655-21-201_Saginaw Update Facility Architectural FP.pdf

PDF 4 MB Posted

Attached to
B599--Confined Space Evaluation
Solicitation number
36C25023Q0083
Issued by

View the file

Other files

File Type Posted
SOP IH-23 Confined Space Entry (new format).docx DOCX document
confined space questions CH.docx DOCX document
36C25023Q0083_1.docx DOCX document

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

UP

DN

DN

UP

DN

UP

UP

UP

UP

UP

UP

UP

DN

UP

UP

UP

MECH.

1-B132A

HVAC SHOP

1-B132

BIOMED

OFFICE

1-B130

CANTEEN

1-B134

BIOMED

SUPERVISORS

1-B130A

SOILED

LINEN

1-B120

LINEN

1-B124

LINEN

1-B122

OFFICE

1-B112

OFFICE

1-B110

OFFICE

1-B108

OFFICE

1-B106

OFFICE

1-B104

MECH.

1-B103

PLUMBING

SHOP

1-B103B

STORAGE

1-B103A

OFFICE

1-B105

OFFICE

1-B115C

ELEC

1-B107

OFFICE

1-B115B

VESTIBULE

FMS

CORRIDOR 3

1-C003

MORGUE

1-B125A

MORGUE

1-B125

BIOMED

OFFICE

1-B127

INDUSTRIAL

HYGENIST

OFFICE

1-B128

OFFICE

1-B129

SECURITY

ROOM

1-B140

TOILET

1-B150A

STAIR #02

1-S2-0

I T HUB

1-B300

OFFICE

1-B305A

CORRIDOR 4

1-C004

LINEN

STORAGE

1-B320

OFFICE

NURSING

1-B201

EVIDENCE

ROOM

1-B301

GIP SHOP

1-B315

CHARGING

ROOM

1-B141

SWITCHGEAR

ROOM

1-B260C

SWITCHGEAR

ROOM

1-B255

LOUNGE

1-B250

SOILED

LINEN

1-B240

OFFICE

1-B241

MEN'S

LOCKER

1-B215

CORRIDOR 2

1-C002

TOILET MALE

1-B215A

SHOWER

1-B215B

CREDIT

UNION

1-B210

DATA -

TELEPHONE

EQUIPMENT

1-B200

OFFICE

1-B220A

TOILET

1-B220H

OFFICE

1-B220D

OFFICE

1-B220C

OFFICE

1-B220B

MEDICAL

RECORDS

1-B220

WAITING

1-B220G

OFFICE

1-B220F

ELEC

1-B203

WOMEN'S

LOCKER

1-B150

OFFICE

1-B305

STORAGE

1-B305B

LAUNDRY

1-B321

STORAGE

VOLUNTEER

1-B325

ELECTRICAL

SHOP

1-B330

PAINT SHOP

1-B332

CARPENTRY

SHOP

1-B340

STAIR #05

1-S5-0

STORAGE

1-B340AOFFICE

SAFETY

TECH

1-B339

OFFICE

SAFETY

1-B338

BULK

STORAGE

1-B349

CANTEEN

STORAGE

1-B326

CLEANING

SUPPLY

STORAGE

1-B324

CORRIDOR 5

1-C005

STAIR #04

WATER

TREATMENT

1-B328

WOMEN'S

LOCKERROOM

1-B354

TOILET

FEMALE

1-B354A

H.A.C.

1-B329

MEN'S

LOCKERROOM

1-B355

TOILET MALE

1-B355A

ELEC

1-B353

H.A.C.

1-B352

MEDICAL

SUPPLY

DISTRIBUTION

1-B350

STERILE

STORAGE

1-B351

OFFICE

1-B361

OFFICE

1-B362

OPEN

OFFICE

1-B360

DECON

ROOM

1-B357

DECON ANTE

ROOM

1-B357A

BUILDING

MANAGEMENT

STORAGE

1-B260B

MACHINE

SHOP

1-B260A

KEY ROOM

1-B260D

SERVICE

ELEVATOR

S1-0

PASSENGER

ELEVATOR

P2-0

PASSENGER

ELEVATOR

P1-0

MEDICAL

RECORDS

1-B220E

STORAGE

xxx

STORAGE

xxx

FMS

1-B115

STAIR #06

1-S6-0

MECHANICAL

1-B380

STERILE

PROCESSING

1-B359

STAIR #1

1-EC0S1

BOILER

ROOM

1-B800

STAIR #2

1-EC0S2

STAIR #04

1-S4-0

STAIR #03

1-S3-0

DATA -

TELEPHONE

EQUIPMENT

1-B237A

CORRIDOR

1-B260

CLOSET

1-B356

1-B381A

1-B381

MECHANICAL

1-B380A

CORRIDOR 7

1-C007

CORRIDOR 8

1-C008

CORRIDOR

1-B119

MECHANICAL

1-B190

NOT FOR CONSTRUCTION

RDC/ JOHN POE ARCHITECTS

VA Project No.

RDC/JPA Project No.

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT

321 4 5 6 7 8 9 10

NOT FOR CONSTRUCTION

Project Schedule Date

2022 CAI Set - 100% 12.28.2021

3/10/2022 11:26:44 AM

Update Facility BIM

12.28.2021

BASEMENT FLOOR PLAN

01-A.100

655-21-201

Saginaw, Michigan (655)

VA Station No:

William Merrill

Record Drawing 21024.00

Scale: 1/16" = 1'-0"

BASEMENT FLOOR PLAN

Key Plan

Revisions Date

UP UP

UP

UP

UP

UP

UP

UP

UP

UP

UP

UP

UPUP

UP

UP

UP

UP UP

UP

UP

UP

OFFICE

CHAPEL

1-1385

OFFICE

CHAPLIN

1-1384

CHAPEL

1-1383

CHAPEL

1-1380

STORAGE

1-1372

STAGE

1-1373 AUDITORIUM

1-1370

STORAGE

1-1364

VOLUNTARY

SERVICE

1-1360

KITCHEN

1-1375

TV ROOM

1-1373E

STORAGE

1-1373D

STORAGE

1-1373A

TOILET

1-1373B

STORAGE

1-1373C

CHIEF

VOLUNTARY

SERVICE

1-1360A

ELEC

1-1356

CORRIDOR

H.A.C.

1-1363

MECH.

1-1361

STAIR #04

TOILET MALE

1-1355

STORAGE

1-1351

DATA -

TELEPHONE

1-1350

EXAM

1-1349

TOILET

FEMALE

1-1352A

WOMENS

LACT

1-1352

CORRIDOR 9

1-C109

EXAM

1-1348

EXAM

1-1347

EXAM

1-1346

EXAM

1-1345

EXAM

1-1344

OFFICE

1-1343

RECEPTIONIST

1-1341

CANTEEN

OFFICE

1-1340A

CANTEEN

RETAIL

STORE

1-1340

WAITING

1-1342

CORRIDOR

1-C110

CORRIDOR

10A

1-C110A

CORRIDOR 7

1-C107

CORRIDOR 5

1-C105

SERVICE

OFFICER

1-1332

SERVICE

OFFICER

1-1331

CAFETERIA

1-1325

SERVICE

OFFICER

1-1330

INPATIENT

PHARMACY

1-1314

STORAGE

1-1324A

KITCHEN

1-1324

RECEP.

FISCAL

1-1305D

PHARMACY

1-1305

CLOSET

FISCAL

1-1305C

INPATIENT

PHARMACY

1-1310

CORRIDOR 6

1-C106

DATA

1-1301

CORRIDOR 4

1-C104

STAIR #02

1-S2-1

OFFICE

FISCAL

1-1305A

OFFICE

FISCAL

1-1305B

H.A.C.

1-1205

ELEC

1-1207

OFFICE

FISCAL

1-1209

AGENT

CASHIER

1-1224

CORRIDOR 2

1-C102

LOBBY

1-1200

OFFICE

FISCAL

1-1227

OFFICE

FISCAL

1-1226

TELE

SWITCHBOARD

PAS

1-1212

OBSERVATION

ROOM

1-1231

OFFICE

1-1233

OBSERVATION

ROOM

1-1235

OFFICE

1-1210

EXAM

1-1237

EXAM

1-1239

EXAM

1-1241

TOILET

PATIENT

1-1243

TOILET

FEMALE

1-1241A

EXAM

1-1244

EXAM

1-1242

EXAM

1-1240

EXAM

1-1238

SOILED

1-1234

STORAGE

ALCOVE

ACOS

TRIAGE

ACOS

1-1250

RECEPTION

WELCOME

CENTER

1-1256

OFFICE

BILLING

1-1260

OFFICE ROI

1-1262

AGENT

CASHIER

1-1225

STAIR #01

1-S1-1

TEAM ROOM

ACOS

1-1257

OFFICE

BILLING

1-1261

ELEC

1-1259

TOILET MALE

1-1277

TOILET

FEMALE

1-1276AMBULANCE

BAY

1-1273

OFFICE

PATIENT

ADVOCATE

1-1270

OFFICE

PATIENT

ADVOCATE

1-1268

OFFICE

MYHEALTHYVET

1-1266

OFFICE

ELEGIBILITY

1-1264

WAITING

ROOM

1-1275

OFFICE ROI

1-1263

TOILET MALE

1-1155

WAITING

1-1125

OFFICE

1-1150

NURSE

STATION

1-1149

OFFICE

1-1146

EXAM

1-1132

EXAM 22

1-1134

EXAM 21

1-1136

CORRIDOR

1-C112

EXAM 20

1-1138

EXAM 19

1-1140

EXAM 18

1-1142

PATIENT

EDU.

1-1141

EXAM 17

1-1139

TOILET

1-1141A

EXAM 16

1-1137

EXAM 14

1-1133

EXAM 13

1-1131

TOILET

FEMALE

1-1129

MECHANICAL

1-1118

SOILED

1-1127

DATA

1-1127A

OFFICE

1-1116

STORAGE

1-1110A

MEDS

1-1114

EXAM 12

1-1110

EXAM 11

1-1108

EXAM 15

1-1135

STAIR #03

1-S3-1

EXAM

1-1117

EXAM

1-1115

EXAM 2

1-1111

CORRIDOR

1-C111

ELEC

1-1113

EXAM 3

1-1109

EXAM 4

1-1107

EXAM 10

1-1106

PATIENT

EDU.

1-1100

EXAM 8

1-1102

EXAM 9

1-1104

EXAM 5

1-1105

EXAM 6

1-1103

EXAM 7

1-1101

STAIR #06

1-S6-1

STAIR #05

1-S5-1

AIR

HANDLER

ROOM

1-1800

MECHANICAL

ENCLOSURE

1-1800A

CLEAN

1-1236

MED /

NURISH

1-1230

TOILET

1-1212A

WAITING

WELCOME

CENTER

1-1258

STORAGE

ACOS

1-1269

OFFICE

ELEGIBILITY

1-1265 SERVICE

ELEVATOR

S1-1

PASSENGER

ELEVATOR

P1-1

PASSENGER

ELEVATOR

P2-1

ANTE ROOM

1-1117A

ANTE ROOM

1-1115A

ANTE ROOM

1-1111A

STAIR #07

1-S7-1

A/C

1-1354

STAIR #06

1-S6-1

PASSENGER

ELEVATOR

1-1203

PIPE TUNNEL

ACCESS

1-1202

LOBBY

STORAGE

1-1202A

NOT FOR CONSTRUCTION

RDC/ JOHN POE ARCHITECTS

VA Project No.

RDC/JPA Project No.

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT

321 4 5 6 7 8 9 10

NOT FOR CONSTRUCTION

Project Schedule Date

2022 CAI Set - 100% 12.28.2021

3/10/2022 11:26:50 AM

Update Facility BIM

12.28.2021

FIRST FLOOR PLAN

01-A.101

655-21-201

Saginaw, Michigan (655)

VA Station No:

William Merrill

Record Drawing 21024.00

Scale: 1/16" = 1'-0"

FIRST FLOOR PLAN

UPUP

UP

UP

UP

UP

UPUP

EMERGENCY

GENERATORS

1-2800

MECHANICAL

1-2800A

STORAGE

1-2362

CORRIDOR 8

1-C208

WOMENS

LOCKER

ROOM

1-2360

BATH

1-2360A

STORAGE

1-2358

MENS

LOCKER

ROOM

1-2361

BATH

1-2361A

STORAGE

1-2359

STAIR #04

1-S4-2

ELEC

1-2356

OFFICE

1-2355

EDUCATION

ROOM

1-2343

PREP ROOM

1-2343

REFRIGERATOR

1-2341

CORRIDOR 9

1-C209

VEG.

REFRIG.

1-2344

THAW BOX

1-2345

FREEZER 1

1-2343C

FREEZER 2

1-2343D

STORAGE

1-2349

DRY

STORAGE

1-2348

POT WASH

1-2346

KITCHEN

1-2330

H.A.C.

1-2340

PATIENT

EDU.

1-2325

OFFICE

1-2330A

STORAGE

1-2330D

STORAGE

1-2330B

STORAGE

1-2330C

CUBICAL

OFFICE

1-2305

OFFICE

1-2304

OFFICE

1-2302

NUTRITION

KITCHEN

1-2303

STORAGE

1-2303B

STORAGE

1-2303A

STAIR #02

1-S2-2

CORRIDOR 7

1-C207

DATA

1-2300

CORRIDOR 4

1-C204

OFFICE LAB

1-2123

SECRETARY

LAB

1-2121

PHLEBOTOMY

LAB

1-2119

STORAGE

1-2119A

CORRIDOR

1-C210

STAIR #03

1-S3-2

TOILET

1-2100H

TECH LAB

1-2122

PATHOLOGY

LOCKERS

1-2100G

LAB

BREAKROOM

1-2100F

MICROBIOLOGY

LAB

1-2100C

STORAGE

1-2100B

BLOOD BANK

1-2100A

STAIR #06

1-S6-2

LAB

1-2100

ELEC

1-2100E

TOILET

1-2124

TOILET

1-2133A

DATA

1-2130

DRESSING

RM.

1-2133

X-RAY

1-2135

BREAK

ROOM

1-2139

BREAK

ROOM

1-2141

CAT SCAN

1-2145

CONTROL

RM.

1-2147

MECH

1-2148

CHIEF RAD.

SERV.

1-2146

CLOSET

1-2146A

WORKROOM

1-2140

X-RAY

1-2142

BATH

1-2142A

DEXA

SCANNER

1-2138

RECEP.

1-2136

CORRIDOR

1-C212

OFFICE

IMAGING

1-2132

STORAGE

1-2134

RECEPTION

1-2208

WAITING

1-2200

OFFICE

DIAGNOSTIC

SERVICES

1-2212

MENS

TOILET

1-2214

WOMENS

TOILET

1-2216

OFFICE

1-2231

OFFICE

1-2233

DENTISTRY

1-2235

DENTISTRY

1-2237

X-RAY

1-2239

SUPPLY

1-2239A

DENTISTRY

1-2241

DENTISTRY

DENTAL

1-2243

DENTISTRY

LAB

1-2242

DENTISTRY

1-2240

X-RAY

DENTAL

1-2238

SOILED

UTILITY

1-2236

DARK ROOM

1-2238A

MECH.

1-2234

OFFICE

1-2232

H.A.C.

1-2228

WAITING

1-2230

LINEN

1-2250

STORAGE

1-2230B

LAB.

1-2230A

IMAGING

ROOM

1-2260

WAITING

1-2264

ECHO

1-2268

ECHO

1-2270

ULTRASOUND

1-2272

CORRIDOR 1

1-C201

ECHO

1-2271

ULTRASOUND

1-2269

BATH

1-2266

BATH

1-2265

VEST.

1-2267

OFFICE

DIAGNOSTIC

SERVICES

1-2263

OFFICE

DIAGNOSTIC

SERVICES

1-2263A

ELEC

1-2261

SCAN

1-2257

STAIR #01

1-S1-2

LOCKERS

1-2224

OFFICE

1-2223

OFFICE

1-2222

RECEPTION

1-2221

RESPIRATORY

STORAGE

1-2219

WAITING

1-2218

ELEC

1-2211

CPAP CLINIC

1-2319

SLEEP

OFFICE

1-2322

CPAP

STORAGE

1-2320

DIETETIC

CLINIC

EDUCATION

1-2315

HOME

OXYGEN

CLINIC

1-2323

HOME

OXYGEN

CLINIC

1-2321

PULMONARY

FUNCTION

LAB

1-2324

STORAGE

1-2315A

DI-WATER

PATHOLOGY

1-2100D

WEAPONS

TRAINING

1-2370

OFFICE

1-2371

DENTAL SPS

CLEAN

STORAGE

1-2232B

SERVICE

ELEVATOR

S1-2

PASSENGER

ELEVATOR

P1-2

PASSENGER

ELEVATOR

P2-2

STAIR #08

1-ECS1-2

STAIR #09

1-ECS2-2

CORRIDOR 3

1-C203

CORRIDOR 6

1-C206

CORRIDOR 5

1-C205

STAIR #05

1-S5-2

CORRIDOR 2

1-C202

NOT FOR CONSTRUCTION

RDC/ JOHN POE ARCHITECTS

VA Project No.

