36C25019B0053-012.pdf
PDF Posted
- Solicitation number
- 36C25019B0053
About this file
This solicitation package describes a federal contract opportunity to replace the surgery roof at the Louis Stokes VA Medical Center in Cleveland, Ohio. The project scope involves replacing approximately 40,000 square feet of single-ply roofing membrane on the second floor of the medical center with a new hybrid styrene-butadiene-styrene modified bituminous membrane roofing system over an existing concrete deck. The solicitation number is 36C25019B0053 with a project number of 541-18-105 and an estimated value between $2-5 million. This is a 100% set-aside for Service-Disabled Veteran-Owned Small Businesses, who must be registered and verified in relevant databases. The North American Industry Classification System code is 238160 and business size standard is $15 million. The service-disabled veteran-owned small business contractor must perform a minimum of 25% of construction work. The project duration shall not exceed 290 calendar days from notice to proceed. Bonds will be required. The solicitation will be posted on www.fbo.gov on or about September 15, 2019 with bid opening approximately 30 days later.
36C25019B0053 Final Combined Specifications - Surgery Roof.pdf
View the file
Other files
| File | Type | Posted |
|---|---|---|
| 36C25019B0053-0003000.docx | DOCX document | |
| 36C25019B0053-0002000.docx | DOCX document | |
| 36C25019B0053-0001000.docx | DOCX document | |
| 36C25019B0053-0001001.pdf | ||
| 36C25019B0053-011.pdf | ||
| 36C25019B0053-010.docx | DOCX document |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
TECHNICAL SPECIFICATIONS
Department of Veterans Affairs Louis Stokes Cleveland VA Medical Center
WADE PARK
10701 East Boulevard Cleveland, OH 44106
Replace Surgery Roof Project No. 541-18-105
PREPARED BY:
Perspectus Architecture Adam Bradley Enterprises 13212 Shaker Square 9967 East Washington Street, Unit B Cleveland, Ohio 44120 Chagrin Falls, Ohio 44023 P (216) 752-1800 F (216) 752-3833 P (440) 543-4971 Project Director: Tim Huffman Project Director: Tom Case
Fredrick, Fredrick & Heller Engineers Stephen J. Sebesta & Associates
672 East Royalton Road 30628 Detroit Road, #258 Broadview Heights, Ohio 44147 Westlake, Ohio 44145 P (440) 546-9696 F (440) 546-9699 P (216) 781-0060 Project Director: Mike Long Project Director: Eileen Oster
FINAL CONSTRUCTION DOCUMENT SUBMISSION
ISSUE DATE: November 22, 2018 William Curtiss Ayars, License #7259 Expiration Date 12/31/2019
Bid Issue Submission VAMC WADE PARK
November 22, 2019 Replace Surgery Roof
Table of Contents
00 01 10 - 1
DEPARTMENT OF VETERANS AFFAIRS
SPECIFICATIONS
TABLE OF CONTENTS
Section 00 01 10
SECTION DESCRIPTION PAGES
DIVISION 0 - SPECIAL SECTIONS
00 01 10 Table of Contents 1-3
00 01 15 Drawing Index 1-1
00 31 26 Existing Hazardous Material Information 1-1
Asbestos Sampling Report 1-26
DIVISION 1 - GENERAL REQUIREMENTS
01 00 00 General Requirements 1-18
OSHA Requirements and Safety and Health Regulations –
Attachment 1
1-7
Pre-Construction Risk Assessment (PCRA) – Att. 2 1-4
Construction Safety Poster - Cleveland VA – Att. 3 1-1
Interim Life Safety Risk Assessment Form – Att.4 1-2
Contractor Safety and Security Orientation – Att.5 1-1
Job Safety Check Sheet - Attachment 6 1-2
01 23 00 Alternates 1-1
01 32 16.13 Network Analysis Schedules 1-23
01 32 33 Photographic Documentation 1-3
01 33 23 Shop Drawings, Product Data, and Samples 1-7
01 35 26 Safety Requirements 1-27
Site Specific Accident Prevention Plan - Sample 28-50
Pre-Construction Risk Assessment (PCRA) 51-57
Appendix A Evacuation Routes Work Zone Layouts and Maps to
Emergency Services
