655-21-201_Saginaw Update Facility Architectural FP.pdf

PDF 4 MB Posted

Attached to
B599--Confined Space Evaluation Federal contract opportunity
Solicitation number
36C25023Q0083
Issued by
Department of Veterans Affairs Veterans Health Administration Veterans Integrated Service Network 10

View the file

Other files for this federal contract opportunity

Other files attached to B599--Confined Space Evaluation, newest first.
File Type Posted
confined space questions CH.docx DOCX document
SOP IH-23 Confined Space Entry (new format).docx DOCX document
36C25023Q0083_1.docx DOCX document

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

UP

DN

DN

UP

DN

UP

UP

UP

UP

UP

UP

UP

DN

UP

UP

UP

MECH.

1-B132A

HVAC SHOP

1-B132

BIOMED

OFFICE

1-B130

CANTEEN

1-B134

BIOMED

SUPERVISORS

1-B130A

SOILED

LINEN

1-B120

LINEN

1-B124

LINEN

1-B122

OFFICE

1-B112

OFFICE

1-B110

OFFICE

1-B108

OFFICE

1-B106

OFFICE

1-B104

MECH.

1-B103

PLUMBING

SHOP

1-B103B

STORAGE

1-B103A

OFFICE

1-B105

OFFICE

1-B115C

ELEC

1-B107

OFFICE

1-B115B

VESTIBULE

FMS

CORRIDOR 3

1-C003

MORGUE

1-B125A

MORGUE

1-B125

BIOMED

OFFICE

1-B127

INDUSTRIAL

HYGENIST

OFFICE

1-B128

OFFICE

1-B129

SECURITY

ROOM

1-B140

TOILET

1-B150A

STAIR #02

1-S2-0

I T HUB

1-B300

OFFICE

1-B305A

CORRIDOR 4

1-C004

LINEN

STORAGE

1-B320

OFFICE

NURSING

1-B201

EVIDENCE

ROOM

1-B301

GIP SHOP

1-B315

CHARGING

ROOM

1-B141

SWITCHGEAR

ROOM

1-B260C

SWITCHGEAR

ROOM

1-B255

LOUNGE

1-B250

SOILED

LINEN

1-B240

OFFICE

1-B241

MEN'S

LOCKER

1-B215

CORRIDOR 2

1-C002

TOILET MALE

1-B215A

SHOWER

1-B215B

CREDIT

UNION

1-B210

DATA -

TELEPHONE

EQUIPMENT

1-B200

OFFICE

1-B220A

TOILET

1-B220H

OFFICE

1-B220D

OFFICE

1-B220C

OFFICE

1-B220B

MEDICAL

RECORDS

1-B220

WAITING

1-B220G

OFFICE

1-B220F

ELEC

1-B203

WOMEN'S

LOCKER

1-B150

OFFICE

1-B305

STORAGE

1-B305B

LAUNDRY

1-B321

STORAGE

VOLUNTEER

1-B325

ELECTRICAL

SHOP

1-B330

PAINT SHOP

1-B332

CARPENTRY

SHOP

1-B340

STAIR #05

1-S5-0

STORAGE

1-B340AOFFICE

SAFETY

TECH

1-B339

OFFICE

SAFETY

1-B338

BULK

STORAGE

1-B349

CANTEEN

STORAGE

1-B326

CLEANING

SUPPLY

STORAGE

1-B324

CORRIDOR 5

1-C005

STAIR #04

WATER

TREATMENT

1-B328

WOMEN'S

LOCKERROOM

1-B354

TOILET

FEMALE

1-B354A

H.A.C.

1-B329

MEN'S

LOCKERROOM

1-B355

TOILET MALE

1-B355A

ELEC

1-B353

H.A.C.

1-B352

MEDICAL

SUPPLY

DISTRIBUTION

1-B350

STERILE

STORAGE

1-B351

OFFICE

1-B361

OFFICE

1-B362

OPEN

OFFICE

1-B360

DECON

ROOM

1-B357

DECON ANTE

ROOM

1-B357A

BUILDING

MANAGEMENT

STORAGE

1-B260B

MACHINE

SHOP

1-B260A

KEY ROOM

1-B260D

SERVICE

ELEVATOR

S1-0

PASSENGER

ELEVATOR

P2-0

PASSENGER

ELEVATOR

P1-0

MEDICAL

RECORDS

1-B220E

STORAGE

xxx

STORAGE

xxx

FMS

1-B115

STAIR #06

1-S6-0

MECHANICAL

1-B380

STERILE

PROCESSING

1-B359

STAIR #1

1-EC0S1

BOILER

ROOM

1-B800

STAIR #2

1-EC0S2

STAIR #04

1-S4-0

STAIR #03

1-S3-0

DATA -

TELEPHONE

EQUIPMENT

1-B237A

CORRIDOR

1-B260

CLOSET

1-B356

1-B381A

1-B381

MECHANICAL

1-B380A

CORRIDOR 7

1-C007

CORRIDOR 8

1-C008

CORRIDOR

1-B119

MECHANICAL

1-B190

NOT FOR CONSTRUCTION

RDC/ JOHN POE ARCHITECTS

VA Project No.

RDC/JPA Project No.

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT

321 4 5 6 7 8 9 10

NOT FOR CONSTRUCTION

Project Schedule Date

2022 CAI Set - 100% 12.28.2021

3/10/2022 11:26:44 AM

Update Facility BIM

12.28.2021

BASEMENT FLOOR PLAN

01-A.100

655-21-201

Saginaw, Michigan (655)

VA Station No:

William Merrill

Record Drawing 21024.00

Scale: 1/16" = 1'-0"

BASEMENT FLOOR PLAN

Key Plan

Revisions Date

UP UP

UP

UP

UP

UP

UP

UP

UP

UP

UP

UP

UPUP

UP

UP

UP

UP UP

UP

UP

UP

OFFICE

CHAPEL

1-1385

OFFICE

CHAPLIN

1-1384

CHAPEL

1-1383

CHAPEL

1-1380

STORAGE

1-1372

STAGE

1-1373 AUDITORIUM

1-1370

STORAGE

1-1364

VOLUNTARY

SERVICE

1-1360

KITCHEN

1-1375

TV ROOM

1-1373E

STORAGE

1-1373D

STORAGE

1-1373A

TOILET

1-1373B

STORAGE

1-1373C

CHIEF

VOLUNTARY

SERVICE

1-1360A

ELEC

1-1356

CORRIDOR

H.A.C.

1-1363

MECH.

1-1361

STAIR #04

TOILET MALE

1-1355

STORAGE

1-1351

DATA -

TELEPHONE

1-1350

EXAM

1-1349

TOILET

FEMALE

1-1352A

WOMENS

LACT

1-1352

CORRIDOR 9

1-C109

EXAM

1-1348

EXAM

1-1347

EXAM

1-1346

EXAM

1-1345

EXAM

1-1344

OFFICE

1-1343

RECEPTIONIST

1-1341

CANTEEN

OFFICE

1-1340A

CANTEEN

RETAIL

STORE

1-1340

WAITING

1-1342

CORRIDOR

1-C110

CORRIDOR

10A

1-C110A

CORRIDOR 7

1-C107

CORRIDOR 5

1-C105

SERVICE

OFFICER

1-1332

SERVICE

OFFICER

1-1331

CAFETERIA

1-1325

SERVICE

OFFICER

1-1330

INPATIENT

PHARMACY

1-1314

STORAGE

1-1324A

KITCHEN

1-1324

RECEP.

FISCAL

1-1305D

PHARMACY

1-1305

CLOSET

FISCAL

1-1305C

INPATIENT

PHARMACY

1-1310

CORRIDOR 6

1-C106

DATA

1-1301

CORRIDOR 4

1-C104

STAIR #02

1-S2-1

OFFICE

FISCAL

1-1305A

OFFICE

FISCAL

1-1305B

H.A.C.

