Expansion Joints Dwgs (07 19 2021).pdf
PDF 36 MB Posted
- Solicitation number
- 36C25021B0070
About this file
This document provides details for a federal contract solicitation to replace expansion joints and update finishes at the Cincinnati VA Medical Center. The solicitation will be issued on September 3rd, 2021 for project number 539-21-106. The contractor will provide all labor, equipment, materials, permits and supervision to replace existing floor and wall expansion joint components and replace or update most floor, wall and ceiling finishes in public corridors throughout building 1. The work includes general construction, piping and electrical and may involve hazardous material abatement. All work must be completed within 365 calendar days of the notice to proceed. The solicitation is a 100% set aside for service-disabled veteran owned small businesses with a small business size standard of $16.5 million or less under NAICS code 238220. The contractor must perform a minimum of 15% of the construction work and have no more than three serious or one repeat or willful OSHA or EPA violations in the past three years, with an experience modification rate of 1.0 or less. The project value is estimated between $2 million and $5 million.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| RFI 1-AE Response.pdf | ||
| Wage Determination OH20210082 07-30-21.txt | TXT text file | |
| Virtual Bid Opening Call-In Information.pdf | ||
| 36C25021B0070 0003.docx | DOCX document | |
| 36C25021B0070 0002.docx | DOCX document | |
| Expansion Joint Specs (07 19 2021).pdf | ||
| Pre-Bid Sign-In Sheet (9-09-21).pdf | ||
| 36C25021B0070 0002.docx | DOCX document | |
| 36C25021B0070 0001.docx | DOCX document | |
| Drawings 04 14 2021.pdf | ||
| 36C25021B0070_1.docx | DOCX document | |
| Wage Determination OH20210010 - 06-18-21.pdf | ||
| Technical Specifications.pdf | ||
| RFI Form.docx | DOCX document | |
| Contractor EMR Certification Form.pdf |
Show all 15
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
CONSTRUCTION / BID
Cincinnati VA
Medical Center
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD
FFE Inc 110 Boggs Lane, Suite 170 Cincinnati, OH 45246 513-522-0956
STAMPCONSULTANT
321 4 5 6 7 8 9 10
REPLACE EXPANSION
JOINTS
CINCINNATI, OH
539-21-106
FULLY SPRINKLED
C U s e rs
\d a n ff
\O n e D ri v e
\D o c u m e n ts \F
F E
C in c in n a ti
E x p a n s io n J o in ts B d a n
.b e rg e rC L
J .r v t
/2
/2
:5
:2
P
M
GI001
COVER SHEET
07/02/21 PQ DB
CINCINNATI VAMC
REPLACE EXPANSION JOINTS
& UPDATE FINISHES
#529-21-106
DEPARTMENT OF VETERANS AFFAIRS
3200 Vine St., Cincinnati, OH 45220
BLDG 1
R E G I O N A L V I C I N I T Y M A P V I C I N I T Y M A P
NTS
*** R.I.D. = RESIDENT INTERIOR DESIGNER. ***
** U.N.O. = UNLESS NOTED OTHERWISE.**
* C.O.R. = CONTRACTING OFFICER'S REPRESENTATIVE. THIS IS USED IN LIEU OF THE TERM OWNER.*
1. ALL WORK SHALL COMPLY WITH ALL APPLICABLE NATIONAL, STATE AND LOCAL CODES, RULES, ORDINANCES AND REGULATIONS INCLUDING THE AMERICAN DISABILITIES ACT (ADA), ARCHITECTURAL BARRIERS ACT(ABA), THE VA BARRIER FREE DESIGN GUIDELINES AND THE AMERICAN
NATIONAL STANDARDS INSTITUTE (ANSI) GUIDELINES.
2. THE C.O.R. SHALL WORK WITH THE CONTRACTOR TO PROVIDE ACCESS TO TEMPORARY SERVICES REQUIRED TO PROVIDE THE WORK INDICATED. SEE SPECIFICATION SECTION 01 00 00 FOR ADDITIONAL REQUIREMENTS ON TEMPORARY ACCESS TO VA UTILITIES.
3. THE CONTRACTOR SHALL COMPLY WITH ALL APPLICABLE PROVISIONS OF THE SPECIFICATIONS, INCLUDING ALL GENERAL CONDITIONS, SUPPLEMENTARY GENERAL CONDITIONS, AND MATERIAL AND CONSTRUCTION PROVISIONS, WHICH APPLY TO MATERIALS OR CONSTRUCTION
METHODS REQUIRED BY THIS PROJECT.
4. PRIOR TO BIDDING, THE CONTRACTOR SHALL VISIT THE SITE, EXAMINE, AND ACCEPT ALL EXISTING CONDITIONS. DATES FOR SITE VISITS WILL BE POSTED IN THE CONTRACT DOCUMENTS AS POSTED ON THE FEDERAL BUSINESS OPPORTUNITIES WEBPAGE FOR THIS PROJECT.
UNSCHEDULED VISITS WILL NOT BE ALLOWED.
5. DO NOT PAINT ANY CAULKING OR SEALANTS WHICH ARE SUBJECT TO MOVEMENT - CONTROL JOINTS SHALL BE CAULKED AFTER PAINT AND SPECIAL COATING APPLICATIONS. PROVIDE CAULKING OR SEALANTS IN COLORS WHICH MATCH ADJACENT FINISHED SURFACE COLORS.
6. VERIFY ALL CONDITIONS AND DIMENSIONS IN THE FIELD BEFORE FABRICATING ANY MATERIALS.
7. IT IS THE INTENT OF THE DOCUMENTS TO INDICATE COMPLETE AND OPERATIONAL SYSTEMS (I.E. STRUCTURAL, HVAC, PLUMBING, ELECTRICAL) THE CONTRACTOR SHALL PROVIDE THE SYSTEMS AS OPERATIONAL SYSTEMS WHICH COMPLY WITH APPLICABLE CODES AND REGULATIONS.
THIS NOTE SHALL BE LIMITED TO THE SYSTEMS AS INDICATED BY THE DOCUMENTS AND SHALL NOT INCLUDE CHANGES TO THE SYSTEMS WHICH
ALTER INDICATED CAPACITIES, OPERATIONAL CHARACTERISTICS.
8. THE CONTRACTOR SHALL VERIFY THE SIZES OF ALL EQUIPMENT OR FIXTURES TO BE INSTALLED IN THE BUILDING THROUGH THE SUBMITTAL PROCESS, AND SHALL MAKE SPECIAL PROVISIONS FOR INSTALLATION OF ANY EQUIPMENT WHICH IS TOO LARGE TO FIT THROUGH A FINISHED
OPENING.
9. ALL CONTRACTORS SHALL BE RESPONSIBLE TO PATCH AND REPAIR ALL SURFACES WHERE EXISTING CONSTRUCTION IS REMOVED OR
DISTURBED BY WORK UNDER THEIR CONTRACT.
10. ALL SUSPENDED ITEMS SUCH AS CEILINGS, DUCTS, PIPES, CONDUITS, SHALL BE SUSPENDED (ATTACHED) DIRECTLY TO STRUCTURE AND SHALL
NOT BE ATTACHED OR ANCHORED TO EXISTING PLASTER, ACOUSTIC TILE.
11. NEW PENETRATIONS SUCH AS DUCTS, CONDUITS, PIPING, ELECTRICAL OUTLETS, LIGHT SWITCHES, RECESSED DEVICES OR ITEMS, HOLES, VOIDS, CRACKS. IN MODIFIED AND NEW CORRIDOR WALLS, SMOKE PARTITIONS, AND FLOOR SLABS SHALL BE SEALED TO PREVENT PASSAGE OF
ANY SMOKE, FLAME, GASES. AS INDICATED IN THE CONTRACT DOCUMENTS.
12. WHERE NEW CONSTRUCTION REQUIRES CORE DRILLING THROUGH EXISTING STRUCTURAL CONCRETE FLOOR SLABS, AND WALLS THE CONTRACTOR SHALL COORDINATE HIS DRILLING WORK TO AVOID DRILLING INTO A STRUCTURAL ELEMENT, INCLUDING JOISTS, BEAMS, COLUMN.
ALSO SEE ELECTRICAL. DRAWINGS AND SPECIFICATIONS.
13. WHERE NEW CONSTRUCTION IS INDICATED TO BE INSTALLED IN EXISTING CONSTRUCTION, THE CONTRACTOR SHALL VERIFY ALL DIMENSIONS FOR PROPER FIT AND FOR ACCESS INTO THE BUILDING PRIOR TO SHOP DRAWING SUBMITTAL, ORDERING AND DELIVERING TO THE SITE.
14. FOR INFECTION CONTROL REASONS, WORK CONDUCTED IN THE CORRIDOR THAT DOES NOT GENERATE DUST MAY ONLY REMOVE UP TO 16 SQUARE FEET OF CEILING TILE AT ONCE. AS LONG AS THIS STANDARD IS FOLLOWED NEGATIVE AIR AND BARRIERS ARE NOT REQUIRED BY THE INFECTION CONTROL NURSES. IF DUST IS GENERATED AND GREATER THAN 16 SF OF CEILING TILES ARE DISTURBED AT ONCE THEN THE WORK AREA SHALL BE SEALED OFF WITH 6 MIL FIRE RETARDANT POLYETHYLENE AND NEGATIVE AIR PROVIDED. MAINTAIN 5' MINIMUM ACCESS IN CORRIDORS AT ALL TIMES. CLEAN THOROUGHLY PRIOR TO COMPLETION OF A GIVEN WORK AREA BY HEPA VACUUM AND WET MOP. REFER TO SPECIFICATION 01 35 26 FOR ADDITIONAL INFORMATION. REFERENCE ICRA LEVEL 2 FOR ALL LOCATIONS NOT SHOWN TO BE ICRA LEVEL 3.
REFERENCE ICRA LEVEL 3 FOR THE FOLLOWING LOCATIONS:
A. 1ST FLOOR WOMENS CLINIC NEGATIVE PRESSURE ROOMS C107 & C108
B. 3RD FLOOR PACU HALLS
C. CORRIDOR WITH 5TH FLOOR EXPANSION JOINT NEAR ROOM A508
15. REPLACE EXISTING CORNER GUARDS AS NOTED ON NEW WORK DRAWINGS. ALL OTHER WALL PROTECTION AND CORNER GUARDS IN AREAS OF
WORK SHALL REMAIN AND BE PROTECTED DURING ALL PHASES OF CONSTRUCTION.
16. CONTRACTORS ARE NOT ALLOWED TO PARK ANYWHERE ON VA CAMPUS.
17. COORDINATE ANY UTILITY SHUTDOWNS (ELECTRIC/WATER/HVAC) SHUTDOWNS WITH THE COR. A MINIMUM 3-WEEK WRITTEN NOTICE TO THE
COR FOR ANY SHUTDOWN IS REQUIRED.
