RFI Responses 36C25023Q0260.pdf
PDF 1 MB Posted
- Solicitation number
- 36C25023Q0260
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Plan of Affected Floors.pdf | ||
| SOW Revised 3.9.23.docx | DOCX document | |
| 36C25023Q0260 0002.docx | DOCX document | |
| 36C25023Q0260 0001.docx | DOCX document | |
| Pre Bid Site Visit Log 1.pdf | ||
| Attachment V - VHA Directive 1192-01.pdf | ||
| Attachment III - EMR.docx | DOCX document | |
| Attachment I - DBA WD.txt | TXT text file | |
| Attachment IV - Limitations on Subcontracting Certificate of Compliance.pdf | ||
| 36C25023Q0260_1.docx | DOCX document | |
| Attachment II - RFI Template.doc | DOC document |
Show all 11
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
NF. bdr. 3/9/23
RFI Responses for Medical Gas Monitoring System Upgrade and Repairs
RFQ# 36C25023Q0260
1. Are there changes to the scope of work.
A: Yes, see amendment posted to SAM.gov.
2. What is the distance from the ED to the Chiller Plant?
A: For wiring, the distance is expected to be between 1,000 and 1,500ft.
Expect no more than 400ft of new conduit will be required.
3. Are the outlets series A or B?
A: The outlets are series B.
4. Can the chiller plant panel be surface mounted?
A: Yes, it can be surface mounted.
5. How many wires need to be pulled to the chiller plant?
A: A sufficient number of wires must be pulled to connect all points of the 30-point master panel. This will allow for expansion at a later date.
6. What is the proposed location of the chiller plant panel?
A: North wall of the chiller plant office. Just to the right of the existing Oxygen panel (see “new proposed panel” picture below).
7. Can we get floor plans for the areas requiring work?
A: See attached floor layout in SAM.gov.
8. Can we get photographs of key areas?
A: Yes, see pictures below.
Photographs
Area Alarm OR Suite
A6035
A6043
C3010
Same Day C4104
Same Day C4105C
C8021
A6124
A6126
A4009
PACU Station
C8011
Zone Valve Issue
New proposed panel location (Chiller plant)
Current Panel (Emergency Dept)
Chiller Plant Oxygen Panel
Police Dispatch Panel
File details come from the government source that posted it. Updated .