58-58
Appendix B Certifications & Jobsite Documentation Program 59-59
Appendix C Contractor Accident Record OSHA 300 Form 60-60
Infection Control During Construction 61-66
Infection Control Risk Assessment 67-72
Inf. Control Orientation for Construction Workers 73-74
Infection Control Construction Permit 75-76
Infection Control Construction Inspection Form 77-78
01 42 19 Reference Standards 1-7
01 45 29 Testing Laboratory Services 1-8
01 50 00 Temporary Construction Facilities and Controls 1-6
01 74 19 Construction Waste Management 1-8
00 01 10 - 2
DIVISION 2 – EXISTING CONDITIONS
02 41 00 Demolition 1-3
02 82 13.21 Asbestos Roofing Abatement (TOC: i-iii) 1-39
DIVISION 3 – CONCRETE
03 30 53 Miscellaneous Cast-In-Place Concrete 1-6
03 73 00 Concrete Rehabilitation 1-4
DIVISION 4 – MASONRY
Not Used
DIVISION 5 – METALS
DIVISION 6 - WOOD, PLASTICS AND COMPOSITES
06 10 00 Rough Carpentry 1-9
DIVISION 7 - THERMAL AND MOISTURE PROTECTION
07 01 50.19 Preparation for Re-Roofing 1-7
07 22 00 Roof and Deck Insulation 1-11
07 52 16.13 Styrene-Butadiene-Styrene (SBS) Modified Bituminous
Roofing, Cold Applied 1-20
07 55 20 Concrete Deck Leveling 1-2
07 60 00 Flashing and Sheet Metal 1-21
07 72 00 Roof Accessories 1-6
07 81 00 Applied Fireproofing 1-6
07 84 00 Firestopping 1-6
07 92 00 Joint Sealants 1-8
DIVISION 8 - OPENINGS
Not used
DIVISION 9 – FINISHES
DIVISION 10 – SPECIALTIES
DIVISION 11 – EQUIPMENT
DIVISION 12 – FURNISHINGS
DIVISION 13 - SPECIAL CONSTRUCTION
00 01 10 - 3
DIVISION 14– CONVEYING EQUIPMENT
DIVISION 21- FIRE SUPPRESSION
DIVISION 22 – PLUMBING
22 05 11 Common Work Results for Plumbing 1-22
22 07 11 Plumbing Insulation 1-12
22 14 00 Facility Storm Drainage 1-15
DIVISION 23 – HEATING, VENTILATING, AND AIR CONDITIONING
DIVISION 26 – ELECTRICAL
26 05 11 Requirements for Electrical Installations 1-9
26 05 26 Grounding and Bonding for Electrical Systems 1-5
26 05 33 Raceway and Boxes for Electrical Systems 1-10
26 41 00 Facility Lightning Protection 1-5
26 56 00 Exterior Lighting 1-6
DIVISION 27 – COMMUNICATIONS
DIVISION 28 – ELECTRONIC SAFETY AND SECURITY
DIVISION 31 – EARTHWORK
DIVISION 32 – EXTERIOR IMPROVEMENTS
DIVISION 33 – UTILITIES
DIVISION 34 – TRANSPORTATION
- - - E N D - - -
Drawing Index
00 01 15 - 1
SECTION 00 01 15
DRAWING INDEX
The Drawings listed below accompanying this Specification form a part of the
Contract.
DRAWING NO. TITLE
GENERAL
X1 COVER SHEET
X2 SITE PLAN, PHASING AND LIFE SAFETY
ARCHITECTURAL
A0.0 ABBREVIATIONS, SYMBOLS AND GENERAL NOTES
A1.1 PARTIAL ROOF DEMOLITION PLAN - WEST
A1.2 PARTIAL ROOF DEMOLITION PLAN - EAST
A1.3 EXISTING CONDITION DETAILS
A2.1 PARTIAL ROOF PLAN - WEST
A2.2 PARTIAL ROOF PLAN - EAST
A3.1 ROOF DETAILS
A3.2 ROOF DETAILS
A3.3 ROOF DETAILS
A3.4 ROOF DETAILS
MECHANICAL
P1.1 PARTIAL ROOF AND SECOND FLOOR PLUMBING PLANS
ELECTRICAL
E0.1 ELECTRICAL LEGEND AND LIGHTING FIXTURE SCHEDULE
E1.1 PARTIAL ROOF ELECTRICAL PLANS
HAZARDOUS MATERIALS
HA1.1 PARTIAL ASBESTOS ABATEMENT PLAN - WEST
HA1.2 PARTIAL ASBESTOS ABATEMENT PLAN - EAST
HA1.3 ASBESTOS ABATEMENT STANDARD DETAILS
EXISTING HAZARDOUS MATERIAL INFORMATION
00 31 26 - 1
SECTION 00 31 26
EXISTING HAZARDOUS MATERIAL INFORMATION
PART 1 - GENERAL
1.1 SUMMARY
A. Section includes report of asbestos sampling of suspected asbestos-containing roofing materials.
1.2 RELATED REQUIREMENTS
A. Abatement procedures: Section 02 82 13.21, ASBESTOS ROOFING ABATEMENT.
B. Section 02 41 00, DEMOLITION.
C. Section 07 01 50.19, PREPARATION FOR RE-ROOFING.
1.3 ASBESTOS REPORT
A. Report includes information on sampling of suspected asbestos-containing roofing materials, prepared by Stephen J. Sebesta &
Associates, Inc., dated May 7,2018.
B. Hazardous material report is attached at the end of this section for review and use.
PART 2 - PRODUCTS - (NOT USED)
PART 3 - EXECUTION - (NOT USED)
- - E N D - -
ATTACHMENT NO. 1
Bulk Sample Log
SUMMARY OF BULK SAMPLE ANALYSES
FROM THE SURGERY ROOF ADDITION AT THE
LOUIS STOKES CLEVELAND VA MEDICAL CENTER LOCATED AT
10701 EAST BOULEVARD, CLEVELAND, OH 44106
JOB NO. 12981
SAMPLE
NUMBER
SAMPLE
DESCRIPTION
SAMPLE LOCATION
ASBESTOS-
CONTAINING
FRIABLE
% ASBESTOS
PLM Point Count
12981-1 Face paper and adhesive from roof insulation below rubber roof
Roof Core #1 No N/A NAD -
12981-2a Tan Caulking over metal counter flashing at junction of surgery roof original building
Near Roof Core #2 No N/A NAD -
12981-2b Black Caulking over metal counter flashing at junction of surgery roof original building
Near Roof Core #2 Yes No (5) 7% -
12981-3 Face paper and adhesive from roof insulation below rubber roof
Roof Core #2 No N/A NAD -
12981-4 Gray caulk over metal termination bar
Roof Core #2 No N/A NAD -
12981-5 Asphalt roof below rubber roofing system
Roof Core #2 (upper) No N/A NAD -
12981-6 Asphalt roof below rubber roofing system
Roof Core #5 No N/A NAD -
12981-7 Caulking over counter flashing at junction of surgery roof original building
Near Roof Core #6 No N/A NAD -
12981-8 “Dens-Deck” board below rubber roof
Roof Core #6 No N/A NAD -
12981-9 Asphalt roof below rubber roofing system
Roof Core #6 No N/A NAD -
12981-10 Roof flashing below rubber roof
Near Roof Core #7 Yes (4) No (5) 6% (4)
12981-11 Gray caulk over metal termination bar
Roof Core #7 No N/A NAD -
12981-12 Face paper and adhesive from roof insulation below rubber roof
Roof Core #8 No N/A NAD -
12981-13 Asphalt roof below rubber roofing system
Roof Core #8 No N/A NAD -
12981-14 Asphalt roof below rubber roofing system
Roof Core #9 No N/A NAD -
12981-15 Asphalt roof below rubber roofing system
Roof Core #10 No N/A NAD -
12981-16 Asphalt roof below rubber roofing system
Roof Core #11 No N/A NAD -
SUMMARY OF BULK SAMPLE ANALYSES
FROM THE SURGERY ROOF ADDITION AT THE
LOUIS STOKES CLEVELAND VA MEDICAL CENTER LOCATED AT
10701 EAST BOULEVARD, CLEVELAND, OH 44106
JOB NO. 12981
SAMPLE
NUMBER
SAMPLE
DESCRIPTION
SAMPLE LOCATION
ASBESTOS-
CONTAINING
FRIABLE
% ASBESTOS
PLM Point Count
12981-17a Tan Caulking over metal counter flashing at junction of surgery roof original building
Near Roof Core #11 No N/A NAD -
12981-17b Black Caulking over metal counter flashing at junction of surgery roof original building
Near Roof Core #11 Yes No (5) 8% -
12981-18 Asphalt roof below rubber roofing system
Roof Core #12 No N/A NAD -
12981-19 “Dens-Deck” board below rubber roof
Roof Core #6 No N/A NAD -
12981-20 Roof flashing below rubber roof
Near Roof Core #7 Yes (4) No (5) 7% (4)
NOTES: (1) NAD means no asbestos detected
(2) N/A means Not Applicable
(3) PLM means Polarized Light Microscopy (Percentages are based on visual estimation)
(4) Lab reported, “Chrysotile present in tar-like material.”