18. ALL WORK IN PUBLIC CORRIDORS SHALL OCCUR AT NIGHT AND ON WEEKENDS AS REQUIRED BY THE COR. EXPOSED CEILINGS SHALL BE COVERED AND SEALED DURING NORMAL WORK HOURS WITH APPROVED FIRE RETARDANT MATERIALS.
19. SCHEDULE ALL WORK WITH C.O.R. A MINIMUM OF TWO-WEEKS PRIOR TO CONSTRUCTION IN EACH AREA.
G E N E R A L N O T E S : N E W W O R K
1. SEE GENERAL PROJECT NOTES FOR NEW WORK FOR ADDITIONAL REQUIREMENTS FOR WORK WITHIN THE EXISTING FACILITY.
2. THE GENERAL CONTRACTOR SHALL VERIFY ALL EXISTING DIMENSIONS AND FIELD CONDITIONS PRIOR TO DEMOLITION AND CONSTRUCTION. IF PROVIDED, THE GENERAL CONTRACTOR SHALL CAREFULLY EXAMINE EXISTING BUILDING DOCUMENTS. THE CONTRACTOR SHALL BRING ANY DISCREPANCIES TO THE IMMEDIATE ATTENTION OF THE
ARCHITECT.
3. THE GENERAL CONTRACTOR IS RESPONSIBLE FOR THE PROTECTION OF EXISTING ITEMS TO REMAIN DURING DEMOLITION AND CONSTRUCTION.
4. MAINTAIN EXIT EGRESS PATHS TO EXISTING EXIT DOORS DURING CONSTRUCTION.
5. THE GENERAL CONTRACTOR IS RESPONSIBLE FOR THE PROTECTION OF ALL CONSTRUCTION ROUTES BEYOND THE AREAS OF WORK AND THE ROUTES MUST BE RETURNED
TO THEIR ORIGINAL CONDITION AT THE END OF THE PROJECT.
6. MAINTAIN THE BUILDING IN A WEATHER TIGHT CONDITION AT ALL TIMES.
7. ALL DEMOLITION AND CONSTRUCTION ACTIVITIES SHALL BE COORDINATED WITH THE C.O.R. TO MINIMIZE DISRUPTIONS OF NORMAL FUNCTIONS OF THE VA'S OCCUPIED AREAS.
8. IF CONSTRUCTION NOISE IS ANTICIPATED, SUBMIT A WRITTEN REQUEST TO THE C.O.R. FOR THE SCHEDULED TIME OF THE CONSTRUCTION ACTIVITIES. NO WORK SHALL BE DONE WITHOUT THE WRITTEN APPROVAL OF THE C.O.R. THE C.O.R. RESERVES THE RIGHT TO DISCONTINUE NOISY CONSTRUCTION AT ANY TIME. NO RADIOS SHALL BE
PERMITTED AT ANY TIME IN WORK AREAS ADJACENT TO OCCUPIED SPACES.
9. ALL EXISTING SERVICES AND UTILITIES SHALL BE MAINTAINED TO ADJACENT DEPARTMENTS OR AREAS THAT ARE IN OPERATION AND SERVED BY THEM. COORDINATE ALL DISRUPTIONS OR DISCONTINUATIONS OF UTILITIES AND SERVICES WITH C.O.R. NO SHUT DOWN OF EXISTING SERVICES IS ALLOWED TO OCCUR UNTIL RECEIVING THE C.O.R.'S WRITTEN APPROVAL OF THE SHUT DOWN SCHEDULE. PROVIDE TEMPORARY SERVICES AND/OR UTILITIES DURING INTERRUPTIONS AS REQUIRED AND APPROVED BY THE C.O.R.
10. THE GENERAL CONTRACTOR SHALL TAKE ALL NECESSARY PRECAUTIONS TO PREVENT DAMAGE TO THE V.A.'S OCCUPIED AREAS ADJACENT TO NEW CONSTRUCTION OR OCCUPIED AREAS WHERE VARIOUS SYSTEM CONNECTIONS OR EXTENSIONS ARE REQUIRED. IN THESE AREAS, THE GENERAL CONTRACTOR IS RESPONSIBLE FOR DAMAGE CAUSED BY LACK OF SUFFICIENT PROTECTION FROM THE WEATHER AND FROM THE RESULTS OF ALL CONSTRUCTION ACTIVITY INCLUDING BUT NOT LIMITED TO DUST AND
WATER.
11. THE GENERAL CONTRACTOR SHALL RECEIVE WRITTEN APPROVAL FROM THE C.O.R. BEFORE USING OPEN FLAMES, WELDING RODS AND TORCHES. THE GENERAL CONTRACTOR IS RESPONSIBLE FOR ALL MEANS AND METHODS TO PROHIBIT THE MIGRATION OF SMOKE AND OTHER PRODUCTS OF COMBUSTION INTO OCCUPIED AREAS OF THE EXISTING BUILDING AND FOR OBTAINING ALL REQUIRED PERMITS RELATED TO HOT WORK.
12. PROVIDE FIRE PROTECTION IN ACCORDANCE WITH THE REQUIREMENTS OF THE GOVERNING AUTHORITY.
13. IT IS THE GENERAL CONTRACTORS RESPONSIBILITY TO PATCH ALL SPRAY-ON FIRE PROTECTION AT REMOVALS, AT ANY EXISTING LOCATIONS WHICH ARE VOID OF PROTECTION WITHIN THE AREA OF WORK AND AT NEW CONSTRUCTION WHICH DISTURBS EXISTING FIRE PROTECTION. FIREPROOFING MUST BE CONTINUOUS AND
UNOBSTRUCTED.
14. DO NOT OVERLOAD THE EXISTING BUILDING STRUCTURE. MAINTAIN THE STRUCTURAL INTEGRITY OF ALL STRUCTURAL FRAMING MEMBERS AND SYSTEMS AT ALL TIMES.
G E N E R A L N O T E S - E X I S T I N G F A C I L I T I E S :
15. ALL DEMOLISHED MATERIAL, EXCEPT MATERIAL THAT IS LISTED OR MARKED BY THE ARCHITECT OR THE C.O.R. FOR RETENTION, SHALL BECOME THE PROPERTY OF THE CONTRACTOR AND IT SHALL BE DISPOSED OF. NO DEBRIS RESULTING FROM WORK SHALL BE LEFT IN THE CONSTRUCTION ROUTES BEYOND THE AREAS OF WORK.
16. REMOVAL OF A PARTICULAR ITEM IS TO INCLUDE ALL RELATED ITEMS, SUCH AS REMOVAL OF WALLS WOULD INCLUDE ASSOCIATED DOORS, HARDWARE, ELECTRICAL, PLUMBING, MECHANICAL, ETC. REFER TO DEMOLITION DRAWINGS FOR MORE INFORMATION. FOR ALL REMOVALS, THE GENERAL CONTRACTOR SHALL COORDINATE WITH ALL OTHER DISCIPLINES INCLUDING BUT NOT LIMITED TO MECHANICAL, ELECTRICAL AND PLUMBING.
17. WHERE CEILINGS ARE SHOWN TO BE REMOVED, ALL UNUSED SUSPENDED EQUIPMENT, WIRES, ANGLES, ETC. SHALL BE REMOVED. SEE DEMOLITION DRAWINGS FOR ADDITIONAL INFORMATION. EXISTING LIGHTS MAY BE MAINTAINED AS TEMPORARY CONSTRUCTION LIGHTING.
18. THE CONTRACTOR SHALL PROVIDE TEMPORARY SUPPORT FOR ITEMS NOT DEMOLISHED OR REMOVED AS REQUIRED UNTIL PERMANENT SUPPORT IS PROVIDED IN THE FINAL
CONSTRUCTION.
19. ALL OPENINGS IN EXISTING WALLS, CEILINGS AND FLOORS, WHICH ARE THE RESULT OF REMOVALS AND OTHER NEW CONSTRUCTION ACTIVITY, SHALL BE PATCHED WITH NEW MATERIALS THAT MATCH THE EXISTING MATERIALS. IF THE PATCH IS TO BE MADE IN FIRE RATED CONSTRUCTION, THE PATCH MUST ACHIEVE THE REQUIRED FIRE RATING. THE
PATCH SHALL BE FINISHED TO A LIKE NEW CONDITION TO MATCH THE EXISTING FINISH.
20. ALL EXISTING OPENINGS IN CEILINGS, FLOORS AND WALLS DISCOVERED IN THE EXISTING STRUCTURE SHALL BE PATCHED WITH NEW MATERIALS THAT MATCH THE EXISTING MATERIALS. IF THE PATCH IS TO BE MADE IN FIRE RATED CONSTRUCTION, THE PATCH MUST ACHIEVE THE REQUIRED FIRE RATING. THE PATCH SHALL BE FINISHED TO A LIKE
NEW CONDITION TO MATCH THE EXISTING FINISH.
21. WHERE EXISTING SURFACES ARE TO BE REFINISHED OR ARE TO SERVE AS SUBSTRATE FOR THE ATTACHMENT OR APPLICATION OF NEW MATERIALS OR CONSTRUCTION, PREPARE OR ALTER THE EXISTING SURFACES AS NECESSARY TO PROPERLY ACCOMMODATE THE NEW MATERIALS.
22. FIELD VERIFY SIZES AND DIMENSIONS OF ALL EXISTING UTILITIES THAT IMPACT THE NEW WORK. DETERMINE THE SIZE AND LOCATION THE PENETRATIONS FROM THE EXISTING
UTILITIES WITHIN THE NEW WORK. SEAL TIGHT TO ALL PENETRATIONS AND CAULK.
23. PENETRATIONS THROUGH EXISTING FIRE RATED CONSTRUCTION MUST BE PROPERLY CLOSED AND FIRE SAFE'D TO ACHIEVE THE PROPER FIRE RATING BY THE END OF
CONSTRUCTION OPERATIONS FOR EACH DAY.
24. NEW HOLES IN EXISTING ELEVATED FLOOR AND ROOF STRUCTURES FOR NEW WORK MUST BE COORDINATED WITH THE EXISTING STRUCTURE SO THAT CRITICAL
STRUCTURAL MEMBERS ARE NOT DAMAGED.
25. UNLESS OTHERWISE NOTED, THE GENERAL CONTRACTOR IS RESPONSIBLE FOR VERIFYING ALL EXISTING SALVAGED STOCK BEFORE ORDERING NEW MATERIAL.
26. COORDINATION MEETINGS SHALL OCCUR DURING REGULAR BUSINESS HOURS.
27. FLOOR PREPARATION SHALL BE ACCOUNTED FOR AT ALL NEW FLOOR FINISHES AS A PART OF THIS PROJECT. ADDITIONAL FLOOR PREPARATION DETERMINED DURING CONSTRUCTION SHALL BE PROVIDED BY THE CONTRACTOR AT NO ADDITIONAL COST TO THE GOVERNMENT.
