610-21-517 - 22-102m - 2 of 7 revision 1.pdf

PDF 387 KB Posted

Attached to
Z2LB--Provide Asphalt Sealcoating and Line Striping - 610-21-517
Solicitation number
36C25022B0038
Issued by

View the file

Other files

File Type Posted
36C25022B0038 0001.docx DOCX document
RFI Form.docx DOCX document
36C25022B0038.docx DOCX document
EMR Attachment.docx DOCX document
Wage determination dtd June 2022.txt TXT text file
610-21-517 asphalt sealcoating - drawings.pdf PDF
610-21-517 asphalt sealcoating - specifications.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

on e ei gh th in ch o ne fo ot

B

A

C

D

E th re e in ch es o ne fo ot 6"

6" on e an d on e ha lf in ch es o ne fo ot on e in ch o ne fo ot

6" 6" th re e qu ar te rs in ch o ne fo ot on e ha lf in ch o ne fo ot th re e ei gh th s in ch o ne fo ot on e qu ar te r i nc h on e fo ot

VA FORM 08-6231, OCT 1978

F

D S

Approved: Project Director

Project Title

Date

Location

Checked

Building Number

Project Number

Drawing Number

Drawn

Dwg. of on e ei gh th in ch o ne fo ot

B

A

C

D

E th re e in ch es o ne fo ot 6"

6" on e an d on e ha lf in ch es o ne fo ot on e in ch o ne fo ot

6" 6" th re e qu ar te rs in ch o ne fo ot on e ha lf in ch o ne fo ot th re e ei gh th s in ch o ne fo ot on e qu ar te r i nc h on e fo ot

VA FORM 08-6231, OCT 1978

1 2 3 4 5 6 87 9

F

E

D

C

B

A

97 8654321

D

U N I T E

TAT E

S

ACIREMAFOS

RI

AF

FA

SNARETEVFOTNEMTRAPE

Drawing Title

F

GENERAL NOTES &

PARKING STALL DETAIL

MARION, IN

WATER

Approved: Medical Center Director

Approved: Medical Center Assoc. Director

Approved: Engineering Department Zachary I. McDaniel

610-21-517

Various Anthony Colon

PROVIDE ASPHALT SEAL

COATING AND LINE STRIPING

Michael E. Hershman

Z. MCDANIEL B.COLEMAN

22-102M

PARKING STALL DETAIL (1):

06/10/2022 7

GENERAL NOTES:

PARKING STALL DETAIL(2):

10 100 1

1. CONTRACTOR WILL PROVIDE ALL LABOR, EQUIPMENT, MATERIALS AND SUPERVISION NECESSARY TO PREP BUILDING 6, BUILDING 47, BUILDING 138 CIRCLE, BUILDING 172 & BUILDING 172A, BUILDINGS 124 & 170, BUILDINGS 52 & 153, BUILDINGS 54, T516 & T504, BUILDING 51, BUILDING 58, BUILDINGS 76, 53 & 165, PARKING LOTS FOR INSTALLATION OF ASPHALT SEAL COATING. THIS WORK WILL ALSO INCLUDE LINE STRIPING (2 COATS WITH

REFLECTIVE GLASS BEADS). LINE STRIPING DETAIL PROVIDED BY VA.

2. THE CONTRACTOR SHALL BE RESPONSIBLE FOR VISITING THE SITE AND PERFORMING ANY AND ALL REQUIRED MEASUREMENTS USED IN PREPARATION OF BIDDING DOCUMENTS. ALL DIMENSIONS ARE APPROXIMATE.

3. IT WILL BE THE CONTRACTORS RESPONSIBILITY TO LOCATE ALL SITE UTILITIES. IF DAMAGE OCCURS TO ANY

UTILITIES, IT MUST BE REPAIRED AT CONTRACTORS OWN EXPENSE.

4. WORK AREAS SHALL BE ROPED OFF AROUND WORK SITES. THE CONTRACTOR SHALL BE RESPONSIBLE FOR BLOCKING OFF AREAS AS REQUIRED, FURNISHING THE NECESSARY BARRICADES, SIGNS, ETC... ALL ENTRANCES SHALL REMAIN OPERATIONAL AT ALL TIMES UNLESS PRIOR PERMISSION HAS BEEN OBTAINED FROM THE PROJECT

ENGINEER TO RESTRICT OTHER THAN EMERGENCY ACCESS.

5. TOOLS AND EQUIPMENT SHALL BE SECURED ANY TIME WORKERS ARE NOT IN THE IMMEDIATE AREA. THE WORK

SITE SHALL BE CLEANED UP AT THE CONCLUSION OF EACH DAYS WORK.