RDC/JPA Project No.

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT

321 4 5 6 7 8 9 10

NOT FOR CONSTRUCTION

Project Schedule Date

2022 CAI Set - 100% 12.28.2021

3/10/2022 11:26:57 AM

Update Facility BIM

12.28.2021

SECOND FLOOR PLAN

01-A.102

655-21-201

Saginaw, Michigan (655)

VA Station No:

William Merrill

Record Drawing 21024.00

Scale: 1/16" = 1'-0"

SECOND FLOOR PLAN

UPUP

STAIR #05

1-S5-3

OPERATING

RM 2

1-3362

STERILE RM.

1-3363

MECH. RM.

1-3359A

SCRUB RM.

1-3359

OPERATING

RM 3

1-3360

DIRTY RM

1-3358

STERILE RM.

1-3357

CYSTO

1-3356

ELEC

1-3356A

H.A.C.

1-3330

OPERATION

RM. 1

1-3355

NURSING

STATION

1-3354

CORRIDOR 7

1-C307

STERILE

SUPPLY

1-3340

ANESTHESIA

1-3342

ELEC

1-3343

ENDOSCOPY

RM. 1

1-3315

BATH

1-3315A

ENDO. 1

1-3328

STORAGE

1-3328A

STAIR #04

1-S4-3

BATH

1-3325A

ENDO. 2

1-3325B

SCOPE

CLEANING

1-3316

MEDIVATOR

1-3319

MECH

1-3342A

ENDO. 3

1-3329

PRE-OP

1-3305B4

PRE-OP

1-3305B3

WOMENS

TOILET

1-3318

MENS

TOILET

1-3326

STORAGE

1-3327

ENDOSCOPY

1-3325

CORRIDOR 6

1-C306

CORRIDOR 5

1-C305

PRE/POST

OP

1-3305

STAIR #02

1-S2-3

STORAGE

1-3304

PRE-OP

1-3305B1

PRE-OP

1-3305B2

PRE-OP

1-3305B8

PRE-OP

1-3305B7

PRE-OP

1-3305B6

PRE-OP

1-3305C1

PRE-OP

1-3305C2

PRE-OP

1-3305C3

PRE-OP

1-3305B5RESTROOM

1-3306

CHECK-IN

1-3305B

DATA

1-3303

WOMENS

TOILET

1-3211

SLIDE

1-3209

HEAD NURSE

1-3161

RECEPTION

1-3125

WAITING RM

1-3132

STAIR #03

1-S3-3 H.A.C.

1-3119

BATH

1-3117A

EXAM

1-3117

EXAM

1-3115

BATH

1-3111A

ELEC

1-3113

EXAM

1-3111

EXAM

1-3107

BATH

1-3107A

STORAGE

1-3105

BATH

1-3101A

STORAGE

1-3103

EXAM

1-3101

EXAM

1-3100

BATH

1-3104A

EXAM

1-3104

EXAM

1-3106

STORAGE

1-3112A

EXAM

1-3112

EXAM

1-3114

BATH

1-3114A

MECHANICAL

1-3120

CLEAN LINEN

1-3131

NURSE

WORK

1-3147

UNIT SUPPLY

1-3133

EXAM ROOM

1-3141

EXAM ROOM

1-3140

EXAM ROOM

1-3143

EXAM ROOM

1-3139

EXAM ROOM

1-3137

EXAM ROOM

1-3135

TOILET

1-3134

EXAM ROOM

1-3136

EXAM ROOM

1-3138

SOILED

HOLD

1-3142

CORRIDOR 9

1-C309

EXAM ROOM

1-3144

EXAM ROOM

1-3146

EXAM ROOM

1-3148

KITCHEN

1-3149

BATH

1-3148A

MED ROOM

1-3150

H.A.C.

1-3152

EXAM

1-3158

EXAM

1-3160

WAITING

1-3170

OFFICE

1-3200

OFFICE

1-3206

DATA

1-3208

OFFICE

1-3210

OFFICE

1-3212

OFFICE

1-3216

OFFICE

1-3223

H.A.C.

1-3218

BATH

1-3216A

KITCHEN

1-3225

OFFICE

1-3229

BATH

1-3229A

OFFICE

1-3231

PATIENT RM

1-3233

BATH

1-3233A

PATIENT RM.

1-3235PATIENT RM.

1-3236

BATH

1-3234A

EXAM

1-3234

OFFICE

1-3232

BATH

1-3230A

PATIENT RM.

1-3230

CORRIDOR 2

1-C302

UNIT SUPPLY

1-3224

DATA

1-3240

SUPPLY

1-3226

MECHANICAL

RM

1-3250

BATH

1-3256A

PATIENT RM.

1-3256

PATIENT RM.

1-3262

OFFICE

1-3262A

BATH

1-3264A

EXAM

1-3264

BATH

1-3266A

PATIENT RM.

1-3266

EXAM

1-3265

BATH

1-3265A

PATIENT RM.

1-3263

BATH

1-3263A

BATH

1-3261A

PATIENT RM.

1-3261

EXAM

1-3257

ELEC

1-3259

CLEAN

UTILITY

1-3253

BATH

1-3257A

SOILED

1-3251

STAIR #01

1-S1-3

EXAM

1-3241

CORRIDOR 1

1-C301

RECEPTION

1-3220

WAITING

ROOM

1-3217

MENS

TOILET

1-3213

CORRIDOR 3

1-C303

CORRIDOR 4

1-C304

OFFICE

1-3228

STAIR #06

1-S6-3

SERVICE

ELEVATOR

S1-3

PASSENGER

ELEVATOR

P1-3

PASSENGER

ELEVATOR

P2-3

NURSE

STATION

1-3352

NOT FOR CONSTRUCTION

RDC/ JOHN POE ARCHITECTS

VA Project No.

RDC/JPA Project No.

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT

321 4 5 6 7 8 9 10

NOT FOR CONSTRUCTION

Project Schedule Date

2022 CAI Set - 100% 12.28.2021

3/10/2022 11:27:03 AM

Update Facility BIM

12.28.2021

THIRD FLOOR PLAN

01-A.103

655-21-201

Saginaw, Michigan (655)

VA Station No:

William Merrill

Record Drawing 21024.00

Scale: 1/16" = 1'-0"

THIRD FLOOR PLAN

UP

UP

UPUP

OFFICE

1-4101

OFFICE

1-4103

OFFICE

1-4105

CONSULT

1-4100A

CONSULT

1-4100

EXAM

1-4102

EXAM

1-4104

EXAM

1-4106

EXAM

1-4108

EXAM

1-4112

CORRIDOR 5

1-C405

EXAM

1-4107

OFFICE

1-4109

WOMENS

TOILET

1-4113

CONSULT

1-4115

CONSULT

1-4114

EXAM

1-4116

EXAM

1-4118

STORAGE

1-4133

STORAGE

1-4131

SOILED

UTILITY

1-4120

RECP.

1-4123

STAIR #03

1-S3-4

EXAM

1-4135

OFFICE

1-4136

EXAM

1-4138 UTILITY

1-4137

BATH

1-4135A

BATH

1-4139A

EXAM

1-4139

EXAM

1-4141

OFFICE

1-4140

OFFICE

1-4142

OFFICE

1-4144

EXAM

1-4143

BATH

1-4140A

BATH

1-4144A

BATH

1-4143A

EXAM

1-4145

EXAM

1-4147

BATH

1-4147A

BATH

1-4146A

MECH.

1-4148

LACTATION

1-4146

CORRIDOR 6

1-C406

KITCHEN

1-4132

MED

1-4150

H.A.C.

1-4152

OFFICE

1-4160

TOILET

1-4124

OFFICE

1-4154

OFFICE

1-4161

OFFICE

1-4170

OFFICE

1-4172

EXAM

1-4200

OFFICE

1-4206

OFFICE

1-4208

OFFICE

1-4208A

OFFICE

1-4218

STORAGE

1-4218A

STORAGE

1-4227

H.A.C.

1-4220

OFFICE

1-4231

EXAM

1-4233

EXAM

1-4235

EXAM

1-4237

EXAM

1-4239

EXAM

1-4241

OFFICE

1-4243

BATH

1-4245

OFFICE

1-4244

EXAM

1-4242

EXAM

1-4240

OFFICE

1-4238

EXAM

1-4236

EXAM

1-4234

CONSULT

1-4232

OFFICE

1-4230

STORAGE

1-4228

H.A.C.

