Steam_System_Drawings.pdf
PDF 19 MB Posted
- Attached to
- Cincinnati Steam Trap Survey Planned Solicitation Release on or About 12/12/18 See SOW Beginning on Page 2
- Solicitation number
- 36C25019Q0210
About this file
36C25019Q0210 Steam System Drawings.pdf
View the file
Other files
| File | Type | Posted |
|---|---|---|
| 36C25019Q0210_0001.docx | DOCX document | |
| 36C25019Q0210_1.docx | DOCX document | |
| 36C25019Q0210_1_Solicitation_13Dec18.pdf | ||
| 36C25019Q0210.docx | DOCX document |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
RECORD DRAWINGS
NOT FOR CONSTRUCTION
HEAPY ENGINEERING
3/26/2013
CONVECTOR
BUTTERFLY VALVE
BALL VALVE
COMBINATION BALANCING/SHUT-OFF VALVE
SAFETY VALVE OR PRESSURE RELIEF
STRAIGHT-THRU TWO-POSITION CONTROL VALVE
THREE-WAY MODULATING CONTROL VALVE
STRAIGHT-THRU MODULATING CONTROL VALVE
EX.
EXISTING
ECCENTRIC REDUCER
DIRECTION OF FLOW
CAPPED OUTLET
SIDE CONNECTION
EXISTING WORK.
ACCESSORIES (SEE STANDARD DETAIL)
INVERTED BUCKET TRAP SET INCLUDING PIPING
POINT OF CONNECTION BETWEEN NEW AND
RISE OR DROP IN PIPE
BOTTOM CONNECTION, 45 DEG. OR 90 DEG.
TOP CONNECTION, 45 DEG. OR 90 DEG.
REDUCER OR INCREASER
DIRECTION OF PIPE PITCH (DOWN)
THERMOMETER
THERMODYNAMIC TRAP
STRAINER
GATE VALVE
PRESSURE GAGE
CHECK VALVE
GLOBE VALVE
PIPING ACCESSORIES (SEE STANDARD DETAIL)
FLOAT AND THERMOSTATIC TRAP SET INCLUDING
GATE VALVE WITH 3/4" HOSE END ADAPTER
UNION
CONV
LOW PRESSURE STEAM CONDENSATE RETURN
LOW PRESSURE STEAM (15 PSIG & BELOW)
MEDIUM PRESSURE STEAM CONDENSATE RETURN
MEDIUM PRESSURE STEAM (16 PSIG THRU 59 PSIG)
NUMBER INDICATES STEAM PRESSURE
NUMBER INDICATES STEAM PRESSURE
LPR
LPS (5)
MPS (30)
MPR
HEATING
DIAMETER
DIA
F&T
FLOAT AND THERMOSTATIC
FT
FEET
HIGH PRESSURE STEAM CONDENSATE RETURN
HIGH PRESSURE STEAM (60 PSIG AND ABOVE)
NUMBER INDICATES STEAM PRESSURE
HPS (125)
HPR
PIPE UP
PIPE DOWN
PIPING SYMBOLS
GENERAL NOTES
GENERAL
VALVES
ABBREVIATIONS
PUMPED CONDENSATE RETURNPR
CONDENSATE PUMP
CP
CABINET UNIT HEATER
CUH
FCU
FAN COIL UNIT
COTR
FD
FLOOR DRAIN
CONTRACTING OFFICER'S TECHNICAL REPRESENTATIVE
ANGLE GLOBE VALVE
PIPE GUIDE
PIPE ANCHOR
ORIFICE UNION
FLOW METER
LEGEND AND
GENERAL NOTES
H0
PLANS REFLECT CONDITIONS AS OF JANUARY 1, 2013.
FREE STEAM (LOW PRESSURE STEAM)
FS(5)
M
EDR
240 BTU
DEPARTMENT OF VETERANS AFFAIRS MEDICAL CENTER
3200 VINE STREET
CINCINNATI, OHIO 45220
PIPE BASEMENT FLOOR PLAN - AREA B
BASEMENT FLOOR PLAN - AREA A
PIPE BASEMENT FLOOR PLAN - AREA C
SUB-BASEMENT SERVICE ROOM PLAN
1-H1
PIPE BASEMENT FLOOR PLAN - AREA A
INDEX OF DRAWINGS
H1
CAMPUS SINGLE LINE KEY
C-SECTION BASEMENT MECH. RM. SCHEMATIC
H2
BUILDING 8 AND BUILDING 13 SCHEMATIC
H3
HIGH CRAWL SPACE SCHMATIC
H4
LPS ZONE 1A
LPS ZONE 2A
LPS ZONE 2B
LPS ZONE 3A
LPS ZONE 3B
LPS ZONE 3C
LPS ZONE 4A
LPS ZONE 4B
LPS ZONE 5A
LPS ZONE 5B
LPS ZONE 5C
LPS ZONE 6B
LPS ZONE 7A
LPS ZONE 8
SUB-BASEMENT SERVICE ROOM SCHEMATIC
H5
LPS ZONE 1B
MPS - AREA A SCHEMATIC
MPS - AREA B SCHEMATIC
OTHER MECHANICAL SPACES SCHEMATICS
LPS ZONE 6A
LPS ZONE 7B
BUILDING 15 SCHEMATIC
H6
AHU-1,2,3,4,& 5 SCHEMATIC
H7
FOURTH FLOOR PENTHOUSE SCHEMATIC
H8
LPS ZONES AND CONDENSATE RETURN SCHEMATIC
H9
H0
COVER SHEET, LEGEND, GENERAL NOTES, AND INDEX
H11
H12
H13
H14
H15
H16
H17
H18
H19
H10
H21
H22
H23
H24
H25
H26
H27
H28
H29
H20
1-H2
1-H3
1-H4
1-H5
1-H6
1-H7
1-H8
1-H9
1-H10
BASEMENT FLOOR PLAN - AREA B
BASEMENT FLOOR PLAN - AREA C
BASEMENT FLOOR PLAN - AREA D
FIRST FLOOR PLAN - AREA A
FIRST FLOOR PLAN - AREA B
FIRST FLOOR PLAN - AREA C
FIRST FLOOR PLAN - AREA D
SECOND FLOOR PLAN - AREA A
1-H11
1-H12
1-H13
1-H14
1-H15
1-H16
1-H17
1-H18
1-H19
1-H20
1-H21
1-H22
1-H23
1-H24
1-H25
1-H26
1-H27
1-H28
1-H29
1-H30
SECOND FLOOR PLAN - AREA B
SECOND FLOOR PLAN - AREA C
SECOND FLOOR PLAN - AREA D
THIRD FLOOR PLAN - AREA A
THIRD FLOOR PLAN - AREA B
THIRD FLOOR PLAN - AREA C
THIRD FLOOR PLAN - AREA D
FOURTH FLOOR PLAN - AREA A
FOURTH FLOOR PLAN - AREA B
FOURTH FLOOR PLAN - AREA C
FOURTH FLOOR PENTHOUSE PLAN
FIFTH FLOOR PLAN - AREA A
1-H31
1-H32
1-H33
1-H34
1-H35
FIFTH FLOOR PLAN - AREA B
FIFTH FLOOR PLAN - AREA C
SIXTH FLOOR PLAN - AREA A
SIXTH FLOOR PLAN - AREAS B & C
SEVENTH FLOOR PLAN - AREA A
SEVENTH FLOOR PLAN - AREAS B & C
EIGHT FLOOR PLAN - AREA A
EIGHT FLOOR PLAN - AREA B
NINTH FLOOR PLAN
TENTH FLOOR PENTHOUSE PLAN
8-H1
8-H2
BUILDING 8 BASEMENT AND GROUND FLOOR PLANS
BUILDING 8 SECOND AND THIRD FLOOR PLANS
(16 PSIG THRU 59 PSIG)
PUMPED CONDENSATE
PREHEAT COIL
REHEAT COIL
STEAM HUMIDIFIER
UNIT HEATER
PRESSURE REDUCING VALVE
MEDIUM PRESSURE STEAM SUPPLY
MEDIUM PRESSURE STEAM CONDENSATE RETURN
VARIABLE FREQUENCY DRIVEVFD
UH
SH
RH
PH
PRV
MPR
PC
MPS
MBH
1000 BTUH
PUMP
P
PROPELLER UNIT HEATER
PUH
OUTSIDE DIAMETER
OD
SQUARE FT OF RADIATION
SF
(1 EDR)
HORSEPOWER
POUNDS PER HOUR
HIGH PRESSURE STEAM SUPPLY (60 PSIG & ABOVE)
LOW PRESSURE STEAM SUPPLY (15 PSIG & BELOW)
LOW PRESSURE STEAM CONDENSATE RETURN
HIGH PRESSURE STEAM CONDENSATE RETURN
HPR
HPS
LPR
LBS/HR
LPS
HP
GALLONS PER MINUTE
GPM
HEAD
HD
INCHES
IN
15-H1
BUILDING 15 FLOOR PLANS
FREE STEAM - AREA A SCHEMATIC
FREE STEAM - AREA B SCHEMATIC
H30
H31
M
5"
L O
W
C
R A
W L
S
P A
C E
4"
4"
M
4" HPS TO BLDG. 15
CONT. ON SHEET H6
12" HPS FROM UC
B U
I L
D I N
G
B U
I L
D I N
G
B U
I L
D I N
G
B U
I L
D I N
G
G R
O U
N D
S
A
R E
A
T O
B
U I L
D I N
G
C O
N T
O
N
S
H E
E
H
B
U I L
D I N
G
C O
N T
O
N
S
H E
B U
I L
D I N
G
2.5" HPS TO BUILDING 3
4" HPS TO BUILDING 2
5" HPS TO 4TH FL. PH
CONT. ON SHEET H8
2" HPS TO MECH. RM.
CONT. ON SHEET H4
S E
R V
I C
E
R
O O
M
H I G
H
C
R A
A
C E
C S
E C
T I O
N
M
E C
H A
N I C
A
R
O
M
4" HPS TO MECH. RM.