28. CONTRACTOR SHALL COORDINATE FURNITURE REMOVAL AND STORAGE WITH VA COR. PROTECT EXISTING FURNITURE AS REQUIRED AND COVER EXISTING FURNITURE WITH
PLASTIC WHERE CEILINGS ARE BEING REPLACED
D R A W I N G I N D E X
SHEET
NUMBER SHEET NAME
BID
GENERAL
GI001 COVER SHEET *
GI002 CODE SHEET AND ABBREVIATIONS *
GI101 FIRST FLOOR LIFE SAFETY PLAN *
GI102 SECOND FLOOR LIFE SAFETY PLAN *
GI103 THIRD FLOOR LIFE SAFETY PLAN *
GI104 FOURTH FLOOR LIFE SAFETY PLAN *
GI105 FIFTH FLOOR LIFE SAFETY PLAN *
GI106 SIXTH FLOOR LIFE SAFETY PLAN *
GI107 SEVENTH FLOOR LIFE SAFETY PLAN *
GI108 EIGHTH FLOOR LIFE SAFETY PLAN *
GI109 NINTH FLOOR LIFE SAFETY PLAN *
ARCHITECTURAL
AD101 FIRST FLOOR DEMOLITION PLAN *
AD102 SECOND FLOOR DEMOLITION PLAN *
AD103 THIRD FLOOR DEMOLITION PLAN *
AD104 FOURTH FLOOR DEMOLITION PLAN *
AD105 FIFTH FLOOR DEMOLITION PLAN *
AD106 SIXTH FLOOR DEMOLITION PLAN *
AD107 SEVENTH FLOOR DEMOLITION PLAN *
AD108 EIGHTH FLOOR DEMOLITION PLAN *
AD109 NINTH FLOOR DEMOLITION PLAN *
AE101 FIRST FLOOR NEW WORK PLAN *
AE101A FIRST FLOOR ENLARGED PLANS *
AE102 SECOND FLOOR NEW WORK PLAN *
AE102A SECOND FLOOR ENLARGED PLANS *
AE103 THIRD FLOOR NEW WORK PLAN *
AE103A THIRD FLOOR ENLARGED PLANS *
AE103B THIRD FLOOR ENLARGED PLANS *
AE104 FOURTH FLOOR NEW WORK PLAN *
AE104A FOURTH FLOOR ENLARGED PLANS *
AE105 FIFTH FLOOR NEW WORK PLAN *
AE105A FIFTH FLOOR ENLARGED PLANS *
AE106 SIXTH FLOOR NEW WORK PLAN *
AE107 SEVENTH FLOOR NEW WORK PLAN *
AE107A SEVENTH FLOOR ENLARGED PLANS *
AE108 EIGHTH FLOOR NEW WORK PLAN *
AE109 NINTH FLOOR NEW WORK PLAN *
AE141 FIRST FLOOR REFLECTED CEILING PLAN *
AE141A ENLARGED RCP - FIRST FLOOR *
AE142 SECOND FLOOR REFLECTED CEILING PLAN *
AE143 THIRD FLOOR REFLECTED CEILING PLAN *
AE144 FOURTH FLOOR REFLECTED CEILING PLAN *
AE145 FIFTH FLOOR REFLECTED CEILING PLAN *
AE146 SIXTH FLOOR REFLECTED CEILING PLAN *
AE147 SEVENTH FLOOR REFLECTED CEILING PLAN *
AE148 EIGHTH FLOOR REFLECTED CEILING PLAN *
AE149 NINTH FLOOR REFLECTED CEILING PLAN *
AE401 INTERIOR ELEVATIONS *
AE402 INTERIOR ELEVATIONS *
AE403 INTERIOR ELEVATIONS *
AE404 INTERIOR ELEVATIONS *
AE405 INTERIOR ELEVATIONS *
AE406 INTERIOR ELEVATIONS *
AE407 INTERIOR ELEVATIONS *
AE408 INTERIOR ELEVATIONS *
AE409 INTERIOR ELEVATIONS *
AE410 INTERIOR ELEVATIONS *
AE411 INTERIOR ELEVATIONS *
AE701 EXPANSION JOINT SCHEDULES AND DETAILS *
AE702 ROOM FINISH SCHEDULE, FINISH LEGEND, AND
DETAILS
FIRE PROTECTION
FX101 FIRST FLOOR FIRE SUPPRESSION PLAN *
FX102 SECOND FLOOR FIRE SUPPRESSION PLAN *
FX103 THIRD FLOOR FIRE SUPPRESSION PLAN *
FX104 FOURTH FLOOR FIRE SUPPRESSION PLAN *
FX105 FIFTH FLOOR FIRE SUPPRESSION PLAN *
FX106 SIXTH FLOOR FIRE SUPPRESSION PLAN *
FX107 SEVENTH FLOOR FIRE SUPPRESSION PLAN *
FX108 EIGHTH FLOOR FIRE SUPPRESSION PLAN *
FX109 NINTH FLOOR FIRE SUPPRESSION PLAN *
ELECTRICAL
ED101 FIRST FLOOR PLAN *
ED101B FIRST FLOOR PLAN *
ED102 SECOND FLOOR PLAN *
ED102B SECOND FLOOR PLAN *
ED102C SECOND FLOOR PLAN *
ED103 THIRD FLOOR PLAN *
ED103B THIRD FLOOR PLAN *
ED104 FOURTH FLOOR PLAN *
ED104B FOURTH FLOOR PLAN *
ED105 FIFTH FLOOR PLAN *
ED106 SIXTH FLOOR PLAN *
ED107 SEVENTH FLOOR PLAN *
ED108 EIGHTH FLOOR PLAN *
ED109 NINTH FLOOR PLAN *
NTS
07/19/21 EXP: 12/31/21
No. Revisions: Date:
BID DOCUMENTS 07/19/2021
C1
10'-0"AFF
A101
SIM
A101
SIM
A101
SIM
A101
SIM
A B B R E V I A T I O N S
LEVEL NAME W/ ELEVATION
GRID HEAD
CALL OUT HEAD W/ SHEET NUMBER
ROOM NAME W/ ROOM NUMBER,
AREA & OCCUPANCY
BUILDING SECTION NUMBER W/
SHEET NUMBER
WALL SECTION NUMBER W/
SHEET NUMBER
DOOR NUMBER
WALL TAG
KEYNOTE
REVISION TAG
CEILING TAG WITH HEIGHT
DETAIL SECTION NUMBER W/
SHEET NUMBER
NORTH ARROW
A.D.
A.C.T.
ACOUS.
A/C
A.C.P.
A.B.
AREA DRAIN
ACOUSTICAL CEILING TILE
ACOUSTIC
AIR CONDITIONING
ASPHALT CONCRETE
ANCHOR BOLT
PAVING
POUND OR NUMBER
PROPERTY LINE
FLOOR LINE
ANGLE
DIAMETER
CENTERLINE
AT
AND
BD.
APPROX.
ARCH.
ASPH.
ALT.
AL.
AGG.
BLDG.
BLK.
BLKG.
BM.
BRG.
BRK.
BOT.
BITUM.
CEM.
C.B.
CARP.
CAB.
B.U.R.
BTWN.
CLKG.
CLG.J.
CLG.
C.J.
CIR.
C.I.
CER.T.
CER.
BRZ.
COMB.
COL.
C.O.
CNTR.
CMU
CLS.
CLR.
C.W.
CTR.
CONV.O.
CONT.
CONST.
CONN.
CONC.
COMP.
DF.
D.F.
DIAG.
DIA.
DIM.
DISP.
DET.
DN.
D.O.
DR.
D.S.
D.T.
D.W.
DWR.
DIV.
CLO.
DOUGLAS FIR
DRINKING FOUNTAIN
DIAMETER
DIAGONAL
DIMENSION
DISPOSAL
DIVISION
DOWN
DOOR OPENING
DOOR
DOWN SPOUT
DRAIN TILE
DISHWASHER
DRAWER
DETAIL
COLD WATER
CENTER
CONVECTION OVEN
CONTINUOUS
CONSTRUCTION
CONNECTION
CONCRETE
COMPOSITION
BENCH MARK or BEAM
BOARD
BITUMINOUS
BUILDING
BLOCK
BLOCKING
APPROXIMATE
ARCHITECT
ASPHALT
CONCRETE MASONRY
COMBINATION
COLUMN
CLEAN OUT
COUNTER
CLOSURE
CLEAR
CLOSET
CAULKING
CEILING JOIST
UNIT
CEILING
BRICK
BEARING
CONSTRUCTION JOINT
CIRCLE
CAST IRON
CERAMIC TILE
CERAMIC
CEMENT
CATCH BASIN
CARPET
CABINET
BUILT-UP ROOFING
BETWEEN
BRONZE
BOTTOM
ALTERNATE
ALUMINUM
AGGREGATE
EA.
E.E.
E.F.
E.J.
ELEC.
ELEV.
E.N.
EXISTING
EACH
EACH END
EXHAUST FAN
EXPANSION JOINT
ELECTRICAL
ELEVATION
EDGE NAIL
(E)
ADJUSTABLEADJ.
LP
LC
LF
Ø
ABOVE FINISH FLOORAFF
CONTRACTOR FURNISH/
OWNER INSTALL
C.F.O.I.
C.F.C.I. CONTRACTOR FURNISH/
CONTRACTOR INSTALL
E.C. ELECTRICAL CONTRACTOR
C.HK. COAT HOOK
C.B.B. CEMENTITIOUS BACKER
BOARD
A.C.M. ASBESTOS CONTAINING
MATERIALS
CW. CURTAINWALL
DWG(S). DRAWING(S)
FACE OF BUILDINGF.O.B.
FIXTURE
FACE OF CONCRETE
FLOOR
FLOOR JOIST
FLOOR LINE
FLASHING
FACE NAIL
GAUGE
FOOTING
FUTURE
FACE OF STUD
FIRE RETARDANT
TREATED WOOD
FACE OF MASONRY
FACE OF FINISH
F.O.S.
F.R.T.W.
FTG.
FUT.
GA.
FIXT.
F.J.
F.L.
FLASH.
FLR.
F.N.
F.O.C.
F.O.F.
F.O.M.
BEAM
GLASS
GLUE LAMINATED
GALVANIZED IRON
GRATE ELEVATION
GRAB BAR
GARBAGE DISPOSAL
GRADE
HOSE BIB
SHEET METAL
GYPSUM BOARD
HANDICAPPED
GALVANIZED
GROUND
HC.
GYP.BD.
H.B.
G.B.
G.D.
G.S.M.
GR.
GND.
GLB.
GL.
G.I.
G.E.
HEIGHT
HOUR
HEATING
HIGH POINT
HORIZONTAL
HOLLOW METAL
HARDWARE
HARDWOOD
INTERIOR
INVERT
HOT WATER
INSULATION
INSIDE DIAMETER
& AIR CONDITIONING
HEATING, VENTILATION
H.W.
INV.
INT.
INSUL.
I.D.
HDWE.
HDWD.
