Text version
5. PROJECT NUMBER (if applicable)
CODE
7. ADMINISTERED BY
2. AMENDMENT/MODIFICATION NUMBER
CODE
6. ISSUED BY
8. NAME AND ADDRESS OF CONTRACTOR
4. REQUISITION/PURCHASE REQ. NUMBER
3. EFFECTIVE DATE
9A. AMENDMENT OF SOLICITATION NUMBER
9B. DATED
PAGE OF PAGES
10A. MODIFICATION OF CONTRACT/ORDER NUMBER
10B. DATED
BPA NO.
1. CONTRACT ID CODE
FACILITY CODE
CODE
Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods:
The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers
E. IMPORTANT:
is extended,
(a) By completing Items 8 and 15, and returning __________ copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted; or (c) By separate letter or electronic communication which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY is not extended.
12. ACCOUNTING AND APPROPRIATION DATA
(REV. 11/2016)
is required to sign this document and return ___________ copies to the issuing office.
is not, A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT ORDER NO. IN ITEM 10A.
15C. DATE SIGNED
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).
RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by letter or electronic communication, provided each letter or electronic communication makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER
Contractor
16C. DATE SIGNED
14. DESCRIPTION OF AMENDMENT/MODIFICATION
16B. UNITED STATES OF AMERICA
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15A. NAME AND TITLE OF SIGNER
16A. NAME AND TITLE OF CONTRACTING OFFICER
15B. CONTRACTOR/OFFEROR
STANDARD FORM 30
PREVIOUS EDITION NOT USABLE
Prescribed by GSA - FAR (48 CFR) 53.243 (Type or print) (Type or print) (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
(Number, street, county, State and ZIP Code) (If other than Item 6) (Specify type of modification and authority) (such as changes in paying office, appropriation date, etc.)
(If required)
(SEE ITEM 11)
(SEE ITEM 13)
(X)
CHECK
ONE
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS,
IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
(Signature of person authorized to sign) (Signature of Contracting Officer) 36C250 Department of Veterans Affairs Network Contracting Office (NCO) 10 260 E. University Avenue Cincinnati
OH
45219 Y 36C250 Department of Veterans Affairs Network Contracting Office (NCO) 10 260 E. University Avenue Cincinnati
OH
45219 To all Offerors/Bidders
36C25021Q0043
X X X
This solicitation is amended to provide answers to questions received. Please see responses attached.
Response date and time are NOT extended.
Megan R. Wallace Questions and Answers
#1 Are there plumbing Drawing to show where the Marlo RO Water Line Go in the Facility.
There is a plumbing drawing on file in our Planning and Design department. They are currently working through some scanner/plotter technical issues but are going to get me a digital copy of this print as soon as they are back online.
#2 I did not notice sample ports at either storage tank for tanking Plate count samples. Can you direct us as to the location you are sampling now?
I asked the tech who is currently providing our quarterly PM, he states that he currently pulls the sample from the product sample valve on the front of the RO unit. VA plans to explore this further between now and when the new contract is awarded to determine the feasibility of adding sample ports directly on the existing tanks, or directly downstream of the tank discharge piping for a more accurate reading of conditions in the tanks.
#3 is there a Standard operating Procedure for the annual disinfection of the product water tanks and piping?
There is not a local SOP in place at this time, however, manufacturer recommendations state that: disinfection be performed by using 100% hydrogen peroxide or peroxyacetic acid. Each machine has specific instructions for disinfectant quantity/process. Product Operation and Maintenance manuals are on hand and copies can be provided to vendors at their request
#4 Both the Marlo and the Suez -Ameriwater Systems call for Feed water Chlorides, Ionic Contaminants, TOC, Hardness and PH. Since they have the same feed water does it make since to only send 1 sample to the lab for testing or do you want 2 separate feed water samples reported on?
Although both machines are, in theory, fed from the same water source; due to them being in different areas VA is required to have samples and results for the above mentioned parameters for each system’s feed water directly before entering the equipment. We will need 2 separate feed water reports, 1 per machine each quarter.
#5 What specific Equipment does the marlo RO supply?
-2 EA. steam sterilizers -1 EA. hydro sonic cleaner (fed from a wall box) (box has one ½” feed of softened/filtered water only and one ½” feed of RO water) -1 EA. washer/disinfector (this machine is fed with water from both systems for separate functions)
#6 What specific equipment do the Ameriwater system supply?
-1 EA. faucet on multi-basin sink -1 EA. washer/disinfector (this machine is fed from both systems for separate functions)
#2 4.1 subtask 1 states annual RO rebed. Is this supposed to be Carbon Rebed or RO Membranes?
This subtask applies to the RO membranes.
To follow up on another question that was asked during the site visit that was not listed above:
To clarify some confusion on the pipe insulation lableling, the ½” pipe labeled “RO water” originating from the Marlo softener/filter/RO system is mis-labeled. That label should read “softened/filtered water”, as it comes directly post the filter/softener, but before entering the RO system. The second 1 ½” pipe is, in fact the RO outgoing water going into the SPS area.
File details come from the government source that posted it. Updated .