Bid and Deduct Schedule.pdf

PDF 110 KB Posted

Attached to
Z2LZ--Resurface and Stripe Parking Lot at Fort Thomas, KY. Project #539-23-201
Solicitation number
36C25023B0046
Issued by

About this file

This document contains a bid and deduct schedule for resurfacing and striping a parking lot at the Fort Thomas Division of the Cincinnati Veterans Affairs Medical Center. The base bid specifies completing all construction work including labor, materials, equipment, and supervision to resurface and stripe the parking lot within 90 calendar days of notice to proceed. Deduct Alternative 1 removes work related to select areas of sidewalk removal and replacement, while Deduct Alternative 2 removes work related to removing and replacing accessible concrete curb ramps, with both alternatives requiring completion within 90 calendar days. Bidders are to specify pricing for the base bid as well as the two deduct alternatives. The related federal contract opportunity posted on the Federal Business Opportunities website solicits bids for this project numbered 539-23-201 with IFB number 36C25023B0046 to be awarded by the Department of Veterans Affairs Veterans Health Administration VISN 10.

View the file

Other files

File Type Posted
36C25023B0046 0003.docx DOCX document
36C25023B0046 0002.docx DOCX document
36C25023B0046 0001.docx DOCX document
Attachment I - Site Visit Log 5.23.23.pdf PDF
36C25023B0046_1.docx DOCX document
Attachment III - Limitations on Subcontracting Certificate of Compliance.docx DOCX document
Attachment V - RFI 539-23-201.docx DOCX document
Attachment VII - Drawings.pdf PDF
Attachment VI - Specifications.pdf PDF
Attachment II - EMR - 539-23-201.docx DOCX document
Attachment IV - VHA Directive 1192-01.pdf PDF
Attachment I - WD Campbell County - 539-23-201.pdf PDF
Show all 12

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

BID & DEDUCT SCHEDULE

Project # 539-23-201 - IFB # 36C25023B0046 Resurface and Stripe Parking Lot

All work to be completed at: Fort Thomas Division - Cincinnati VAMC - 1000 S. Ft Thomas Ave, Ft Thomas, KY 41075.

BASE BID: The contractor shall provide complete construction services including labor, materials, equipment, and supervision required to complete the project.

Work to be completed within 90 calendar days from notice to proceed.

Base Bid: $_______________________________

DEDUCT #1: All work included in BASE BID above except deduct – Elimination of work related to select areas of sidewalk removal and replacement.

Work to be completed within 90 calendar days from notice to proceed.

Deduct #1 Bid: $_______________________________

DEDUCT #2: All work included in BASE BID above except deduct - Elimination of work related to the removal and replacement of accessible concrete curb ramps.

Work to be completed within 90 calendar days from notice to proceed.

Deduct #2 Bid: $_______________________________

Text1:
Text2:
Text3: