Questions for 36C25023R0103.pdf
PDF 73 KB Posted
- Attached to
- X1DB--Howard City CBOC
- Solicitation number
- 36C25023R0103
About this file
This document contains questions and responses related to solicitation number 36C25023R0103 for the Howard City CBOC Preproposal project. The solicitation seeks proposals for a new Community Based Outpatient Clinic facility in Howard City, Michigan to be operated by the Department of Veterans Affairs Veterans Health Administration Veterans Integrated Service Network 10. Questions from offerors covered topics such as accessibility standards to be followed, requirements for fire sprinklers and automatic fire suppression systems, and the need for a Design-Basis Threat risk assessment. Responses clarified that proposals must meet ABAAS and local accessibility requirements, and that fire sprinkler and Design-Basis Threat provisions only apply if all proposals are for new construction. A request for a 30-day extension to the proposal deadline was denied with no time extension granted.
View the file
Other files
Show all 28
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Questions for Solicitation Number 36C25023R0103
Number Document Paragraph Page # Question 1 Exhibit A 3.19 p. 20 Exhibit A identifies that the CBOC facility must comply with ABAAS accessibility standards and local accessibility requirements, but does not mention VA accessibility standards. Is the proposed leased facility required to also comply with VA accessibility requirements?
A: The Requirement will proceed under the guidance listed in the RLP at this time. IF VA Accessibility requirements are to be included, they will be done by amendment to the RLP at that time.
2 Exhibit A Exhibit D
Ex A-3.45 Ex A-p27 Ex D-p1
Exhibit A section 3.45 and Exhibit D indicate that the Design-Basis Threat (DBT) risk assessment will be conducted post-award. Recognizing that the DBT can have significant impacts on site selection, design team requirements, building setback, and force protection design (i.e. bollards, window glazing, blast resistant construction) that will affect pricing, please provide a baseline threat assessment for the Howard City area (i.e.
minimum building setback distances from parking areas or Net Explosive Weight to plan against).
A: Section 3.45 of Exhibit A only applies if all acceptable offers received are for new construction only.
3 Exhibit A
3.12 & 3.47 pp.18 &
Exhibit A provides conflicting information on whether fire sprinkler systems are required. Section 3.12 indicates that fire sprinklers are not required for CBOC buildings with less than 6 floors. Section 3.47 indicates that new construction shall be protected throughout by an automatic fire sprinkler system. Please clarify CBOC sprinkler requirements.
A: Section 3.47 of Exhibit A only applies if all acceptable offers received are for new construction only.
4 RLP p. 1 Given the detail needed to meet the RLP and design plan requirements, request a 30-day extension to the current proposal deadline of 3/1/2024.
A: No time extension is granted at this time