H.V.A.C.
HTG.
HR.
H.P.
HORIZ.
H.M.
HGT.
HDR. HEADER
JOIST
JANITOR
KITCHEN
JOINT
LABORATORY
JOIST HANGER
LAG BOLT
LAVATORY
LAMINATE
J.H.
JAN.
L.B.
LAV.
LAM.
LAB.
KIT.
JT.
JST.
EQUIV.
E.S.
E.W.
EXP.
EXP.B.
EXPO.
EXT.
F.
ENCL.
F.B.
F.BD.
F.BELL
F.B.O.
F.D.
FDN.
F.E.
FH.M.S.
F.HORN
F.F.
F.G.
FGL.
F.H.
F.E.C.
F.A.
FH.W.S.
FIN.
F.H.S.
ENCLOSURE
EQUIVALENT
EACH SIDE
EACH WAY
EXPANSION
EXPANSION BOLT
EXPOSURE
EXTERIOR
FLAT HEAD MACHINE
SCREW
SCREW
FIRE HORN
FIRE HOSE STATION
FLAT HEAD WOOD
FINISH
FLOOR DRAIN
FOUNDATION
FIRE EXTINGUISHER
FIRE EXTINGUISHER
FINISH FLOOR
FINISH GRADE
FIBERGLASS
FIRE HYDRANT
CABINET
FIRE ALARM
FACE BRICK
FIREBOARD
FIRE BELL
FURNISHED BY OTHERS
FACE
GALV. GALVANIZED
HOLLOW STRUC. STL.H.S.S.
FLUORESCENTFLOUR.
GENERAL CONTRACTORG.C.
E.W.C. ELECTRIC WATER CLOSET
FIRE VALVE CABINETF.V.C.
FOOD SERVICE EQUIPMENT
CONTRACTOR
F.S.E.C.
H.V.A.C. CONTRACTORH.C.
FIRE SUPPRESSION
CONTRACTOR
F.S.C.
PLASTIC LAMINATEP.LAM.
O.H.W.S.
SCREW
OVAL HEAD WOOD
APPROVAL)
PAPER TOWEL DISPENSER
PAPER TOWEL
PARTITION
DOUGLAS FIR
PRESSURE TREATED
REFLECTED CEILING
RADIUS
RUBBER BASE
QUARRY TILE
POLYVINYL-CHLORIDE
RECEPTACLE
R.C.P.
Q.T.
RAD.
R.B.
P.T.D.
PTN.
P.T.R.
P.V.C.
P.T.D.F.
REDWOOD
REFERENCE
REINFORCING
ROOF HATCH
ROUND HEAD METAL
RESILIENT
REFRIGERATOR
ROOF DRAIN
SCREW
ROOM
RAIN WATER LEADER
ROUGH OPENING
ROUND HEAD WOOD
SCREW
RDWD.
R.H.W.S.
R.W.L.
R.O.
RM.
R.H.M.S.
R.H.
RESIL.
REINF.
REFR.
REF.
R.D.
LIGHT
MATERIAL
LOW POINT
LIVE LOAD
LEFT HAND
MAT.
LT.
L.P.
L.L.
L.H.
MANHOLE
MINIMUM
MEDIUM
MANUFACTURER
MEMBRANE
MECHANICAL
MEDICINE CABINET
MACHINE BOLT
METAL
MASONRY OPENING
METAL THRESHOLD
MISCELLANEOUS
MODULAR
MOISTURE RESISTANT
MIRROR
M.C.
M.B.
MIN.
MH.
MFG.
MEMB.
MED.
MECH.
MIR.
MISC.
M.O.
MOD.
M.R.
M.T.
MTL.
MAX. MAXIMUM
NORTH
NATURAL
OVER
NUMBER
NOMINAL
NOT TO SCALE
NOT IN CONTRACT
OBSCURE
OUTSIDE DIAMETER
STUD
OFFICE
OUTSIDE FACE OF
ON CENTER
OVERFLOW
OVERALL
N.T.S.
O/ O.A.
OBS.
O.C.
O.D.
O.F.
OFF.
O.F.S.
(NOT PART OF OSA
N.
NAT.
N.I.C.
NO.
NOM.
PAINT
PLATE
PERFORATED
FOOT
POUNDS PER CUBIC
PANEL EDGE NAILING
PRESSED METAL
PAIR
FRAME
FOOT
POUNDS PER LINEAR
PLYWOOD
POUNDS PER SQUARE
PROPERTY
PLASTER
P.
P.C.F.
P.E.N.
PERF.
PL.
PLAS.
P.L.F.
PLYWD.
P.M.F.
PR.
P.S.F.
PROP.
OPP. OPPOSITE
POINT
PULL STATION
POUNDS PER SQUARE
INCH
P.STA.
PT.
P.S.I.
FOOT
(N) NEW
PLAN
REQUIREDREQD.
NON-COMBUSTIBLENON/COM
PLUMBING CONTRACTORP.C.
MECHANICAL, ELECTRICAL,
PLUMBING
M.E.P.
FRAMED MIRRORMR.
ROBE HOOKR.HK.
MOP HOLDERMP.H.
MOUNTEDMTD.
PAINTEDPTD.
TONGUE AND GROOVE
DRAWINGS
SOUTH
SEE CIVIL DRAWINGS
STORM DRAIN
SOLID CORE WOOD DOOR
DRAWINGS
SHEET
SIMILAR
SLIDING
SHEATHING
SHOWER
SECTION
SEALANT
SEE ELECTRICAL
SOLID BLOCKING
SOAP DISPENSER
SEE ARCHITECTURAL
S.E.D.
SHR.
SHT.
SIM.
SL.
SHTG.
S.BLKG.
S.A.D.
S.
SECT.
SEAL.
S.DISP.
S.D.
S.C.D.
SCWD
SQUARE
DRAWINGS
SPECIFICATION
SOUNDPROOF
DRAWINGS
STATION
STEEL
STORAGE
STANDARD
SUSPENDED
STRUCTURAL
DRAWINGS
STAINLESS STEEL
SEE MECHANICAL
SANITARY SEWER
SEE STRUCTURAL
SQUARE FOOT (FEET)
THICK
TEMPERED
TELEPHONE
TERRAZZO
TACKBOARD
TOP OF CURB
TRANSOM
TOP OF PLATE
TOP OF WALL
TOILET PAPER DISPENSER
TOE NAIL
TOOL JOINT
TOP OF PAVEMENT
TOP AND BOTTOM
T.O.C.
T.O.P.
T.O.PL.
T.O.W.
T.P.D.
TRN.
S.M.D.
SPEC.
S.P.
SQ.
S.S.D.
S. STL.
STO.
STL.
STD.
STA.
S.S.
SQ. FT.
T.B.
T&B.
TEL.
TEMP.
TER.
T&G.
SUSP.
T.J.
T.N.
THK.
STRUC.
S.L.D. SEE LANDSCAPE
TYPICAL
UNLESS NOTED OTHERWISE
URINAL
UNFINISHED
TELEVISION
VENT TO ROOF
VERTICAL
VESTIBULE
VERIFY IN FIELD
VINYL TILE
VINYL COMPOSITION
TILE
VERTICAL GRAIN
WEST
WITH
WINDOW
WOOD
WATER CLOSET
VINYL WALL COVERING
WITHOUT
WEIGHT
YARD
WATER PROOF
WATER HEATER
WATER COOLER
WELDED WIRE FABRIC
WATER RESISTANT
W/O
W.W.F.
W.P.
W.R.
WT.
YD.
T.V.
TYP.
UNF.
U.N.O.
V.C.T.
VERT.
VEST.
V.G.
V.I.F.
UR.
V.W.C.
W.
W/
W.C.
V.T.R.
W.F.
W.H
WDW.
WD.
V.T.
T.S. TUBE STEEL
SELF ADHERED SHEET
MEMBRANE
S.A.S.M.
SELF ADHERED FLEXIBLE
FLASHING
S.A.F.F.
WITHINW/IN
UNDERSIDEU/S
SANITARY NAPKIN
DISPOSAL
S.N.D.
T.S.C.D. TOILET SEAT COVER
DISPENSER
SANITARY NAPKIN
DISPENSER
S.N.V.
TOP OF SEATT.O.S.
SOUND ATTENUATION
BATT
S.A.B.
Name
Elevation
Room name
150 SF
S Y M B O L S
V.A. FURNISHED / CONTRACTOR
INSTALLED
(VC)
V.A. FURNISHED AND INSTALLED(VV)
SOLID WOOD DOORS.W.D.
E L E C T R I C A L A B B R E V I A T I O N S
EMT
CU
C
ELECTRICAL METALLIC
TUBING
COPPER
CONDUIT
ABOVE COUNTER, 42" AFF
AMERICANS WITH
DISABILITIES ACT
AMPERE
GFP GROUND FAULT
PROTECTION
FREQUENCY MODULATIONFM
A
AC
ADA
GROUND FAULT CIRCUIT
INTERRUPTER
GFI
CB CIRCUIT BREAKER
HP
HPS
IDS
HACR
J
KWH
LED
MCB
MH
NEC
NF
HEATING AIR CONDITIONING
REFRIGERATION
HORSE POWER
HIGH PRESSURE SODIUM
MAIN CIRCUIT BREAKER
MOUNTING HEIGHT TO
CENTER
NATIONAL ELECTRIC CODE
NON FUSED
JUNCTION BOX
KILOWATT HOUR
LIGHT EMITTING DIODE
INTRUSION DETECTION
SYSTEM
HZ HERTZ
PHASE
OCCUPANCY SENSOR
PH
OS
SURGE PROTECTIVE DEVICE
SINGLE MODE
VOLT
SPD
SM
V
PIR PASSIVE INFRARED
WEATHERPROOF
TRANSFORMER
WP
XFMR
W WATTS
VARIABLE VOLUME DAMPERVVD
VOLT AMPEREVA
ONE CONDUCTOR1/C
FACP FIRE ALARM CONTROL
PANEL
MLO MAIN LUGS ONLY
RIGID GALVANIZED STEELRGS
TELEPHONE TERMINAL BOARDTTB
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
CONSTRUCTION / BID
Cincinnati VA
Medical Center
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD
FFE Inc 110 Boggs Lane, Suite 170 Cincinnati, OH 45246 513-522-0956
STAMPCONSULTANT
321 4 5 6 7 8 9 10
REPLACE EXPANSION
JOINTS
CINCINNATI, OH
539-21-106
FULLY SPRINKLED
C U s e rs
\d a n ff
\O n e D ri v e
\D o c u m e n ts \F
F E
C in c in n a ti
E x p a n s io n J o in ts B d a n
.b e rg e rC L
J .r v t
/2
/2
:3
:1
P M
GI002
CODE SHEET AND ABBREVIATIONS
07/02/21 PQ DB
C O D E N O T E S
2021 NFPA 101 LIFE SAFETY CODE REVIEW
BUILDING 1, 1ST - 9TH FLOOR
AREA OF WORK = 54,538 SF
EXISTING FLOORS ARE AMBULATORY HEALTH CARE OCCUPANCY - CHAPTER 21
CHAPTER 3 DEFINITIONS
3.3.285.4 PATIENT CARE NON-SLEEPING SUITE (HEALTH CARE OCCUPANCIES)
3.3.285.5 PATIENT CARE SLEEPING SUITE (HEALTH CARE OCCUPANCIES)
CHAPTER 6 - CLASSIFICATION OF OCCUPANCY AND HAZARD OF CONTENT
6.1.5 HEALTHCARE OCCUPANCY (CHAPTER 19)
6.2.2 HAZARD CLASSIFICATION: ORDINARY - NO CHANGE
CHAPTER 7- MEANS OF EGRESS: NO CHANGE
T7.3.1.2 OCCUPANT LOAD OF SPACE: NO CHANGE
CHAPTER 8 - FEATURES OF FIRE PROTECTION: NO CHANGE
CHAPTER 9 - BUILDING SERVICE AND FIRE PROTECTION EQUIPMENT: NO CHANGE
CHAPTER 10 - INTERIOR FINISH, CONTENTS, AND FURNISHES
10.2.3.1
INTERIOR WALL AND CEILING FINISH MATERIALS TESTED IN ACCORDANCE
WITH NFPA 286.