CONT. ON SHEET H4
HPS TO GROUNDS
CONT. ON SHEET H3
KITCHEN EQUIPMENT
CONT. ON SHEET H5
AHU 14, 15, & 16
CONT. ON SHEET H5
PLATE & FRAME HX
CONT. ON SHEET H5
MPS ZONE LOOP
CONT. ON SHEET H5
HPS TO SPD
CONT. ON SHEET H5
AHU 19 & 20
CONT. ON SHEET H5
LPS ZONES
CONT. ON SHEET H9
AHU 1, 2, 3, 4, & 5
CONT. ON SHEET H7
B U
I L
D I N
G
6"
8"
5"
2"4"
4"
10" 10"12"
4"
GENERAL NOTES
A PLANS REFLECT CONDITIONS AS OF JANUARY 1,
2013.
M
4"
B U
I L
D I N
G
C
L C
H I G
H
C
R A
A
C E
L O
W
C
R A
A
C E
8" PR TO UC
5" PR
CONT. ON SHEET H3
1.5" PR
CONT. ON SHEET H7
1.5" PR
CONT. ON SHEET H4
2.5" PR
CONT. ON SHEET H4
PR
CONT. ON SHEET H3
M
M
8" 5"5"
1.5"
2.5"
1.5"
B U
I L
D I N
G
B U
I L
D I N
G
1.25" PR FROM BUILDING 3
2" PR FROM BUILDING 2
B U
I L
D I N
G
C
L C
B U
I L
D I N
G
G R
O U
N D
S
A
R E
A
H I G
H
C
R A
A
C E
RECORD DRAWINGS
NOT FOR CONSTRUCTION
HEAPY ENGINEERING
3/26/2013
H1
CAMPUS SINGLE LINE KEY
M M
10" HPS TO BLDG. 1
CONT. ON SHEET H3
4" HPS TO BLDG. 2
AND BUILDING 3
12" HPS FROM UC
5" PR FROM BLDG. 1
CONT. ON SHEET H2
2" PR FROM BLDG. 2
AND BLDG. 3
M
8" PR TO UC
GENERAL NOTES
A PLANS REFLECT CONDITIONS AS OF JANUARY 1,
2013.
M
RECORD DRAWINGS
NOT FOR CONSTRUCTION
HEAPY ENGINEERING
3/26/2013
8,13
H2
BUILDING 8 AND BUILDING 13
103 FT² EDR
B151A
24 FT² EDR
B151F
32 FT² EDR
B151H
40 FT² EDR
B151H
?? FT² EDR
B151H EXIT
32 FT² EDR
B151H
24 FT² EDR
B151H
14 FT² EDR
B151I
80 FT² EDR
B151
80 FT² EDR
B151L
80 FT² EDR
B151
80 FT² EDR
B151
80 FT² EDR
B151
80 FT² EDR
B151
4" HPS
CONT. ON SHEET H4
2" HPS
CONT. ON SHEET H4
5" HPS
CONT. ON SHEET H4
2.5" PR
CONT. ON SHEET H4
1.5" PR
CONT. ON SHEET H4
10" HPS
CONT. ON SHEET H5
10" HPS FROM BLDG. 8
CONT. ON SHEET H2
5" PR TO BLDG. 8
CONT. ON SHEET H2
1.25" MPR
CONT. ON SHEET H28
5" PR
CONT. ON SHEET H9
GENERAL NOTES
A PLANS REFLECT CONDITIONS AS OF JANUARY 1,
2013.
2" LPR
CONT. ON SHEET H14
RECORD DRAWINGS
NOT FOR CONSTRUCTION
HEAPY ENGINEERING
3/26/2013
H3
GROUNDS AREA AND HIGH CRAWL SPACE
2.5" PR
CONT. ON SHEET H3
5" HPS
CONT. ON SHEET H3
1.5" PR
CONT. ON SHEET H3
2" HPS
CONT. ON SHEET H3
4" HPS
CONT. ON SHEET H3
2.5" PR
CONT. ON SHEET H8
5" HPS
CONT. ON SHEET H8
3" HPS
CONT. ON SHEET H8
1.25" HPS
CONT. ON SHEET H8
0.75" HPR
CONT. ON SHEET H8
1" HPR
CONT. ON SHEET H8
GENERAL NOTES
A PLANS REFLECT CONDITIONS AS OF JANUARY 1,
2013.
BASEMENT
THIRD FLOOR
SECOND FLOOR
FIRST FLOOR
3RD FLOOR ROOF 3RD FLOOR ROOF
RECORD DRAWINGS
NOT FOR CONSTRUCTION
HEAPY ENGINEERING
3/26/2013
H4
BASEMENT MECHANICAL ROOM
M
10" HPS
CONT. ON SHEET H3
2" PR FROM BLDG. 15
CONT. ON SHEET H6
4" HPS TO BLDG. 15
CONT. ON SHEET H6
5" HPS AHU 1-5 PRV
CONT. ON SHEET H7
6" HPS TO LPS ZONE PRV
CONT. ON SHEET H9
5" MPS
CONT. ON SHEET H28
1.5" MPR
CONT. ON SHEET H9
2" HPR
CONT. ON SHEET H9
3" MPR
CONT. ON SHEET H28
1" MPR
CONT. ON SHEET H7
3" MPR
CONT. ON SHEET H9
1.5" MPR
CONT. ON SHEET H9
3" PR
CONT. ON SHEET H9
5" MPS
CONT. ON SHEET H27
1" MPR
CONT. ON SHEET H9
GENERAL NOTES
A PLANS REFLECT CONDITIONS AS OF JANUARY 1,
2013.
VENT PIPE
CONT. ON SHEET H7
VENT PIPE
CONT. ON SHEET H9
VENT PIPE
CONT. ON SHEET H9
1.25" HPS
CONT. ON SHEET H27
1" MPR
CONT. ON SHEET H7
HPR FROM P&F SKIDS
CONT. ON SHEET H9
.75" HPR
CONT. ON SHEET H27
RECORD DRAWINGS
NOT FOR CONSTRUCTION
HEAPY ENGINEERING
3/26/2013
H5
SUB-BASEMENT SERVICE ROOM
3RD FLOOR
1ST FLOOR ROOF
1ST FLOOR
BASEMENT
4" HPS FROM BLDG. 1
CONT. ON SHEET H5
2" PR TO BLDG. 1
CONT. ON SHEET H5
GENERAL NOTES
A PLANS REFLECT CONDITIONS AS OF JANUARY 1,
2013.
ROOF
2ND FLOOR
RECORD DRAWINGS
NOT FOR CONSTRUCTION
HEAPY ENGINEERING
3/26/2013
H6
BUILDING 15
M
M
9TH FLOOR ROOF 9TH FLOOR ROOF
9TH FLOOR 9TH FLOOR
8TH FLOOR 8TH FLOOR
7TH FLOOR 7TH FLOOR
6TH FLOOR 6TH FLOOR
5TH FLOOR 5TH FLOOR
4TH FLOOR 4TH FLOOR
3RD FLOOR 3RD FLOOR
2ND FLOOR 2ND FLOOR
1ST FLOOR 1ST FLOOR
BASEMENT BASEMENT
SUB-BASEMENT SUB-BASEMENT
2.5" MPR
CONT. ON SHEET H9
5" HPS
CONT. ON SHEET H5
2.5" MPR
CONT. ON SHEET H9
1" MPR
CONT. ON SHEET H5
1.5" PR
CONT. ON SHEET H9
2.5" MPR
CONT. ON SHEET H9
GENERAL NOTES
A PLANS REFLECT CONDITIONS AS OF JANUARY 1,
2013.
VENT PIPE
CONT. ON SHEET H5
1" HPR
CONT. ON SHEET H5
RECORD DRAWINGS
NOT FOR CONSTRUCTION
HEAPY ENGINEERING
3/26/2013
H7
AHUS 1-5
1.25" HPS
CONT. ON SHEET H4
0.75" HPR
CONT. ON SHEET H4
1" HPR
CONT. ON SHEET H4
5" HPS
CONT. ON SHEET H4
3" HPS
CONT. ON SHEET H4
2.5" PR
CONT. ON SHEET H4
GENERAL NOTES
A PLANS REFLECT CONDITIONS AS OF JANUARY 1,
2013.
RECORD DRAWINGS
NOT FOR CONSTRUCTION
HEAPY ENGINEERING
3/26/2013
H8
4TH FLOOR PENTHOUSE
L
P S
6" 8" 8" 14"
4"4"
4"4"
5"5"
5"5"
5"
L
P S
L
P S
5"5"
5"
4"
4"
5"
6"6"
6"
6"6"
6"
6"6"
6"
5"5"
5"
8"8"
8"
L
P S
L1
L8
F1
F2
6" HPS
CONT. ON SHEET H5
4" LPS (ZONE #1)
CONT. ON SHEET H10
L2
4" LPS (ZONE #2)
CONT. ON SHEET H12
L3
5" LPS (ZONE #3)
CONT. ON SHEET H14
5" LPS (ZONE #8)
CONT. ON SHEET H26
L7
6" LPS (ZONE #7)
CONT. ON SHEET H24
L6
6" LPS (ZONE #6)
CONT. ON SHEET H22
L5
6" LPS (ZONE #5)
CONT. ON SHEET H19
L4
5" LPS (ZONE #4)
CONT. ON SHEET H17
2" MPR
CONT. ON SHEET H27
2.5" MPR
CONT. ON SHEET H7
1.5" MPR
CONT. ON SHEET H27
1" MPR
CONT. ON SHEET H5
2" HPR
CONT. ON SHEET H5
1.5" MPR
CONT. ON SHEET H5
3" MPR
CONT. ON SHEET H5
2.5" MPR
CONT. ON SHEET H7
2.5" MPR
CONT. ON SHEET H7
3" PR
CONT. ON SHEET H5
1.5" MPR
CONT. ON SHEET H5
5" PR
CONT. ON SHEET H3
2" MPR
CONT. ON SHEET H28
1.5" PR
CONT. ON SHEET H7
GENERAL NOTES
A PLANS REFLECT CONDITIONS AS OF JANUARY 1,
2013.