1-4250

OFFICE

1-4254

OFFICE

1-4260

EXAM

1-4270A

EXAM

1-4270B

EXAM

1-4270C

OFFICE

1-4270D

STORAGE

1-4270E

EXAM

1-4265

STORAGE

1-4265A

EXAM

1-4263

MENS

TOILET

1-4257

OFFICE

1-4255

STAIR #01

1-S1-4

ELEC

1-4259

CORRIDOR 1

1-C401

CORRIDOR 2

1-C402

WAITING

1-4225

DATA

1-4305A

TELEHEALTH

1-4213

EXAM

1-4211

CORRIDOR 3

1-C403

RECEPTION

1-4217

CORRIDOR 4

1-C404

BATH

1-4310

STAIR #02

1-S2-4

OFFICE

1-4305

RECEPTION

1-4226

STAIR #06

1-S6-4

PASSENGER

ELEVATOR

P2-4

PASSENGER

ELEVATOR

P1-4

SERVICE

ELEVATOR

S1-4

ELEC

1-4215

CORRIDOR

1-4125

NOT FOR CONSTRUCTION

RDC/ JOHN POE ARCHITECTS

VA Project No.

RDC/JPA Project No.

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT

321 4 5 6 7 8 9 10

NOT FOR CONSTRUCTION

Project Schedule Date

2022 CAI Set - 100% 12.28.2021

3/10/2022 11:27:07 AM

Update Facility BIM

12.28.2021

FOURTH FLOOR PLAN

01-A.104

655-21-201

Saginaw, Michigan (655)

VA Station No:

William Merrill

Record Drawing 21024.00

Scale: 1/16" = 1'-0"

FOURTH FLOOR PLAN

UP

UP

UP

UP

CONFERENCE

1-5230

STORAGE

1-5221

WAITING

1-5220

MENS

TOILET

1-5234

STORAGE

1-5236

EXAM

1-5238

EYE EXAM 6

1-5242

EYE EXAM 5

1-5244

EYE EXAM 4

1-5246

EXAM

1-5248

EYE EXAM 1

1-5249

EYE EXAM

1-5247

OFFICE/

PROVIDERS

1-5243

STORAGE

1-5239

STAIR #01

1-S1-5

EXAM

1-5233

EXAM

1-5231

OPTICAL

1-5223

EXAM

1-5215

CORRIDOR 1

1-C501

OFFICE

1-5205

EXAM

1-5211

OFFICE

1-5213

RECEP.

1-5210

CHIEF OF

OPTOMETRY

1-5204

OFFICE

1-5202

OFFICE

1-5200

ELEC

1-5207

WOMEN'S

TOILET

1-5160

C&P

1-5156

H.A.C.

1-5203

STORAGE

1-5205A

OFFICE

1-5306B

TOILET

1-5310

STAIR #02

1-S2-5

FIRE CLOSET

1-FC5C

C&P

1-5155

C&P

1-5145

ELEC

1-5245

CORRIDOR 3

1-C503

C&P

1-5150

CONFERENCE

1-5142

CORRIDOR 6

1-C506

STORAGE

1-5126

H.A.C.

1-5128

CLOSET

1-5126A

INFORMATICS

1-5120

NON VA

CARE

1-5129

NCCPAC

BILLING

1-5133

ELEC

1-5131

STORAGE

1-5143

DATA

1-5127

CORRIDOR 5

1-C505

CONFERENCE

1-5140

MECH.

1-5141

OFFICE

1-5305

TEL

1-5306

CORRIDOR 4

1-C504

CORRIDOR 2

1-C502

MECH.

1-5240

STAIR #03

1-S3-5

SERVICE

ELEVATOR

S1-5

PASSENGER

ELEVATOR

P1-5

PASSENGER

ELEVATOR

P2-5

NOT FOR CONSTRUCTION

RDC/ JOHN POE ARCHITECTS

VA Project No.

RDC/JPA Project No.

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT

321 4 5 6 7 8 9 10

NOT FOR CONSTRUCTION

Project Schedule Date

2022 CAI Set - 100% 12.28.2021

3/10/2022 11:27:11 AM

Update Facility BIM

12.28.2021

FIFTH FLOOR PLAN

01-A.105

655-21-201

Saginaw, Michigan (655)

VA Station No:

William Merrill

Record Drawing 21024.00

Scale: 1/16" = 1'-0"

FIFTH FLOOR PLAN

UP

UP

MECHANICAL

1-PHB2-1

MECHANICAL

1-PHB3-1

MECHANICAL

1-PHB4-1

MECHANICAL

1-PHC1-1

STAIR #2A

1-S2-6

MECHANICAL

1-PHB1-1

NOT FOR CONSTRUCTION

RDC/ JOHN POE ARCHITECTS

VA Project No.

RDC/JPA Project No.

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT

321 4 5 6 7 8 9 10

NOT FOR CONSTRUCTION

Project Schedule Date

2022 CAI Set - 100% 12.28.2021

3/10/2022 11:27:12 AM

Update Facility BIM

12.28.2021

SIXTH FLOOR PLAN

01-A.106

655-21-201

Saginaw, Michigan (655)

VA Station No:

William Merrill

Record Drawing 21024.00

Scale: 1/16" = 1'-0"

PENTHOUSE PLAN

UP

SYSTEMS

REDESIGN

2-104

LOCKER

ROOM

2-105

OFFICE

2-101

CORRIDOR

2-C100

CHIEF

POLICE

2-102

EMERGENCY

MANAGER

2-102A

TOILET

2-102B

DATA

2-106

STORAGE

2-107

CLOSET

2-102C

NOT FOR CONSTRUCTION

RDC/ JOHN POE ARCHITECTS

VA Project No.

RDC/JPA Project No.

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT

321 4 5 6 7 8 9 10

NOT FOR CONSTRUCTION

Project Schedule Date

2022 CAI Set - 100% 12.28.2021

12/22/2021 4:43:38 PM

Update Facility BIM

12.28.2021

FIRST FLOOR PLAN

02-A.101

655-21-201

Saginaw, Michigan (655)

VA Station No:

William Merrill

Record Drawing 21024.00

Scale: 3/8" = 1'-0"

FIRST FLOOR PLAN

OFFICE

2-202

OFFICE

2-203

CLOSET

2-203A

CLOSET

2-208A

OFFICE

2-204

CORRIDOR

2-C200

EXPLOSIVES

STORAGE

2-200

CLOSET

2-201A

CLOSET

2-200A

RESTROOM

2-201

EVIDENCE

2-202A

CLOSET

2-202B

CLOSET

2-202C

NOT FOR CONSTRUCTION

RDC/ JOHN POE ARCHITECTS

VA Project No.

RDC/JPA Project No.

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT

321 4 5 6 7 8 9 10

NOT FOR CONSTRUCTION

Project Schedule Date

2022 CAI Set - 100% 12.28.2021

12/22/2021 4:43:39 PM

Update Facility BIM

12.28.2021

SECOND FLOOR PLAN

02-A.102

655-21-201

Saginaw, Michigan (655)

VA Station No:

William Merrill

Record Drawing 21024.00

Scale: 3/8" = 1'-0"

SECOND FLOOR PLAN

MECH FMS

3-B104 3-B103

MECH

3-B100

STORAGE

3-B101

DATA

3-B102

NOT FOR CONSTRUCTION

RDC/ JOHN POE ARCHITECTS

VA Project No.

RDC/JPA Project No.

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT

321 4 5 6 7 8 9 10

NOT FOR CONSTRUCTION

Project Schedule Date

2022 CAI Set - 100% 12.28.2021

12/22/2021 4:55:47 PM

Update Facility BIM

12.28.2021

BASEMENT FLOOR PLAN

03-A.100

655-21-201

Saginaw, Michigan (655)

VA Station No:

William Merrill

Record Drawing 21024.00

Scale: 1/4" = 1'-0"

BASEMENT FLOOR PLAN

DN

UP

UP

OFFICE

3-104

OFFICE

3-105

OFFICE

3-106

OFFICE

3-103

CORRIDOR

3-C101

OFFICE

3-108

WOMENS

TOILET

3-102

OFFICE

3-101

VEST

1-3

VEST.

