This document contains a request for information (RFI) response related to a federal construction contract opportunity for site preparation work at a Department of Veterans Affairs medical center. The RFI response provides answers to questions about electrical outlet and communications outlet locations, conduit and cable requirements, panel schedules, and addresses for proposal submission.
The related federal contract opportunity is a pre-solicitation notice for a firm fixed price construction contract valued between $1 million and $5 million to install 251 hospital-grade duplex receptacles, 332 terminated CAT-6A cables, conduit, raceways, and firestopping at a VA medical center in Detroit, Michigan. The work must be completed within 60 days of award. The solicitation will be issued on July 28, 2021 via beta.SAM.gov with a response due date specified in the solicitation documents. The NAICS code is 238210 and size standard of $16.5 million applies. All questions must be submitted in writing to the contracting officer by the specified date.
View the file
Other files for this federal contract opportunity
Show all 24
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
36C25021B0062 ‐ Project 553‐21‐706 – DDPO – Detroit VAMC. Detroit MI
1. Can the VA please provide the spreadsheet which identifies the outlet locations throughout the facility? Attached.
2. Will there be any dedicated electrical circuits such as 120v/20A or 208v/30A for communications equipment? See RFI response 10.
3. Can the VA please provide existing electrical panel schedules for all affected electrical rooms/panels? It’s assumed that there is existing space for the required work; panel schedules are not necessary but shall be updated during the project.
4. Does the VA anticipate the need for new distribution panels or sub‐panels to support the new electrical outlets? The VA does not anticipate the need for any additional panels or sub‐panels.
5. ‐In Div. 26 it identifies colored conduit systems, is this an actual requirement that all conduits shall be color coded per system type? Yes. HFC cable can be used to fish the wall but shall enter a J‐box connected to appropriate colored conduit once entering interstitial space.
6. The drawings provided on Beta.Sam.Gov do not appear to be formatted correctly for viewing in
PDF or printing. Can the VA provide properly formatted drawings of the facility for our use, preferably scaled drawings for appropriate take offs? Already provided to CO/CS
7. The provided drawings identify ~100 communications outlets and 1 electrical outlet, can the VA provide the appropriate locations for each electrical and communications outlet, as well as any special requirements per outlet location such as dedicated circuits? Outlet can be on gen purpose if there is space on the circuit. See RFI 10.
8. Per Block 8 of the SF1442 it identifies to address the offer to Department of VA, NCO 10, Independence, OH. Is this the correct address to submit our proposal responses? If not, can you please provide the correct address to hand deliver bid packages?
Answer: ALL BID should be addressed to Mr. Kyle Lipper 24 Frank Lloyd Wright Dr., Suite M‐
2200, Ann Arbor 48105
9. Requesting drawings/schematic for interstitial spaces of the affected areas of hospital.
10. How many Circuits per drop? Each drop is 2‐4 duplex receptacles? Follow NEC guidelines for loading circuits typically 13 max to 20A/120V circuit for general purpose use. NEC 220.14, I.
36C25021B0062 ‐ Project 553‐21‐706 – DDPO – Detroit VAMC. Detroit MI
11. Are we to use double gang cut in boxes or (2) single gang? Double gang cut‐in boxes are acceptable.
12. Are we to provide patch panels for terminating Cat 6A or will that be provided by the VA?
Termination, jacks and patch panels are responsibility of the contractor.
13. Base on the walk‐through noticed that the square duct that’s in the data closets are over 100% filled with data cabling. Was there plans on adding an additional square duct or 4” conduit from the rack location to the interstitial area for all the new Cat6 cabling that’s require, the plans doesn’t call out for any new duct or 4” conduit in the data closets. As and alternative to running cable in interstitial, use 4” conduit as a sleeve to run horizontally above drop ceilings as required using j‐hooks above ceiling to suspend data cable.