QASP_Adult_Day.docx
DOCX document 17 KB Posted
- Attached to
- Frenchtown Senior Center (VA-19-00026565)
- Solicitation number
- 36C25019Q0281
About this file
36C25019Q0281 QASP Adult Day.docx
View the file
Other files
| File | Type | Posted |
|---|---|---|
| 36C25019D0042-000.docx | DOCX document | |
| CONTRACTORS_PAST_PERFORMANCE.docx | DOCX document | |
| WD_15-4859_R-7_Monroe.docx | DOCX document | |
| CONTRACTOR_CERTIFICATION_OF_COMPLIANCE_WITH_THE_IMMIGRATION_AND_NATIONALITY_ACT_OF_1952.pdf | ||
| 36C25019Q0281.docx | DOCX document | |
| 36C25019Q0281_1.docx | DOCX document |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
D.2 Adult Day Health Services Quality Assurance Surveillance Plan (QASP)
1. PURPOSE
Quality Assurance Surveillance Plan (QASP) is required to ensure that the medical, adult day and psycho-social needs of VA beneficiaries are being met and that they are receiving the same or comparable level of care as other adult day care patients.
The VA, at its sole option, will monitor the professional care and administrative management of services provided to VA beneficiaries under this agreement, through one or any combination of the following methods; reviews of state agencies reports, on-site review of the Adult Day facility by VA staff, and/or on-site monitoring of VA patients. It is agreed that the Adult Dave Services shall provide VA with copies of all state agency reports when requested, and cooperate fully with VA's quality improvement-quality assurance program functions relating to this agreement, including VA's on-site review and monitoring.
2. GOVERNMENT ROLES AND RESPONSIBILITIES
The following personnel shall oversee and coordinate surveillance activities.
| a. | Contracting Officer (CO) – The CO shall ensure performance of all necessary actions for effective contracting, ensure compliance with the contract terms, and shall safeguard the interests of the United States in the contractual relationship. The CO shall also assure that the contractor receives impartial, fair, and equitable treatment under this contract. The CO is ultimately responsible for the final determination of the adequacy of the contractor’s performance. |
| b. | Contracting Officer’s Representative (COR) – The COR is responsible for technical administration of the contract and shall assure proper Government surveillance of the contractor’s performance. The COR shall keep a quality assurance file. The COR is not empowered to make any contractual commitments or to authorize any contractual changes on the Government’s behalf. |
| 3. | PERFORMANCE STANDARDS |
The contractor is responsible for performance of ALL terms and conditions of the contract. CORs will provide contract progress reports annually to the CO reflecting performance and all other aspects of the resultant contract. The performance standards outlined in this Statement of Work (SOW) shall be used to determine the level of contractor performance in the elements defined.
Performance standards define desired services. The Government performs surveillance to determine the level of Contractor performance to these standards.
4. DOCUMENTING PERFORMANCE
a. The Government shall document positive and/or negative performance. Any report may become a part of the supporting documentation for any contractual action and preparing annual past performance using CONTRACTOR PERFORMANCE ASSESSMENT REPORT (CPAR).
b. If contractor performance does not meet the Acceptable Quality level, the CO shall inform the contractor. This will normally be in writing unless circumstances necessitate verbal communication. In any case the CO shall document the discussion and place it in the contract file. When the COR and the CO determines formal written communication is required, the COR shall prepare a Contract Discrepancy Report (CDR), and present it to CO. The CO will in turn review and will present to the contractor's program manager for corrective action. The contractor shall acknowledge receipt of the CDR in writing. The CDR will specify if the contractor is required to prepare a corrective action plan to document how the contractor shall correct the unacceptable performance and avoid a recurrence. The CDR will also state how long after receipt the contractor has to present this corrective action plan to the CO. The Government shall review the contractor's corrective action plan to determine acceptability. The CO shall also assure that the contractor receives impartial, fair, and equitable treatment. The CO is ultimately responsible for the final determination of the adequacy of the contractor’s performance and the acceptability of the Contractor’s corrective action plan. Any CDRs may become a part of the supporting documentation for any contractual action deemed necessary by the CO.
File details come from the government source that posted it.