3-100

TOILET

3-113

OFFICE

3-112

CLOSET

3-105A

CLOSET

3-103A

CLOSET

3-104A

CLOSET

3-108A

OFFICE

3-109

OFFICE

3-110

OFFICE

3-111

CLOSET

3-109A

CLOSET

3-110A

CLOSET

3-111A

CLOSET

3-112A

STAIR

3-S1-1

NOT FOR CONSTRUCTION

RDC/ JOHN POE ARCHITECTS

VA Project No.

RDC/JPA Project No.

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT

321 4 5 6 7 8 9 10

NOT FOR CONSTRUCTION

Project Schedule Date

2022 CAI Set - 100% 12.28.2021

12/22/2021 4:55:47 PM

Update Facility BIM

12.28.2021

FIRST FLOOR PLAN

03-A.101

655-21-201

Saginaw, Michigan (655)

VA Station No:

William Merrill

Record Drawing 21024.00

Scale: 1/4" = 1'-0"

FIRST FLOOR PLAN

OFFICE

3-209

OFFICE

3-210

OFFICE

3-211

OFFICE

3-208

TOILET

3-207

RECEP.

3-206

CLOSET

3-209A

CLOSET

3-210A

CLOSET

3-208A

CLOSET

3-207A

CLOSET

3-212A

CLOSET

3-200A

COPY

ROOM

3-212

STAIR

3-S1-2

KITCHEN

3-200

RECEP.

3-205

OFFICE

3-201

OFFICE

3-202

CLOSET

3-202A

OFFICE

3-203

TOILET

3-204

CLOSET

3-204A

CLOSET

3-203A

NOT FOR CONSTRUCTION

RDC/ JOHN POE ARCHITECTS

VA Project No.

RDC/JPA Project No.

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT

321 4 5 6 7 8 9 10

NOT FOR CONSTRUCTION

Project Schedule Date

2022 CAI Set - 100% 12.28.2021

12/22/2021 4:55:48 PM

Update Facility BIM

12.28.2021

SECOND FLOOR PLAN

03-A.102

655-21-201

Saginaw, Michigan (655)

VA Station No:

William Merrill

Record Drawing 21024.00

Scale: 1/4" = 1'-0"

SECOND FLOOR PLAN

UP

NOT FOR CONSTRUCTION

RDC/ JOHN POE ARCHITECTS

VA Project No.

RDC/JPA Project No.

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT

321 4 5 6 7 8 9 10

NOT FOR CONSTRUCTION

Project Schedule Date

2022 CAI Set - 100% 12.28.2021

12/23/2021 8:01:19 AM

Update Facility BIM

12.28.2021

BASEMENT FLOOR PLAN

04-A.100

655-21-201

Saginaw, Michigan (655)

VA Station No:

William Merrill

Record Drawing 21024.00

Scale: 1/4" = 1'-0"

BASEMENT FLOOR PLAN

UP

DN

OFFICE

4-107

OFFICE

4-107B

DATA

4-106A

ELEC

4-106

OFFICE

4-105

MENS

TOILET

4-108

STORAGE

4-109

CLOSET

4-110

WOMENS

TOILET

4-111

VEST.

4-100

OFFICE

4-102A

OFFICE

4-102

CLOSET

4-112

CORRIDOR

4-COR101

FOYER

4-107C

CLOSET

4-105A

NOT FOR CONSTRUCTION

RDC/ JOHN POE ARCHITECTS

VA Project No.

RDC/JPA Project No.

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT

321 4 5 6 7 8 9 10

NOT FOR CONSTRUCTION

Project Schedule Date

2022 CAI Set - 100% 12.28.2021

12/23/2021 8:01:20 AM

Update Facility BIM

12.28.2021

FIRST FLOOR PLAN

04-A.101

655-21-201

Saginaw, Michigan (655)

VA Station No:

William Merrill

Record Drawing 21024.00

Scale: 1/4" = 1'-0"

FIRST FLOOR PLAN

OFFICE

4-207

OFFICE

4-206

OFFICE

4-205

OFFICE

4-204

BATH

4-215

STORAGE

4-214

OFFICE

4-203

STORAGE

4-212

BATH

4-213

STAIRS

4-S1-2

OFFICE

4-208

H.A.C.

4-211

OFFICE

4-209

OFFICE

4-210

NOT FOR CONSTRUCTION

RDC/ JOHN POE ARCHITECTS

VA Project No.

RDC/JPA Project No.

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT

321 4 5 6 7 8 9 10

NOT FOR CONSTRUCTION

Project Schedule Date

2022 CAI Set - 100% 12.28.2021

12/23/2021 8:01:20 AM

Update Facility BIM

12.28.2021

SECOND FLOOR PLAN

04-A.102

655-21-201

Saginaw, Michigan (655)

VA Station No:

William Merrill

Record Drawing 21024.00

Scale: 1/4" = 1'-0"

SECOND FLOOR PLAN

OFFICE

6-112

OFFICE

6-111

OFFICE

6-109

OFFICE

6-110

CORRIDOR

6-C102

COPY

6-107

OFFICE

6-108

VESTIBULE

6-101

RECEPTION

6-106

ALCOVE

6-105

H.A.C.

6-104

BATH

6-103

WAITING

ROOM

6-102ELEVATOR

6-EL1-1

ELEVATOR

EQUIPMENT

ROOM

6-118

STAIRS

6-S1-1

CORRIDOR

6-C101

ELEC

6-117

UTILITY

STORAGE

6-116

WHOLE

HEALTH

6-115

PRIVACY

OFFICER

6-114

CONFERENCE

/ BREAK

ROOM

6-113

CORRIDOR

6-COR103

STAIRS

6-S2-1

NOT FOR CONSTRUCTION

RDC/ JOHN POE ARCHITECTS

VA Project No.

RDC/JPA Project No.

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT

321 4 5 6 7 8 9 10

NOT FOR CONSTRUCTION

Project Schedule Date

2022 CAI Set - 100% 12.28.2021

12/23/2021 8:03:46 AM

Update Facility BIM

12.28.2021

FIRST FLOOR PLAN

06-A.101

655-21-201

Saginaw, Michigan (655)

VA Station No:

William Merrill

Record Drawing 21024.00

Scale: 1/4" = 1'-0"

FIRST FLOOR PLAN

OPEN

WORK

AREA

6-201

STAIRS

6-S2-2

STORAGE

6-205

COPY

ROOM

6-204

TOILET

6-203

TOILET

6-202

OFFICE

6-206

CORRIDOR

6-C201

EQUIPMENT

ROOM

6-207

ELEC

6-208

STAIRS

6-S1-2

DATA

6-209

CORRIDOR

6-C202

NOT FOR CONSTRUCTION

RDC/ JOHN POE ARCHITECTS

VA Project No.

RDC/JPA Project No.

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT

321 4 5 6 7 8 9 10

NOT FOR CONSTRUCTION

Project Schedule Date

2022 CAI Set - 100% 12.28.2021

12/23/2021 8:03:47 AM

Update Facility BIM

12.28.2021

SECOND FLOOR PLAN

06-A.102

655-21-201

Saginaw, Michigan (655)

VA Station No:

William Merrill

Record Drawing 21024.00

Scale: 1/4" = 1'-0"

SECOND FLOOR PLAN

SERVICE

ROOM

9-B100

NOT FOR CONSTRUCTION

RDC/ JOHN POE ARCHITECTS

VA Project No.

RDC/JPA Project No.

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT

321 4 5 6 7 8 9 10

NOT FOR CONSTRUCTION

Project Schedule Date

2022 CAI Set - 100% 12.28.2021

12/23/2021 8:05:36 AM

Update Facility BIM

12.28.2021

BASEMENT FLOOR PLAN

09-A.100

655-21-201

Saginaw, Michigan (655)

VA Station No:

William Merrill

Record Drawing 21024.00

Scale: 3/16" = 1'-0"

BASEMENT FLOOR PLAN

UP

COPY

107-9

OFFICE

106-9

OFFICE

105-9

STORAGE

9-100

OFFICE

9-103

DATA

103-9

OFFICE

101-9

BATH

102-9

RECIEVING

100A-9

NOT FOR CONSTRUCTION

RDC/ JOHN POE ARCHITECTS

VA Project No.

RDC/JPA Project No.

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT

321 4 5 6 7 8 9 10

NOT FOR CONSTRUCTION

Project Schedule Date

2022 CAI Set - 100% 12.28.2021

12/23/2021 8:05:37 AM

Update Facility BIM

12.28.2021

FIRST FLOOR PLAN

09-A.101

655-21-201

Saginaw, Michigan (655)

VA Station No:

William Merrill

Record Drawing 21024.00

Scale: 3/16" = 1'-0"

FIRST FLOOR PLAN

B17

NOT FOR CONSTRUCTION

RDC/ JOHN POE ARCHITECTS

VA Project No.