10.2.3.1.1
INTERIOR WALL AND CEILING FINISH MATERIALS SHALL BE CLASSIFIED IN
ACCORDANCE WITH NFPA 286 AND COMPLY WITH 10.2.3.2.
10.2.3.1.2
MATERIALS TESTED IN ACCORDANCE WITH 10.2.3.1.1 AND COMPLYING
WITH 10.2.3.2 SHALL BE CONSIDERED ALSO TO COMPLY WITH THE
REQUIREMENTS OF CLASS A, CLASS B, OR CLASS C IN ACCORDANCE WITH 10.2.3.3
10.2.3.2.
(1) DURING THE 40 KW EXPOSURE, FLAMES SHALL NOT SPREAD TO THE CEILING.
(2) THE FLAME SHALL NOT SPREAD TO THE OUTER EXTREMITY OF THE SAMPLE
ON ANY WALL OR CEILING.
(3) FLASHOVER, AS DESCRIBED IN NFPA 286, SHALL NOT OCCUR.
(4) THE PEAK HEAT RELEASE RATE THROUGHOUT THE TEST SHALL NOT EXCEED
800 KW.
(5) FOR NEW INSTALLATIONS, THE TOTAL SMOKE RELEASED THROUGH-OUT THE
TEST SHALL NOT EXCEED 1000 M2.
10.2.3.3
WALL AND CEILING- CLASSIFICATIONS CHARACTERISTICS.
(1) CLASS A: FLAME SPREAD: 0-25; SMOKE DEV. : 0-450.
(2) CLASS B: FLAME SPREAD: 26-75; SMOKE DEV. : 0-450
(3) CLASS C: FLAME SPREAD: 76-200; SMOKE DEV. : 0-450
10.2.7.2
INTERIOR FLOOR- CLASSIFICATIONS CHARACTERISTICS:
(1) CLASS I: RAD FLUX: FIN .45 W/CM2
(2) CLASS II: RAD FLUX: FIN .22 W/CM2, AND MAX. .45 W/CM2
10.2.7.3
INTERIOR FLOOR FINISH- SHALL BE CLASSIFIED BASED ON NFPA 253 OR
ASTEM E 648.
10.2.8.1
WALL AND CEILING FINISHES, WHERE SPRINKLED:
CLASS C PERMITTED IN ANY LOCATION WHERE CLASS B IS REQ’D.
CLASS B PERMITTED IN ANY LOCATION WHERE CLASS A IS REQ’D.
10.2.8.2
FLOOR FINISHES, WHERE SPRINKLED:
CLASS II PERMITTED IN ANY LOCATION WHERE CLASS I IS REQ’D.
NO CRITICAL RAD. FLUX PERMITTED IN ANY LOCATION WHERE CLASS II IS
REQ’D
20.3.5.3
AND NFPA 10 SECTION 9.9 FIRE EXTINGUISHERS ARE REQUIRED WITHIN
75’ OF ANY POINT IN THE SPACE.
- MAINTAIN ACCESSIBILITY TO EXISTING FIRE EXTINGUISHERS DURING CONSTRUCTION
CHAPTER 19 - EXISTING HEALTH CARE OCCUPANCIES:
19.1.1.1
THE REQUIREMENTS OF THIS CHAPTER SHALL APPLY TO EXISTING BUILDINGS
OR PORTIONS THEREOF CURRENTLY OCCUPIED AS HEALTH CARE OCCUPANCIES.
19.2.5.3
DEAD END CORRIDORS SHALL NOT EXCEED 30 FT.
19.2.5.3
LIMITATIONS ON COMMON PATH OF TRAVEL SHALL BE IN ACCORDANCE WITH
19.2.5.3.1.
19.2.6
TRAVEL DISTANCE TO EXITS. TRAVEL DISTANCE SHALL COMPLY WITH 19.2.6.2.1
THROUGH 19.2.6.2.4.
19.2.6.2.2
TRAVEL DISTANCE SHALL NOT EXCEED 200 FT IN HEALTH CARE OCCUPANCIES
PROTECTED THROUGHOUT BY AN APPROVED, SUPERVISED AUTOMATIC SPRINKLER
SYSTEM IN ACCORDANCE WITH SECTION 19.3.5.7.
19.2.9.1
EMERGENCY LIGHTING SHALL BE PROVIDED IN ACCORDANCE WITH SECTION
7.9.
19.3.3.1
INTERIOR FINISH SHALL BE IN ACCORDANCE WITH SECTION 10.2.
19.3.3.2
INTERIOR WALL AND CEILING FINISH MATERIALS COMPLYING SECTION
10.2 SHALL BE CLASS A OR CLASS B.
BID DOCUMENTS 07/02/2021
DN
UP
UP
DN DN
DN
UP
UP
UP
UP
DN
UP
UP
DN
DN
DN
DN DN
UPDN UP
DN
DN UP
DN
UP
DN
DN
2 HOUR FIRE BARRIER
1 HOUR FIRE BARRIER
EX EXIT
EXIT STAIR OR PASSAGEWAY
REMOTE POINT
30 MINUTE SMOKE BARRIER
NOT IN SCOPE
PATH OF EGRESS
EX
EX
EX
EX
EX
EX
EX
EX
EX
EX
EX
EX
EX
EX
EX
EX
EX
EX
A. EGRESS PATHS AND PATH OF TRAVEL SHALL NOT BE AFFECTED DURING CONSTRUCTION. CORRIDORS CLOSED FOR CONSTRUCTION SHALL NOT IMPEDE EGRESS IN CASE OF EMERGENCY. REFER TO GI002
FOR CODE INFORMATION.
B. ALL EXISTING SPACES WITHIN THIS PROJECT MEET TRAVEL DISTANCE REQUIREMENTS.
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
CONSTRUCTION / BID
Cincinnati VA
Medical Center
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD
FFE Inc 110 Boggs Lane, Suite 170 Cincinnati, OH 45246 513-522-0956
STAMPCONSULTANT
321 4 5 6 7 8 9 10
REPLACE EXPANSION
JOINTS
CINCINNATI, OH
539-21-106
FULLY SPRINKLED
C U s e rs
\d a n ff
\O n e D ri v e
\D o c u m e n ts \F
F E
C in c in n a ti
E x p a n s io n J o in ts B d a n
.b e rg e rC L
J .r v t
/2
/2
:3
:4
P M
GI101
FIRST FLOOR LIFE SAFETY PLAN
07/02/21 PQ DB
G E N E R A L N O T E S
L E G E N D
N Scale: 1/16" = 1'-0"
FIRST FLOOR LIFE SAFETY PLAN
DN
DN
DN
UP
DN
UP
UP
DN UP DN
DN UP
UP
DN
UP
UP
2 HOUR FIRE BARRIER
1 HOUR FIRE BARRIER
EX EXIT
EXIT STAIR OR PASSAGEWAY
REMOTE POINT
30 MINUTE SMOKE BARRIER
NOT IN SCOPE
PATH OF EGRESS
A/C Shaft
A/C Shaft
A/C Shaft
/4
/4
A. EGRESS PATHS AND PATH OF TRAVEL SHALL NOT BE AFFECTED DURING CONSTRUCTION. CORRIDORS CLOSED FOR CONSTRUCTION SHALL NOT IMPEDE EGRESS IN CASE OF EMERGENCY. REFER TO GI002
FOR CODE INFORMATION.
B. ALL EXISTING SPACES WITHIN THIS PROJECT MEET TRAVEL DISTANCE REQUIREMENTS.
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
CONSTRUCTION / BID
Cincinnati VA
Medical Center
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD
FFE Inc 110 Boggs Lane, Suite 170 Cincinnati, OH 45246 513-522-0956
STAMPCONSULTANT
321 4 5 6 7 8 9 10
REPLACE EXPANSION
JOINTS
CINCINNATI, OH
539-21-106
FULLY SPRINKLED
C U s e rs
\d a n ff
\O n e D ri v e
\D o c u m e n ts \F
F E
C in c in n a ti
E x p a n s io n J o in ts B d a n
.b e rg e rC L
J .r v t
/2
/2
:4
:1
P M
GI102
SECOND FLOOR LIFE SAFETY PLAN
07/02/21 PQ DB
G E N E R A L N O T E S
N Scale: 1/16" = 1'-0"
SECOND FLOOR LIFE SAFETY PLAN
L E G E N D
FD
UP
UP
UP
UP
UP
UP
UP
DN
DN
DN
DNUP
DN UP
DN
UP
UPDN
DN
2 HOUR FIRE BARRIER
1 HOUR FIRE BARRIER
EX EXIT
EXIT STAIR OR PASSAGEWAY
REMOTE POINT
30 MINUTE SMOKE BARRIER
NOT IN SCOPE
PATH OF EGRESS
A/C Shaft A/C Shaft
A/C Shaft
3A
A. EGRESS PATHS AND PATH OF TRAVEL SHALL NOT BE AFFECTED DURING CONSTRUCTION. CORRIDORS CLOSED FOR CONSTRUCTION SHALL NOT IMPEDE EGRESS IN CASE OF EMERGENCY. REFER TO GI002
FOR CODE INFORMATION.