VENT PIPE
CONT. ON SHEET H5
VENT PIPE
CONT. ON SHEET H5
1" HPR
CONT. ON SHEET H27
M
4" LPR
CONT. ON SHEET H11
6" LPR
CONT. ON SHEET H17
4" LPR
CONT. ON SHEET H20
1" LPR
CONT. ON SHEET H16
1.25" LPR
CONT. ON SHEET H13
1" LPR
CONT. ON SHEET H13
.75" LPR
CONT. ON SHEET H13
5" FREE STEAM
CONT. ON SHEET H31
8" FREE STEAM
CONT. ON SHEET H30
HPR FROM P&F SKIDS
CONT. ON SHEET H5
.75" LPR
CONT. ON SHEET H13
RECORD DRAWINGS
NOT FOR CONSTRUCTION
HEAPY ENGINEERING
3/26/2013
H9
LPS ZONES AND CONENSATE RETURN HEADERS
GENERAL NOTES
A PLANS REFLECT CONDITIONS AS OF JANUARY 1,
2013.
L1
4"
L
P S
L
P R
L
P S
L
P S
L
P S
3" LPS
L
P S
L
P R
L
P S
L
P S
L
P S
28 FT² EDR
B-627
34 FT² EDR
B-727
L
P S
2-1/2" LPS
L
P S
L
P R
L
P S
L
P S
28 FT² EDR
B-626
28 FT² EDR
B-625
L
P S
34 FT² EDR
B-726
36 FT² EDR
B-725b
L
P S
L
P R
L
P S
L
P S
44 FT² EDR
B-525
42 FT² EDR
B-625
L
P S
36 FT² EDR
B-725b
3/4"
1SR01 1SR02 1SR03 1SR04
1" LPR1-1/4" LPR1-1/2" LPR
4" LPS (ZONE #1)
CONT. ON SHEET H9
3" LPS
CONT. ON SHEET H11
2" LPR
CONT. ON SHEET H11
RECORD DRAWINGS
NOT FOR CONSTRUCTION
HEAPY ENGINEERING
3/26/2013
H10
STEAM RISER DIAGRAM - ZONE 1A
1SR05
L
P S
L
P R
36 FT² EDR
B-210
L
P S
32 FT² EDR
B-308
2-1/2" LPS
1SR06
L
P S
L
P R
28 FT² EDR
B-106
L
P S
20 FT² EDR
B-210b
20 FT² EDR
B-210b
32 FT² EDR
B-308
32 FT² EDR
B-308
1SR07
L
P S
L
P R
28 FT² EDR
B-107
28 FT² EDR
B-108
32 FT² EDR
B-210c
32 FT² EDR
B-210c
L
P S
32 FT² EDR
B-308
32 FT² EDR
B-309
36 FT² EDR
B-001c
1SR08
L
P S
L
P R
28 FT² EDR
B-109
55 FT² EDR
B-003
1SR09
L
P S
L
P R
32 FT² EDR
STAIR
32 FT² EDR
STAIR
L
P S
32 FT² EDR
STAIR
28 FT² EDR
B-004
1S10
L
P S
28 FT² EDR
B-111
L
P S
3/4"
1" LPR
L
P R
1R10
1-1/4" LPR1-1/2" LPR
28 FT² EDR
B-105
28 FT² EDR
B-110
?? FT² EDR
B-211a
20 FT² EDR
B-412
20 FT² EDR
B-412
3" LPS
CONT. ON SHEET H10
GENERAL NOTES
A PLANS REFLECT CONDITIONS AS OF JANUARY 1,
2013.
.75" LPR
CONT. ON SHEET H31
.75" LPR.75" LPR.75" LPR
3" LPR
CONT. ON SHEET H15
2" LPR
CONT. ON SHEET H10
4" LPR
CONT. ON SHEET H9
RECORD DRAWINGS
NOT FOR CONSTRUCTION
HEAPY ENGINEERING
3/26/2013
H11
STEAM RISER DIAGRAM - ZONE 1B
L2
3/4"
24 FT² EDR
B-010
L
P S
L
P R
20 FT² EDR
B-125a
24 FT² EDR
B-125
20 FT² EDR
B-223
20 FT² EDR
B-223
18 FT² EDR
B-314
22 FT² EDR
B-314
L
P S
34 FT² EDR
B-507
L
P S
34 FT² EDR
B-709
L
P S
26 FT² EDR
B-814
26 FT² EDR
B-814
3" LPS
2SR01 2SR02
L
P S
L
P R
24 FT² EDR
B-127A
L
P S
26 FT² EDR
B-225
28 FT² EDR
B-315
34 FT² EDR
B-507
L
P S
18.8 FT² EDR
B-610
34 FT² EDR
B-709
L
P S
26 FT² EDR
B-814
2SR03
L
P S
L
P R
26 FT² EDR
B-814
38 FT² EDR
B-814
2SR04
L
P S
L
P R
L
P S
2-1/2" LPS
2SR05
L
P S
L
P R
28 FT² EDR
B-226
28 FT² EDR
B-226
30 FT² EDR
B-318
L
P S
28 FT² EDR
B-509
28 FT² EDR
B-510
L
P S
18.8 FT² EDR
B-611b
18.8 FT² EDR
B-612a
32 FT² EDR
B-711
32 FT² EDR
B-712
20 FT² EDR
B-11
2SR06
L
P S
L
P R
L
P S
44 FT² EDR
B-226
L
P S
30 FT² EDR
B-319a
28 FT² EDR
B-510
3/4"
1" LPR1-1/4" LPR1-1/2" LPR2" LPR
?? FT² EDR
B-128
28 FT² EDR
B-508
18.8 FT² EDR
B-609
23.9 FT² EDR
B-612B
4" LPS (ZONE #2)
CONT. ON SHEET H9
2" LPR
CONT. ON SHEET H15
2.5" LPS
CONT. ON SHEET H13
2.5" LPS
CONT. ON SHEET H13
GENERAL NOTES
A PLANS REFLECT CONDITIONS AS OF JANUARY 1,
2013.
.75" LPR
CONT. ON SHEET H31
.75" LPR
CONT. ON SHEET H15
.75" LPR
CONT. ON SHEET H31
.75" LPR
CONT. ON SHEET H31
.75" LPR
CONT. ON SHEET H31
RECORD DRAWINGS
NOT FOR CONSTRUCTION
HEAPY ENGINEERING
3/26/2013
H12
STEAM RISER DIAGRAM - ZONE 2A
L
P S
L
P R
2SR07
30 FT² EDR
A-538
L
P S
32 FT² EDR
A-634c
32 FT² EDR
A-634c
22 FT² EDR
A-728d
L
P S
32 FT² EDR
A-833a
28 FT² EDR
A-921
2SR08
L
P S
L
P R
30 FT² EDR
A-537e
L
P S
32 FT² EDR
A-634b
32 FT² EDR
A-634b
22 FT² EDR
A-728d
18 FT² EDR
A-728
L
P S
18 FT² EDR
A-833
22 FT² EDR
A-833
L
P S
28 FT² EDR
A-921
22 FT² EDR
A-919
3/4"
L
P S
L
P R
36 FT² EDR
B-403a
22 FT² EDR
B-503
22 FT² EDR
B-501
22 FT² EDR
B-604
22 FT² EDR
B-601
L
P S
22 FT² EDR
B-705a
22 FT² EDR
B-702
L
P S
22 FT² EDR
B-807
22 FT² EDR
B-806
36 FT² EDR
B-903
26 FT² EDR
B-902
L
P S
L
P R
2SR09 2SR10
L
P S
22 FT² EDR
B-501
22 FT² EDR
B-601
22 FT² EDR
B-701
L
P S
22 FT² EDR
B-805
L
P S
26 FT² EDR
B-901
L
P S
L
P R
2SR11
L
P S
30 FT² EDR
A-538
32 FT² EDR
A-634c
22 FT² EDR
A-728d
L
P S
L
P S
36 FT² EDR
A-437
?? FT² EDR
B-437d
?? FT² EDR
A-537f
2.5" LPS
CONT. ON SHEET H12
2.5" LPS
CONT. ON SHEET H12
1" LPR
CONT. ON SHEET H16
GENERAL NOTES
A PLANS REFLECT CONDITIONS AS OF JANUARY 1,
2013.
1.25" LPR
CONT. ON SHEET H9
1" LPR
CONT. ON SHEET H9
.75" LPR
CONT. ON SHEET H9
.75" LPR
CONT. ON SHEET H9
RECORD DRAWINGS
NOT FOR CONSTRUCTION
HEAPY ENGINEERING
3/26/2013
H13
STEAM RISER DIAGRAM - ZONE 2B
L3
3SR01
L
P S
L
P R
24 FT² EDR
B-605
L
P S
L
P S
22 FT² EDR
B-809
3" LPS
L
P S
L
P R
L
P S
20 FT² EDR
B-505h
L
P S
22 FT² EDR
B-810a
28 FT² EDR
B-813
3SR02
3SR03
L
P S
L
P R
L
P S
30 FT² EDR
B-322
28 FT² EDR
B-432
L
P S
28 FT² EDR
B-521a
28 FT² EDR
B-620
L
P S
34 FT² EDR
B-819
4"
3SR04
L
P S
L
P R
28 FT² EDR
B-233
L
P S
30 FT² EDR
B-322
30 FT² EDR
B-322
32 FT² EDR
B-432
32 FT² EDR
B-432
28 FT² EDR
B-522
28 FT² EDR
B-523
28 FT² EDR
B-620
28 FT² EDR
B-621
L
P S
28 FT² EDR
B-722
34 FT² EDR
B-723
50 FT² EDR
B-819
L
P S
3SR05
L
P S
L
P R
42 FT² EDR
B-234b
42 FT² EDR
B-234c
L
P S
30 FT² EDR
B-322
40 FT² EDR
B-322
32 FT² EDR
B-433
38 FT² EDR
B-433
L
P S
28 FT² EDR
B-523
28 FT² EDR
B-622
28 FT² EDR
B-623
L
P S
34 FT² EDR
B-724
36 FT² EDR
B-725
3SR06
L
P S
L
P R
40 FT² EDR
B-322
L
P S
38 FT² EDR
B-433
L
P S
44 FT² EDR
B-525
42 FT² EDR
B-623
L
P S
36 FT² EDR
B-725
2-1/2" LPS
3S07
L
P S
L
P R
3R07
32 FT² EDR
B-322
36 FT² EDR
B-725
L
P R
3/4"
2-1/2" LPR3" LPR
?? FT² EDR
B-505c
28 FT² EDR
B-721
32 FT² EDR
B-234a
28 FT² EDR
B-313
?? FT² EDR
B-418
24 FT² EDR
B-505h
24 FT² EDR
B-706
5" LPS (ZONE #3)
CONT. ON SHEET H9
.75" LPR
CONT. ON SHEET H15
2.5" LPS
CONT. ON SHEET H16
3" LPS
CONT. ON SHEET H15
4" LPS
CONT. ON SHEET H16
3" LPR
CONT. ON SHEET H16
2" LPR
CONT. ON SHEET H3
GENERAL NOTES
A PLANS REFLECT CONDITIONS AS OF JANUARY 1,
2013.