(5) Category 1 non-friable asbestos-containing material
ATTACHMENT NO. 2
Environmental Hazards Services Laboratory Report for Bulk Asbestos Samples
Asbestos Bulk Analysis Report
Client:
Report Number:
Project/Test Address:
Client Number:
Reported Date:
Received Date:
Analyzed Date:
Stephen J. Sebesta & Assoc. 05/01/2018
36-3130
05/04/2018
18-05-00061
7469 Whitepine Rd
Telephone: 800.347.4010
Richmond, VA 23237
Environmental Hazards Services, L.L.C.
12981; VA Surgery Addition Roof Replacement
Laboratory Results Fax Number:
29931 Shadow Creek Lane West Lake OH, 44145
05/04/2018
Layer Type AsbestosClient Sample Number
Other Materials
Lab Gross DescriptionLab Sample Number
Black Tar-Like Fibrous;
Rubbery; Inhomogeneous
18-05-00061-001 12981-1 35% Cellulose 25% Fibrous Glass 40% Non-Fibrous
NAD
Tan Rubbery Adhesive;
Homogeneous
18-05-00061-002A 12981-2 100% Non-FibrousCaulking NAD
Black Tar-Like;
Homogeneous
18-05-00061-002B 12981-2 93% Non-FibrousTar 7% Chrysotile
7%Total Asbestos:
Black Fibrous; Rubbery;
White Foam;
Inhomogeneous
18-05-00061-003 12981-3 35% Cellulose 25% Fibrous Glass 40% Non-Fibrous
NAD
Gray Rubbery Adhesive;
Homogeneous
18-05-00061-004 12981-4 100% Non-FibrousNAD
1 of 5Page
Black Tar-Like; Gray Fibrous; Tan Adhesive;
Inhomogeneous
18-05-00061-005 12981-5 35% Cellulose 18% Fibrous Glass 47% Non-Fibrous
NAD
Black Tar-Like Fibrous;
Homogeneous
18-05-00061-006 12981-6 16% Cellulose 6% Fibrous Glass 78% Non-Fibrous
NAD
Tan Rubbery Adhesive;
Black Tar-Like;
Inhomogeneous
18-05-00061-007 12981-7 100% Non-FibrousNAD
White Powdery Fibrous;
Homogeneous
18-05-00061-008 12981-8 2% Cellulose 65% Fibrous Glass 33% Non-Fibrous
NAD
Black Tar-Like;
Homogeneous
18-05-00061-009 12981-9 18% Fibrous Glass 82% Non-Fibrous
NAD
Black Tar-Like; Gray Adhesive; Inhomogeneous
18-05-00061-010 12981-10 94% Non-Fibrous6% Chrysotile
Chrysotile present in tar-like material.
6%Total Asbestos:
Gray Rubbery Adhesive;
Homogeneous
18-05-00061-011 12981-11 100% Non-FibrousNAD
Environmental Hazards Services, L.L.C
Project/Test Address:
Client Number: Report Number:36-3130 18-05-00061
12981; VA Surgery Addition Roof Replacement
Other Materials
AsbestosLab Sample Number
Layer Type Lab Gross DescriptionClient Sample Number
2 of 5Page
Black Fibrous; Rubbery;
White Foam;
Inhomogeneous
18-05-00061-012 12981-12 45% Cellulose 25% Fibrous Glass 30% Non-Fibrous
NAD
Black Tar-Like;
Homogeneous
18-05-00061-013 12981-13 12% Cellulose 18% Fibrous Glass 70% Non-Fibrous
NAD
Black Tar-Like;
Homogeneous
18-05-00061-014 12981-14 8% Cellulose 24% Fibrous Glass 68% Non-Fibrous
NAD
Black Tar-Like Rubbery;
Gray Fibrous;
Inhomogeneous
18-05-00061-015 12981-15 48% Cellulose 24% Fibrous Glass 28% Non-Fibrous
NAD
Black Tar-Like;
Homogeneous
18-05-00061-016 12981-16 26% Cellulose 74% Non-Fibrous
NAD
Tan Rubbery Adhesive;
Homogeneous
18-05-00061-017A 12981-17 100% Non-FibrousCaulking NAD
Black Black Tar-Like;
Homogeneous
18-05-00061-017B 12981-17 92% Non-FibrousTar 8% Chrysotile
8%Total Asbestos:
Environmental Hazards Services, L.L.C
Project/Test Address:
Client Number: Report Number:36-3130 18-05-00061
12981; VA Surgery Addition Roof Replacement
Other Materials
AsbestosLab Sample Number
Layer Type Lab Gross DescriptionClient Sample
3 of 5Page
Black Black Tar-Like;
Homogeneous
18-05-00061-018 12981-18 2% Cellulose 16% Fibrous Glass 82% Non-Fibrous
NAD
White Powdery Fibrous;
Homogeneous
18-05-00061-019 12981-19 2% Cellulose 65% Fibrous Glass 33% Non-Fibrous
NAD
Black Tar-Like; Gray Adhesive; Inhomogeneous
18-05-00061-020 12981-20 93% Non-Fibrous7% Chrysotile
Chrysotile present in tar-like material.
