This document contains a request for information and related federal contract opportunity notice for renovations to the third floor west wing at the Northern Indiana Health Care System facility in Fort Wayne, Indiana. The Department of Veterans Affairs is seeking proposals from Service-Disabled Veteran-Owned Small Businesses for construction services including demolition, repairs, and finishes work to modernize spaces for cardiology, cardiopulmonary, nuclear medicine, urology and supporting areas. The contract value is estimated between $2-5 million. Offerors should monitor the solicitation to be posted on May 24, 2021 on Beta.SAM.gov for additional details. Questions will only be addressed through formal requests for information submitted after issuance of the solicitation documents.

View the file

Other files

File Type Posted
36C25021B0049 0008.docx DOCX document
VHA Directive 1193 COVID 2019 Vaccination August 13 2021.pdf PDF
36C25021B0049 0007.docx DOCX document
RFI 43 - Response.pdf PDF
RFI 61 - Response.pdf PDF
RFI 73 - Response.pdf PDF
RFI 71 - Response.pdf PDF
RFI 63 - Response.pdf PDF
RFI 77 - Response.pdf PDF
RFI 56 - Response.pdf PDF
RFI 59 - Response.pdf PDF
RFI 53 - Response.pdf PDF
RFI 41 - Response.pdf PDF
RFI 33 - Response.pdf PDF
RFI 35 - Response.pdf PDF
RFI 44 - Response.pdf PDF
RFI 36 - Response.pdf PDF
RFI 81 - Response.pdf PDF
RFI 75 - Response.pdf PDF
RFI 37 - Response.pdf PDF
RFI 32 - Response.pdf PDF
RFI 58 - Response.pdf PDF
36C25021B0049 0006.docx DOCX document
RFI 49 - Response.pdf PDF
RFI 66 - Response.pdf PDF
RFI 46 - Response.pdf PDF
RFI 64 - Response.pdf PDF
RFI 79 - Response.pdf PDF
RFI 62 - Response.pdf PDF
RFI 34 - Response.pdf PDF
RFI 83 - Response.pdf PDF
RFI 60 - Response.pdf PDF
RFI 51 - Response.pdf PDF
RFI 55 - Response.pdf PDF
RFI 84 - Response.pdf PDF
RFI 52 - Response.pdf PDF
RFI 54 - Response.pdf PDF
RFI 39 - Response.pdf PDF
RFI 76 - Response.pdf PDF
RFI 45 - Response.pdf PDF
RFI 40 - Response.pdf PDF
RFI 38 - Response.pdf PDF
RFI 80 - Response.pdf PDF
RFI 42 - Response.pdf PDF
RFI 67 - Response.pdf PDF
RFI 57 - Response.pdf PDF
RFI 82 - Response.pdf PDF
RFI 70 - Response.pdf PDF
RFI 47 - Response.pdf PDF
RFI 74 - Response.pdf PDF
Show 40 more

Latest 50 of 98 listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

REQUEST FOR INFORMATION (RFI)

36C25021B0049

PROJECT NUMBER: 610A4-18-102 Please ensure that before submitting questions or requests for clarification that you thoroughly read the solicitation, specifications, drawings and other pertinent documents. When submitting questions on this project the Government requires contractors to specifically identify the specification and/or solicitation section(s) or drawing number(s) in reference to the question or request for clarification submitted. No question or request for clarification will be answered by the Government unless the above requirements are met. Failure to comply may prevent the Government from responding in a timely manner.

PROJECT TITLE: Remodel West Wing, 3rd Floor

PROJECT LOCATION:

Department of Veterans Affairs 2121 Lake Avenue Fort Wayne, IN 46805

TO:

Yvonne Demorest, Contracting Officer Department of Veterans Affairs NCO10 Contracting Office 2780 Airport Drive, Suite 340 Columbus, OH 43219 Yvonne.demorest@va.gov

RFI NO.: DATE:

SPEC/DWG. REFERENCE(s):

REPLY NEEDED BY:

INFORMATION NEEDED:

REPLY:

REPLY FROM: DATE:

ATTACHMENTS: COPY TO:

SUBMITTED BY: CITY/STATE:

PHONE:

1.In the alternate pricing CLIN 0003, Can the VA provide what they are wanting for the Shell Space? Are we to demo and rework this space to convert it to a shell space? If so we have no drawings related to said work?

Please Clarify

2. Will you provide a demolition drawing for the light fixtures that are being demolished?

3. What is the manufacture and model of switchboard DP1?

4. Will you provide a drawing showing the routing from switchboard DP1 to Panel LP3F?

4 7/30/2021

ToriRoberts Text Box 1.) Existing space to be demo'd and finished with corridor finishes.

2.) Sheet ED103 provides direction for demolition of the light fixtures. Reference ED103 plan and ED103 general note #1.

3.) This information will need to be field verified.

4.) Routing from DP1 to LP3F will be considered means and methods. Best routing approaches should be determined in field by the contractor.