.75" LPR
CONT. ON SHEET H31
.75" LPR
CONT. ON SHEET H15
.75" LPR
CONT. ON SHEET H31
.75" LPR
CONT. ON SHEET H31
.75" LPR
CONT. ON SHEET H31
RECORD DRAWINGS
NOT FOR CONSTRUCTION
HEAPY ENGINEERING
3/26/2013
H14
STEAM RISER DIAGRAM - ZONE 3A
3SR10
L
P S
L
P R
L
P S
20 FT² EDR
B-220
L
P S
28 FT² EDR
B-312
3SR11
L
P S
L
P R
L
P S
20 FT² EDR
B-220
26 FT² EDR
B-219
L
P S
48 FT² EDR
B-7
3S12
L
P S
L
P R
28 FT² EDR
B-123
28 FT² EDR
B-119
L
P S
26 FT² EDR
B-218
26 FT² EDR
B-218
3R12
42 FT² EDR
B-6
3SR13
L
P S
L
P R
28 FT² EDR
B-119
28 FT² EDR
B-118
L
P S
30 FT² EDR
B-217
26 FT² EDR
B-216
32 FT² EDR
B-311g
32 FT² EDR
B-311f
2-1/2" LPS
3SR14
L
P S
L
P R
28 FT² EDR
B-117
28 FT² EDR
B-117
L
P S
26 FT² EDR
B-215
26 FT² EDR
B-215
32 FT² EDR
B-311e
32 FT² EDR
B-311d
3SR15
L
P S
L
P R
28 FT² EDR
B-115
28 FT² EDR
B-115
L
P S
32 FT² EDR
B-311c
32 FT² EDR
B-311b
42 FT² EDR
B-5A
3SR16
L
P S
L
P R
28 FT² EDR
B-114
24 FT² EDR
B-112
L
P S
32 FT² EDR
B-311a
42 FT² EDR
B-5
3S17
3R17
L
P S
L
P R
42 FT² EDR
B-112
3/4"
1-1/4" LPR1-1/2" LPR2" LPR
24 FT² EDR
B-7
?? FT² EDR
B-311I
?? FT² EDR
B-311H
3" LPS
CONT. ON SHEET H14
.75" LPR
CONT. ON SHEET H14
2" LPR
CONT. ON SHEET H12
.75" LP
CONT. ON SHEET H14
GENERAL NOTES
A PLANS REFLECT CONDITIONS AS OF JANUARY 1,
2013.
1" LPR
CONT. ON SHEET H31
3" LPR
CONT. ON SHEET H16
3" LPR
CONT. ON SHEET H11
.75" LPR
CONT. ON SHEET H31
.75" LPR
CONT. ON SHEET H31
1" LPR
CONT. ON SHEET H31
RECORD DRAWINGS
NOT FOR CONSTRUCTION
HEAPY ENGINEERING
3/26/2013
H15
STEAM RISER DIAGRAM - ZONE 3B
3SR08
L
P S
L
P R
24 FT² EDR
B-504
22 FT² EDR
B-604
L
P S
24 FT² EDR
B-705a
L
P S
36 FT² EDR
B-903
3SR09
L
P S
L
P R
28 FT² EDR
A-325
L
P S
28 FT² EDR
B-535c
L
P S
L
P S
22 FT² EDR
B-19a
3/4"
3SR18
L
P S
L
P R
L
P S
30 FT² EDR
B-322a
28 FT² EDR
B-429b
L
P S
28 FT² EDR
B-518
18.8 FT² EDR
B-618
30 FT² EDR
B-716b
L
P S
34 FT² EDR
B-814
24 FT² EDR
B-14
3SR19
L
P S
L
P R
26 FT² EDR
B-231a
26 FT² EDR
B-231
30 FT² EDR
B-321
28 FT² EDR
B-517
30 FT² EDR
B-516
L
P S
30 FT² EDR
B-716a
30 FT² EDR
B-715b
L
P S
34 FT² EDR
B-814
32 FT² EDR
B-814
3" LPS
24 FT² EDR
B-14
3SR20
L
P S
L
P R
28 FT² EDR
B-135
L
P S
32 FT² EDR
B-230
28 FT² EDR
B-229
54 FT² EDR
B-320
30 FT² EDR
B-319f
28 FT² EDR
B-515
L
P S
L
P S
30 FT² EDR
B-715a
32 FT² EDR
B-714a
30 FT² EDR
B-814
20 FT² EDR
B-11
L
P S
L
P R
3SR21
28 FT² EDR
B-134
44 FT² EDR
B-227
30 FT² EDR
B-319e
30 FT² EDR
B-319d
L
P S
28 FT² EDR
B-514
28 FT² EDR
B-513
L
P S
32 FT² EDR
B-714
32 FT² EDR
B-713
2-1/2" LPS
20 FT² EDR
B-11
3SR22
L
P S
L
P R
24 FT² EDR
B-133
L
P S
30 FT² EDR
B-319c
L
P S
28 FT² EDR
B-512
L
P S
32 FT² EDR
B-713
L
P S
3/4"
L
P S
L
P S
30 FT² EDR
B-319b
28 FT² EDR
B-511
28.7 FT² EDR
B-613
L
P S
32 FT² EDR
B-712
L
P R
1" LPR1-1/4" LPR1-1/2" LPR2" LPR
3S23
3R23
?? FT² EDR
B-232
54 FT² EDR
B-320a
18.8 FT² EDR
B-617
18.8 FT² EDR
B-616
18.8 FT² EDR
B-612D
28.7 FT² EDR
B-612C
?? FT² EDR
B-403
24 FT² EDR
B-733a
28 FT² EDR
B-824
52 FT² EDR
B-905a
2.5" LPS
CONT. ON SHEET H14
1" LPR
CONT. ON SHEET H9
4" LPS
CONT. ON SHEET H14
3" LPR
CONT. ON SHEET H14
GENERAL NOTES
A PLANS REFLECT CONDITIONS AS OF JANUARY 1,
2013.
.75" LPR
CONT. ON SHEET H31
.75" LPR
CONT. ON SHEET H31
.75" LPR
CONT. ON SHEET H31
.75" LPR
CONT. ON SHEET H31
.75" LPR
CONT. ON SHEET H31
.75" LPR
CONT. ON SHEET H31
.75" LPR
CONT. ON SHEET H31
3" LPR
CONT. ON SHEET H15
1.25" LPR
CONT. ON SHEET H13
RECORD DRAWINGS
NOT FOR CONSTRUCTION
HEAPY ENGINEERING
3/26/2013
H16
STEAM RISER DIAGRAM - ZONE 3C
5"
3/4"
4SR01
L
P S
L
P R
20 FT² EDR
A-431
L
P S
36 FT² EDR
A-527
32 FT² EDR
A-631
40 FT² EDR
A-725b
L
P S
22 FT² EDR
A-826
L
P S
26 FT² EDR
A-914
4SR02
L
P S
L
P R
20 FT² EDR
A-222
22 FT² EDR
A-337
26 FT² EDR
A-430
24 FT² EDR
A-431
36 FT² EDR
A-526
28 FT² EDR
A-527a
L
P S
40 FT² EDR
A-629
40 FT² EDR
A-629a
28 FT² EDR
A-725
L
P S
22 FT² EDR
A-825
22 FT² EDR
A-826
28 FT² EDR
A-911a
28 FT² EDR
A-912
4" LPS
4SR03
L
P S
L
P R
40 FT² EDR
A-122
L
P S
40 FT² EDR
A-334
40 FT² EDR
A-524a
L
P S
40 FT² EDR
A-723b
L
P S
40 FT² EDR
A-910
28 FT² EDR
A-911
30 FT² EDR
A-07
4SR04
L
P S
L
P R
26 FT² EDR
A-119
20 FT² EDR
A-121
26 FT² EDR
A-218
18 FT² EDR
A-218a
24 FT² EDR
A-332
24 FT² EDR
A-332
34 FT² EDR
A-426
L
P S
28 FT² EDR
A-523
48 FT² EDR
A-626
L
P S
28 FT² EDR
A-723
28 FT² EDR
A-723
28 FT² EDR
A-821a
L
P S
38 FT² EDR
A-909
4SR05
L
P S
L
P R
26 FT² EDR
A-119C
26 FT² EDR
A-218
30 FT² EDR
A-425a
28 FT² EDR
A-523
L
P S
28 FT² EDR
A-723
L
P S
40 FT² EDR
A-821
38 FT² EDR
A-908
38 FT² EDR
A-908
3" LPS
4SR06
L
P S
L
P R
28 FT² EDR
A-330
L
P S
28 FT² EDR
A-424g
36 FT² EDR
A-522
48 FT² EDR
A-624
4SR07
L
P S
L
P R
L
P S
28 FT² EDR
A-217
28 FT² EDR
A-217
30 FT² EDR
A-324e
28 FT² EDR
A-324f
28 FT² EDR
A-424e
28 FT² EDR
A-424f
L
P S
36 FT² EDR
A-521
28 FT² EDR
A-522a
L
P S
48 FT² EDR
A-623
48 FT² EDR
A-624
L
P S
2-1/2" LPS
4SR08
L
P S
L
P R
L
P S
28 FT² EDR
A-217
42 FT² EDR
A-324d
L
P S
28 FT² EDR
A-424d
36 FT² EDR
A-521
48 FT² EDR
A-623
3/4"
1"
1-1/4" LPR1-1/2" LPR2" LPR2-1/2" LPR
L4
L
P R
4R09
L
P S
28 FT² EDR
A-722
24 FT² EDR
A-331
26 FT² EDR
A-118A
28 FT² EDR
A-117
26 FT² EDR
A-118
?? FT² EDR
A-116
44 FT² EDR
A-116
48 FT² EDR
A-626
28 FT² EDR
A-722
36 FT² EDR
A-722
24 FT² EDR
A-913
5" LPS (ZONE #4)
CONT. ON SHEET H9
2.5" LPR
CONT. ON SHEET H20
4" LPS
CONT. ON SHEET H18
6" LPR
CONT. ON SHEET H9
1" LPR
GENERAL NOTES
A PLANS REFLECT CONDITIONS AS OF JANUARY 1,
2013.