RDC/JPA Project No.

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT

321 4 5 6 7 8 9 10

NOT FOR CONSTRUCTION

Project Schedule Date

2022 CAI Set - 100% 12.28.2021

12/23/2021 8:07:17 AM

Update Facility BIM

12.28.2021

FIRST FLOOR PLAN

17-A.101

655-21-201

Saginaw, Michigan (655)

VA Station No:

William Merrill

Record Drawing 21024.00

Scale: 1/2" = 1'-0"

FIRST FLOOR PLAN

ELECTRICAL

B19

NOT FOR CONSTRUCTION

RDC/ JOHN POE ARCHITECTS

VA Project No.

RDC/JPA Project No.

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT

321 4 5 6 7 8 9 10

NOT FOR CONSTRUCTION

Project Schedule Date

2022 CAI Set - 100% 12.28.2021

12/23/2021 8:09:02 AM

Update Facility BIM

12.28.2021

FIRST FLOOR PLAN

19-A.101

655-21-201

Saginaw, Michigan (655)

VA Station No:

William Merrill

Record Drawing 21024.00

Scale: 3/8" = 1'-0"

FIRST FLOOR PLAN

ELECTRICAL

B20

NOT FOR CONSTRUCTION

RDC/ JOHN POE ARCHITECTS

VA Project No.

RDC/JPA Project No.

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT

321 4 5 6 7 8 9 10

NOT FOR CONSTRUCTION

Project Schedule Date

2022 CAI Set - 100% 12.28.2021

12/23/2021 8:10:48 AM

Update Facility BIM

12.28.2021

FIRST FLOOR PLAN

20-A.101

655-21-201

Saginaw, Michigan (655)

VA Station No:

William Merrill

Record Drawing 21024.00

Scale: 1/2" = 1'-0"

FIRST FLOOR PLAN

DN

PHARMACY

CACHE

21-107

GARAGE

21-101

DATA

21-103

BATH

21-102

OFFICE

21-100

GENERATOR

ROOM

21-104

NOT FOR CONSTRUCTION

RDC/ JOHN POE ARCHITECTS

VA Project No.

RDC/JPA Project No.

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT

321 4 5 6 7 8 9 10

NOT FOR CONSTRUCTION

Project Schedule Date

2022 CAI Set - 100% 12.28.2021

12/23/2021 8:13:41 AM

Update Facility BIM

12.28.2021

FIRST FLOOR PLAN

21-A.101

655-21-201

Saginaw, Michigan (655)

VA Station No:

William Merrill

Record Drawing 21024.00

Scale: 1/8" = 1'-0"

FIRST FLOOR PLAN

8' - 0"

8' - 0"

8' - 0"

10' - 0"

NOT FOR CONSTRUCTION

RDC/ JOHN POE ARCHITECTS

VA Project No.

RDC/JPA Project No.

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT

321 4 5 6 7 8 9 10

NOT FOR CONSTRUCTION

Project Schedule Date

2022 CAI Set - 100% 12.28.2021

12/23/2021 8:13:42 AM

Update Facility BIM

12.28.2021

RCP - FIRST FLOOR

21-A.121

655-21-201

Saginaw, Michigan (655)

VA Station No:

William Merrill

Record Drawing 21024.00

Scale: 1/8" = 1'-0"

FIRST FLOOR REFLECTED CELING PLAN

UP

UP

UP

UP

UP

DN

DN

UP

STAIR #02

22-S2-0

OFFICE

22-B524

OFFICE

22-B525

WAITING

22-B520

PROS. CHIEF

22-B526

CHIEF. PMR

22-B516

SHOE BRACE

CLINIC

22-B512

OFFICE

22-B508

VESTIBULE

MH

22-B507

H.A.C.

22-B506

OFFICE

22-B523

OFFICE

22-B522

SUPERVISOR

22-B521

VESTIBULE

MH

22-B517

OFFICE

22-B515

OFFICE

22-B509

STORAGE

22-B505

CORRIDOR 1

22-C001

OFFICE

22-B504

OFFICE

22-B502

ELEC

22-B500

MECHANICAL

22-B449 MECHANICAL

22-B450

H.A.C.

22-B444

WOMENS

TOILET

22-B444-1

MENS

TOILET

22-B443

STAIR #01

22-S1-0

MENS

TOILET

22-B437

WOMENS

TOILET

22-B435

MECHANICAL

22-B438

MAINFRAME

22-B406

STAIR #05

22-S5-0

DATA

22-B416

MECHANICAL

22-B418

PATIENT

LIBRARY

22-B420 AUDIOVISUAL

STORAGE

22-B420E

CUBICLES

22-B420C

WORK ROOM

22-B420B

SIMULATION

LAB

22-B420A

COMPUTER

CLASSROOM

22-B420D

ELEC

22-B434

CORRIDOR 3

22-C003

CORRIDOR 2

22-C002

MAIL ROOM

22-B701

STORAGE

22-B600E

OFFICE

22-B706

OFFICE

22-B707

CHIEF

OFFICE

22-B708

PHARMACY

SECRETARY

22-B705

STORAGE

22-B712A

STORAGE/OFFICE

PHARMACY

22-B712

OFFICE/STORAGE

22-B711

LOUNGE

22-B713

VAULT

22-B714

I.V. DRUGS

22-B715

MED.

22-B715B

CLOSET

22-B717

STORAGE

22-B715A

PHARMACY

22-B710

STAIR #04

22-S4-0

CLOSET

22-B716

DATA

22-B700

STAIR #03

22-S3-0

PROSTHETICS

PM&R

22-B600

STORAGE

22-B600D

PROSTHETICS

SENSORY

22-B600C

OFFICE/EXAM

22-B600A

OFFICES

22-B600B

REHAB

22-B601

OPEN

OFFICE

22-B405

SHOP

22-B405A

OFFICE

22-B409

OFFICE

22-B405C

OFFICE

22-B405B

STORAGE

22-B420F

DATA

22-B702

PASSENGER

ELEVATOR

22-P1-0

PASSENGER

ELEVATOR

22-P2-0

NOT FOR CONSTRUCTION

RDC/ JOHN POE ARCHITECTS

VA Project No.

RDC/JPA Project No.

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT

321 4 5 6 7 8 9 10

NOT FOR CONSTRUCTION

Project Schedule Date

2022 CAI Set - 100% 12.28.2021

12/23/2021 8:15:57 AM

Update Facility BIM

12.28.2021

BASEMENT FLOOR PLAN

22-A.100

655-21-201

Saginaw, Michigan (655)

VA Station No:

William Merrill

Record Drawing 21024.00

Scale: 1/16" = 1'-0"

BASEMENT FLOOR PLAN

UP

UP

UP

UP

UP

UP

UPUP

UP

UP

UP

TEMPORARY

STORAGE

22-1718

STAIR #04

22-S4-1

CORRIDOR 3

22-C103

PATIENT

ROOM

22-1719

PATIENT

ROOM

22-1717

PATIENT

ROOM

22-1715

PATIENT

ROOM

22-1713

BATH

22-1713A

BATH

22-1717A

BATH

22-1716A

TEMPORARY

STORAGE

22-1716

PATIENT

ROOM

22-1714

PATIENT

ROOM

22-1712

BATH

22-1712A

BATH

22-1711A

PATIENT

ROOM

22-1711

OFFICE

22-1709

SOILED UTIL.

22-1707

PATIENT

ROOM

22-1710

BATH

22-1710A

TOILET

22-1708

MNGR

NURSE

22-1706

OFFICE

22-1705

H.A.C.

22-1704

CLEAN UTIL.

22-1703

LOUNGE

22-1701

BATH

22-1600

PATIENT

ROOM

22-1602

BATH

22-1602A

PATIENT

ROOM

22-1604

PATIENT

ROOM

22-1606

PATIENT

ROOM

22-1608

BATH

22-1606A

PATIENT

ROOM

22-1610

BATH

22-1610A

SOCIAL

WORKER

22-1612

STAIR #03

22-S3-1

MOD

22-1613

BATH

22-1611A

OFFICE

22-1611

CLEAN

EQUIP ROOM

22-1609

BATH

22-1607A

PATIENT

ROOM

22-1607

PATIENT

ROOM

22-1605

BATH

22-1603A

PATIENT

ROOM

22-1603

LAUNDRY

ROOM

22-1601

LOUNGE

22-1500

ELEC

22-1502

MED.