7%Total Asbestos:
Environmental Hazards Services, L.L.C
Project/Test Address:
Client Number: Report Number:36-3130 18-05-00061
12981; VA Surgery Addition Roof Replacement
Other Materials
AsbestosLab Sample Number
Layer Type Lab Gross DescriptionClient Sample
4 of 5Page
Environmental Hazards Services, L.L.C
Project/Test Address:
Client Number: Report Number:36-3130 18-05-00061
12981; VA Surgery Addition Roof Replacement
Other Materials
AsbestosLab Sample Number
Layer Type Lab Gross DescriptionClient Sample Number
Tasha Eaddy
1% Asbestos
Analyst:
Reporting Limit:
Method:
QC Blank:
QC Sample:
Sami Hosn
EPA Method 600/R-93/116, EPA Method 600/M4-82-020
QA/QC Clerk
Reviewed By Authorized Signatory:
26-M22010-1
SRM 1866 Fiberglass
NAD = no asbestos detectedLEGEND:
The condition of the samples analyzed was acceptable upon receipt per laboratory protocol unless otherwise noted on this report. Each distinct component in an inhomogeneous sample was analyzed separately and reported as a composite. Results represent the analysis of samples submitted by the client. Sample location, description, area, volume, etc., was provided by the client. This report cannot be used by the client to claim product endorsement by NVLAP or any agency of the U.S. Government. This report shall not be reproduced except in full, without the written consent of the
Environmental Hazards Service, L.L.C. California Certification #2319 NY ELAP #11714 NVLAP #101882-0 VELAP 460172. All information concerning sampling location, date, and time can be found on Chain-of-Custody. Environmental Hazards Services, L.L.C. does not perform any sample collection.
Environmental Hazards Services, L.L.C. recommends reanalysis by point count (for more accurate quantification) or Transmission Electron Microscopy
(TEM), (for enhanced detection capabilities) for materials regulated by EPA NESHAP (National Emission Standards for Hazardous Air Pollutants) and found to contain less than ten percent (<10%) asbestos by polarized light microscopy (PLM). Both services are available for an additional fee.
400 Point Count Analysis, where noted, performed per EPA Method 600/R-93/116 with a Reporting Limit of 0.25%.
* All California samples analyzed by Polarized Light Microscopy, EPA Method 600/M4-82-020, Dec. 1982.
5 of 5Page
Sami Hosn
Analyst Signature Page
Richmond, VA 23237
Telephone: 800.347.4010
Environmental Hazards Services, L.L.C.
05/04/2018
Received Date:
29931 Shadow Creek Lane West Lake OH, 44145
Client:
05/04/2018
18-05-00061
Stephen J. Sebesta & Assoc. 05/01/2018
Report Number:
Reported Date:
Analyzed Date:
36-3130Client Number:
12981; VA Surgery Addition Roof ReplacementProject/Test Address:
7469 Whitepine Rd
Analyst(s)
ATTACHMENT NO. 3
Photographs
Photo SR-1, Non asbestos-containing face paper and adhesive on foam insulation below rubber roof, Core #1 over MICU addition (Sample No. 12981-1)
Photo SR-2, Non asbestos-containing rubber roof over MICU addition, looking west
Photo SR-3, Non asbestos-containing rubber roof over MICU addition, looking west
Photo SR-4, Non asbestos-containing face paper and adhesive on foam insulation below rubber roof, Core #2, northwest end of roof between MICU addition and main building (Sample No. 12981-3)
Photo SR-5, Asbestos-containing caulking over metal counter flashing near Core #2 at junction of surgery roof and original building (Sample No. 12981-2)
Photo SR-6, Non asbestos-containing gray caulking over termination bar near Core #2, Northwest end of MICU roof (Sample No. 12981-4)
Photo SR-7, Non asbestos-containing residual asphalt roofing below rubber roofing system, Core #3, northwest end of surgery roof (Sample No. 12981-5)
Photo SR-8, Non asbestos-containing rubber roof over MICU addition, looking north
Photo SR-9, Non asbestos-containing rubber roof over non asbestos-containing asphalt roof, surgery addition, looking east
Photo SR-10, Non asbestos-containing rubber roof over non asbestos-containing asphalt roof, surgery addition, Core #5 (Sample No. 12981-5)
Photo SR-11, Non asbestos-containing Dens-Deck board below rubber roof (Sample Nos.
