36C25024R0052.docx
DOCX document 30 KB Posted
- Attached to
- Z1DA--Request for SF330 Qualification Statements - AE Project Upgrade Campus Landscaping #610A4-25-227
- Solicitation number
- 36C25024R0052
About this file
This document is a presolicitation notice for professional architectural and engineering services to design and manage landscape upgrades at a Department of Veterans Affairs medical center campus. Key details include the solicitation number 36C25024R0052 for services including schematic design, design development, construction documents, cost estimates, and construction administration support. The response deadline is January 26, 2024 at 12:00 PM Eastern Time. The project scope involves designing new courtyard, seating, and walking areas along with environmental protections and plantings. Selection criteria include professional qualifications, experience on similar projects, capacity to complete the work within 154 days, past performance, and location. Interested contractors must submit SF330 qualification statements electronically to the contract specialist by the response date.
View the file
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
SUBJECT*
Request for SF330 Qualification Statements - AE Project Upgrade Campus Landscaping #610A4-25-227
GENERAL INFORMATION
| CONTRACTING OFFICE’S ZIP CODE* |
| 45409-1337 |
| SOLICITATION NUMBER* |
| 36C25024R0052 |
| RESPONSE DATE/TIME/ZONE |
| 01-26-2024 12:00 EASTERN TIME, NEW YORK, USA |
| ARCHIVE |
| 60 DAYS AFTER THE RESPONSE DATE |
| SET-ASIDE |
| SDVOSBC |
| PRODUCT SERVICE CODE* |
| Z1DA |
| NAICS CODE* |
| 541320 |
| PLACE OF PERFORMANCE |
| VA Northern Indiana Healthcare System |
2121 Lake Ave
Ft. Wayne IN
| POSTAL CODE |
| 46805 |
| COUNTRY |
| USA |
CONTACT INFORMATION
| CONTRACTING OFFICE ADDRESS |
| Network Contracting Office Ten |
Department of Veterans Affairs
3140 Governor’s Place Blvd. Suite 210 Kettering OH 45409-1337
POINT OF CONTACT*
Contract Specialist Brian Rosciszewski Brian.Rosciszewski@VA.gov
(937) 268-6511 x 4421
ADDITIONAL INFORMATION
AGENCY’S URL
URL DESCRIPTION
AGENCY CONTACT’S EMAIL ADDRESS
EMAIL DESCRIPTION
Presolicitation Notice Presolicitation Notice
DESCRIPTION
| *=Required Field |
| Presolicitation Notice |
Presolicitation Notice
Project: 610A4-25-227 Upgrade Campus Landscaping Date: 11/13/2023 Scope of Work A. The Architect/Engineer (A/E) firm shall furnish professional services for 100% design to Install Landscaping at VA Northern Indiana Health Care System, Fort Wayne Campus, 2121 Lake Ave, Fort Wayne, IN 46805. Schematic Design, Design Development, Construction/Bid Documents per the A/E Design Submission Instructions Documents, Construction Administration Services, Technical Specifications, Cost Estimates, and Statement of Work. The design shall also include a Service Dog Park feasibility study. The landscape shall be designed to accommodate the following functions based on the guides, manuals, and planning criteria:
1. Court Yard
i. Shall have a 5000sf garden-like fenced area
ii. Shall have a home-like atmosphere
iii. Shall have a 30ft x 15ft pavilion or similar
iv. Shall have shade
v. Shall have colorful plants
vi. Shall have raised beds for gardening
vii. Shall have trees
viii. Shall have shrubs
ix. Shall have mulch or stone
x. Shall provide paved walking surface
xi. Shall provide seating, covered and un-covered
xii. Tables for residents, staff, and visitors to share a meal or other activities
xiii. Shall be handicap accessible
2. Environmental Protection
i. Silt fence shall be used where applicable during construction
ii. Straw waddles shall be used over any storm water drains
iii. Design of landscaping shall use environmental protection best practices
iv. Design shall incorporate Storm Water Pollution Prevention Plan to control erosion during construction
3. Mulch and Stone
i. Shall be naturally sourced
ii. Stone shall be white or natural in color
iii. Mulch shall be red or natural in color
iv. Shall have underlayment in all areas used
v. Underlayment shall be secured prior to being coved with mulch or stone
4. Plants, shrubs, and trees
i. shall not be poisonous if ingested
ii. shall be indigenous to the area and climate
iii. shall be able to give visual interest year-round through color, shade, and texture
5. Seating areas
i. Covered and un-covered seating areas
6. Walking area
i. Shall have level walking surfaces materials
ii. Primary routes shall be textured for traction
iii. Shall be shaded by natural material (i.e., trees or vines)
B. Special items to consider for this project:
1. A/E shall provide a preliminary construction duration time for planning purposes. This information shall be communicated to all bidders for their review and inclusion within their bids. It shall be communicated within the bid documents that the contractor will be required to review and provide any concerns regarding the projected construction duration.
2. A/E shall develop and provide schedules of equipment and furniture necessary to activate areas located on the project.
3. A/E will be responsible for complete functional design and provide biddable documents meeting all the requirements. All work shall be coordinated with upcoming and current project to prevent any duplication of efforts.
4. Construction Period Services are required.
5. Multiple on-site visits are expected.
6. The expected period of performance for design is 154 days. Milestones and number of days are subject to negotiation.
C. SELECTION CRITERIA. The government will evaluate each potential contractor under the terms of its:
1. Professional qualifications necessary for satisfactory performance of required services;
2. Specialized experience and technical competence in the type of work required, including, where appropriate, experience in energy conservation, pollution prevention, waste reduction, and the use of recovered materials;
3. Capacity to accomplish the work in the required time;
4. Past performance on contracts with Government agencies and private industry in terms of cost control, quality of work, and compliance with performance schedules;
5. Location in the general geographical area of the project and knowledge of the locality of the project; provided, that application of this criterion leaves an appropriate number of qualified firms, given the nature and size of the project.
6. Experience in construction period services to include professional field inspections during the construction period, review of construction submittals, support in answering requests for information during the construction period, and support of construction contract changes to include drafting statements of work, and cost estimates shall be included as an evaluation criterion when construction period services is included in the statement of work for A-E services.
D. SUBMITTAL INSTRUCTIONS. All interested and capable contractors must submit an electronic copy of their SF330s, via email, by the closing time/date of this announcement. No hard/physical copies will be accepted. The total size of the electronic submission (email and attachments) shall not exceed 15MB; larger emails may be rejected by the server and may be considered non-responsive. Submit packages via email to the contract specialist at Brian.Rosciszewski@VA.gov.
Fort Wayne AE SOW Page 1
Page 1 of
| General | Program Guide, PG-08-15, Volume C |
| Page 4 | April 1995 |
Page 1 of
File details come from the government source that posted it. Updated .