.75" LPR
CONT. ON SHEET H30
5" LPR
CONT. ON SHEET H22
3" LPR
CONT. ON SHEET H24
?? FT² EDR
MORGUE SUITE
UP TO
.75" LPR
CONT. ON SHEET H17
RECORD DRAWINGS
NOT FOR CONSTRUCTION
HEAPY ENGINEERING
3/26/2013
H17
STEAM RISER DIAGRAM - ZONE 4A
4SR09
L
P S
L
P R
48 FT² EDR
28 FT² EDR
A-103
L
P S
26 FT² EDR
A-205
32 FT² EDR
A-307
30 FT² EDR
A-406
L
P S
28 FT² EDR
A-506
40 FT² EDR
A-607
L
P S
44 FT² EDR
A-809
L
P S
L
P R
4SR10
40 FT² EDR
A-104
26 FT² EDR
A-206
L
P S
40 FT² EDR
A-309
32 FT² EDR
A-308
30 FT² EDR
A-408
30 FT² EDR
A-407
28 FT² EDR
A-507a
36 FT² EDR
A-507
L
P S
40 FT² EDR
A-609
40 FT² EDR
A-608
L
P S
28 FT² EDR
A-706a
3" LPS
4SR11
L
P S
L
P R
40 FT² EDR
A-106
40 FT² EDR
A-105
L
P S
42 FT² EDR
A-208
30 FT² EDR
A-207
54 FT² EDR
A-311a
32 FT² EDR
A-310
30 FT² EDR
A-410
30 FT² EDR
A-409
L
P S
28 FT² EDR
A-508
28 FT² EDR
A-508
L
P S
40 FT² EDR
A-610
40 FT² EDR
A-609a
L
P S
44 FT² EDR
A-810
28 FT² EDR
A-707
28 FT² EDR
A-707
2-1/2" LPS
4SR12
L
P S
L
P R
40 FT² EDR
A-106
L
P R
L
P R
54 FT² EDR
A-311a
L
P S
48 FT² EDR
A-411
L
P S
50 FT² EDR
A-509
56 FT² EDR
A-610
L
P S
36 FT² EDR
A-707
3/4"
1-1/4" LPR2-1/2" LPR
28 FT² EDR
A-705a
28 FT² EDR
A-706
?? FT² EDR
A-811
?? FT² EDR
A-811
4" LPS
CONT. ON SHEET H17
2.5" LPR
CONT. ON SHEET H19
GENERAL NOTES
A PLANS REFLECT CONDITIONS AS OF JANUARY 1,
2013.
.75" LPR
CONT. ON SHEET H30
.75" LPR
CONT. ON SHEET H30
RECORD DRAWINGS
NOT FOR CONSTRUCTION
HEAPY ENGINEERING
3/26/2013
H18
STEAM RISER DIAGRAM - ZONE 4B
3/4"
6"
5SR01
L
P S
L
P R
89 FT² EDR
A-101c
L
P S
L
P R
5SR02
32 FT² EDR
A-1
24 FT² EDR
A-203
L
P S
26 FT² EDR
A-305
28 FT² EDR
A-305
30 FT² EDR
A-402a
30 FT² EDR
A-401b
L
P S
30 FT² EDR
A-502
28 FT² EDR
A-501
40 FT² EDR
A-604
40 FT² EDR
A-603
L
P R
28 FT² EDR
A-804
?? FT² EDR
A-803
L
P S
34 FT² EDR
A-903a
34 FT² EDR
A-903b
32 FT² EDR
A-1
5SR03
L
P S
L
P R
28 FT² EDR
A-102
28 FT² EDR
A-203
26 FT² EDR
A-305
30 FT² EDR
A-402b
40 FT² EDR
A-604
L
P S
30 FT² EDR
A-805
1-1/4"
34 FT² EDR
A-903
34 FT² EDR
A-902
5SR04
L
P S
L
P R
28 FT² EDR
A-112
26 FT² EDR
A-319
30 FT² EDR
A-422
L
P S
28 FT² EDR
A-517
40 FT² EDR
A-619
L
P S
28 FT² EDR
A-715
26 FT² EDR
A-819
34 FT² EDR
A-905A
5SR05
L
P S
L
P R
28 FT² EDR
A-113
28 FT² EDR
A-112
L
P R
24 FT² EDR
A-321
24 FT² EDR
A-320
L
P S
32 FT² EDR
A-423
30 FT² EDR
A-422A
28 FT² EDR
A-518
28 FT² EDR
A-517
40 FT² EDR
A-620
40 FT² EDR
A-619
L
P S
28 FT² EDR
A-717
28 FT² EDR
A-715a
L
P S
26 FT² EDR
A-820
26 FT² EDR
A-820
32 FT² EDR
A-906c
38 FT² EDR
A-906
3" LPS5" LPS 4" LPS
5SR06
L
P S
L
P R
28 FT² EDR
A-113a
L
P R
28 FT² EDR
A-323
32 FT² EDR
A-423A
L
P S
28 FT² EDR
A-518
40 FT² EDR
A-620a
L
P S
28 FT² EDR
A-718
44 FT² EDR
A-820
34 FT² EDR
A-907
34 FT² EDR
A-907
5SR07
L
P S
L
P R
28 FT² EDR
A-114
L
P S
28 FT² EDR
A-217
28 FT² EDR
A-323
L
P S
28 FT² EDR
A-424
36 FT² EDR
A-519
48 FT² EDR
A-621
L
P S
5SR08
L
P S
L
P R
28 FT² EDR
A-115
28 FT² EDR
A-114a
L
P S
28 FT² EDR
A-217
28 FT² EDR
A-217
30 FT² EDR
A-324B
28 FT² EDR
A-324A
28 FT² EDR
A-424a
28 FT² EDR
A-424
L
P S
36 FT² EDR
A-520
28 FT² EDR
A-519a
L
P S
48 FT² EDR
A-622
48 FT² EDR
A-621
L
P S
5SR09
L
P S
L
P R
44 FT² EDR
A-115a
L
P S
28 FT² EDR
A-217
42 FT² EDR
A-324B
L
P S
28 FT² EDR
A-424b
36 FT² EDR
A-520
L
P S
48 FT² EDR
A-622
3/4"
2-1/2" LPS
2" LPR
4" LPR4
L5
28 FT² EDR
A-102
28 FT² EDR
A-719
28 FT² EDR
A-719a
28 FT² EDR
A-215A
28 FT² EDR
A-720
28 FT² EDR
A-720
28 FT² EDR
A-720
28 FT² EDR
A-705
34 FT² EDR
A-905
6" LPS (ZONE #5)
CONT. ON SHEET H9
4" LPS
CONT. ON SHEET H21
2.5" LPS
CONT. ON SHEET H21
4" LPS
CONT. ON SHEET H20
2.5" LPR
CONT. ON SHEET H21
2.5" LPR
CONT. ON SHEET H18
GENERAL NOTES
A PLANS REFLECT CONDITIONS AS OF JANUARY 1,
2013.
1.5" LPR
CONT. ON SHEET H30
4" LPR
CONT. ON SHEET H22
.75" LPR
CONT. ON SHEET H30
.75" LPR
CONT. ON SHEET H30
.75" LPR
CONT. ON SHEET H30
1" LPR
CONT. ON SHEET H22
.75" LPR
CONT. ON SHEET H30
1.25" LPR
CONT. ON SHEET H30
RECORD DRAWINGS
NOT FOR CONSTRUCTION
HEAPY ENGINEERING
3/26/2013
H19
STEAM RISER DIAGRAM - ZONE 5A
5SR13
L
P S
L
P R
L
P R
22 FT² EDR
A-431
36 FT² EDR
A-534
32 FT² EDR
A-631
28 FT² EDR
A-726
22 FT² EDR
A-827
22 FT² EDR
A-916a
26 FT² EDR
A-915
5SR14
L
P R
L
P S
L
P S
L
P S
L
P S
L
P R
L
P S
L
P R
5SR15
L
P S
L
P R
30 FT² EDR
A-537d
L
P S
32 FT² EDR
A-634a
20 FT² EDR
A-632d
22 FT² EDR
A-728
22 FT² EDR
A-728
L
P S
20 FT² EDR
A-832
20 FT² EDR
A-831
L
P S
22 FT² EDR
A-919a
20 FT² EDR
A-919b
3" LPS
3/4"
5SR16
L
P S
L
P R
30 FT² EDR
A-127
3" LPS
5SR17
L
P S
L
P R
30 FT² EDR
A-127
L
P S
2-1/2" LPS
5SR18
L
P S
L
P R
30 FT² EDR
A-133
L
P S
L
P S
L
P R
5SR19
30 FT² EDR
L
P S
20 FT² EDR
A-20
32 FT² EDR
CB-4
5SR20
L
P S
L
P R
28 FT² EDR
A-134
L
P S
40 FT² EDR
A-228
5SR21
L
P S
L
P R
?? FT² EDR
B-207c
5R22
5S22
L
P S
L
P R
?? FT² EDR
B-207c
3/4"
1-1/4" LPR1-1/2" LPR2" LPR2-1/2" LPR
L
P R
L
P R
L
P R
L
P R
5R19 5R20
30 FT² EDR
L
P R
?? FT² EDR
A-727b
4" LPS
CONT. ON SHEET H19
.75" LPR
CONT. ON SHEET H17
2.5" LPR
CONT. ON SHEET H17
GENERAL NOTES
A PLANS REFLECT CONDITIONS AS OF JANUARY 1,
2013.