12981-8 and 12981-19) over non asbestos-containing foam board over non asbestos-containing residual asphalt roofing on concrete deck (Sample Nos. 12981-9)
Photo SR-12, Asbestos-containing asphalt roof flashing below rubber roof, surgery addition roof near Core #7 (Sample Nos. 12981-10)
Photo SR-13, Non asbestos-containing residual asphalt roofing (Sample No. 12981-13) below rubber roofing system with non asbestos-containing face paper and adhesive, (Sample No. 12981-12) Core #8, southwest end of surgery roof
Photo SR-14, Non asbestos-containing residual asphalt roofing (Sample No. 12981-14)
Core #9, southeast end of surgery roof
Photo SR-15, Non asbestos-containing residual asphalt roofing (Sample No. 12981-15)
Core #10, east end of surgery roof
Photo SR-16, Non asbestos-containing residual asphalt roofing (Sample No. 12981-18)
Core #12, north end of surgery roof near mechanical penthouse
Photo SR-17, Non asbestos-containing rubber roof over non asbestos-containing asphalt roof, surgery addition, looking south near mechanical penthouse
Photo SR-18, Non asbestos-containing rubber roof over non asbestos-containing asphalt roof, surgery addition, looking west between mechanical penthouse and main building
ATTACHMENT 4
Ohio Asbestos Certification for Asbestos Inspector
General Requirements 01 00 00 - 1
SECTION 01 00 00
GENERAL REQUIREMENTS
TABLE OF CONTENTS
1.1 RELATED REQUIREMENTS
1.2 GENERAL INTENTION
1.3 STATEMENT OF BID ITEMS
1.4 SPECIFICATIONS AND DRAWINGS FOR CONTRACTOR
1.5 CONSTRUCTION SECURITY REQUIREMENTS
1.6 OPERATIONS AND STORAGE AREAS
1.7 DISPOSAL AND RETENTION
1.8 PROTECTION OF EXISTING VEGETATION, STRUCTURES, EQUIPMENT, UTILITIES, AND
IMPROVEMENTS
1.9 RESTORATION
1.10 LAYOUT OF WORK
1.11 AS-BUILT DRAWINGS
1.12 USE OF ROADWAYS
1.13 TEMPORARY USE OF EXISTING STAIRS AND ELEVATORS
1.14 TEMPORARY TOILETS
1.15 AVAILABILITY AND USE OF UTILITY SERVICES
1.16 TESTS
1.17 INSTRUCTIONS
1.18 GOVERNMENT-FURNISHED PROPERTY
1.19 RELOCATED EQUIPMENT and ITEMS
ATTACHMENTS
OSHA Requirements and Safety and Health Regulations - Attachment 1 Pre Construction Risk Assessment - Attachment 2 Construction Safety Poster - Cleveland VA - Attachment 3 Interim Life Safety Risk Assessment Form - Attachment 4 Contractor Safety and Security Orientation - Attachment 5 Job Safety Check Sheet - Attachment 6
01 00 00 - 2
SECTION 01 00 00
GENERAL REQUIREMENTS
1.1 RELATED REQUIREMENTS
A. Refer to section 01 35 26, SAFETY REQUIREMENTS for safety and infection control requirements.
B. Refer to Section 01 50 00, TEMPORARY CONSTRUCTION FACILITIES for construction and logistics plans, and scaffolding plan requirements.
1.2 GENERAL INTENTION
A. Project Description: The project will provide roof replacement of the
1987 Surgery Addition and adjacent areas. Existing roofs will be replaced with a protected roof membrane assembly, including flashing at perimeter conditions, in accordance with project documents. Access for staging and booming materials to the roof and locating a dumpster will be made available at ground level at approximate locations indicated on the drawings. There will be limited staging area at the ground level.
Site access for the project will be from the building exterior only.
1. Contractor shall completely prepare site for building operations, including demolition, removal and replacement of existing curtainwall, roofing, and other building elements, and furnish labor and materials and perform work for the REPLACE SURGERY ROOF project as required by drawings and specifications.