22-1504

NURSE

STATION

22-1450

PATIENT

ROOM

22-1506

PATIENT

ROOM

22-1508

BATH

22-1506A

PATIENT

ROOM

22-1510

BATH

22-1510A

PATIENT

ROOM

22-1512

PATIENT

ROOM

22-1514

BATH

22-1516A

PATIENT

ROOM

22-1516

STAIR #02

22-S2-1

CORRIDOR 4

22-C104

CLEAN

EQUIP ROOM

22-1515

BATH

22-1515A

PATIENT

ROOM

22-1513

PATIENT

ROOM

22-1511

PATIENT

ROOM

22-1509

BATH

22-1509A

PATIENT

ROOM

22-1507

BATH

22-1507A

SOILED

22-1505

SHOWER

22-1501D

CONGREGATE

BATH

22-1501

SHOWERS

22-1501C

BATH

22-1501A

PANTRY

22-1441

CART WASH

22-1501B

REPORT

BREAK

ROOM

22-1439

OFFICE

22-1437

STAIR #01

22-S1-1

OXYGEN

STOR.

22-1431

EMS

STORAGE

22-1435

CORRIDOR

22-C122

H.A.C.

22-1425A

ELECTRICAL/SWITCH

GEAR

22-1430

STORAGE

22-1425C

SOILED

LINEN

22-1429

TRASH

22-1428

RECREATION

THERAPY

22-1425

WASH ROOM

22-1425B

CONFERENCE

ROOM

22-1411

OFFICE

22-1405A

MENS

TOILET

22-1409

DINING

ROOM

22-1405

CORRIDOR

22-C120

STAIR #05

22-S5-1

STORAGE

22-1400A

OCCUPATIONAL

THERAPY

22-1400

THERAPIST

OFFICE

22-1400B

STORAGE

22-1400C

SPEECH

PATH.

22-1412

OFFICE

22-1416A

OFFICE

22-1416

VESTIBULE

C1-6

TOILET

22-1415

ELEC

22-1414

DATA

22-1413

CORRIDOR 2

22-C102

CORRIDOR

22-C121

LOBBY

22-1417

LOUNGE

22-1418

OFFICE

22-1419

OFFICE

22-1420

CORRIDOR

22-C123

H.A.C.

22-1436

LOUNGE

22-1438

WOMENS

LOCKER

ROOM

22-1438A

MENS

LOCKER

ROOM

22-1438B

SUPPLY

ROOM

22-1442

STAFF

WORKROOM

22-1448

DATA

22-1702

PASSENGER

ELEVATOR

22-P1-1

PASSENGER

ELEVATOR

22-P2-1

NOT FOR CONSTRUCTION

RDC/ JOHN POE ARCHITECTS

VA Project No.

RDC/JPA Project No.

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT

321 4 5 6 7 8 9 10

NOT FOR CONSTRUCTION

Project Schedule Date

2022 CAI Set - 100% 12.28.2021

12/23/2021 8:16:01 AM

Update Facility BIM

12.28.2021

FIRST FLOOR PLAN

22-A.101

655-21-201

Saginaw, Michigan (655)

VA Station No:

William Merrill

Record Drawing 21024.00

Scale: 1/16" = 1'-0"

FIRST FLOOR PLAN

UP

UP

UP

UP

STAIR #02

22-S2-2

OFFICE

22-2517

BATH

22-2515A

PATIENT

ROOM

22-2515

BATH

22-2511A

PATIENT

ROOM

22-2513

PATIENT

ROOM

22-2511

INFUSION

CLINIC 2

22-2516

INFUSION

CLINIC

22-2514

BATH

22-2514A

ACT NURSE

SCAN

22-2512

PATIENT

ROOM

22-2510

BATH

22-2510A

PATIENT

ROOM

22-2508

PATIENT

ROOM

22-2506

MED.

22-2504

ELEC

22-2502

BATH

22-2506A

PATIENT

ROOM

22-2603

PATIENT

ROOM

22-2605

BATH

22-2603A

PATIENT

ROOM

22-2607

BATH

22-2607A

EQUIP

STORAGE

22-2609

FAMILY

LOUNGE

22-2608

PATIENT

ROOM

22-2606

BATH

22-2606A

PATIENT

ROOM

22-2611

PATIENT

ROOM

22-2610

PATIENT

ROOM

22-2612

PATIENT

ROOM

22-2613

BATH

22-2611A

BATH

22-2610A

STAIR #03

22-S3-2

CORRIDOR 6

22-C206

CORRIDOR 7

22-C207

PATIENT

ROOM

22-2604

BATH

22-2602A

PATIENT

ROOM

22-2602

PATIENT

ROOM

22-2507

BATH

22-2507A

SOILED

UTILITY

22-2505

CONGREGATE

BATH

22-2501

CLEAN UTIL.

22-2703

SOILED

22-2707

INPATIENT

NURSE

22-2709

PATIENT

ROOM

22-2711

BATH

22-2711A

PATIENT

ROOM

22-2713

BATH

22-2713A

PATIENT

ROOM

22-2715

PATIENT

ROOM

22-2717

PATIENT

ROOM

22-2719

BATH

22-2717A

STAIR #04

22-S4-2

COMFORT

CLINICS

22-2718

BATH

22-2716A

COMFORT

CLINICS

22-2716

PATIENT

ROOM

22-2714

BATH

22-2712A

OCCUPATIONAL

THERAPY

22-2712

BATH

22-2710A

PATIENT

ROOM

22-2710

BATH

22-2708

CLINICAL

PSYCHOLOGIST

22-2706

PROVIDER

22-2705

H.A.C.

22-2704

CORRIDOR 8

22-C208

DATA

22-2702

CLINICAL

COPY

22-2448

MENS

LOCKER

ROOM

22-2438B

STORAGE

22-2442

BATH

22-2501A

PANTRY

22-2441

REPORT

BREAK

ROOM

22-2439

STAFF ROOM

22-2438

WOMENS

LOCKER

ROOM

22-2438A

CORRIDOR 5

22-C205

NURSE

STATION

22-2450

OFFICE

22-2437 H.A.C.

22-2436

EMS

STORAGE

22-2435

STORAGE

22-2410

BATH

22-2418

H.A.C.

22-2400A

DINING

ROOM

22-240

OFFICE

22-2409

OFFICE

22-2407

FITNESS RM.

22-2411

TRASH

22-2412

SOILED

LINEN

22-2413

MECHANICAL

22-2415

OFFICE/STORAGE

22-2405

CORRIDOR 3

22-C203

CORRIDOR 4

22-C204

CORRIDOR 2

22-C202

STAIR #01

22-S1-2

LOUNGE

22-2701

BATH

22-2600

LAUNDRY

22-2601

LOUNGE

22-2500

CART WASH

22-2501B

SHOWERS

22-2501C

SHOWER

22-2501D

PASSENGER

ELEVATOR

22-P1-2

PASSENGER

ELEVATOR

22-P2-2

CORRIDOR 1

22-C201

NOT FOR CONSTRUCTION

RDC/ JOHN POE ARCHITECTS

VA Project No.

RDC/JPA Project No.

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT

321 4 5 6 7 8 9 10

NOT FOR CONSTRUCTION

Project Schedule Date

2022 CAI Set - 100% 12.28.2021

12/23/2021 8:16:05 AM

Update Facility BIM

12.28.2021

SECOND FLOOR PLAN

22-A.102

655-21-201

Saginaw, Michigan (655)

VA Station No:

William Merrill

Record Drawing 21024.00

Scale: 1/16" = 1'-0"

SECOND FLOOR PLAN

OPEN

30-101

OFFICE

30-108

OFFICE

30-107

OFFICE

30-106

DATA

30-105

TOILET

FEMALE

30-104

TOILET

MALE

30-102

H.A.C.

30-103

MECHANICAL

30-106A

NOT FOR CONSTRUCTION

RDC/ JOHN POE ARCHITECTS

VA Project No.

RDC/JPA Project No.

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT

321 4 5 6 7 8 9 10

NOT FOR CONSTRUCTION

Project Schedule Date

2022 CAI Set - 100% 12.28.2021

12/23/2021 8:19:28 AM

Update Facility BIM

12.28.2021

FIRST FLOOR PLAN

30-A.101

655-21-201

Saginaw, Michigan (655)

VA Station No:

William Merrill

Record Drawing 21024.00

Scale: 1/4" = 1'-0"

FIRST FLOOR PLAN

STORAGE

32-102

PUMP

ROOM

32-101

ELECTRICAL

32-101A

DATA

32-101B

NOT FOR CONSTRUCTION

RDC/ JOHN POE ARCHITECTS

VA Project No.

