite physical and chemical testing.Year Five5/1/284/30/2930EA$1.00$30.00
5006ACCooling Tower sample collection, analysis, and results management.Year Five5/1/284/30/290EA$1.00$0.00
5006ADNon-Routine HPC Testing (Cooling Tower) performed outside of quarterly sampling, including onsite physical and chemical testing.Year Five5/1/284/30/290EA$1.00$0.00
5006AEQuarterly Dental Waterline Heterthropic Plate Count AnalysisYear Five5/1/284/30/290EA$1.00$0.00
5006AFNon-Routine HPC Testing (Dental Waterlines) performed outside of quarterly sampling.Year Five5/1/284/30/290EA$1.00$0.00

Annual Totals

Annual Totals
Line Item 1001$381.00
Line Item 1002$1,032.00
Line Item 1003$158.00
Line Item 1004$259.00
Line Item 1005$394.00
Line Item 1006$122.00
Ordering Year One Total$2,346.00
Line Item 2001$381.00
Line Item 2002$1,032.00
Line Item 2003$158.00
Line Item 2004$259.00
Line Item 2005$394.00
Line Item 2006$122.00
Ordering Year Two Total$2,346.00
Line Item 3001$381.00
Line Item 3002$1,032.00
Line Item 3003$158.00
Line Item 3004$259.00
Line Item 3005$394.00
Line Item 3006$122.00
Ordering Year Three Total$2,346.00
Line Item 4001$381.00
Line Item 4002$1,032.00
Line Item 4003$158.00
Line Item 4004$259.00
Line Item 4005$394.00
Line Item 4006$122.00
Ordering Year Four Total$2,346.00
Line Item 5001$381.00
Line Item 5002$1,032.00
Line Item 5003$158.00
Line Item 5004$259.00
Line Item 5005$394.00
Line Item 5006$122.00
Ordering Year Five Total$2,346.00
Total Estimate Contract Value$11,730.00

File details come from the government source that posted it. Updated .