B. ALL EXISTING SPACES WITHIN THIS PROJECT MEET TRAVEL DISTANCE REQUIREMENTS.
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
CONSTRUCTION / BID
Cincinnati VA
Medical Center
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD
FFE Inc 110 Boggs Lane, Suite 170 Cincinnati, OH 45246 513-522-0956
STAMPCONSULTANT
321 4 5 6 7 8 9 10
REPLACE EXPANSION
JOINTS
CINCINNATI, OH
539-21-106
FULLY SPRINKLED
C U s e rs
\d a n ff
\O n e D ri v e
\D o c u m e n ts \F
F E
C in c in n a ti
E x p a n s io n J o in ts B d a n
.b e rg e rC L
J .r v t
/2
/2
:4
:3
P M
GI103
THIRD FLOOR LIFE SAFETY PLAN
07/02/21 PQ DB
G E N E R A L N O T E S
N Scale: 1/16" = 1'-0"
THIRD FLOOR LIFE SAFETY PLAN
L E G E N D
UP DNUP
DN
UP
DN
UP
UP
DN
A/C ShaftA/C Shaft
A/C Shaft
2 HOUR FIRE BARRIER
1 HOUR FIRE BARRIER
EX EXIT
EXIT STAIR OR PASSAGEWAY
REMOTE POINT
30 MINUTE SMOKE BARRIER
NOT IN SCOPE
PATH OF EGRESS
A. EGRESS PATHS AND PATH OF TRAVEL SHALL NOT BE AFFECTED DURING CONSTRUCTION. CORRIDORS CLOSED FOR CONSTRUCTION SHALL NOT IMPEDE EGRESS IN CASE OF EMERGENCY. REFER TO GI002
FOR CODE INFORMATION.
B. ALL EXISTING SPACES WITHIN THIS PROJECT MEET TRAVEL DISTANCE REQUIREMENTS.
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
CONSTRUCTION / BID
Cincinnati VA
Medical Center
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD
FFE Inc 110 Boggs Lane, Suite 170 Cincinnati, OH 45246 513-522-0956
STAMPCONSULTANT
321 4 5 6 7 8 9 10
REPLACE EXPANSION
JOINTS
CINCINNATI, OH
539-21-106
FULLY SPRINKLED
C U s e rs
\d a n ff
\O n e D ri v e
\D o c u m e n ts \F
F E
C in c in n a ti
E x p a n s io n J o in ts B d a n
.b e rg e rC L
J .r v t
/2
/2
:4
:5
P M
GI104
FOURTH FLOOR LIFE SAFETY PLAN
07/02/21 PQ DB
G E N E R A L N O T E S
N Scale: 1/16" = 1'-0"
FOURTH FLOOR LIFE SAFETY PLAN
L E G E N D
** 4TH FLOOR SCOPE IS INCLUDED UNDER PROJECT ALTERNATE NUMBER 2
DN UP DNUP
DN UP
DN
UP
DN
A/C Shaft
A/C ShaftA/C Shaft
2 HOUR FIRE BARRIER
1 HOUR FIRE BARRIER
EX EXIT
EXIT STAIR OR PASSAGEWAY
REMOTE POINT
30 MINUTE SMOKE BARRIER
NOT IN SCOPE
PATH OF EGRESS
A. EGRESS PATHS AND PATH OF TRAVEL SHALL NOT BE AFFECTED DURING CONSTRUCTION. CORRIDORS CLOSED FOR CONSTRUCTION SHALL NOT IMPEDE EGRESS IN CASE OF EMERGENCY. REFER TO GI002
FOR CODE INFORMATION.
B. ALL EXISTING SPACES WITHIN THIS PROJECT MEET TRAVEL DISTANCE REQUIREMENTS.
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
CONSTRUCTION / BID
Cincinnati VA
Medical Center
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD
FFE Inc 110 Boggs Lane, Suite 170 Cincinnati, OH 45246 513-522-0956
STAMPCONSULTANT
321 4 5 6 7 8 9 10
REPLACE EXPANSION
JOINTS
CINCINNATI, OH
539-21-106
FULLY SPRINKLED
C U s e rs
\d a n ff
\O n e D ri v e
\D o c u m e n ts \F
F E
C in c in n a ti
E x p a n s io n J o in ts B d a n
.b e rg e rC L
J .r v t
/2
/2
:4
:0
P M
GI105
FIFTH FLOOR LIFE SAFETY PLAN
07/02/21 PQ DB
G E N E R A L N O T E S
N Scale: 1/16" = 1'-0"
FIFTH FLOOR LIFE SAFETY PLAN
L E G E N D
DN
UP
A/C Shaft
A/C Shaft
A/C Shaft
2 HOUR FIRE BARRIER
1 HOUR FIRE BARRIER
EX EXIT
EXIT STAIR OR PASSAGEWAY
REMOTE POINT
30 MINUTE SMOKE BARRIER
NOT IN SCOPE
PATH OF EGRESS
A. EGRESS PATHS AND PATH OF TRAVEL SHALL NOT BE AFFECTED DURING CONSTRUCTION. CORRIDORS CLOSED FOR CONSTRUCTION SHALL NOT IMPEDE EGRESS IN CASE OF EMERGENCY. REFER TO GI002
FOR CODE INFORMATION.
B. ALL EXISTING SPACES WITHIN THIS PROJECT MEET TRAVEL DISTANCE REQUIREMENTS.
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
CONSTRUCTION / BID
Cincinnati VA
Medical Center
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD
FFE Inc 110 Boggs Lane, Suite 170 Cincinnati, OH 45246 513-522-0956
STAMPCONSULTANT
321 4 5 6 7 8 9 10
REPLACE EXPANSION
JOINTS
CINCINNATI, OH
539-21-106
FULLY SPRINKLED
C U s e rs
\d a n ff
\O n e D ri v e
\D o c u m e n ts \F
F E
C in c in n a ti
E x p a n s io n J o in ts B d a n
.b e rg e rC L
J .r v t
/2
/2
:4
:1
P M
GI106
SIXTH FLOOR LIFE SAFETY PLAN
07/02/21 PQ DB
G E N E R A L N O T E S
N Scale: 1/16" = 1'-0"
SIXTH FLOOR LIFE SAFETY PLAN
L E G E N D
UP
DN
UP
2 HOUR FIRE BARRIER
1 HOUR FIRE BARRIER
EX EXIT
EXIT STAIR OR PASSAGEWAY
REMOTE POINT
30 MINUTE SMOKE BARRIER
NOT IN SCOPE
PATH OF EGRESS
A/C Shaft
A/C Shaft
A/C Shaft
A. EGRESS PATHS AND PATH OF TRAVEL SHALL NOT BE AFFECTED DURING CONSTRUCTION. CORRIDORS CLOSED FOR CONSTRUCTION SHALL NOT IMPEDE EGRESS IN CASE OF EMERGENCY. REFER TO GI002
FOR CODE INFORMATION.
B. ALL EXISTING SPACES WITHIN THIS PROJECT MEET TRAVEL DISTANCE REQUIREMENTS.
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
CONSTRUCTION / BID
Cincinnati VA
Medical Center
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD
FFE Inc 110 Boggs Lane, Suite 170 Cincinnati, OH 45246 513-522-0956
STAMPCONSULTANT
321 4 5 6 7 8 9 10
REPLACE EXPANSION
JOINTS
CINCINNATI, OH
539-21-106
FULLY SPRINKLED
C U s e rs
\d a n ff
\O n e D ri v e
\D o c u m e n ts \F
F E
C in c in n a ti
E x p a n s io n J o in ts B d a n
.b e rg e rC L
J .r v t
/2
/2
:4
:2
P M
GI107
SEVENTH FLOOR LIFE SAFETY PLAN
07/02/21 PQ DB
G E N E R A L N O T E S
N Scale: 1/16" = 1'-0"
SEVENTH FLOOR LIFE SAFETY PLAN
L E G E N D
DN UP DNUP
DN UP
DN
A/C Shaft A/C Shaft
2 HOUR FIRE BARRIER
1 HOUR FIRE BARRIER
EX EXIT
EXIT STAIR OR PASSAGEWAY
REMOTE POINT
30 MINUTE SMOKE BARRIER
NOT IN SCOPE
PATH OF EGRESS
A. EGRESS PATHS AND PATH OF TRAVEL SHALL NOT BE AFFECTED DURING CONSTRUCTION. CORRIDORS CLOSED FOR CONSTRUCTION SHALL NOT IMPEDE EGRESS IN CASE OF EMERGENCY. REFER TO GI002
FOR CODE INFORMATION.
B. ALL EXISTING SPACES WITHIN THIS PROJECT MEET TRAVEL DISTANCE REQUIREMENTS.
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
CONSTRUCTION / BID
Cincinnati VA
Medical Center
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD
FFE Inc 110 Boggs Lane, Suite 170 Cincinnati, OH 45246 513-522-0956
STAMPCONSULTANT
321 4 5 6 7 8 9 10
REPLACE EXPANSION
JOINTS
CINCINNATI, OH
539-21-106
FULLY SPRINKLED
C U s e rs
\d a n ff
\O n e D ri v e
\D o c u m e n ts \F
F E
C in c in n a ti
E x p a n s io n J o in ts B d a n
.b e rg e rC L
J .r v t
/2
/2
:4
:3
P M
GI108
EIGHTH FLOOR LIFE SAFETY PLAN
07/02/21 PQ DB
G E N E R A L N O T E S
N Scale: 1/16" = 1'-0"
EIGHTH FLOOR PLAN
L E G E N D
** 8TH FLOOR SCOPE IS INCLUDED UNDER PROJECT ALTERNATE NUMBER 1
DN DN
A/C ShaftA/C Shaft
2 HOUR FIRE BARRIER
1 HOUR FIRE BARRIER
EX EXIT
EXIT STAIR OR PASSAGEWAY
REMOTE POINT
30 MINUTE SMOKE BARRIER
NOT IN SCOPE
PATH OF EGRESS
A. EGRESS PATHS AND PATH OF TRAVEL SHALL NOT BE AFFECTED DURING CONSTRUCTION. CORRIDORS CLOSED FOR CONSTRUCTION SHALL NOT IMPEDE EGRESS IN CASE OF EMERGENCY. REFER TO GI002
FOR CODE INFORMATION.
B. ALL EXISTING SPACES WITHIN THIS PROJECT MEET TRAVEL DISTANCE REQUIREMENTS.
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
CONSTRUCTION / BID
Cincinnati VA
Medical Center
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD
FFE Inc 110 Boggs Lane, Suite 170 Cincinnati, OH 45246 513-522-0956
STAMPCONSULTANT
321 4 5 6 7 8 9 10
REPLACE EXPANSION
JOINTS
CINCINNATI, OH
539-21-106
FULLY SPRINKLED
C U s e rs
\d a n ff
\O n e D ri v e
\D o c u m e n ts \F
F E
C in c in n a ti
E x p a n s io n J o in ts B d a n
.b e rg e rC L
J .r v t
/2
/2
:4
:4
P M
GI109
NINTH FLOOR LIFE SAFETY PLAN
07/02/21 PQ DB
N Scale: 1/16" = 1'-0"
NINTH FLOOR LIFE SAFETY PLAN
G E N E R A L N O T E S
L E G E N D
UP
DN DN
DN
UP
UP
UP
UP
DN
UP
UP
DN
DN
DN
DN DN
UPDN UP
DN
DN UP
DN
UP
DN
DN
1 1
3 33
3 3 3
Corridor A1001
1B
1A
1C
1D
1E1F
1G
1H
Corridor C*1*7
Corridor C*1*8
Corridor C*1*1
Corridor C*1*9
Corridor C1*1*14
Corridor C*1*5
Corridor C*1*10
Corridor C101
WAITING
C103
8 8
1J
EXISTING EXPANSION JOINT TO BE REMOVED
AREA NOT IN SCOPE
2I
EXPANSION JOINT TAG. REFER TO
SCHEDULE ON AE701
A. WALL- AND CEILING-MOUNTED ITEMS TO BE REMOVED AND REPLACED BY THE CONTRACTOR: CONVEX MIRRORS, CEILING HUNG SIGNS. EXISTING EMERGENCY EXIT SIGNS SHALL REMAIN AND BE MAINTAINED
THROUGHOUT CONSTRUCTION.