1-1205

ELEC

1-1207

OFFICE

FISCAL

1-1209

AGENT

CASHIER

1-1224

CORRIDOR 2

1-C102

LOBBY

1-1200

OFFICE

FISCAL

1-1227

OFFICE

FISCAL

1-1226

TELE

SWITCHBOARD

PAS

1-1212

OBSERVATION

ROOM

1-1231

OFFICE

1-1233

OBSERVATION

ROOM

1-1235

OFFICE

1-1210

EXAM

1-1237

EXAM

1-1239

EXAM

1-1241

TOILET

PATIENT

1-1243

TOILET

FEMALE

1-1241A

EXAM

1-1244

EXAM

1-1242

EXAM

1-1240

EXAM

1-1238

SOILED

1-1234

STORAGE

ALCOVE

ACOS

TRIAGE

ACOS

1-1250

RECEPTION

WELCOME

CENTER

1-1256

OFFICE

BILLING

1-1260

OFFICE ROI

1-1262

AGENT

CASHIER

1-1225

STAIR #01

1-S1-1

TEAM ROOM

ACOS

1-1257

OFFICE

BILLING

1-1261

ELEC

1-1259

TOILET MALE

1-1277

TOILET

FEMALE

1-1276AMBULANCE

BAY

1-1273

OFFICE

PATIENT

ADVOCATE

1-1270

OFFICE

PATIENT

ADVOCATE

1-1268

OFFICE

MYHEALTHYVET

1-1266

OFFICE

ELEGIBILITY

1-1264

WAITING

ROOM

1-1275

OFFICE ROI

1-1263

TOILET MALE

1-1155

WAITING

1-1125

OFFICE

1-1150

NURSE

STATION

1-1149

OFFICE

1-1146

EXAM

1-1132

EXAM 22

1-1134

EXAM 21

1-1136

CORRIDOR

1-C112

EXAM 20

1-1138

EXAM 19

1-1140

EXAM 18

1-1142

PATIENT

EDU.

1-1141

EXAM 17

1-1139

TOILET

1-1141A

EXAM 16

1-1137

EXAM 14

1-1133

EXAM 13

1-1131

TOILET

FEMALE

1-1129

MECHANICAL

1-1118

SOILED

1-1127

DATA

1-1127A

OFFICE

1-1116

STORAGE

1-1110A

MEDS

1-1114

EXAM 12

1-1110

EXAM 11

1-1108

EXAM 15

1-1135

STAIR #03

1-S3-1

EXAM

1-1117

EXAM

1-1115

EXAM 2

1-1111

CORRIDOR

1-C111

ELEC

1-1113

EXAM 3

1-1109

EXAM 4

1-1107

EXAM 10

1-1106

PATIENT

EDU.

1-1100

EXAM 8

1-1102

EXAM 9

1-1104

EXAM 5

1-1105

EXAM 6

1-1103

EXAM 7

1-1101

STAIR #06

1-S6-1

STAIR #05

1-S5-1

AIR

HANDLER

ROOM

1-1800

MECHANICAL

ENCLOSURE

1-1800A

CLEAN

1-1236

MED /

NURISH

1-1230

TOILET

1-1212A

WAITING

WELCOME

CENTER

1-1258

STORAGE

ACOS

1-1269

OFFICE

ELEGIBILITY

1-1265 SERVICE

ELEVATOR

S1-1

PASSENGER

ELEVATOR

P1-1

PASSENGER

ELEVATOR

P2-1

ANTE ROOM

1-1117A

ANTE ROOM

1-1115A

ANTE ROOM

1-1111A

STAIR #07

1-S7-1

A/C

1-1354

STAIR #06

1-S6-1

PASSENGER

ELEVATOR

1-1203

PIPE TUNNEL

ACCESS

1-1202

LOBBY

STORAGE

1-1202A

NOT FOR CONSTRUCTION

RDC/ JOHN POE ARCHITECTS

VA Project No.

RDC/JPA Project No.

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT

321 4 5 6 7 8 9 10

NOT FOR CONSTRUCTION

Project Schedule Date

2022 CAI Set - 100% 12.28.2021

3/10/2022 11:26:50 AM

Update Facility BIM

12.28.2021

FIRST FLOOR PLAN

01-A.101

655-21-201

Saginaw, Michigan (655)

VA Station No:

William Merrill

Record Drawing 21024.00

Scale: 1/16" = 1'-0"

FIRST FLOOR PLAN

UPUP

UP

UP

UP

UP

UPUP

EMERGENCY

GENERATORS

1-2800

MECHANICAL

1-2800A

STORAGE

1-2362

CORRIDOR 8

1-C208

WOMENS

LOCKER

ROOM

1-2360

BATH

1-2360A

STORAGE

1-2358

MENS

LOCKER

ROOM

1-2361

BATH

1-2361A

STORAGE

1-2359

STAIR #04

1-S4-2

ELEC

1-2356

OFFICE

1-2355

EDUCATION

ROOM

1-2343

PREP ROOM

1-2343

REFRIGERATOR

1-2341

CORRIDOR 9

1-C209

VEG.

REFRIG.

1-2344

THAW BOX

1-2345

FREEZER 1

1-2343C

FREEZER 2

1-2343D

STORAGE

1-2349

DRY

STORAGE

1-2348

POT WASH

1-2346

KITCHEN

1-2330

H.A.C.

1-2340

PATIENT

EDU.

1-2325

OFFICE

1-2330A

STORAGE

1-2330D

STORAGE

1-2330B

STORAGE

1-2330C

CUBICAL

OFFICE

1-2305

OFFICE

1-2304

OFFICE

1-2302

NUTRITION

KITCHEN

1-2303

STORAGE

1-2303B

STORAGE

1-2303A

STAIR #02

1-S2-2

CORRIDOR 7

1-C207

DATA

1-2300

CORRIDOR 4

1-C204

OFFICE LAB

1-2123

SECRETARY

LAB

1-2121

PHLEBOTOMY

LAB

1-2119

STORAGE

1-2119A

CORRIDOR

1-C210

STAIR #03

1-S3-2

TOILET

1-2100H

TECH LAB

1-2122

PATHOLOGY

LOCKERS

1-2100G

LAB

BREAKROOM

1-2100F

MICROBIOLOGY

LAB

1-2100C

STORAGE

1-2100B

BLOOD BANK

1-2100A

STAIR #06

1-S6-2

LAB

1-2100

ELEC

1-2100E

TOILET

1-2124

TOILET

1-2133A

DATA

1-2130

DRESSING

RM.

1-2133

X-RAY

1-2135

BREAK

ROOM

1-2139

BREAK

ROOM

1-2141

CAT SCAN

1-2145

CONTROL

RM.

1-2147

MECH

1-2148

CHIEF RAD.

SERV.

1-2146

CLOSET

1-2146A

WORKROOM

1-2140

X-RAY

1-2142

BATH

1-2142A

DEXA

SCANNER

1-2138

RECEP.

1-2136

CORRIDOR

1-C212

OFFICE

IMAGING

1-2132

STORAGE

1-2134

RECEPTION

1-2208

WAITING

1-2200

OFFICE

DIAGNOSTIC

SERVICES

1-2212

MENS

TOILET

1-2214

WOMENS

TOILET

1-2216

OFFICE

1-2231

OFFICE

1-2233

DENTISTRY

1-2235

DENTISTRY

1-2237

X-RAY

1-2239

SUPPLY

1-2239A

DENTISTRY

1-2241

DENTISTRY

DENTAL

1-2243

DENTISTRY

LAB

1-2242

DENTISTRY

1-2240

X-RAY

DENTAL

1-2238

SOILED

UTILITY

1-2236

DARK ROOM

1-2238A

MECH.

1-2234

OFFICE

1-2232

H.A.C.

1-2228

WAITING

1-2230

LINEN

1-2250

STORAGE

1-2230B

LAB.

1-2230A

IMAGING

ROOM

1-2260

WAITING

1-2264

ECHO

1-2268

ECHO

1-2270

ULTRASOUND

1-2272

CORRIDOR 1

1-C201

ECHO

1-2271

ULTRASOUND

1-2269

BATH

1-2266

BATH

1-2265

VEST.

1-2267

OFFICE

DIAGNOSTIC

SERVICES

1-2263

OFFICE

DIAGNOSTIC

SERVICES

1-2263A

ELEC

1-2261

SCAN

1-2257

STAIR #01

1-S1-2

LOCKERS

1-2224

OFFICE

1-2223

OFFICE

1-2222

RECEPTION

1-2221

RESPIRATORY

STORAGE

1-2219

WAITING

1-2218

ELEC

1-2211

CPAP CLINIC

1-2319

SLEEP

OFFICE

1-2322

CPAP

STORAGE

1-2320

DIETETIC

CLINIC

EDUCATION

1-2315

HOME

OXYGEN

CLINIC

1-2323

HOME

OXYGEN

CLINIC

1-2321

PULMONARY

FUNCTION

LAB

1-2324

STORAGE

1-2315A

DI-WATER

PATHOLOGY

1-2100D

WEAPONS

TRAINING

1-2370

OFFICE

1-2371

DENTAL SPS

CLEAN

STORAGE

1-2232B

SERVICE

ELEVATOR

S1-2

PASSENGER

ELEVATOR

P1-2

PASSENGER

ELEVATOR

P2-2

STAIR #08

1-ECS1-2

STAIR #09

1-ECS2-2

CORRIDOR 3

1-C203

CORRIDOR 6

1-C206

CORRIDOR 5

1-C205

STAIR #05

1-S5-2

CORRIDOR 2

1-C202

NOT FOR CONSTRUCTION

RDC/ JOHN POE ARCHITECTS

VA Project No.