B. Visits to the site by Bidders will be in accordance with FAR clause
“52.236-27 Site Visits.”
C. Offices of Perspectus Architecture, Fredrick, Fredrick and Heller
Engineers, Adam Bradley Enterprises, and Stephen J. Sebesta, as
Architect-Engineers, will render certain technical services during construction. Such services shall be considered as advisory to the
Government and shall not be construed as expressing or implying a contractual act of the Government without affirmations by Contracting
Officer or his duly authorized representative.
D. Before placement and installation of work subject to tests by testing laboratory retained and paid for by the Contractor, the Contractor shall notify the COR in sufficient time to enable testing laboratory personnel to be present at the site in time for proper taking and testing of specimens and field inspection. Such prior notice shall be not less than three work days unless otherwise designated by the COR.
E. All employees of general contractor and subcontractors shall comply with
VA security management program and obtain permission of the VA police, be identified by project and employer, and restricted from unauthorized access.
01 00 00 - 3
F. Prior to commencing work, general contractor shall provide proof that a
OSHA certified “competent person” (CP) (29 CFR 1926.20(b)(2) will maintain a presence at the work site whenever the general or subcontractors are present.
1. General Contractor shall designate a full time superintendent dedicated solely to the project and who will be on site for the duration of the project.
G. Training:
1. All employees of general contractor or subcontractors shall have the following required hours of OSHA certified Construction Safety course and /or other relevant competency training, as determined by VA CP with input from the ICRA team.
a. Superintendent: 30 hours
b. All other Workers: 10 hours
2. Submit training records of all such employees for approval before the start of work.
1.3 STATEMENT OF BID ITEMS
General Contractor shall refer to the solicitation for bid item descriptions.
1.4 SPECIFICATIONS AND DRAWINGS FOR CONTRACTOR
A. AFTER AWARD OF CONTRACT, zero (0) sets of specifications and drawings will be furnished.
B. Drawings and contract documents may be obtained from the website where the solicitation is posted. Additional copies will be at Contractor's expense.
1.5 CONSTRUCTION SECURITY REQUIREMENTS
A. Security Plan:
1. The security plan defines both physical and administrative security procedures that will remain effective for the entire duration of the project.
2. The General Contractor is responsible for assuring that all sub-contractors working on the project and their employees also comply with these regulations.
B. Security Procedures:
1. General Contractor’s employees shall not enter the project site without appropriate badge. They may also be subject to inspection of their personal effects when entering or leaving the project site.
2. For working outside the “regular hours” as defined in the contract, the General Contractor shall give 3 days' notice to the Contracting
Officer so that security arrangements can be provided for the
01 00 00 - 4 employees. This notice is separate from any notices required for utility shutdown described later in this section.
3. No photography of VA premises is allowed without written permission of the Contracting Officer.
4. VA reserves the right to close down or shut down the project site and order General Contractor’s employees off the premises in the event of a national emergency. The General Contractor may return to the site only with the written approval of the Contracting Officer.
C. Key Control:
1. The General Contractor shall provide duplicate keys and lock combinations to the COR for the purpose of security inspections of every area of project including tool boxes and parked machines and take any emergency action.
2. The General Contractor shall turn over all permanent lock cylinders to the VA locksmith for permanent installation.
3. All construction doors/access doors must use VA key system and remain locked at all times from the corridor/exterior side.
D. Document Control:
1. Before starting any work, the General Contractor/Sub Contractors shall submit an electronic security memorandum describing the approach to following goals and maintaining confidentiality of
“sensitive information”.
2. The General Contractor is responsible for safekeeping of all drawings, project manual and other project information. This information shall be shared only with those with a specific need to accomplish the project.
3. Certain documents, sketches, videos or photographs and drawings may be marked “Law Enforcement Sensitive” or “Sensitive Unclassified”.
Secure such information in separate containers and limit the access to only those who will need it for the project. Return the information to the Contracting Officer upon request.
4. These security documents shall not be removed or transmitted from the project site without the written approval of Contracting Officer.
5. All paper waste or electronic media such as CD’s and diskettes shall be shredded and destroyed in a manner acceptable to the VA.
6. Notify Contracting Officer and Site Security Officer immediately when there is a loss or compromise of “sensitive information”.
7. All electronic information shall be stored in specified location following VA standards and procedures using an Engineering Document
Management Software (EDMS).
01 00 00 - 5
a. Security, access and maintenance of all project drawings, both scanned and electronic shall be performed and tracked through the
EDMS system.
b. “Sensitive information” including drawings and other documents may be attached to e-mail provided all VA encryption procedures are followed.