.75" LPR
CONT. ON SHEET H30
4" LPR
CONT. ON SHEET H9
.75" LPR
CONT. ON SHEET H30
RECORD DRAWINGS
NOT FOR CONSTRUCTION
HEAPY ENGINEERING
3/26/2013
H20
STEAM RISER DIAGRAM - ZONE 5B
5SR10
L
P S
L
P R
50 FT² EDR
A-101
L
P S
L
P R
50 FT² EDR
A-101
32 FT² EDR
A-1
5SR125SR11
L
P S
L
P R
89 FT² EDR
A-101
3/4"
5SR23
L
P S
L
P R
32 FT² EDR
28 FT² EDR
A-110
28 FT² EDR
A-211
32 FT² EDR
A-315
30 FT² EDR
A-417
28 FT² EDR
A-512a
40 FT² EDR
A-614
L
P S
L
P S
L
P S
48 FT² EDR
5SR24
L
P S
L
P R
28 FT² EDR
A-108
28 FT² EDR
A-109
28 FT² EDR
A-209
28 FT² EDR
A-210
40 FT² EDR
A-314
32 FT² EDR
A-307a
30 FT² EDR
A-415
30 FT² EDR
A-416
28 FT² EDR
A-511
36 FT² EDR
A-512
40 FT² EDR
A-612
40 FT² EDR
A-614a
L
P S
L
P S
L
P S
48 FT² EDR
5SR25
L
P S
L
P R
40 FT² EDR
A-107
28 FT² EDR
A-108
42 FT² EDR
A-208a
28 FT² EDR
A-209a
54 FT² EDR
A-312
32 FT² EDR
A-313
30 FT² EDR
A-413
30 FT² EDR
A-414
28 FT² EDR
A-510a
28 FT² EDR
A-511
40 FT² EDR
A-611
40 FT² EDR
A-612a
28 FT² EDR
A-708
L
P S
L
P S
L
P S
L
P S
5SR26
L
P S
L
P R
3" LPS 2-1/2" LPS
54 FT² EDR
A-311
48 FT² EDR
A-412
50 FT² EDR
A-510
56 FT² EDR
A-611
36 FT² EDR
A-708
L
P R
L
P R
L
P S
L
P S
L
P S
3/4"
1-1/2" LPR2" LPR
40 FT² EDR
A-107
28 FT² EDR
A-711b
28 FT² EDR
A-709a
28 FT² EDR
A-709a
44 FT² EDR
A-813
44 FT² EDR
A-812
?? FT² EDR
A-811
?? FT² EDR
A-811
2.5" LPS
CONT. ON SHEET H19
4" LPS
CONT. ON SHEET H19
2.5" LPR
CONT. ON SHEET H19
1.5" LPR
CONT. ON SHEET H22
GENERAL NOTES
A PLANS REFLECT CONDITIONS AS OF JANUARY 1,
2013.
.75" LPR
CONT. ON SHEET H30
1.5" LPR
CONT. ON SHEET H30
1.25" LPR
CONT. ON SHEET H30
RECORD DRAWINGS
NOT FOR CONSTRUCTION
HEAPY ENGINEERING
3/26/2013
H21
STEAM RISER DIAGRAM - ZONE 5C
6"
3/4"
6SR01
L
P S
L
P R
28 FT² EDR
A-302
28 FT² EDR
A-303
L
P S
30 FT² EDR
A-401a
30 FT² EDR
A-401
28 FT² EDR
A-582
28 FT² EDR
A-501
28 FT² EDR
A-600
40 FT² EDR
A-601
L
P S
28 FT² EDR
A-702
28 FT² EDR
A-702
26 FT² EDR
A-801
28 FT² EDR
A-802
L
P S
36 FT² EDR
A-901a
L
P S
L
P R
28 FT² EDR
A-301
28 FT² EDR
A-301
L
P S
30 FT² EDR
A-479
30 FT² EDR
A-400
28 FT² EDR
A-581
28 FT² EDR
A-581
26 FT² EDR
A-600
30 FT² EDR
A-600
L
P S
28 FT² EDR
A-700
28 FT² EDR
A-701
28 FT² EDR
A-800a
26 FT² EDR
A-800b
L
P S
36 FT² EDR
A-946a
L
P S
L
P R
28 FT² EDR
A-175
89 FT² EDR
A-176
28 FT² EDR
A-379
28 FT² EDR
A-300
L
P S
30 FT² EDR
A-479
30 FT² EDR
A-479
28 FT² EDR
A-579a
36 FT² EDR
A-579
26 FT² EDR
A-675
26 FT² EDR
A-676
L
P S
28 FT² EDR
A-775
28 FT² EDR
A-776
28 FT² EDR
A-800
L
P S
36 FT² EDR
A-945a
36 FT² EDR
A-945
5" LPS
L
P S
L
P R
28 FT² EDR
A-379
30 FT² EDR
A-479
28 FT² EDR
A-578
28 FT² EDR
A-675
L
P S
28 FT² EDR
A-774
28 FT² EDR
A-868
1-1/4"
34 FT² EDR
A-944
L
P S
L
P R
22 FT² EDR
A-32
24 FT² EDR
A-253b
30 FT² EDR
A-458c
28 FT² EDR
A-559a
28 FT² EDR
A-659
L
P S
28 FT² EDR
A-757
28 FT² EDR
A-857
34 FT² EDR
A-941
6SR02 6SR03 6SR04 6SR05 6SR06
L
P S
L
P R
22 FT² EDR
A-32
L
P R
L
P S
32 FT² EDR
A-458a
30 FT² EDR
A-458b
28 FT² EDR
A-558
28 FT² EDR
A-559
28 FT² EDR
A-658
28 FT² EDR
A-659
L
P S
28 FT² EDR
A-755
28 FT² EDR
A-756
L
P S
28 FT² EDR
A-855
28 FT² EDR
A-856
L
P S
28 FT² EDR
A-939c
38 FT² EDR
A-940
4" LPS
22 FT² EDR
A-31
L
P S
L
P R
6SR07
32 FT² EDR
A-458
L
P S
28 FT² EDR
A-558
28 FT² EDR
A-658
28 FT² EDR
A-754
L
P S
28 FT² EDR
A-854
34 FT² EDR
A-944
46 FT² EDR
A-943
34 FT² EDR
A-941
2" LPR4" LPR 3" LPR
1-1/4"
L6
6" LPS (ZONE #6)
CONT. ON SHEET H9
1.5" LPR
CONT. ON SHEET H23
4" LPS
CONT. ON SHEET H23
2.5" LPR
CONT. ON SHEET H25
1.5" LPR
CONT. ON SHEET H23
3" LPS
CONT. ON SHEET H23
1.5" LPR
CONT. ON SHEET H21
GENERAL NOTES
A PLANS REFLECT CONDITIONS AS OF JANUARY 1,
2013.
5" LPR
CONT. ON SHEET H17
4" LPR
CONT. ON SHEET H19
1" LPR
CONT. ON SHEET H19
RECORD DRAWINGS
NOT FOR CONSTRUCTION
HEAPY ENGINEERING
3/26/2013
H22
STEAM RISER DIAGRAM - ZONE 6A
L
P S
L
P R
L
P S
28 FT² EDR
A-457g
L
P S
28 FT² EDR
A-557d
30 FT² EDR
A-657
28 FT² EDR
A-753
L
P S
34 FT² EDR
A-853
6SR08 6SR09
L
P S
L
P R
L
P R
26 FT² EDR
A-457e
28 FT² EDR
A-457f
26 FT² EDR
A-557c
28 FT² EDR
A-557d
L
P S
30 FT² EDR
A-656
30 FT² EDR
A-657
28 FT² EDR
A-751
28 FT² EDR
A-752
L
P S
48 FT² EDR
A-853
6SR10
L
P S
L
P R
L
P S
L
P S
28 FT² EDR
A-457e
28 FT² EDR
A-557c
L
P S
30 FT² EDR
A-656
3/4"
1" LPR1-1/4" LPR
6SR11
L
P S
L
P R
28 FT² EDR
A-172
L
P S
30 FT² EDR
A-264
36 FT² EDR
A-360
L
P S
30 FT² EDR
A-474
36 FT² EDR
A-574
28 FT² EDR
A-672
L
P S
32 FT² EDR
A-867
22 FT² EDR
A-33E
6SR12
L
P S
L
P R
28 FT² EDR
A-171
28 FT² EDR
A-262a
28 FT² EDR
A-263
L
P S
28 FT² EDR
A-358
28 FT² EDR
A-359
30 FT² EDR
A-472
30 FT² EDR
A-473
36 FT² EDR
A-572
36 FT² EDR
A-573
L
P S
26 FT² EDR
A-670
L
P S
32 FT² EDR
A-866
32 FT² EDR
A-866
6SR13
L
P S
L
P R
40 FT² EDR
A-169
28 FT² EDR
A-170
L
P S
3" LPS
40 FT² EDR
A-261
28 FT² EDR
A-262
28 FT² EDR
A-356
28 FT² EDR
A-357
30 FT² EDR
A-470
30 FT² EDR
A-471
L
P S
36 FT² EDR
A-570
36 FT² EDR
A-571
26 FT² EDR
A-669
26 FT² EDR
A-670a
L
P S
32 FT² EDR
A-865
32 FT² EDR
A-865
2-1/2" LPS
6SR14
L
P S
L
P R
40 FT² EDR
A-168
40 FT² EDR
A-261
L
P S
48 FT² EDR
A-355b
L
P S
48 FT² EDR
A-469
36 FT² EDR
A-569
L
P S
26 FT² EDR
A-669
32 FT² EDR
A-865
3/4"
1" LPR1-1/4" LPR1-1/2" LPR
22 FT² EDR
A-33E
28 FT² EDR
A-772
28 FT² EDR
A-769
28 FT² EDR
A-770
28 FT² EDR
A-767
28 FT² EDR
A-768
328 FT² EDR
A-767
28 FT² EDR
A-751
28 FT² EDR
A-751
3" LPS
CONT. ON SHEET H22
1.5" LPR
CONT. ON SHEET H22
4" LPS
CONT. ON SHEET H22
1.5" LPR
CONT. ON SHEET H22
GENERAL NOTES
A PLANS REFLECT CONDITIONS AS OF JANUARY 1,
2013.