RDC/JPA Project No.

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT

321 4 5 6 7 8 9 10

NOT FOR CONSTRUCTION

Project Schedule Date

2022 CAI Set - 100% 12.28.2021

3/10/2022 11:26:57 AM

Update Facility BIM

12.28.2021

SECOND FLOOR PLAN

01-A.102

655-21-201

Saginaw, Michigan (655)

VA Station No:

William Merrill

Record Drawing 21024.00

Scale: 1/16" = 1'-0"

SECOND FLOOR PLAN

UPUP

STAIR #05

1-S5-3

OPERATING

RM 2

1-3362

STERILE RM.

1-3363

MECH. RM.

1-3359A

SCRUB RM.

1-3359

OPERATING

RM 3

1-3360

DIRTY RM

1-3358

STERILE RM.

1-3357

CYSTO

1-3356

ELEC

1-3356A

H.A.C.

1-3330

OPERATION

RM. 1

1-3355

NURSING

STATION

1-3354

CORRIDOR 7

1-C307

STERILE

SUPPLY

1-3340

ANESTHESIA

1-3342

ELEC

1-3343

ENDOSCOPY

RM. 1

1-3315

BATH

1-3315A

ENDO. 1

1-3328

STORAGE

1-3328A

STAIR #04

1-S4-3

BATH

1-3325A

ENDO. 2

1-3325B

SCOPE

CLEANING

1-3316

MEDIVATOR

1-3319

MECH

1-3342A

ENDO. 3

1-3329

PRE-OP

1-3305B4

PRE-OP

1-3305B3

WOMENS

TOILET

1-3318

MENS

TOILET

1-3326

STORAGE

1-3327

ENDOSCOPY

1-3325

CORRIDOR 6

1-C306

CORRIDOR 5

1-C305

PRE/POST

OP

1-3305

STAIR #02

1-S2-3

STORAGE

1-3304

PRE-OP

1-3305B1

PRE-OP

1-3305B2

PRE-OP

1-3305B8

PRE-OP

1-3305B7

PRE-OP

1-3305B6

PRE-OP

1-3305C1

PRE-OP

1-3305C2

PRE-OP

1-3305C3

PRE-OP

1-3305B5RESTROOM

1-3306

CHECK-IN

1-3305B

DATA

1-3303

WOMENS

TOILET

1-3211

SLIDE

1-3209

HEAD NURSE

1-3161

RECEPTION

1-3125

WAITING RM

1-3132

STAIR #03

1-S3-3 H.A.C.

1-3119

BATH

1-3117A

EXAM

1-3117

EXAM

1-3115

BATH

1-3111A

ELEC

1-3113

EXAM

1-3111

EXAM

1-3107

BATH

1-3107A

STORAGE

1-3105

BATH

1-3101A

STORAGE

1-3103

EXAM

1-3101

EXAM

1-3100

BATH

1-3104A

EXAM

1-3104

EXAM

1-3106

STORAGE

1-3112A

EXAM

1-3112

EXAM

1-3114

BATH

1-3114A

MECHANICAL

1-3120

CLEAN LINEN

1-3131

NURSE

WORK

1-3147

UNIT SUPPLY

1-3133

EXAM ROOM

1-3141

EXAM ROOM

1-3140

EXAM ROOM

1-3143

EXAM ROOM

1-3139

EXAM ROOM

1-3137

EXAM ROOM

1-3135

TOILET

1-3134

EXAM ROOM

1-3136

EXAM ROOM

1-3138

SOILED

HOLD

1-3142

CORRIDOR 9

1-C309

EXAM ROOM

1-3144

EXAM ROOM

1-3146

EXAM ROOM

1-3148

KITCHEN

1-3149

BATH

1-3148A

MED ROOM

1-3150

H.A.C.

1-3152

EXAM

1-3158

EXAM

1-3160

WAITING

1-3170

OFFICE

1-3200

OFFICE

1-3206

DATA

1-3208

OFFICE

1-3210

OFFICE

1-3212

OFFICE

1-3216

OFFICE

1-3223

H.A.C.

1-3218

BATH

1-3216A

KITCHEN

1-3225

OFFICE

1-3229

BATH

1-3229A

OFFICE

1-3231

PATIENT RM

1-3233

BATH

1-3233A

PATIENT RM.

1-3235PATIENT RM.

1-3236

BATH

1-3234A

EXAM

1-3234

OFFICE

1-3232

BATH

1-3230A

PATIENT RM.

1-3230

CORRIDOR 2

1-C302

UNIT SUPPLY

1-3224

DATA

1-3240

SUPPLY

1-3226

MECHANICAL

RM

1-3250

BATH

1-3256A

PATIENT RM.

1-3256

PATIENT RM.

1-3262

OFFICE

1-3262A

BATH

1-3264A

EXAM

1-3264

BATH

1-3266A

PATIENT RM.

1-3266

EXAM

1-3265

BATH

1-3265A

PATIENT RM.

1-3263

BATH

1-3263A

BATH

1-3261A

PATIENT RM.

1-3261

EXAM

1-3257

ELEC

1-3259

CLEAN

UTILITY

1-3253

BATH

1-3257A

SOILED

1-3251

STAIR #01

1-S1-3

EXAM

1-3241

CORRIDOR 1

1-C301

RECEPTION

1-3220

WAITING

ROOM

1-3217

MENS

TOILET

1-3213

CORRIDOR 3

1-C303

CORRIDOR 4

1-C304

OFFICE

1-3228

STAIR #06

1-S6-3

SERVICE

ELEVATOR

S1-3

PASSENGER

ELEVATOR

P1-3

PASSENGER

ELEVATOR

P2-3

NURSE

STATION

1-3352

NOT FOR CONSTRUCTION

RDC/ JOHN POE ARCHITECTS

VA Project No.

RDC/JPA Project No.

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT

321 4 5 6 7 8 9 10

NOT FOR CONSTRUCTION

Project Schedule Date

2022 CAI Set - 100% 12.28.2021

3/10/2022 11:27:03 AM

Update Facility BIM

12.28.2021

THIRD FLOOR PLAN

01-A.103

655-21-201

Saginaw, Michigan (655)

VA Station No:

William Merrill

Record Drawing 21024.00

Scale: 1/16" = 1'-0"

THIRD FLOOR PLAN

UP

UP

UPUP

OFFICE

1-4101

OFFICE

1-4103

OFFICE

1-4105

CONSULT

1-4100A

CONSULT

1-4100

EXAM

1-4102

EXAM

1-4104

EXAM

1-4106

EXAM

1-4108

EXAM

1-4112

CORRIDOR 5

1-C405

EXAM

1-4107

OFFICE

1-4109

WOMENS

TOILET

1-4113

CONSULT

1-4115

CONSULT

1-4114

EXAM

1-4116

EXAM

1-4118

STORAGE

1-4133

STORAGE

1-4131

SOILED

UTILITY

1-4120

RECP.

1-4123

STAIR #03

1-S3-4

EXAM

1-4135

OFFICE

1-4136

EXAM

1-4138 UTILITY

1-4137

BATH

1-4135A

BATH

1-4139A

EXAM

1-4139

EXAM

1-4141

OFFICE

1-4140

OFFICE

1-4142

OFFICE

1-4144

EXAM

1-4143

BATH

1-4140A

BATH

1-4144A

BATH

1-4143A

EXAM

1-4145

EXAM

1-4147

BATH

1-4147A

BATH

1-4146A

MECH.

1-4148

LACTATION

1-4146

CORRIDOR 6

1-C406

KITCHEN

1-4132

MED

1-4150

H.A.C.

1-4152

OFFICE

1-4160

TOILET

1-4124

OFFICE

1-4154

OFFICE

1-4161

OFFICE

1-4170

OFFICE

1-4172

EXAM

1-4200

OFFICE

1-4206

OFFICE

1-4208

OFFICE

1-4208A

OFFICE

1-4218

STORAGE

1-4218A

STORAGE

1-4227

H.A.C.

