About this file

This combined synopsis/solicitation notice seeks proposals for a turbine/generator overhaul at a Department of Veterans Affairs medical center. The contractor will inspect and overhaul a Coppus Model RLHA-24 steam turbine, a Murray model K steam turbine, a Lufkin Gear model N1400C gearbox, and an Ideal Generator model SAB 2200 kW generator with Ewing Controls located at the Battle Creek VA Medical Center in Michigan. The contractor must complete all work within 21 calendar days and coordinate any utility interruptions with the contracting officer representative. The solicitation response deadline is May 26, 2021. Offerors must demonstrate experience with turbine/generator inspection, mechanical maintenance, and turbine/generator controls calibration and testing.

View the file

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Contract Opportunity Combined Synopsis/Solicitation Notice

PRODUCT SERVICE CODE

SUBJECT

CONTRACTING OFFICE'S

ZIP-CODE

SOLICITATION NUMBER

RESPONSE DATE/TIME/ZONE

ARCHIVE

DAYS AFTER THE RESPONSE DATE

RECOVERY ACT FUNDS

SET-ASIDE

NAICS CODE

CONTRACTING OFFICE

ADDRESS

POINT OF CONTACT

(POC Information Automatically Filled from User Profile Unless Entered)

DESCRIPTION

See Attachment

AGENCY'S URL

URL DESCRIPTION

AGENCY CONTACT'S EMAIL

ADDRESS

EMAIL DESCRIPTION

ADDRESS

POSTAL CODE

COUNTRY

ADDITIONAL INFORMATION

GENERAL INFORMATION

PLACE OF PERFORMANCE

* = Required Field Contract Opportunity Combined Synopsis/Solicitation Notice

Z1DA

Turbine Overhaul & Testing 48602 36C25021Q0597 05-26-2021

2:00PM

EASTERN TIME, NEW YORK, USA

N

SBA

333611 Department of Veteran Affairs Aleda E. Lutz Medical Center Network Contracting Office 10 1500 Weiss Street Saginaw MI 48602 Contract Specialist Bruce Frierson Bruce.Frierson@va.gov 989-321-4491 VAMC Battle Creek 5500 Armstrong Road Battle Creek

Michigan 49037

USA

COMBINED HEATING AND POWER PLANT TURBINE/GENERATOR OVERHAUL STATEMENT OF WORK

1. GENERAL INTENTION:

a. This Statement of Work describes the service necessary to overhaul the Steam Turbine located at the 5500 Armstrong Road, Battle Creek, Michigan, Combined Heating and Power (CHP) plant.

b. Equipment consists of a complete Engineered Turbine Generator skid (attached). This includes a Coppus Model RLHA-24 steam turbine, a Murray model K steam turbine, a Lufkin Gear model N1400C gearbox, and an Ideal Generator model SAB 2200 kW generator with Ewing Controls.

c. Contractor will provide Craft labor support with supervision, tooling/specialty tooling, forklift, air compressor, on-site glassbead/sandblast and other miscellaneous special tooling/handling equipment.

2. PERFORMANCE PERIOD/SCHEDULE:

a. The contractor shall fully complete the work required under this Statement of Work (SOW) in 21 calendar days of beginning work.

b. Any portions of the work outlined in this Statement of Work which cannot be performed without the system being operational will be coordinated with the Contracting Officer Representative (COR).

c. Any utility interruptions shall be coordinated and scheduled through the COR.

d. Should the steam turbine generator inspection result in the need for additional time to complete repairs or replacement of internal parts, additional services, for unforeseen conditions, may be presented for a contract change notice.

e. Coordinate the work schedule with the COR so that VA can prepare the boilers in advance and have personnel available to monitor the work. The COR is Robert J Pavlovic.

3. REQUIRED TASKS

a. Turbine/generator inspection and overhaul. This includes, but not limited to:

· Base Scope: Packaged Steam Turbine and Generator Outage

· Borescope the LP

· Pull cover on the HP to inspect turbine rotor and replace carbon seals if needed.

· Inspect bearings. HP(2) HP thrust(1) LP(2) thrust(1) Gearbox(4) thrust(1) Generator(2)

· Inspect HP trip valve

· Inspect HP control valve

· Inspect gear box. Perform a gear contact check

· Pull generator end shields and check end windings and rotor in place

· Electrical checks on generator rotor, stator and exciter.

· Open and inspect HP non-return valve. Paper check on disk to seat. Lift check for bushing clearances.

· PM checks on Woodward governor and start up support

· Stator testing. Power Factor, Megger, Winding Resistance

· Rotor testing. Megger, Winding Resistance • Brush-less Exciter. Megger, visual inspection

· Generator Breaker. Maintenance cleaning & Inspection, Megger, Contact Resistance

· Hi-pot Vacuum Bottles.

· Generator Cables to the breaker. Megger

· Generator Protection Relay. Test the programed functions and verify if trip power is available.

· Sample lubricating oil; renew as necessary

· Drain water and dirt from reservoir/ bearing housing; top off oil as needed

· Check instrument air & lube oil filters; replace as needed

b. Provide a completed report with overhaul findings/corrections/recommendations.

4. QUALIFICATOINS

a. The contractor shall provide certification and/or experience with Turbine/Generator inspecting and testing.

b. The contractor shall provide certification and/or experience of mechanical maintenance which will include tooling and supervision.

c. The contractor shall provide certification and/or experience of Turbine/Generator Control knowledge, calibration, and testing.

File details come from the government source that posted it. Updated .