B. VA WILL COORDINATE REMOVAL OF EXISTING ARTWORK. CONTRACTOR SHALL NOTIFY THE VA THREE WEEKS AHEAD OF CONSTRUCTION WORK IN EACH AREA IN ORDER FOR VA COORDINATE ARTWORK REMOVAL.
C. WALL-MOUNTED ITEMS TO REMAIN: WAYFINDING, HORN STROBES, FIRE ALARM DEVICES, AIR PRESSURE
SENSORS, BAROMETERS, NURSE CALL BUTTONS, ROOM INDICATOR LIGHTS, ROOM SIGNS AND
THERMOSTATS. PROTECT DURING ALL PHASES OF CONSTRUCTION.
D. EXISTING WALLS AND CONCRETE SLAB SHALL BE PATCHED AND REPAIRED AFTER EXPANSION JOINT REMOVAL. SLAB TO RECEIVE NEW FLOORING FINISH OR NEW EXPANSION JOINT, TYPICAL ALL FLOORS. REFER
TO AD101 FOR DEMOLITION DETAILS.
E. SEE GI001 FOR INFECTION CONTROL REQUIREMENTS IN EACH SPACE.
REMOVE EXISTING
EXPANSION JOINT COVER
PATCH AND REPAIR EXISTING
ADJACENT GYP BOARD TO RECEIVE
NEW FINISH / EXPANSION JOINT
COVER
INSPECT EXISTING FIRE
SAFING. REMOVE AND REPLACE
IF GAPS OR HOLES ARE SEEN
IN EXISTING CONSTRUCTION
EXISTING METAL
FRAMING TO
REMAIN
+/- 2"
EXISTING
FLOORING
EXISTING
FLOORING
INSPECT EXISTING FIRE
SAFING. REMOVE & REPLACE
IF GAPS OR HOLES ARE SEEN IN
EXISTING CONSTRUCTION
REMOVE COVER PLATE
REMOVE
COMPRESSIBLE
FILLER
REMOVE EXPANSION
ANCHORS. PATCH AND
PREPARE EXISTING
CONCRETE SLAB TO
RECEIVE NEW
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
CONSTRUCTION / BID
Cincinnati VA
Medical Center
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD
FFE Inc 110 Boggs Lane, Suite 170 Cincinnati, OH 45246 513-522-0956
STAMPCONSULTANT
321 4 5 6 7 8 9 10
REPLACE EXPANSION
JOINTS
CINCINNATI, OH
539-21-106
FULLY SPRINKLED
C U s e rs
\d a n ff
\O n e D ri v e
\D o c u m e n ts \F
F E
C in c in n a ti
E x p a n s io n J o in ts B d a n
.b e rg e rC L
J .r v t
/2
/2
:4
:0
P M
AD101
FIRST FLOOR DEMOLITION PLAN
07/02/21 PQ DB
N Scale: 1/16" = 1'-0"
FIRST FLOOR DEMOLITION PLAN
1 REMOVE EXISTING FLOOR EXPANSION JOINT COVER AND WALL EXPANSION JOINT COVER. INSPECT ALL FIRESAFING ASSOCIATED WITH EXPANSION JOINT AND REPLACE AS NECESSARY. SEE AE701 FOR
EXPANSION JOINT SCHEDULE AND DETAILS.
2 REMOVE EXISTING FLOORING TO EDGES OF SCOPE OF WORK AND CENTERLINE OF DOOR. REMOVE EXISTING WALL BASE, CEILING TILES AND GRID. PREPARE TO RECEIVE NEW FINISHES. SEE NEW WORK
PLANS.
3 REMOVE EXISTING ACOUSTIC CEILING TILES AND GRID. CONTRACTOR SHALL COORDINATE
REINSTALLATION OF EXISTING LIGHT FIXTURES, EQUIPMENT, AND ALL OTHER ITEMS. DO NOT DISCONNECT
FIXTURES/EQUIPMENT WHEREVER POSSIBLE.
4 REMOVE PORTION OF EXISTING WALL AS REQUIRED TO INSTALL FRT BLOCKING FOR NEW HANDRAIL
INSTALLATION. REFER TO 1/AE702 FOR DETAIL.
5 LEVEL EXISTING CONCRETE SLABS AND FEATHER EACH SLAB. PREPARE FOR NEW EXPANSION JOINT.
6 REMOVE EXISTING CARPET, WALL BASE, AND ADHESIVES FROM EXISTING FLOOR SLAB. PREPARE SLAB
FOR NEW FINISHES.
7 EXISTING WALL TILE TO REMAIN.
8 EXISTING GYPSUM BOARD SOFFIT ABOVE TO REMAIN.
G E N E R A L N O T E S
D R A W I N G N O T E S
L E G E N D
6" = 1'-0"AD101
2 EXP. JOINT WALL - DEMO
6" = 1'-0"AD101
3 EXP. JOINT FLOOR - DEMO
DN
DN
DN
UP
DN
UP
UP
DN UP DN
DN UP
UP
DN
UP
UP
A/C Shaft
A/C Shaft
A/C Shaft
2 2
3 3
2E
2D
2I
2N
2A
2C 2B
Corridor C*2*9
Corridor C*2*8
Corridor C*2*9
Corridor C*2*6
Corridor C*2*6Corridor
C*2*1
Corridor C*2*1
Corridor C*2*5
Corridor C*2*2
Corridor C*2*2
Corridor C*2*4
Corridor C*2*3
Corridor C*2*7
EXISTING EXPANSION JOINT TO BE REMOVED
AREA NOT IN SCOPE
2I
EXPANSION JOINT TAG. REFER TO
SCHEDULE ON AE701
A. WALL- AND CEILING-MOUNTED ITEMS TO BE REMOVED AND REPLACED BY THE CONTRACTOR: CONVEX MIRRORS, CEILING HUNG SIGNS. EXISTING EMERGENCY EXIT SIGNS SHALL REMAIN AND BE MAINTAINED
THROUGHOUT CONSTRUCTION.
B. VA WILL COORDINATE REMOVAL OF EXISTING ARTWORK. CONTRACTOR SHALL NOTIFY THE VA THREE WEEKS AHEAD OF CONSTRUCTION WORK IN EACH AREA IN ORDER FOR VA COORDINATE ARTWORK REMOVAL.
C. WALL-MOUNTED ITEMS TO REMAIN: WAYFINDING, HORN STROBES, FIRE ALARM DEVICES, AIR PRESSURE
SENSORS, BAROMETERS, NURSE CALL BUTTONS, ROOM INDICATOR LIGHTS, ROOM SIGNS AND
THERMOSTATS. PROTECT DURING ALL PHASES OF CONSTRUCTION.
D. EXISTING WALLS AND CONCRETE SLAB SHALL BE PATCHED AND REPAIRED AFTER EXPANSION JOINT REMOVAL. SLAB TO RECEIVE NEW FLOORING FINISH OR NEW EXPANSION JOINT, TYPICAL ALL FLOORS. REFER
TO AD101 FOR DEMOLITION DETAILS.
E. SEE GI001 FOR INFECTION CONTROL REQUIREMENTS IN EACH SPACE.
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
CONSTRUCTION / BID
Cincinnati VA
Medical Center
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD
FFE Inc 110 Boggs Lane, Suite 170 Cincinnati, OH 45246 513-522-0956
STAMPCONSULTANT
321 4 5 6 7 8 9 10
REPLACE EXPANSION
JOINTS
CINCINNATI, OH
539-21-106
FULLY SPRINKLED
C U s e rs
\d a n ff
\O n e D ri v e
\D o c u m e n ts \F
F E
C in c in n a ti
E x p a n s io n J o in ts B d a n
.b e rg e rC L
J .r v t
/2
/2
:4
:2
P M
AD102
SECOND FLOOR DEMOLITION PLAN
07/02/21 PQ DB
N Scale: 1/16" = 1'-0"
SECOND FLOOR DEMOLITION PLAN
1 REMOVE EXISTING FLOOR EXPANSION JOINT COVER AND WALL EXPANSION JOINT COVER. INSPECT ALL FIRESAFING ASSOCIATED WITH EXPANSION JOINT AND REPLACE AS NECESSARY. SEE AE701 FOR
EXPANSION JOINT SCHEDULE AND DETAILS.
2 REMOVE EXISTING FLOORING TO EDGES OF SCOPE OF WORK AND CENTERLINE OF DOOR. REMOVE EXISTING WALL BASE, CEILING TILES AND GRID. PREPARE TO RECEIVE NEW FINISHES. SEE NEW WORK
PLANS.
3 REMOVE EXISTING ACOUSTIC CEILING TILES AND GRID. CONTRACTOR SHALL COORDINATE
REINSTALLATION OF EXISTING LIGHT FIXTURES, EQUIPMENT, AND ALL OTHER ITEMS. DO NOT DISCONNECT
FIXTURES/EQUIPMENT WHEREVER POSSIBLE.
4 EXISTING GYPSUM BOARD SOFFIT ABOVE TO REMAIN.
5 EXISTING LOBBY NOT IN SCOPE OF WORK.
G E N E R A L N O T E S
D R A W I N G N O T E S
L E G E N D
UP
UP
UP
UP
UP
UP
UP
DN
DN
DN
DNUP
DN UP
DN
UP
UPDN
DN
A/C Shaft A/C Shaft
A/C Shaft
4 4
5 5 5
3C
3A
3B
3N
3Q
Corridor A304
Corridor C*3*1
Corridor C*3*3
Corridor C*3*4
Corridor C*3*6
Corridor C3*0*8
Corridor C*3*5
Corridor C*3*1
Work Area B322A
Adm. Asst.
A324
CORRIDOR
A311
EXISTING EXPANSION JOINT TO BE REMOVED
AREA NOT IN SCOPE
2I
EXPANSION JOINT TAG. REFER TO
SCHEDULE ON AE701
A. WALL- AND CEILING-MOUNTED ITEMS TO BE REMOVED AND REPLACED BY THE CONTRACTOR: CONVEX MIRRORS, CEILING HUNG SIGNS. EXISTING EMERGENCY EXIT SIGNS SHALL REMAIN AND BE MAINTAINED
THROUGHOUT CONSTRUCTION.