1-4220

OFFICE

1-4231

EXAM

1-4233

EXAM

1-4235

EXAM

1-4237

EXAM

1-4239

EXAM

1-4241

OFFICE

1-4243

BATH

1-4245

OFFICE

1-4244

EXAM

1-4242

EXAM

1-4240

OFFICE

1-4238

EXAM

1-4236

EXAM

1-4234

CONSULT

1-4232

OFFICE

1-4230

STORAGE

1-4228

H.A.C.

1-4250

OFFICE

1-4254

OFFICE

1-4260

EXAM

1-4270A

EXAM

1-4270B

EXAM

1-4270C

OFFICE

1-4270D

STORAGE

1-4270E

EXAM

1-4265

STORAGE

1-4265A

EXAM

1-4263

MENS

TOILET

1-4257

OFFICE

1-4255

STAIR #01

1-S1-4

ELEC

1-4259

CORRIDOR 1

1-C401

CORRIDOR 2

1-C402

WAITING

1-4225

DATA

1-4305A

TELEHEALTH

1-4213

EXAM

1-4211

CORRIDOR 3

1-C403

RECEPTION

1-4217

CORRIDOR 4

1-C404

BATH

1-4310

STAIR #02

1-S2-4

OFFICE

1-4305

RECEPTION

1-4226

STAIR #06

1-S6-4

PASSENGER

ELEVATOR

P2-4

PASSENGER

ELEVATOR

P1-4

SERVICE

ELEVATOR

S1-4

ELEC

1-4215

CORRIDOR

1-4125

NOT FOR CONSTRUCTION

RDC/ JOHN POE ARCHITECTS

VA Project No.

RDC/JPA Project No.

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT

321 4 5 6 7 8 9 10

NOT FOR CONSTRUCTION

Project Schedule Date

2022 CAI Set - 100% 12.28.2021

3/10/2022 11:27:07 AM

Update Facility BIM

12.28.2021

FOURTH FLOOR PLAN

01-A.104

655-21-201

Saginaw, Michigan (655)

VA Station No:

William Merrill

Record Drawing 21024.00

Scale: 1/16" = 1'-0"

FOURTH FLOOR PLAN

UP

UP

UP

UP

CONFERENCE

1-5230

STORAGE

1-5221

WAITING

1-5220

MENS

TOILET

1-5234

STORAGE

1-5236

EXAM

1-5238

EYE EXAM 6

1-5242

EYE EXAM 5

1-5244

EYE EXAM 4

1-5246

EXAM

1-5248

EYE EXAM 1

1-5249

EYE EXAM

1-5247

OFFICE/

PROVIDERS

1-5243

STORAGE

1-5239

STAIR #01

1-S1-5

EXAM

1-5233

EXAM

1-5231

OPTICAL

1-5223

EXAM

1-5215

CORRIDOR 1

1-C501

OFFICE

1-5205

EXAM

1-5211

OFFICE

1-5213

RECEP.

1-5210

CHIEF OF

OPTOMETRY

1-5204

OFFICE

1-5202

OFFICE

1-5200

ELEC

1-5207

WOMEN'S

TOILET

1-5160

C&P

1-5156

H.A.C.

1-5203

STORAGE

1-5205A

OFFICE

1-5306B

TOILET

1-5310

STAIR #02

1-S2-5

FIRE CLOSET

1-FC5C

C&P

1-5155

C&P

1-5145

ELEC

1-5245

CORRIDOR 3

1-C503

C&P

1-5150

CONFERENCE

1-5142

CORRIDOR 6

1-C506

STORAGE

1-5126

H.A.C.

1-5128

CLOSET

1-5126A

INFORMATICS

1-5120

NON VA

CARE

1-5129

NCCPAC

BILLING

1-5133

ELEC

1-5131

STORAGE

1-5143

DATA

1-5127

CORRIDOR 5

1-C505

CONFERENCE

1-5140

MECH.

1-5141

OFFICE

1-5305

TEL

1-5306

CORRIDOR 4

1-C504

CORRIDOR 2

1-C502

MECH.

1-5240

STAIR #03

1-S3-5

SERVICE

ELEVATOR

S1-5

PASSENGER

ELEVATOR

P1-5

PASSENGER

ELEVATOR

P2-5

NOT FOR CONSTRUCTION

RDC/ JOHN POE ARCHITECTS

VA Project No.

RDC/JPA Project No.

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT

321 4 5 6 7 8 9 10

NOT FOR CONSTRUCTION

Project Schedule Date

2022 CAI Set - 100% 12.28.2021

3/10/2022 11:27:11 AM

Update Facility BIM

12.28.2021

FIFTH FLOOR PLAN

01-A.105

655-21-201

Saginaw, Michigan (655)

VA Station No:

William Merrill

Record Drawing 21024.00

Scale: 1/16" = 1'-0"

FIFTH FLOOR PLAN

UP

UP

MECHANICAL

1-PHB2-1

MECHANICAL

1-PHB3-1

MECHANICAL

1-PHB4-1

MECHANICAL

1-PHC1-1

STAIR #2A

1-S2-6

MECHANICAL

1-PHB1-1

NOT FOR CONSTRUCTION

RDC/ JOHN POE ARCHITECTS

VA Project No.

RDC/JPA Project No.

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT

321 4 5 6 7 8 9 10

NOT FOR CONSTRUCTION

Project Schedule Date

2022 CAI Set - 100% 12.28.2021

3/10/2022 11:27:12 AM

Update Facility BIM

12.28.2021

SIXTH FLOOR PLAN

01-A.106

655-21-201

Saginaw, Michigan (655)

VA Station No:

William Merrill

Record Drawing 21024.00

Scale: 1/16" = 1'-0"

PENTHOUSE PLAN

UP

SYSTEMS

REDESIGN

2-104

LOCKER

ROOM

2-105

OFFICE

2-101

CORRIDOR

2-C100

CHIEF

POLICE

2-102

EMERGENCY

MANAGER

2-102A

TOILET

2-102B

DATA

2-106

STORAGE

2-107

CLOSET

2-102C

NOT FOR CONSTRUCTION

RDC/ JOHN POE ARCHITECTS

VA Project No.

RDC/JPA Project No.

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT

321 4 5 6 7 8 9 10

NOT FOR CONSTRUCTION

Project Schedule Date

2022 CAI Set - 100% 12.28.2021

12/22/2021 4:43:38 PM

Update Facility BIM

12.28.2021

FIRST FLOOR PLAN

02-A.101

655-21-201

Saginaw, Michigan (655)

VA Station No:

William Merrill

Record Drawing 21024.00

Scale: 3/8" = 1'-0"

FIRST FLOOR PLAN

OFFICE

2-202

OFFICE

2-203

CLOSET

2-203A

CLOSET

2-208A

OFFICE

2-204

CORRIDOR

2-C200

EXPLOSIVES

STORAGE

2-200

CLOSET

2-201A

CLOSET

2-200A

RESTROOM

2-201

EVIDENCE

2-202A

CLOSET

2-202B

CLOSET

2-202C

NOT FOR CONSTRUCTION

RDC/ JOHN POE ARCHITECTS

VA Project No.

RDC/JPA Project No.

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT

321 4 5 6 7 8 9 10

NOT FOR CONSTRUCTION

Project Schedule Date

2022 CAI Set - 100% 12.28.2021

12/22/2021 4:43:39 PM

Update Facility BIM

12.28.2021

SECOND FLOOR PLAN

02-A.102

655-21-201

Saginaw, Michigan (655)

VA Station No:

William Merrill

Record Drawing 21024.00

Scale: 3/8" = 1'-0"

SECOND FLOOR PLAN

MECH FMS

3-B104 3-B103

MECH

3-B100

STORAGE

3-B101

DATA

3-B102

NOT FOR CONSTRUCTION

RDC/ JOHN POE ARCHITECTS

VA Project No.

RDC/JPA Project No.

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT

321 4 5 6 7 8 9 10

NOT FOR CONSTRUCTION

Project Schedule Date

2022 CAI Set - 100% 12.28.2021

12/22/2021 4:55:47 PM

Update Facility BIM

12.28.2021

BASEMENT FLOOR PLAN

03-A.100

655-21-201

Saginaw, Michigan (655)

VA Station No:

William Merrill

Record Drawing 21024.00

Scale: 1/4" = 1'-0"

BASEMENT FLOOR PLAN

DN

UP

UP

OFFICE

3-104

OFFICE

3-105

OFFICE

3-106

OFFICE

3-103

CORRIDOR

3-C101

OFFICE

3-108

WOMENS

TOILET

3-102

OFFICE

3-101

VEST

1-3

VEST.

