RFI QA.docx

DOCX document 15 KB Posted

Attached to
Conduct Boiler Tank Inspection 610A4-23-513
Solicitation number
36C25023Q0493
Issued by

View the file

Other files

File Type Posted
Site Visit Sign-In Sheet.pdf PDF
36C25023Q0493 0001.docx DOCX document
WD.pdf PDF
VHA Directive 1192 01.pdf PDF
36C25023Q0493 Sam.gov.docx DOCX document
Attachment II - RFI Form.doc DOC document
852.219-75.docx DOCX document
Attachment III - EMR.docx DOCX document

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Q&A RFI’s for Project# 610A4-23-513 Conduct Boiler Tank Inspection

1. What is unit availability for inspection? How many trips will be required?

Will the hospital staff provide the confined entry attendant (hole watch) for internal inspections?

Will the hospital staff provide fresh air ventilation for internal inspections?

What is the deaerator manufacturer’s name?

What is the deaerator manufacturer’s model number?

What is the deaerator manufacturer’s serial number?

What is the deaerator’s National Board Number?

In what year was the deaerator manufactured?

What are the deaerator’s manway dimensions (height x width)?

What is the deaerator design/type (spray, tray, packed tower)?

What is the deaerator’s main tank internal diameter?

What is the deaerator’s main tank length (either overall, tangent-to-tangent, or weld-to-weld)?

What is the deaerator’s maximum allowable working pressure?

How many condensate tanks are to be inspected?

For each condensate tank, who is the manufacturer?

For each condensate tank, what is the manufacturer’s model number?

For each condensate tank, what is the manufacturer’s serial number?

For each condensate tank, what is the National Board Number?

For each condensate tank, what is the year manufactured?

For each condensate tank, what are the manway dimensions (height x width)?

For each condensate tank, what is the main tank internal diameter?

For each condensate tank, what is the main tank length (either overall, tangent-to-tangent, or weld-to-weld)?

For each condensate tank, what is the maximum allowable working pressure?

Answer: Unit inspection was provided at site visit, Contractor is responsible to provide confined space attendant.

Contractor is required to provide all confined space requirements staff, ventilation equipment, monitors, and safety equipment during testing. A confined space permit and plan must be submitted to the VA for approval before the start of work.

All tank specifications were to be collected by contractor during the site visit when access was provided to tanks.

1 condensate tank and 1 deaerator tank will be inspected.

2. Section 13 B of the solicitation page (Page 1) indicates that an “offer guarantee” (bid bond) is required. For what amount should this bid bond be for? Are there any specific guidelines for the bid bond?

2.A Are there any licenses or certifications our inspectors are required to have for this bid?

Answer: Bond amount is 20% of the agreed upon price of this contract once signed by both the CO and the contractor.

Answer 2A: Contractor conducting the inspection must be a ASME authorized inspection agency (AIA). Contractor must meet all standards required for inspecting DA and condensate as required by the attached specifications and the TIL which can be found at www.cfm.va.gov

3. Section 13 B of the solicitation page (Page 1) indicates that an “offer guarantee” (bid bond) is required. For what amount should this bid bond be for? Are there any specific guidelines for the bid bond?

Answers: Bond amount is 20% of the agreed upon price of this contract once signed by both the CO and the contractor.

3A. Are there any licenses or certifications our inspectors are required to have for this bid?

Answers: Contractor conducting the inspection must be a ASME authorized inspection agency (AIA). Contractor must meet all standards required for inspecting DA and condensate as required by the attached specifications and the TIL which can be found at www.cfm.va.gov

3B. Scope of work on Page 6, line items 1-4, indicates that the contractor shall prepare the interior of the tank, clean it, and close both tanks with new gaskets. So we can fully understand the extent of the services expected, can you provide photos of the tanks? If no photos are available, do you have make and model information you can provide?

Answers: The services required for nondestructive testing are stated in the ASME standards, the specifications attached to the solicitation and the TIL which can be found at www.cfm.va.gov. It was the responsibility of the contractor to collect all tank specifications at the site visit where the VA allowed the inspection of the work location, tank setup, and the actual tanks to be inspected.

File details come from the government source that posted it. Updated .