6. UPON FINAL CLEAN-UP, THE CONTRACTOR SHALL REMOVE ANY DEBRIS, RUBBISH, AND EXCESS MATERIAL FROM

THE STATION.

7. THE CONTRACTOR SHALL FOLLOW ALL APPLICABLE VAMC REGULATIONS, OSHA STANDARDS AND INTERIM LIFE

SAFETY MEASURES.

8. THE CONTRACTOR SHALL TAKE EVERY PRECAUTION TO PREVENT DAMAGING ADJACENT PAVING, SIDEWALKS, SHRUBBERY, ETC... IF DAMAGE OCCURS IT MUST BE REPAIRED AT CONTRACTORS OWN EXPENSE.

9. THE CONTRACTOR SHALL BE RESPONSIBLE FOR REQUIRED REPAIRS TO DAMAGED SOD. COMPLETED REPAIRS

MADE BY EXPERIENCED PERSONNEL SHALL MATCH THE EXISTING.

10. THE WORK PREFORMED IN THIS CONTRACT SHALL BE CAREFULLY COORDINATED WITH THE PROJECT MANAGER/ COR AND A WORK SCHEDULE SHALL BE SUBMITTED BY THE CONTRACTOR FOR APPROVAL, PRIOR TO THE START OF ANY WORK. EACH PARKING LOT CLOSURE WILL REQUIRE A MINIMUM OF 4 WORKING DAYS NOTIFICATION PRIOR TO WORK STARTING. IF MORE THAN ONE PARKING LOT CLOSURE IS REQUESTED, SUCH PLANNING MUST BE

SUBMITTED FOR REVIEW/CONSIDERATION AND APPROVED BY THE PROJECT MANAGER/COR.

11. THE CONTRACTOR SHALL HAVE ON THE JOB AT ALL TIMES DURING THE PROGRESS A FORMAN, SUPERINTENDENT OR OTHER COMPETENT REPRESENTATIVE TO WHOM ORDERS AND INSTRUCTIONS MAY BE GIVEN. HIS NAME IS TO BE CERTIFIED TO THE VA AND ANY ORDERS GIVEN TO SUCH REPRESENTATIVE SHALL HAVE THE SAME FORCE AND EFFECT AS IF GIVEN DIRECTLY TO THE CONTRACTOR. A PHONE NUMBER WHERE A RESPONSIBLE PERSON CAN BE

REACHED AFTER HOURS IN CASE OF PROBLEMS ETC... SHALL BE PROVIDED ALSO.

12. THE CONTRACTOR MUST HAVE A PRE-INSTALLATION MEETING WITH THE COR WITHIN 48-HOURS PRIOR TO

STARTING.

13. LINE STRIPING/AISLES ON BOTH SIDES OF HANDICAP STALL(S)ALONG WITH NUMBERING FOR HANDICAP SPACES SHOULD ALL BE BLUE, THE HANDICAP SYMBOL(S) SHOULD BE WHITE WITH A BLUE BACKGROUND. ALL OTHER LINE

STRIPING IS TO BE WHITE UNLESS NOTED OTHERWISE IF ANY QUESTIONS CONSULT COR.

14. ALL STALL NUMBERING TO BE LOCATED AT THE AT THE OPEN END OF THE STALL AND CENTERED, IF IT IS A HANDICAP STALL THE SYMBOL SHOULD BE LOCATED ABOVE NUMBERING AND ALSO CENTERED. PARKING STALL

DETAIL (2) FOR REFERENCE.

15. CONCRETE SHOULD RECEIVE NO SEAL COATING, ONLY LINE STRIPING WHERE IT IS CALLED FOR.

16. STALLS TO BE 10' WIDE, HANDICAP STALLS SHOULD INCLUDE 5' WIDE AISLES ON BOTH SIDES UNLESS STALL IS VAN

ACCESSIBLE WHICH REQUIRES 11' WIDE STALLS AND 8' WIDE AISLES, ANY DEVIATION MUST BE APPROVED BY COR

BEFORE INSTALLATION.

17. MOTORCYCLE PARKING SPOTS TO BE 5' WIDE AND THE LENGTH OF THE CONCRETE PAD.

18. FIRE HYDRANT ACCESS LINE STRIPING TO BE RED.

ONE DIGIT

TWO DIGITS THREE DIGITS

30"

30" 20'

60"8' MIN.

2'

11' MIN. VAN

AutoCAD SHX Text N

Sheets and Views
Model