B. VA WILL COORDINATE REMOVAL OF EXISTING ARTWORK. CONTRACTOR SHALL NOTIFY THE VA THREE WEEKS AHEAD OF CONSTRUCTION WORK IN EACH AREA IN ORDER FOR VA COORDINATE ARTWORK REMOVAL.
C. WALL-MOUNTED ITEMS TO REMAIN: WAYFINDING, HORN STROBES, FIRE ALARM DEVICES, AIR PRESSURE
SENSORS, BAROMETERS, NURSE CALL BUTTONS, ROOM INDICATOR LIGHTS, ROOM SIGNS AND
THERMOSTATS. PROTECT DURING ALL PHASES OF CONSTRUCTION.
D. EXISTING WALLS AND CONCRETE SLAB SHALL BE PATCHED AND REPAIRED AFTER EXPANSION JOINT REMOVAL. SLAB TO RECEIVE NEW FLOORING FINISH OR NEW EXPANSION JOINT, TYPICAL ALL FLOORS. REFER
TO AD101 FOR DEMOLITION DETAILS.
E. SEE GI001 FOR INFECTION CONTROL REQUIREMENTS IN EACH SPACE.
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
CONSTRUCTION / BID
Cincinnati VA
Medical Center
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD
FFE Inc 110 Boggs Lane, Suite 170 Cincinnati, OH 45246 513-522-0956
STAMPCONSULTANT
321 4 5 6 7 8 9 10
REPLACE EXPANSION
JOINTS
CINCINNATI, OH
539-21-106
FULLY SPRINKLED
C U s e rs
\d a n ff
\O n e D ri v e
\D o c u m e n ts \F
F E
C in c in n a ti
E x p a n s io n J o in ts B d a n
.b e rg e rC L
J .r v t
/2
/2
:4
:5
P M
AD103
THIRD FLOOR DEMOLITION PLAN
07/02/21 PQ DB
N Scale: 1/16" = 1'-0"
THIRD FLOOR DEMOLITION PLAN
1 VA SHALL REMOVE EXISTING WALL-MOUNTED ARTWORK. CONTRACTOR COORDINATE REMOVAL AND
STORAGE WITH VA. SEE NEW WORK PLAN FOR EXTENT OF NEW WALL FINISH.
2 REMOVE EXISTING FLOOR EXPANSION JOINT COVER AND WALL EXPANSION JOINT COVER. INSPECT ALL FIRESAFING ASSOCIATED WITH EXPANSION JOINT AND REPLACE AS NECESSARY. SEE AE701 FOR
EXPANSION JOINT SCHEDULE AND DETAILS.
3 REMOVE EXISTING ACOUSTIC CEILING TILES AND GRID. CONTRACTOR SHALL COORDINATE
REINSTALLATION OF EXISTING LIGHT FIXTURES, EQUIPMENT, AND ALL OTHER ITEMS. DO NOT DISCONNECT
FIXTURES/EQUIPMENT WHEREVER POSSIBLE.
4 REMOVE EXISTING FLOORING TO EDGES OF SCOPE OF WORK AND CENTERLINE OF DOOR. REMOVE EXISTING WALL BASE, CEILING TILES AND GRID. PREPARE TO RECEIVE NEW FINISHES. SEE NEW WORK
PLANS.
5 REMOVE EXISTING CARPET, WALL BASE, AND ADHESIVES FROM EXISTING FLOOR SLAB. PREPARE SLAB
FOR NEW FINISHES.
6 REMOVE PORTION OF EXISTING WALL AS REQUIRED TO INSTALL FRT BLOCKING FOR NEW HANDRAIL
INSTALLATION. REFER TO 1/AE702 FOR DETAIL.
7 REMOVE EXISTING WALL COVERING - PREPARE EXISTING WALL FOR NEW FINISH.
8 EXISTING STAINLESS STEEL WALL PANELS TO REMAIN. PROTECT DURING ALL PHASES OF CONSTRUCTION.
9 EXISTING WALL STORAGE TO REMAIN.
10 EXISTING GYPSUM BOARD SOFFIT ABOVE TO REMAIN.
11 REMOVE WALL TILE. PATCH AND REPAIR EXISTING GYPSUM BOARD TO LIKE NEW CONDITION.
12 REMOVE FRP WALL PROTECTION - REPAIR ADJACENT GYPSUM BOARD TO RECEIVE NEW FINISH.
13 REMOVE FRP WALL PROTECTION AROUND EXISTING DRINKING FOUNTAIN - REPAIR ADJACENT GYPSUM
BOARD TO RECEIVE NEW FINISH.
G E N E R A L N O T E S
D R A W I N G N O T E S
L E G E N D
UP DNUP
DN
UP
DN
UP
UP
DN
A/C ShaftA/C Shaft
A/C Shaft
A/C ShaftA/C Shaft
A/C Shaft
2 2
4B
4 4
Corridor C*4*2
Corridor C*4*3
Corridor C*4*2
Corridor C*4*4
Corridor C*4*1
Corridor C*4*6
Corridor C*4*1
EXISTING EXPANSION JOINT TO BE REMOVED
AREA NOT IN SCOPE
2I
EXPANSION JOINT TAG. REFER TO
SCHEDULE ON AE701
A. WALL- AND CEILING-MOUNTED ITEMS TO BE REMOVED AND REPLACED BY THE CONTRACTOR: CONVEX MIRRORS, CEILING HUNG SIGNS. EXISTING EMERGENCY EXIT SIGNS SHALL REMAIN AND BE MAINTAINED
THROUGHOUT CONSTRUCTION.
B. VA WILL COORDINATE REMOVAL OF EXISTING ARTWORK. CONTRACTOR SHALL NOTIFY THE VA THREE WEEKS AHEAD OF CONSTRUCTION WORK IN EACH AREA IN ORDER FOR VA COORDINATE ARTWORK REMOVAL.
C. WALL-MOUNTED ITEMS TO REMAIN: WAYFINDING, HORN STROBES, FIRE ALARM DEVICES, AIR PRESSURE
SENSORS, BAROMETERS, NURSE CALL BUTTONS, ROOM INDICATOR LIGHTS, ROOM SIGNS AND
THERMOSTATS. PROTECT DURING ALL PHASES OF CONSTRUCTION.
D. EXISTING WALLS AND CONCRETE SLAB SHALL BE PATCHED AND REPAIRED AFTER EXPANSION JOINT REMOVAL. SLAB TO RECEIVE NEW FLOORING FINISH OR NEW EXPANSION JOINT, TYPICAL ALL FLOORS. REFER
TO AD101 FOR DEMOLITION DETAILS.
E. SEE GI001 FOR INFECTION CONTROL REQUIREMENTS IN EACH SPACE.
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
CONSTRUCTION / BID
Cincinnati VA
Medical Center
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD
FFE Inc 110 Boggs Lane, Suite 170 Cincinnati, OH 45246 513-522-0956
STAMPCONSULTANT
321 4 5 6 7 8 9 10
REPLACE EXPANSION
JOINTS
CINCINNATI, OH
539-21-106
FULLY SPRINKLED
C U s e rs
\d a n ff
\O n e D ri v e
\D o c u m e n ts \F
F E
C in c in n a ti
E x p a n s io n J o in ts B d a n
.b e rg e rC L
J .r v t
/2
/2
:4
:0
P M
AD104
FOURTH FLOOR DEMOLITION PLAN
07/02/21 PQ DB
N Scale: 1/16" = 1'-0"
FOURTH FLOOR DEMOLITION PLAN
1 REMOVE EXISTING FLOOR EXPANSION JOINT COVER AND WALL EXPANSION JOINT COVER. INSPECT ALL FIRESAFING ASSOCIATED WITH EXPANSION JOINT AND REPLACE AS NECESSARY. SEE AE701 FOR
EXPANSION JOINT SCHEDULE AND DETAILS.
2 REMOVE EXISTING FLOORING TO EDGES OF SCOPE OF WORK AND CENTERLINE OF DOOR. REMOVE EXISTING WALL BASE, CEILING TILES AND GRID. PREPARE TO RECEIVE NEW FINISHES. SEE NEW WORK
PLANS.
3 REMOVE EXISTING WALL COVERING - PREPARE EXISTING WALL FOR NEW FINISH.
4 EXISTING WALL PROTECTION PANELS TO REMAIN. PROTECT DURING ALL PHASES OF CONSTRUCTION.
5 EXISTING WALL TILE TO REMAIN.
6 EXISTING GYPSUM BOARD SOFFIT ABOVE TO REMAIN.
7 REMOVE EXISTING FRP WALL PROTECTION.
G E N E R A L N O T E S
D R A W I N G N O T E S
L E G E N D
** 4TH FLOOR SCOPE IS INCLUDED UNDER PROJECT ALTERNATE NUMBER 2
DN
UP
DN
A/C Shaft
A/C ShaftA/C Shaft
2 2
5B
Corridor C*5*5
Waiting Area A550
Corridor C*5*2
Corridor C*5*4
Corridor C*5*1
Corridor C*5*1
5D
EXISTING EXPANSION JOINT TO BE REMOVED
AREA NOT IN SCOPE
2I
EXPANSION JOINT TAG. REFER TO
SCHEDULE ON AE701
A. WALL- AND CEILING-MOUNTED ITEMS TO BE REMOVED AND REPLACED BY THE CONTRACTOR: CONVEX MIRRORS, CEILING HUNG SIGNS. EXISTING EMERGENCY EXIT SIGNS SHALL REMAIN AND BE MAINTAINED
THROUGHOUT CONSTRUCTION.
B. VA WILL COORDINATE REMOVAL OF EXISTING ARTWORK. CONTRACTOR SHALL NOTIFY THE VA THREE WEEKS AHEAD OF CONSTRUCTION WORK IN EACH AREA IN ORDER FOR VA COORDINATE ARTWORK REMOVAL.
C. WALL-MOUNTED ITEMS TO REMAIN: WAYFINDING, HORN STROBES, FIRE ALARM DEVICES, AIR PRESSURE
SENSORS, BAROMETERS, NURSE CALL BUTTONS, ROOM INDICATOR LIGHTS, ROOM SIGNS AND
THERMOSTATS. PROTECT DURING ALL PHASES OF CONSTRUCTION.
D. EXISTING WALLS AND CONCRETE SLAB SHALL BE PATCHED AND REPAIRED AFTER EXPANSION JOINT REMOVAL. SLAB TO RECEIVE NEW FLOORING FINISH OR NEW EXPANSION JOINT, TYPICAL ALL FLOORS. REFER
TO AD101 FOR DEMOLITION DETAILS.
E. SEE GI001 FOR INFECTION CONTROL REQUIREMENTS IN EACH SPACE.
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA…
This is the start of the file's text. The full file is on GovTribe.