3-100

TOILET

3-113

OFFICE

3-112

CLOSET

3-105A

CLOSET

3-103A

CLOSET

3-104A

CLOSET

3-108A

OFFICE

3-109

OFFICE

3-110

OFFICE

3-111

CLOSET

3-109A

CLOSET

3-110A

CLOSET

3-111A

CLOSET

3-112A

STAIR

3-S1-1

NOT FOR CONSTRUCTION

RDC/ JOHN POE ARCHITECTS

VA Project No.

RDC/JPA Project No.

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT

321 4 5 6 7 8 9 10

NOT FOR CONSTRUCTION

Project Schedule Date

2022 CAI Set - 100% 12.28.2021

12/22/2021 4:55:47 PM

Update Facility BIM

12.28.2021

FIRST FLOOR PLAN

03-A.101

655-21-201

Saginaw, Michigan (655)

VA Station No:

William Merrill

Record Drawing 21024.00

Scale: 1/4" = 1'-0"

FIRST FLOOR PLAN

OFFICE

3-209

OFFICE

3-210

OFFICE

3-211

OFFICE

3-208

TOILET

3-207

RECEP.

3-206

CLOSET

3-209A

CLOSET

3-210A

CLOSET

3-208A

CLOSET

3-207A

CLOSET

3-212A

CLOSET

3-200A

COPY

ROOM

3-212

STAIR

3-S1-2

KITCHEN

3-200

RECEP.

3-205

OFFICE

3-201

OFFICE

3-202

CLOSET

3-202A

OFFICE

3-203

TOILET

3-204

CLOSET

3-204A

CLOSET

3-203A

NOT FOR CONSTRUCTION

RDC/ JOHN POE ARCHITECTS

VA Project No.

RDC/JPA Project No.

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT

321 4 5 6 7 8 9 10

NOT FOR CONSTRUCTION

Project Schedule Date

2022 CAI Set - 100% 12.28.2021

12/22/2021 4:55:48 PM

Update Facility BIM

12.28.2021

SECOND FLOOR PLAN

03-A.102

655-21-201

Saginaw, Michigan (655)

VA Station No:

William Merrill

Record Drawing 21024.00

Scale: 1/4" = 1'-0"

SECOND FLOOR PLAN

UP

NOT FOR CONSTRUCTION

RDC/ JOHN POE ARCHITECTS

VA Project No.

RDC/JPA Project No.

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT

321 4 5 6 7 8 9 10

NOT FOR CONSTRUCTION

Project Schedule Date

2022 CAI Set - 100% 12.28.2021

12/23/2021 8:01:19 AM

Update Facility BIM

12.28.2021

BASEMENT FLOOR PLAN

04-A.100

655-21-201

Saginaw, Michigan (655)

VA Station No:

William Merrill

Record Drawing 21024.00

Scale: 1/4" = 1'-0"

BASEMENT FLOOR PLAN

UP

DN

OFFICE

4-107

OFFICE

4-107B

DATA

4-106A

ELEC

4-106

OFFICE

4-105

MENS

TOILET

4-108

STORAGE

4-109

CLOSET

4-110

WOMENS

TOILET

4-111

VEST.

4-100

OFFICE

4-102A

OFFICE

4-102

CLOSET

4-112

CORRIDOR

4-COR101

FOYER

4-107C

CLOSET

4-105A

NOT FOR CONSTRUCTION

RDC/ JOHN POE ARCHITECTS

VA Project No.

RDC/JPA Project No.

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT

321 4 5 6 7 8 9 10

NOT FOR CONSTRUCTION

Project Schedule Date

2022 CAI Set - 100% 12.28.2021

12/23/2021 8:01:20 AM

Update Facility BIM

12.28.2021

FIRST FLOOR PLAN

04-A.101

655-21-201

Saginaw, Michigan (655)

VA Station No:

William Merrill

Record Drawing 21024.00

Scale: 1/4" = 1'-0"

FIRST FLOOR PLAN

OFFICE

4-207

OFFICE

4-206

OFFICE

4-205

OFFICE

4-204

BATH

4-215

STORAGE

4-214

OFFICE

4-203

STORAGE

4-212

BATH

4-213

STAIRS

4-S1-2

OFFICE

4-208

H.A.C.

4-211

OFFICE

4-209

OFFICE

4-210

NOT FOR CONSTRUCTION

RDC/ JOHN POE ARCHITECTS

VA Project No.

RDC/JPA Project No.

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT

321 4 5 6 7 8 9 10

NOT FOR CONSTRUCTION

Project Schedule Date

2022 CAI Set - 100% 12.28.2021

12/23/2021 8:01:20 AM

Update Facility BIM

12.28.2021

SECOND FLOOR PLAN

04-A.102

655-21-201

Saginaw, Michigan (655)

VA Station No:

William Merrill

Record Drawing 21024.00

Scale: 1/4" = 1'-0"

SECOND FLOOR PLAN

OFFICE

6-112

OFFICE

6-111

OFFICE

6-109

OFFICE

6-110

CORRIDOR

6-C102

COPY

6-107

OFFICE

6-108

VESTIBULE

6-101

RECEPTION

6-106

ALCOVE

6-105

H.A.C.

6-104

BATH

6-103

WAITING

ROOM

6-102ELEVATOR

6-EL1-1

ELEVATOR

EQUIPMENT

ROOM

6-118

STAIRS

6-S1-1

CORRIDOR

6-C101

ELEC

6-117

UTILITY

STORAGE

6-116

WHOLE

HEALTH

6-115

PRIVACY

OFFICER

6-114

CONFERENCE

/ BREAK

ROOM

6-113

CORRIDOR

6-COR103

STAIRS

6-S2-1

NOT FOR CONSTRUCTION

RDC/ JOHN POE ARCHITECTS

VA Project No.

RDC/JPA Project No.

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT

321 4 5 6 7 8 9 10

NOT FOR CONSTRUCTION

Project Schedule Date

2022 CAI Set - 100% 12.28.2021

12/23/2021 8:03:46 AM

Update Facility BIM

12.28.2021

FIRST FLOOR PLAN

06-A.101

655-21-201

Saginaw, Michigan (655)

VA Station No:

William Merrill

Record Drawing 21024.00

Scale: 1/4" = 1'-0"

FIRST FLOOR PLAN

OPEN

WORK

AREA

6-201

STAIRS

6-S2-2

STORAGE

6-205

COPY

ROOM

6-204

TOILET

6-203

TOILET

6-202

OFFICE

6-206

CORRIDOR

6-C201

EQUIPMENT

ROOM

6-207

ELEC

6-208

STAIRS

6-S1-2

DATA

6-209

CORRIDOR

6-C202

NOT FOR CONSTRUCTION

RDC/ JOHN POE ARCHITECTS

VA Project No.

RDC/JPA Project No.

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT

321 4 5 6 7 8 9 10

NOT FOR CONSTRUCTION

Project Schedule Date

2022 CAI Set - 100% 12.28.2021

12/23/2021 8:03:47 AM

Update Facility BIM

12.28.2021

SECOND FLOOR PLAN

06-A.102

655-21-201

Saginaw, Michigan (655)

VA Station No:

William Merrill

Record Drawing 21024.00

Scale: 1/4" = 1'-0"

SECOND FLOOR PLAN

SERVICE

ROOM

9-B100

NOT FOR CONSTRUCTION

RDC/ JOHN POE ARCHITECTS

VA Project No.

RDC/JPA Project No.

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT

321 4 5 6 7 8 9 10

NOT FOR CONSTRUCTION

Project Schedule Date

2022 CAI Set - 100% 12.28.2021

12/23/2021 8:05:36 AM

Update Facility BIM

12.28.2021

BASEMENT FLOOR PLAN

09-A.100

655-21-201

Saginaw, Michigan (655)

VA Station No:

William Merrill

Record Drawing 21024.00

Scale: 3/16" = 1'-0"

BASEMENT FLOOR PLAN

UP

COPY

107-9

OFFICE

106-9

OFFICE

105-9

STORAGE

9-100

OFFICE

9-103

DATA

103-9

OFFICE

101-9

BATH

102-9

RECIEVING

100A-9

NOT FOR CONSTRUCTION

RDC/ JOHN POE ARCHITECTS

VA Project No.

RDC/JPA Project No.

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT

321 4 5 6 7 8 9 10

NOT FOR CONSTRUCTION

Project Schedule Date

2022 CAI Set - 100% 12.28.2021

12/23/2021 8:05:37 AM

Update Facility BIM

12.28.2021

FIRST FLOOR PLAN

09-A.101

655-21-201

Saginaw, Michigan (655)

VA Station No:

William Merrill

Record Drawing 21024.00

Scale: 3/16" = 1'-0"

FIRST FLOOR PLAN

B17

NOT FOR CONSTRUCTION

RDC/ JOHN POE ARCHITECTS

VA Project No.