RECORD DRAWINGS
NOT FOR CONSTRUCTION
HEAPY ENGINEERING
3/26/2013
H23
STEAM RISER DIAGRAM - ZONE 6B
6"
7SR01
L
P S
L
P R
L
P S
22 FT² EDR
A-447
L
P S
42 FT² EDR
A-549
22 FT² EDR
A-647
28 FT² EDR
A-741
L
P S
22 FT² EDR
A-846
L
P S
26 FT² EDR
A-932
L
P S
L
P R
L
P S
26 FT² EDR
A-450
26 FT² EDR
A-449
26 FT² EDR
A-551b
24 FT² EDR
A-550
24 FT² EDR
A-649
24 FT² EDR
A-647
L
P S
28 FT² EDR
A-743
28 FT² EDR
A-742
L
P S
22 FT² EDR
A-846
26 FT² EDR
A-846
26 FT² EDR
A-934b
40 FT² EDR
A-934
5" LPS
L
P S
L
P R
40 FT² EDR
A-145
L
P S
40 FT² EDR
A-349a
22 FT² EDR
A-451
22 FT² EDR
A-551a
40 FT² EDR
A-552b
L
P S
20 FT² EDR
A-649
28 FT² EDR
A-744
40 FT² EDR
A-745
L
P S
22 FT² EDR
A-846c
40 FT² EDR
A-936
26 FT² EDR
A-935
4" LPS
20 FT² EDR
A-30
7SR02 7SR03 7SR04
L
P S
L
P R
36 FT² EDR
A-554a
L
P S
32 FT² EDR
A-651
28 FT² EDR
A-746
28 FT² EDR
A-746
L
P S
20 FT² EDR
A-851
L
P S
18 FT² EDR
A-937b
32 FT² EDR
A-937
14 FT² EDR
A-31a
L
P S
L
P R
7SR05
L
P S
36 FT² EDR
A-555
28 FT² EDR
A-746
L
P S
34 FT² EDR
A-851a
34 FT² EDR
A-938
L
P R
3" LPS
L
P S
L
P R
20 FT² EDR
A-31b
L
P S
28 FT² EDR
A-457b
L
P S
28 FT² EDR
A-557a
30 FT² EDR
A-654
L
P S
34 FT² EDR
A-852
20 FT² EDR
A-31c
7SR06
L
P S
L
P R
L
P R
L
P S
L
P R
28 FT² EDR
A-457b
28 FT² EDR
A-557a
L
P S
30 FT² EDR
A-654
28 FT² EDR
A-748
L
P S
48 FT² EDR
A-852
32 FT² EDR
A-853
7SR07
1-1/2" LPR2" LPR
3/4"
2-1/2" LPR
34 FT² EDR
A-938
L7
28 FT² EDR
A-457d
28 FT² EDR
A-557b
30 FT² EDR
A-655
28 FT² EDR
A-749
6" LPS (ZONE #7)
CONT. ON SHEET H9
2.5" LPR
CONT. ON SHEET H26
4" LPS
CONT. ON SHEET H25
1.25" LPR
CONT. ON SHEET H25
2.5" LPS
CONT. ON SHEET H25
GENERAL NOTES
A PLANS REFLECT CONDITIONS AS OF JANUARY 1,
2013.
.75" LPR
CONT. ON SHEET H30
.75" LPR
CONT. ON SHEET H30
3" LPR
CONT. ON SHEET H17
RECORD DRAWINGS
NOT FOR CONSTRUCTION
HEAPY ENGINEERING
3/26/2013
H24
STEAM RISER DIAGRAM - ZONE 7A
28 FT² EDR
A-31d
28 FT² EDR
A-31d
7SR08
L
P S
L
P R
L
P S
28 FT² EDR
A-457d
28 FT² EDR
A-557b
L
P S
30 FT² EDR
A-655
L
P S
L
P R
7R09 7S09
28 FT² EDR
A-557b
1" LPR
7SR10
L
P S
L
P R
26 FT² EDR
A-162
L
P S
28 FT² EDR
A-256
44 FT² EDR
A-352
30 FT² EDR
A-463
L
P S
36 FT² EDR
A-563
28 FT² EDR
A-663
L
P S
32 FT² EDR
A-862
22 FT² EDR
A-33b
L
P S
L
P R
28 FT² EDR
A-164
28 FT² EDR
A-163
16 FT² EDR
A-258a
30 FT² EDR
A-257
L
P S
44 FT² EDR
A-354
44 FT² EDR
A-353
30 FT² EDR
A-465
30 FT² EDR
A-464
36 FT² EDR
A-564
36 FT² EDR
A-564
L
P S
26 FT² EDR
A-667
28 FT² EDR
A-664
L
P S
28 FT² EDR
A-764
32 FT² EDR
A-863
36 FT² EDR
A-863
22 FT² EDR
A-33b
3" LPS
L
P S
L
P R
7SR11 7SR12
28 FT² EDR
A-166
28 FT² EDR
A-165
L
P S
38 FT² EDR
A-259
28 FT² EDR
A-258
36 FT² EDR
A-355
44 FT² EDR
A-355
30 FT² EDR
A-467
30 FT² EDR
A-466
L
P S
36 FT² EDR
A-567
36 FT² EDR
A-566
L
P S
26 FT² EDR
A-668
26 FT² EDR
A-667a
28 FT² EDR
A-765
32 FT² EDR
A-864
32 FT² EDR
A-864
L
P S
L
P R
26 FT² EDR
A-167
26 FT² EDR
A-167
38 FT² EDR
A-260
66 FT² EDR
A-355a
L
P S
48 FT² EDR
A-468
L
P S
36 FT² EDR
A-568
26 FT² EDR
A-668
L
P S
32 FT² EDR
A-864
2-1/2" LPS
7SR13
3/4" 3/4"
28 FT² EDR
A-762
28 FT² EDR
A-763
28 FT² EDR
A-766
28 FT² EDR
A-766
28 FT² EDR
A-750
28 FT² EDR
A-750
2.5" LPS
CONT. ON SHEET H24
1.25" LPR
CONT. ON SHEET H24
4" LPS
CONT. ON SHEET H24
2.5" LPR
CONT. ON SHEET H22
GENERAL NOTES
A PLANS REFLECT CONDITIONS AS OF JANUARY 1,
2013.
2" LPR
CONT. ON SHEET H30
RECORD DRAWINGS
NOT FOR CONSTRUCTION
HEAPY ENGINEERING
3/26/2013
H25
STEAM RISER DIAGRAM - ZONE 7B
8SR01
L
P S
L
P S
L
P S
L
P S
L
P S
L
P R
8SR02
L
P S
L
P R
L
P S
L
P S
L
P S
L
P S
L
P R
L
P S
L
P S
L
P S
L
P S
40 FT² EDR
A-141
8SR03
30 FT² EDR
A-342
32 FT² EDR
A-442
32 FT² EDR
A-442a
30 FT² EDR
A-541
30 FT² EDR
A-542
28 FT² EDR
A-642
28 FT² EDR
A-643
28 FT² EDR
A-732
32 FT² EDR
A-732
28 FT² EDR
A-839
28 FT² EDR
A-839
26 FT² EDR
A-926
30 FT² EDR
A-927
32 FT² EDR
A-343
32 FT² EDR
A-733
32 FT² EDR
A-928
8SR04
L
P S
L
P R
8SR05
L
P S
L
P R
30 FT² EDR
A-440
30 FT² EDR
A-441
28 FT² EDR
B-540
28 FT² EDR
A-540
28 FT² EDR
A-641
L
P S
28 FT² EDR
A-731
28 FT² EDR
A-732
L
P S
20 FT² EDR
A-837
28 FT² EDR
A-838
L
P S
28 FT² EDR
A-925
26 FT² EDR
A-926
L
P S
L
P R
8SR06
L
P S
L
P R
8SR07
L
P S
L
P R
L
P S
L
P R
L
P S
L
P R
L
P S
L
P S
L
P S
8SR108SR098SR08
3" LPS
8SR11
L
P S
L
P R
L
P S
28 FT² EDR
A-439
28 FT² EDR
B-539
L
P S
28 FT² EDR
B-730
L
P S
20 FT² EDR
B-826
L
P S
L
P R
1-1/2" LPR
3/4" LPR 3/4" LPR
L
P R
L8
32 FT² EDR
A-543
28 FT² EDR
A-439
28 FT² EDR
A-538
30 FT² EDR
A-734
28 FT² EDR
A-825
34 FT² EDR
A-907
28 FT² EDR
B-924
5" LPS (ZONE #8)
CONT. ON SHEET H9
2.5" LPR
CONT. ON SHEET H24
GENERAL NOTES
A PLANS REFLECT CONDITIONS AS OF JANUARY 1,
2013.
.75" LPR
CONT. ON SHEET H30
.75" LPR
CONT. ON SHEET H30
RECORD DRAWINGS
NOT FOR CONSTRUCTION
HEAPY ENGINEERING
3/26/2013
H26
STEAM RISER DIAGRAM - ZONE 8
5" MPS
CONT. ON SHEET H5
3RD FLOOR
KITCHEN EQ.
2" MPR
CONT. ON SHEET H9
MD18 MD19 M20 MD21
MD04 MD05 MD08 M09 MD10 MD12 MD13 M14 MD15 M16
1.5" MPR
CONT. ON SHEET H9
1.25" MPR
CONT. ON SHEET H29
2" MPS
CONT. ON SHEET H29
GENERAL NOTES
A PLANS REFLECT CONDITIONS AS OF JANUARY 1,
2013.