RDC/JPA Project No.

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT

321 4 5 6 7 8 9 10

NOT FOR CONSTRUCTION

Project Schedule Date

2022 CAI Set - 100% 12.28.2021

12/23/2021 8:21:15 AM

Master Record Drawings BIM

12.28.2021

FIRST FLOOR PLAN

32-A.101

655-21-201

Saginaw, Michigan (655)

VA Station No:

William Merrill

Record Drawing 21024.00

Scale: 3/8" = 1'-0"

FIRST FLOOR PLAN

STORAGE

BACKFLOW

NOT FOR CONSTRUCTION

RDC/ JOHN POE ARCHITECTS

VA Project No.

RDC/JPA Project No.

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT

321 4 5 6 7 8 9 10

NOT FOR CONSTRUCTION

Project Schedule Date

2022 CAI Set - 100% 12.28.2021

12/23/2021 8:24:25 AM

Update Facility BIM

12.28.2021

FIRST FLOOR PLAN

34-A.101

655-21-201

Saginaw, Michigan (655)

VA Station No:

William Merrill

Record Drawing 21024.00

Scale: 1/2" = 1'-0"

FIRST FLOOR PLAN

TOILET

FEMALE

35-103

TOILET

MALE

35-104

STORAGE

35-102

MECHANICAL

35-101

PAVILION/

MULTI-PURPOSE

35-100

SERVING

KITCHEN

35-105

NOT FOR CONSTRUCTION

RDC/ JOHN POE ARCHITECTS

VA Project No.

RDC/JPA Project No.

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT

321 4 5 6 7 8 9 10

NOT FOR CONSTRUCTION

Project Schedule Date

2022 CAI Set - 100% 12.28.2021

12/23/2021 8:26:34 AM

Update Facility BIM

12.28.2021

FIRST FLOOR PLAN

35-A.101

655-21-201

Saginaw, Michigan (655)

VA Station No:

William Merrill

Record Drawing 21024.00

Scale: 1/4" = 1'-0"

FIRST FLOOR PLAN

GREENHOUSE

B36

NOT FOR CONSTRUCTION

RDC/ JOHN POE ARCHITECTS

VA Project No.

RDC/JPA Project No.

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT

321 4 5 6 7 8 9 10

NOT FOR CONSTRUCTION

Project Schedule Date

2022 CAI Set - 100% 12.28.2021

12/23/2021 8:28:03 AM

Update Facility BIM

12.28.2021

FIRST FLOOR PLAN

36-A.101

655-21-201

Saginaw, Michigan (655)

VA Station No:

William Merrill

Record Drawing 21024.00

Scale: 1/2" = 1'-0"

FIRST FLOOR PLAN

SCOPE

CHIEF

CPS CHIEF

TOILET

H.A.C.

DATA

OFFICE

OFFICE

SCOPE

OPEN

OFFICE

OFFICE

OFFICE

NOT FOR CONSTRUCTION

RDC/ JOHN POE ARCHITECTS

VA Project No.

RDC/JPA Project No.

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT

321 4 5 6 7 8 9 10

NOT FOR CONSTRUCTION

Project Schedule Date

2022 CAI Set - 100% 12.28.2021

12/23/2021 8:40:28 AM

Update Facility BIM

12.28.2021

FIRST FLOOR PLAN

T38-A.101

655-21-201

Saginaw, Michigan (655)

T38

VA Station No:

William Merrill

Record Drawing 21024.00

Scale: 1/4" = 1'-0"

FIRST FLOOR PLAN

B01_ARC
01-A.100 - BASEMENT FLOOR PLAN
01-A.101 - FIRST FLOOR PLAN
01-A.102 - SECOND FLOOR PLAN
01-A.103 - THIRD FLOOR PLAN
01-A.104 - FOURTH FLOOR PLAN
01-A.105 - FIFTH FLOOR PLAN
01-A.106 - SIXTH FLOOR PLAN
01-A.120 - RCP - BASEMENT
01-A.121 - RCP - FIRST FLOOR
01-A.122 - RCP - SECOND FLOOR
01-A.123 - RCP - THIRD FLOOR
01-A.124 - RCP - FOURTH FLOOR
01-A.125 - RCP - FIFTH FLOOR
01-A.200 - NORTH & SOUTH ELEVATIONS
01-A.201 - EAST & WEST ELEVATIONS
B02_ARC
02-A.101 - FIRST FLOOR PLAN
02-A.102 - SECOND FLOOR PLAN
02-A.121 - RCP - FIRST FLOOR
02-A.122 - RCP - SECOND FLOOR
02-A.200 - NORTH & SOUTH ELEVATIONS
02-A.201 - EAST & WEST ELEVATIONS
B03_ARC
03-A.100 - BASEMENT FLOOR PLAN
03-A.101 - FIRST FLOOR PLAN
03-A.102 - SECOND FLOOR PLAN
03-A.121 - RCP - FIRST FLOOR
03-A.122 - RCP - SECOND FLOOR
03-A.200 - EAST & WEST ELEVATIONS
03-A.201 - NORTH & SOUTH ELEVATIONS
B04_ARC
04-A.100 - BASEMENT FLOOR PLAN
04-A.101 - FIRST FLOOR PLAN
04-A.102 - SECOND FLOOR PLAN
04-A.121 - RCP - FIRST FLOOR
04-A.122 - RCP - SECOND FLOOR
04-A.200 - NORTH & SOUTH ELEVATIONS
04-A.201 - EAST & WEST ELEVATIONS
B06_ARC
06-A.101 - FIRST FLOOR PLAN
06-A.102 - SECOND FLOOR PLAN
06-A.103 - ROOF PLAN
06-A.121 - RCP - FIRST FLOOR
06-A.122 - RCP - SECOND FLOOR
06-A.200 - NORTH & SOUTH ELEVATIONS
06-A.201 - EAST & WEST ELEVATIONS
B09_ARC
09-A.100 - BASEMENT FLOOR PLAN
09-A.101 - FIRST FLOOR PLAN
09-A.121 - RCP - FIRST FLOOR
09-A.200 - NORTH & SOUTH ELEVATIONS
09-A.201 - EAST & WEST ELEVATIONS
B17_ARC
17-A.101 - FIRST FLOOR PLAN
17-A.200 - ELEVATIONS
B19_ARC
19-A.101 - FIRST FLOOR PLAN
19-A.121 - RCP - FIRST FLOOR
19-A.200 - ELEVATIONS
B20_ARC
20-A.101 - FIRST FLOOR PLAN
20-A.121 - RCP - FIRST FLOOR
20-A.200 - ELEVATIONS
B21_ARC
21-A.101 - FIRST FLOOR PLAN
21-A.121 - RCP - FIRST FLOOR
21-A.200 - ELEVATIONS
B22_ARC
22-A.100 - BASEMENT FLOOR PLAN
22-A.101 - FIRST FLOOR PLAN
22-A.102 - SECOND FLOOR PLAN
22-A.120 - RCP - BASEMENT
22-A.121 - RCP - FIRST FLOOR
22-A.122 - RCP - SECOND FLOOR
22-A.200 - NORTH & SOUTH ELEVATIONS
22-A.201 - EAST & WEST ELEVATIONS
B30_ARC
30-A.101 - FIRST FLOOR PLAN
30-A.121 - RCP - FIRST FLOOR
30-A.200 - ELEVATIONS
B32_ARC
32-A.101 - FIRST FLOOR PLAN
32-A.121 - RCP - FIRST FLOOR
32-A.200 - ELEVATIONS
B33_ARC
33-A.101 - FIRST FLOOR PLAN
33-A.200 - ELEVATIONS
B34_ARC
34-A.101 - FIRST FLOOR PLAN
34-A.121 - RCP - FIRST FLOOR
34-A.200 - ELEVATIONS
B35_ARC
35-A.101 - FIRST FLOOR PLAN
35-A.121 - RCP - FIRST FLOOR
35-A.200 - ELEVATIONS
B36_ARC
36-A.101 - FIRST FLOOR PLAN
36-A.121 - RCP - FIRST FLOOR
36-A.200 - ELEVATIONS
B37_ARC
37-A.101 - FIRST FLOOR PLAN
37-A.200 - ELEVATIONS
B39_ARC
39-A.101 - FIRST FLOOR PLAN
39-A.200 - ELEVATIONS
BT38_ARC
T38-A.101 - FIRST FLOOR PLAN
T38-A.121 - RCP - FIRST FLOOR
T38-A.200 - ELEVATIONS

File details come from the government source that posted it. Updated .