RDC/JPA Project No.

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT

321 4 5 6 7 8 9 10

NOT FOR CONSTRUCTION

Project Schedule Date

2022 CAI Set - 100% 12.28.2021

12/23/2021 8:07:17 AM

Update Facility BIM

12.28.2021

FIRST FLOOR PLAN

17-A.101

655-21-201

Saginaw, Michigan (655)

VA Station No:

William Merrill

Record Drawing 21024.00

Scale: 1/2" = 1'-0"

FIRST FLOOR PLAN

ELECTRICAL

B19

NOT FOR CONSTRUCTION

RDC/ JOHN POE ARCHITECTS

VA Project No.

RDC/JPA Project No.

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT

321 4 5 6 7 8 9 10

NOT FOR CONSTRUCTION

Project Schedule Date

2022 CAI Set - 100% 12.28.2021

12/23/2021 8:09:02 AM

Update Facility BIM

12.28.2021

FIRST FLOOR PLAN

19-A.101

655-21-201

Saginaw, Michigan (655)

VA Station No:

William Merrill

Record Drawing 21024.00

Scale: 3/8" = 1'-0"

FIRST FLOOR PLAN

ELECTRICAL

B20

NOT FOR CONSTRUCTION

RDC/ JOHN POE ARCHITECTS

VA Project No.

RDC/JPA Project No.

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT

321 4 5 6 7 8 9 10

NOT FOR CONSTRUCTION

Project Schedule Date

2022 CAI Set - 100% 12.28.2021

12/23/2021 8:10:48 AM

Update Facility BIM

12.28.2021

FIRST FLOOR PLAN

20-A.101

655-21-201

Saginaw, Michigan (655)

VA Station No:

William Merrill

Record Drawing 21024.00

Scale: 1/2" = 1'-0"

FIRST FLOOR PLAN

DN

PHARMACY

CACHE

21-107

GARAGE

21-101

DATA

21-103

BATH

21-102

OFFICE

21-100

GENERATOR

ROOM

21-104

NOT FOR CONSTRUCTION

RDC/ JOHN POE ARCHITECTS

VA Project No.

RDC/JPA Project No.

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT

321 4 5 6 7 8 9 10

NOT FOR CONSTRUCTION

Project Schedule Date

2022 CAI Set - 100% 12.28.2021

12/23/2021 8:13:41 AM

Update Facility BIM

12.28.2021

FIRST FLOOR PLAN

21-A.101

655-21-201

Saginaw, Michigan (655)

VA Station No:

William Merrill

Record Drawing 21024.00

Scale: 1/8" = 1'-0"

FIRST FLOOR PLAN

8' - 0"

8' - 0"

8' - 0"

10' - 0"

NOT FOR CONSTRUCTION

RDC/ JOHN POE ARCHITECTS

VA Project No.

RDC/JPA Project No.

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT

321 4 5 6 7 8 9 10

NOT FOR CONSTRUCTION

Project Schedule Date

2022 CAI Set - 100% 12.28.2021

12/23/2021 8:13:42 AM

Update Facility BIM

12.28.2021

RCP - FIRST FLOOR

21-A.121

655-21-201

Saginaw, Michigan (655)

VA Station No:

William Merrill

Record Drawing 21024.00

Scale: 1/8" = 1'-0"

FIRST FLOOR REFLECTED CELING PLAN

UP

UP

UP

UP

UP

DN

DN

UP

STAIR #02

22-S2-0

OFFICE

22-B524

OFFICE

22-B525

WAITING

22-B520

PROS. CHIEF

22-B526

CHIEF. PMR

22-B516

SHOE BRACE

CLINIC

22-B512

OFFICE

22-B508

VESTIBULE

MH

22-B507

H.A.C.

22-B506

OFFICE

22-B523

OFFICE

22-B522

SUPERVISOR

22-B521

VESTIBULE

MH

22-B517

OFFICE

22-B515

OFFICE

22-B509

STORAGE

22-B505

CORRIDOR 1

22-C001

OFFICE

22-B504

OFFICE

22-B502

ELEC

22-B500

MECHANICAL

22-B449 MECHANICAL

22-B450

H.A.C.

22-B444

WOMENS

TOILET

22-B444-1

MENS

TOILET

22-B443

STAIR #01

22-S1-0

MENS

TOILET

22-B437

WOMENS

TOILET

22-B435

MECHANICAL

22-B438

MAINFRAME

22-B406

STAIR #05

22-S5-0

DATA

22-B416

MECHANICAL

22-B418

PATIENT

LIBRARY

22-B420 AUDIOVISUAL

STORAGE

22-B420E

CUBICLES

22-B420C

WORK ROOM

22-B420B

SIMULATION

LAB

22-B420A

COMPUTER

CLASSROOM

22-B420D

ELEC

22-B434

CORRIDOR 3

22-C003

CORRIDOR 2

22-C002

MAIL ROOM

22-B701

STORAGE

22-B600E

OFFICE

22-B706

OFFICE

22-B707

CHIEF

OFFICE

22-B708

PHARMACY

SECRETARY

22-B705

STORAGE

22-B712A

STORAGE/OFFICE

PHARMACY

22-B712

OFFICE/STORAGE

22-B711

LOUNGE

22-B713

VAULT

22-B714

I.V. DRUGS

22-B715

MED.

22-B715B

CLOSET

22-B717

STORAGE

22-B715A

PHARMACY

22-B710

STAIR #04

22-S4-0

CLOSET

22-B716

DATA

22-B700

STAIR #03

22-S3-0

PROSTHETICS

PM&R

22-B600

STORAGE

22-B600D

PROSTHETICS

SENSORY

22-B600C

OFFICE/EXAM

22-B600A

OFFICES

22-B600B

REHAB

22-B601

OPEN

OFFICE

22-B405

SHOP

22-B405A

OFFICE

22-B409

OFFICE

22-B405C

OFFICE

22-B405B

STORAGE

22-B420F

DATA

22-B702

PASSENGER

ELEVATOR

22-P1-0

PASSENGER

ELEVATOR

22-P2-0

NOT FOR CONSTRUCTION

RDC/ JOHN POE ARCHITECTS

VA Project No.

RDC/JPA Project No.

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT

321 4 5 6 7 8 9 10

NOT FOR CONSTRUCTION

Project Schedule Date

2022 CAI Set - 100% 12.28.2021

12/23/2021 8:15:57 AM

Update Facility BIM

12.28.2021

BASEMENT FLOOR PLAN

22-A.100

655-21-201

Saginaw, Michigan (655)

VA Station No:

William Merrill

Record Drawing 21024.00

Scale: 1/16" = 1'-0"

BASEMENT FLOOR PLAN

UP

UP

UP

UP

UP

UP

UPUP

UP

UP

UP

TEMPORARY

STORAGE

22-1718

STAIR #04

22-S4-1

CORRIDOR 3

22-C103

PATIENT

ROOM

22-1719

PATIENT

ROOM

22-1717

PATIENT

ROOM

22-1715

PATIENT

ROOM

22-1713

BATH

22-1713A

BATH

22-1717A

BATH

22-1716A

TEMPORARY

STORAGE

22-1716

PATIENT

ROOM

22-1714

PATIENT

ROOM

22-1712

BATH

22-1712A

BATH

22-1711A

PATIENT

ROOM

22-1711

OFFICE

22-1709

SOILED UTIL.

22-1707

PATIENT

ROOM

22-1710

BATH

22-1710A

TOILET

22-1708

MNGR

NURSE

22-1706

OFFICE

22-1705

H.A.C.

22-1704

CLEAN UTIL.

22-1703

LOUNGE

22-1701

BATH

22-1600

PATIENT

ROOM

22-1602

BATH

22-1602A

PATIENT

ROOM

22-1604

PATIENT

ROOM

22-1606

PATIENT

ROOM

22-1608

BATH

22-1606A

PATIENT

ROOM

22-1610

BATH

22-1610A

SOCIAL

WORKER

22-1612

STAIR #03

22-S3-1

MOD

22-1613

BATH

22-1611A

OFFICE

22-1611

CLEAN

EQUIP ROOM

22-1609

BATH

22-1607A

PATIENT

ROOM

22-1607

PATIENT

ROOM

22-1605

BATH

22-1603A

PATIENT

ROOM

22-1603

LAUNDRY

ROOM

22-1601

LOUNGE

22-1500

ELEC

22-1502

MED.