1.25" HPS
CONT. ON SHEET H5
1" HPR
CONT. ON SHEET H9
.75" HPR
CONT. ON SHEET H5
M17
RECORD DRAWINGS
NOT FOR CONSTRUCTION
HEAPY ENGINEERING
3/26/2013
H27
MPS LOOP AREA A
UNIT HEATER
B-013
UNIT HEATER
B-013
5" MPS
CONT. ON SHEET H5
1.25" MPR
CONT. ON SHEET H3
MD24 MD25 MD26 M27 MD28
MD29 M30 MD31 MD32 MD33 MD34 MD35 MD36
2" MPR
CONT. ON SHEET H9
3" MPR
CONT. ON SHEET H5
2" MPS
CONT. ON SHEET H29
4" MPS
CONT. ON SHEET H29
PUH
1.25" MPR
CONT. ON SHEET H29
2" MPR
CONT. ON SHEET H29
GENERAL NOTES
A PLANS REFLECT CONDITIONS AS OF JANUARY 1,
2013.
(IN ABANDONED PENTHOUSE)
CLOSED
OPEN
RECORD DRAWINGS
NOT FOR CONSTRUCTION
HEAPY ENGINEERING
3/26/2013
H28
MPS LOOP AREA B
32 FT² EDR
4" MPS
CONT. ON SHEET H28
2" MPR
CONT. ON SHEET H28
2" MPS
CONT. ON SHEET H27
1.25" MPR
CONT. ON SHEET H27
1.25" MPR
CONT. ON SHEET H28
2" MPS
CONT. ON SHEET H28
GENERAL NOTES
A PLANS REFLECT CONDITIONS AS OF JANUARY 1,
2013.
MD36
RECORD DRAWINGS
NOT FOR CONSTRUCTION
HEAPY ENGINEERING
3/26/2013
H29
MISC. MECHANICAL SPACES
8" LPS
CONT. ON SHEET H9
36 FT² EDR
30 FT² EDR
28 FT² EDR
.75" LPR
CONT. ON SHEET H24
2.5" LPR
CONT. ON SHEET H25
.75" LPR
CONT. ON SHEET H24
28 FT² EDR
A-216
28 FT² EDR
A-216
.75" LPR
CONT. ON SHEET H17
1.5" LPR
CONT. ON SHEET H19
.75" LPR
CONT. ON SHEET H19
28 FT² EDR
A-704a
36 FT² EDR
A-704
L
P R
C O
N T
O
N
S
H E
L
P R
C O
N T
O
N
S
H E
220 FT² EDR
A-208
L
P R
C O
N T
O
N
S
H E
220 FT² EDR
A-208a
L
P R
C O
N T
O
N
S
H E
220 FT² EDR
28 FT² EDR
A-509a
28 FT² EDR
A-708a
220 FT² EDR
A-216
L
P R
C O
N T
O
N
S
H E
220 FT² EDR
A-324c
220 FT² EDR
B-303
220 FT² EDR
A-821
1.5" LPR
CONT. ON SHEET H21
1.25" LPR
CONT. ON SHEET H21
.75" LPR
CONT. ON SHEET H18
.75" LPR
CONT. ON SHEET H17
1" LPR
CONT. ON SHEET H17
.75" LPR
CONT. ON SHEET H20
.75" LPR
CONT. ON SHEET H26
.75" LPR
CONT. ON SHEET H26
.75" LPR
CONT. ON SHEET H19
1.25" LPR
CONT. ON SHEET H19
GENERAL NOTES
1. REFER TO SHEET SRD-001 FOR ABBREVIATIONS
AND SYMBOL LEGEND.
RECORD DRAWINGS
NOT FOR CONSTRUCTION
HEAPY ENGINEERING
3/26/2013
H30
FREE STEAM LOOP - AREA A SCHEMATIC
20 FT² EDR
B-420
20 FT² EDR
B-420
8" LPS
CONT. ON SHEET H9
24 FT² EDR
B-606
26 FT² EDR
B-705
24 FT² EDR
B-810
.75" LPR
CONT. ON SHEET H14
.75" LPR
CONT. ON SHEET H14
.75" LPR
CONT. ON SHEET H14
220 FT² EDR
B-308
.75" LPR
CONT. ON SHEET H11
220 FT² EDR
1" LPR
CONT. ON SHEET H15
.75" LPR
CONT. ON SHEET H12 .75" LPR
CONT. ON SHEET H16
24 FT² EDR
B-606
24 FT² EDR
B-606
24 FT² EDR
B-606
.75" LPR
CONT. ON SHEET H14
.75" LPR
CONT. ON SHEET H16
20 FT² EDR
B-420
32 FT² EDR
B-420b
L
P R
C O
N T
O
N
S
H E
L
P R
C O
N T
O
N
S
H E
L
P R
C O
N T
O
N
S
H E
L
P R
C O
N T
O
N
S
H E
16 FT² EDR
B-428
L
P R
C O
N T
O
N
S
H E
28 FT² EDR
B-426a
L
P R
C O
N T
O
N
S
H E
28 FT² EDR
B-426a
L
P R
C O
N T
O
N
S
H E
.75" LPR
CONT. ON SHEET H14
.75" LPR
CONT. ON SHEET H14
.75" LPR
CONT. ON SHEET H14
L
P R
C O
N T
O
N
S
H E
26 FT² EDR
B-211
26 FT² EDR
B-211
26 FT² EDR
B-211
26 FT² EDR
B-211
220 FT² EDR
B-308
.75" LPR
CONT. ON SHEET H16
.75" LPR
CONT. ON SHEET H15
.75" LPR
CONT. ON SHEET H15
1" LPR
CONT. ON SHEET H15
GENERAL NOTES
1. REFER TO SHEET SRD-001 FOR ABBREVIATIONS
AND SYMBOL LEGEND.
RECORD DRAWINGS
NOT FOR CONSTRUCTION
HEAPY ENGINEERING
3/26/2013
H31
FREE STEAM LOOP - AREA B SCHEMATIC
HEAPY ENGINEERING
3/26/2013
1-H1
PIPE BASEMENT FLOOR PLAN - AREA A
UP
HEAPY ENGINEERING
3/26/2013
1-H2
PIPE BASEMENT FLOOR PLAN - AREA B
HEAPY ENGINEERING
3/26/2013
1-H3
PIPE BASEMENT FLOOR PLAN - AREA C
HEAPY ENGINEERING
3/26/2013
1-H4
PIPE BASEMENT FLOOR PLAN
SERVICE ROOM PLAN
HEAPY ENGINEERING
3/26/2013
1-H5
BASEMENT FLOOR PLAN - AREA A
HEAPY ENGINEERING
3/26/2013
1-H6
BASEMENT FLOOR PLAN - AREA B
HEAPY ENGINEERING
3/26/2013
1-H7
BASEMENT FLOOR PLAN - AREA C
HEAPY ENGINEERING
3/26/2013
1-H8
BASEMENT FLOOR PLAN - AREA D
HEAPY ENGINEERING
3/26/2013
1-H9
FIRST FLOOR PLAN - AREA A
HEAPY ENGINEERING
3/26/2013
1-H10
FIRST FLOOR PLAN - AREA B
STAIR #6
C101
RECORD DRAWINGS
NOT FOR CONSTRUCTION
HEAPY ENGINEERING
3/26/2013
1-H11
FIRST FLOOR PLAN - AREA C
HEAPY ENGINEERING
3/26/2013
1-H12
FIRST FLOOR PLAN - AREA D
HEAPY ENGINEERING
3/26/2013
1-H13
SECOND FLOOR PLAN - AREA A
DN
D N
STAIR
#10
HEAPY ENGINEERING
3/26/2013
1-H14
SECOND FLOOR PLAN - AREA B
DN
D N
HEAPY ENGINEERING
3/26/2013
1-H15
SECOND FLOOR PLAN - AREA C
DN
D N
HEAPY ENGINEERING
3/26/2013
1-H16
SECOND FLOOR PLAN - AREA D
DN
D N
HEAPY ENGINEERING
3/26/2013
1-H17
THIRD FLOOR PLAN - AREA A
HEAPY ENGINEERING
3/26/2013
1-H18
THIRD FLOOR PLAN - AREA B
HEAPY ENGINEERING
3/26/2013
1-H19
THIRD FLOOR PLAN - AREA C
HEAPY ENGINEERING
3/26/2013
1-H20
THIRD FLOOR PLAN - AREA D
HEAPY ENGINEERING
3/26/2013
1-H21
FOURTH FLOOR PLAN - AREA A
HEAPY ENGINEERING
3/26/2013
1-H22
FOURTH FLOOR PLAN - AREA B
HEAPY ENGINEERING
3/26/2013
1-H23
FOURTH FLOOR PLAN - AREA C
HEAPY ENGINEERING
3/26/2013
FOURTH FLOOR PENTHOUSE PLAN
1-H24
HEAPY ENGINEERING
3/26/2013
1-H25
FIFTH FLOOR PLAN - AREA A
HEAPY ENGINEERING
3/26/2013
1-H26
FIFTH FLOOR PLAN - AREA B
HEAPY ENGINEERING
3/26/2013
1-H27
FIFTH FLOOR PLAN - AREA C
HEAPY ENGINEERING
3/26/2013
1-H28
SIXTH FLOOR PLAN - AREA A
HEAPY ENGINEERING
3/26/2013
1-H29
SIXTH FLOOR PLAN - AREAS B & C
HEAPY ENGINEERING
3/26/2013
1-H30
SEVENTH FLOOR PLAN - AREA A
HEAPY ENGINEERING
3/26/2013
1-H31
SEVENTH FLOOR PLAN - AREAS B & C
HEAPY ENGINEERING
3/26/2013
1-H32
EIGHTH FLOOR PLAN - AREA A
AHU #9
HEAPY ENGINEERING
3/26/2013
1-H33
EIGHTH FLOOR PLAN - AREA B
AHU #9
HEAPY ENGINEERING
3/26/2013
1-H34
NINTH FLOOR PLAN
HEAPY ENGINEERING
3/26/2013
1-H35
TENTH FLOOR PLAN
S
RECORD DRAWINGS
NOT FOR CONSTRUCTION
HEAPY ENGINEERING
3/26/2013
8-H1
BUILDING 8 BASEMENT AND
GROUND FLOOR
HEAPY ENGINEERING
3/26/2013
8-H2
BUILDING 8 SECOND AND THIRD FLOOR
HEAPY ENGINEERING
3/26/2013
15-H1
BUILDING 15 BASEMENT PLAN