22-1504

NURSE

STATION

22-1450

PATIENT

ROOM

22-1506

PATIENT

ROOM

22-1508

BATH

22-1506A

PATIENT

ROOM

22-1510

BATH

22-1510A

PATIENT

ROOM

22-1512

PATIENT

ROOM

22-1514

BATH

22-1516A

PATIENT

ROOM

22-1516

STAIR #02

22-S2-1

CORRIDOR 4

22-C104

CLEAN

EQUIP ROOM

22-1515

BATH

22-1515A

PATIENT

ROOM

22-1513

PATIENT

ROOM

22-1511

PATIENT

ROOM

22-1509

BATH

22-1509A

PATIENT

ROOM

22-1507

BATH

22-1507A

SOILED

22-1505

SHOWER

22-1501D

CONGREGATE

BATH

22-1501

SHOWERS

22-1501C

BATH

22-1501A

PANTRY

22-1441

CART WASH

22-1501B

REPORT

BREAK

ROOM

22-1439

OFFICE

22-1437

STAIR #01

22-S1-1

OXYGEN

STOR.

22-1431

EMS

STORAGE

22-1435

CORRIDOR

22-C122

H.A.C.

22-1425A

ELECTRICAL/SWITCH

GEAR

22-1430

STORAGE

22-1425C

SOILED

LINEN

22-1429

TRASH

22-1428

RECREATION

THERAPY

22-1425

WASH ROOM

22-1425B

CONFERENCE

ROOM

22-1411

OFFICE

22-1405A

MENS

TOILET

22-1409

DINING

ROOM

22-1405

CORRIDOR

22-C120

STAIR #05

22-S5-1

STORAGE

22-1400A

OCCUPATIONAL

THERAPY

22-1400

THERAPIST

OFFICE

22-1400B

STORAGE

22-1400C

SPEECH

PATH.

22-1412

OFFICE

22-1416A

OFFICE

22-1416

VESTIBULE

C1-6

TOILET

22-1415

ELEC

22-1414

DATA

22-1413

CORRIDOR 2

22-C102

CORRIDOR

22-C121

LOBBY

22-1417

LOUNGE

22-1418

OFFICE

22-1419

OFFICE

22-1420

CORRIDOR

22-C123

H.A.C.

22-1436

LOUNGE

22-1438

WOMENS

LOCKER

ROOM

22-1438A

MENS

LOCKER

ROOM

22-1438B

SUPPLY

ROOM

22-1442

STAFF

WORKROOM

22-1448

DATA

22-1702

PASSENGER

ELEVATOR

22-P1-1

PASSENGER

ELEVATOR

22-P2-1

NOT FOR CONSTRUCTION

RDC/ JOHN POE ARCHITECTS

VA Project No.

RDC/JPA Project No.

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT

321 4 5 6 7 8 9 10

NOT FOR CONSTRUCTION

Project Schedule Date

2022 CAI Set - 100% 12.28.2021

12/23/2021 8:16:01 AM

Update Facility BIM

12.28.2021

FIRST FLOOR PLAN

22-A.101

655-21-201

Saginaw, Michigan (655)

VA Station No:

William Merrill

Record Drawing 21024.00

Scale: 1/16" = 1'-0"

FIRST FLOOR PLAN

UP

UP

UP

UP

STAIR #02

22-S2-2

OFFICE

22-2517

BATH

22-2515A

PATIENT

ROOM

22-2515

BATH

22-2511A

PATIENT

ROOM

22-2513

PATIENT

ROOM

22-2511

INFUSION

CLINIC 2

22-2516

INFUSION

CLINIC

22-2514

BATH

22-2514A

ACT NURSE

SCAN

22-2512

PATIENT

ROOM

22-2510

BATH

22-2510A

PATIENT

ROOM

22-2508

PATIENT

ROOM

22-2506

MED.

22-2504

ELEC

22-2502

BATH

22-2506A

PATIENT

ROOM

22-2603

PATIENT

ROOM

22-2605

BATH

22-2603A

PATIENT

ROOM

22-2607

BATH

22-2607A

EQUIP

STORAGE

22-2609

FAMILY

LOUNGE

22-2608

PATIENT

ROOM

22-2606

BATH

22-2606A

PATIENT

ROOM

22-2611

PATIENT

ROOM

22-2610

PATIENT

ROOM

22-2612

PATIENT

ROOM

22-2613

BATH

22-2611A

BATH

22-2610A

STAIR #03

22-S3-2

CORRIDOR 6

22-C206

CORRIDOR 7

22-C207

PATIENT

ROOM

22-2604

BATH

22-2602A

PATIENT

ROOM

22-2602

PATIENT

ROOM

22-2507

BATH

22-2507A

SOILED

UTILITY

22-2505

CONGREGATE

BATH

22-2501

CLEAN UTIL.

22-2703

SOILED

22-2707

INPATIENT

NURSE

22-2709

PATIENT

ROOM

22-2711

BATH

22-2711A

PATIENT

ROOM

22-2713

BATH

22-2713A

PATIENT

ROOM

22-2715

PATIENT

ROOM

22-2717

PATIENT

ROOM

22-2719

BATH

22-2717A

STAIR #04

22-S4-2

COMFORT

CLINICS

22-2718

BATH

22-2716A

COMFORT

CLINICS

22-2716

PATIENT

ROOM

22-2714

BATH

22-2712A

OCCUPATIONAL

THERAPY

22-2712

BATH

22-2710A

PATIENT

ROOM

22-2710

BATH

22-2708

CLINICAL

PSYCHOLOGIST

22-2706

PROVIDER

22-2705

H.A.C.

22-2704

CORRIDOR 8

22-C208

DATA

22-2702

CLINICAL

COPY

22-2448

MENS

LOCKER

ROOM

22-2438B

STORAGE

22-2442

BATH

22-2501A

PANTRY

22-2441

REPORT

BREAK

ROOM

22-2439

STAFF ROOM

22-2438

WOMENS

LOCKER

ROOM

22-2438A

CORRIDOR 5

22-C205

NURSE

STATION

22-2450

OFFICE

22-2437 H.A.C.

22-2436

EMS

STORAGE

22-2435

STORAGE

22-2410

BATH

22-2418

H.A.C.

22-2400A

DINING

ROOM

22-240

OFFICE

22-2409

OFFICE

22-2407

FITNESS RM.

22-2411

TRASH

22-2412

SOILED

LINEN

22-2413

MECHANICAL

22-2415

OFFICE/STORAGE

22-2405

CORRIDOR 3

22-C203

CORRIDOR 4

22-C204

CORRIDOR 2

22-C202

STAIR #01

22-S1-2

LOUNGE

22-2701

BATH

22-2600

LAUNDRY

22-2601

LOUNGE

22-2500

CART WASH

22-2501B

SHOWERS

22-2501C

SHOWER

22-2501D

PASSENGER

ELEVATOR

22-P1-2

PASSENGER

ELEVATOR

22-P2-2

CORRIDOR 1

22-C201

NOT FOR CONSTRUCTION

RDC/ JOHN POE ARCHITECTS

VA Project No.

RDC/JPA Project No.

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT

321 4 5 6 7 8 9 10

NOT FOR CONSTRUCTION

Project Schedule Date

2022 CAI Set - 100% 12.28.2021

12/23/2021 8:16:05 AM

Update Facility BIM

12.28.2021

SECOND FLOOR PLAN

22-A.102

655-21-201

Saginaw, Michigan (655)

VA Station No:

William Merrill

Record Drawing 21024.00

Scale: 1/16" = 1'-0"

SECOND FLOOR PLAN

OPEN

30-101

OFFICE

30-108

OFFICE

30-107

OFFICE

30-106

DATA

30-105

TOILET

FEMALE

30-104

TOILET

MALE

30-102

H.A.C.

30-103

MECHANICAL

30-106A

NOT FOR CONSTRUCTION

RDC/ JOHN POE ARCHITECTS

VA Project No.

RDC/JPA Project No.

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT

321 4 5 6 7 8 9 10

NOT FOR CONSTRUCTION

Project Schedule Date

2022 CAI Set - 100% 12.28.2021

12/23/2021 8:19:28 AM

Update Facility BIM

12.28.2021

FIRST FLOOR PLAN

30-A.101

655-21-201

Saginaw, Michigan (655)

VA Station No:

William Merrill

Record Drawing 21024.00

Scale: 1/4" = 1'-0"

FIRST FLOOR PLAN

STORAGE

32-102

PUMP

ROOM

32-101

ELECTRICAL

32-101A

DATA

32-101B

NOT FOR CONSTRUCTION

RDC/ JOHN POE ARCHITECTS

VA Project No.

RDC/JPA Project No.

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT

321 4 5 6 7 8 9 10

NOT FOR CONSTRUCTION

Project Schedule Date

2022 CAI Set - 100% 12.28.2021

12/23/2021 8:21:15 AM

Master Record Drawings BIM

12.28.2021

FIRST FLOOR PLAN

32-A.101

655-21-201

Saginaw, Michigan (655)

VA Station No:

William Merrill

Record Drawing 21024.00

Scale: 3/8" = 1'-0"

FIRST FLOOR PLAN

STORAGE

BACKFLOW

NOT FOR CONSTRUCTION

RDC/ JOHN POE ARCHITECTS

VA Project No.

RDC/JPA Project No.

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT

321 4 5 6 7 8 9 10

NOT FOR CONSTRUCTION

Project Schedule Date

2022 CAI Set - 100% 12.28.2021

12/23/2021 8:24:25 AM

Update Facility BIM

12.28.2021

FIRST FLOOR PLAN

34-A.101

655-21-201

Saginaw, Michigan (655)

VA Station No:

William Merrill

Record Drawing 21024.00

Scale: 1/2" = 1'-0"

FIRST FLOOR PLAN

TOILET

FEMALE

35-103

TOILET

MALE

35-104

STORAGE

35-102

MECHANICAL

35-101

PAVILION/

MULTI-PURPOSE

35-100

SERVING

KITCHEN

35-105

NOT FOR CONSTRUCTION

RDC/ JOHN POE ARCHITECTS

VA Project No.

RDC/JPA Project No.

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT

321 4 5 6 7 8 9 10

NOT FOR CONSTRUCTION

Project Schedule Date

2022 CAI Set - 100% 12.28.2021

12/23/2021 8:26:34 AM

Update Facility BIM

12.28.2021

FIRST FLOOR PLAN

35-A.101

655-21-201

Saginaw, Michigan (655)

VA Station No:

William Merrill

Record Drawing 21024.00

Scale: 1/4" = 1'-0"

FIRST FLOOR PLAN

GREENHOUSE

B36

NOT FOR CONSTRUCTION

RDC/ JOHN POE ARCHITECTS

VA Project No.

RDC/JPA Project No.

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT

321 4 5 6 7 8 9 10

NOT FOR CONSTRUCTION

Project Schedule Date

2022 CAI Set - 100% 12.28.2021

12/23/2021 8:28:03 AM

Update Facility BIM

12.28.2021

FIRST FLOOR PLAN

36-A.101

655-21-201

Saginaw, Michigan (655)

VA Station No:

William Merrill

Record Drawing 21024.00

Scale: 1/2" = 1'-0"

FIRST FLOOR PLAN

SCOPE

CHIEF

CPS CHIEF

TOILET

H.A.C.

DATA

OFFICE

OFFICE

SCOPE

OPEN

OFFICE

OFFICE

OFFICE

NOT FOR CONSTRUCTION

RDC/ JOHN POE ARCHITECTS

VA Project No.

RDC/JPA Project No.

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT

321 4 5 6 7 8 9 10

NOT FOR CONSTRUCTION

Project Schedule Date

2022 CAI Set - 100% 12.28.2021

12/23/2021 8:40:28 AM

Update Facility BIM

12.28.2021

FIRST FLOOR PLAN

T38-A.101

655-21-201

Saginaw, Michigan (655)

T38

VA Station No:

William Merrill

Record Drawing 21024.00

Scale: 1/4" = 1'-0"

FIRST FLOOR PLAN

B01_ARC
01-A.100 - BASEMENT FLOOR PLAN
01-A.101 - FIRST FLOOR PLAN
01-A.102 - SECOND FLOOR PLAN
01-A.103 - THIRD FLOOR PLAN
01-A.104 - FOURTH FLOOR PLAN
01-A.105 - FIFTH FLOOR PLAN
01-A.106 - SIXTH FLOOR PLAN
01-A.120 - RCP - BASEMENT
01-A.121 - RCP - FIRST FLOOR
01-A.122 - RCP - SECOND FLOOR
01-A.123 - RCP - THIRD FLOOR
01-A.124 - RCP - FOURTH FLOOR
01-A.125 - RCP - FIFTH FLOOR
01-A.200 - NORTH & SOUTH ELEVATIONS
01-A.201 - EAST & WEST ELEVATIONS
B02_ARC
02-A.101 - FIRST FLOOR PLAN
02-A.102 - SECOND FLOOR PLAN
02-A.121 - RCP - FIRST FLOOR
02-A.122 - RCP - SECOND FLOOR
02-A.200 - NORTH & SOUTH ELEVATIONS
02-A.201 - EAST & WEST ELEVATIONS
B03_ARC
03-A.100 - BASEMENT FLOOR PLAN
03-A.101 - FIRST FLOOR PLAN
03-A.102 - SECOND FLOOR PLAN
03-A.121 - RCP - FIRST FLOOR
03-A.122 - RCP - SECOND FLOOR
03-A.200 - EAST & WEST ELEVATIONS
03-A.201 - NORTH & SOUTH ELEVATIONS
B04_ARC
04-A.100 - BASEMENT FLOOR PLAN
04-A.101 - FIRST FLOOR PLAN
04-A.102 - SECOND FLOOR PLAN
04-A.121 - RCP - FIRST FLOOR
04-A.122 - RCP - SECOND FLOOR
04-A.200 - NORTH & SOUTH ELEVATIONS
04-A.201 - EAST & WEST ELEVATIONS
B06_ARC
06-A.101 - FIRST FLOOR PLAN
06-A.102 - SECOND FLOOR PLAN
06-A.103 - ROOF PLAN
06-A.121 - RCP - FIRST FLOOR
06-A.122 - RCP - SECOND FLOOR
06-A.200 - NORTH & SOUTH ELEVATIONS
06-A.201 - EAST & WEST ELEVATIONS
B09_ARC
09-A.100 - BASEMENT FLOOR PLAN
09-A.101 - FIRST FLOOR PLAN
09-A.121 - RCP - FIRST FLOOR
09-A.200 - NORTH & SOUTH ELEVATIONS
09-A.201 - EAST & WEST ELEVATIONS
B17_ARC
17-A.101 - FIRST FLOOR PLAN
17-A.200 - ELEVATIONS
B19_ARC
19-A.101 - FIRST FLOOR PLAN
19-A.121 - RCP - FIRST FLOOR
19-A.200 - ELEVATIONS
B20_ARC
20-A.101 - FIRST FLOOR PLAN
20-A.121 - RCP - FIRST FLOOR
20-A.200 - ELEVATIONS
B21_ARC
21-A.101 - FIRST FLOOR PLAN
21-A.121 - RCP - FIRST FLOOR
21-A.200 - ELEVATIONS
B22_ARC
22-A.100 - BASEMENT FLOOR PLAN
22-A.101 - FIRST FLOOR PLAN
22-A.102 - SECOND FLOOR PLAN
22-A.120 - RCP - BASEMENT
22-A.121 - RCP - FIRST FLOOR
22-A.122 - RCP - SECOND FLOOR
22-A.200 - NORTH & SOUTH ELEVATIONS
22-A.201 - EAST & WEST ELEVATIONS
B30_ARC
30-A.101 - FIRST FLOOR PLAN
30-A.121 - RCP - FIRST FLOOR
30-A.200 - ELEVATIONS
B32_ARC
32-A.101 - FIRST FLOOR PLAN
32-A.121 - RCP - FIRST FLOOR
32-A.200 - ELEVATIONS
B33_ARC
33-A.101 - FIRST FLOOR PLAN
33-A.200 - ELEVATIONS
B34_ARC
34-A.101 - FIRST FLOOR PLAN
34-A.121 - RCP - FIRST FLOOR
34-A.200 - ELEVATIONS
B35_ARC
35-A.101 - FIRST FLOOR PLAN
35-A.121 - RCP - FIRST FLOOR
35-A.200 - ELEVATIONS
B36_ARC
36-A.101 - FIRST FLOOR PLAN
36-A.121 - RCP - FIRST FLOOR
36-A.200 - ELEVATIONS
B37_ARC
37-A.101 - FIRST FLOOR PLAN
37-A.200 - ELEVATIONS
B39_ARC
39-A.101 - FIRST FLOOR PLAN
39-A.200 - ELEVATIONS
BT38_ARC
T38-A.101 - FIRST FLOOR PLAN
T38-A.121 - RCP - FIRST FLOOR
T38-A.200 - ELEVATIONS

File details come from the government source that posted it. Updated .