E. Motor Vehicle Restrictions
1. Vehicle authorization request shall be required for any vehicle entering the site and such request shall be submitted 24 hours before the date and time of access. Access shall be restricted to picking up and dropping off materials and supplies.
2. No parking is available at Medical Center for contractors and
Contractor commuter vehicles shall be parked off-site.
1.6 OPERATIONS AND STORAGE AREAS
A. The Contractor shall confine all operations (including storage of materials) on Government premises to areas authorized or approved by the
Contracting Officer. The Contractor shall hold and save the Government, its officers and agents, free and harmless from liability of any nature occasioned by the Contractor's performance. Storage and protection of stored material is the contractor’s sole responsibility.
B. Temporary buildings (e.g., storage sheds, shops, offices) and utilities may be erected by the Contractor only with the approval of the
Contracting Officer and shall be built with labor and materials furnished by the Contractor without expense to the Government. The temporary buildings and utilities shall remain the property of the
Contractor and shall be removed by the Contractor at its expense upon completion of the work. With the written consent of the Contracting
Officer, the buildings and utilities may be abandoned and need not be removed.
C. The Contractor shall, under regulations prescribed by the Contracting
Officer, use only established roadways, or use temporary roadways constructed by the Contractor when and as authorized by the Contracting
Officer. When materials are transported in prosecuting the work, vehicles shall not be loaded beyond the loading capacity recommended by the manufacturer of the vehicle or prescribed by any Federal, State, or local law or regulation. When it is necessary to cross curbs or sidewalks, the Contractor shall protect them from damage. The Contractor shall repair or pay for the repair of any damaged curbs, sidewalks, or roads.
D. Scaffolding, Lifts, and Material Delivery Access: Should the contractor chose to utilize the existing roofs as an access path for material
01 00 00 - 6 delivery and debris removal from the Work area, the contractor shall retain an engineer licensed in the State of Ohio to assess the existing roof structure and design all supports, bracing, reinforcing, and other related requirements for the protection of the roof surface and structural integrity of the building. The VA will make drawings available for the engineer’s use.
E. Enclosure Fence: install an enclosure fence with lockable entrance gates. Install in a manner that will prevent people and animals from easily entering the site. Maintain security with temporary key control system and distribution records.
1. Locate where indicated or, if not indicated, enclose the portion determined sufficient to accommodate construction operations, and permitting access and egress form the Building. Coordinate exact locations with the COR.
2. Provide open mesh chain link fencing with posts set in a compacted mixture of gravel and earth, or set in metal or pre-fab concrete portable bases.
F. Working space and space available for storing materials shall be as determined by the COR.
G. Workmen are subject to rules of Medical Center applicable to their conduct.
H. Execute work so as to interfere as little as possible with normal functioning of Medical Center as a whole, including operations of utility services, fire protection systems and any existing equipment, and with work being done by others. Use of equipment and tools that transmit vibrations and noises through the building structure, are not permitted in buildings that are occupied, during construction, jointly by patients or medical personnel, and Contractor's personnel, except as permitted by COR where required by limited working space.
1. Do not store materials and equipment in other than assigned areas.
2. Schedule delivery of materials and equipment to immediate construction working areas within buildings in use by Department of
Veterans Affairs in quantities sufficient that do not impede with
Medical Center activities. Provide unobstructed access to Medical
Center areas required to remain in operation.
3. Where access by Medical Center personnel to vacated portions of buildings is not required, storage of Contractor's materials and equipment will be permitted subject to fire and safety requirements and review and approval by COR.
4. All noise generating operations which are disruptive to Hospital operations as determined by the COR, including but not limited to
01 00 00 - 7 cutting of ceilings, walls and floor coring, drilling etc., shall be scheduled during weekends or between 6:00 PM and 7:00 AM on weekdays, unless otherwise determined by COR. Include all premium time charges in Bid.
5. All odor producing activities are to occur in such as manner as to prevent the odors from entering the facilities' air distribution systems.
a. The Contractor shall make special provisions to provide devices including baffles, diverters, or other constructions at air-intake louver or grill locations to prevent odors from the roofing demolition and installation operations from entering the building.
I. Phasing:
1. The work for this project is intended to be accomplished in a single phase as described by the Drawings, however the work is to be sequenced such that traffic on newly completed areas is minimized. If the Contractor elects to create phases, Contractor shall furnish the COR with a schedule of approximate phasing dates on which the
Contractor intends to accomplish work in each specific area of the site, building or portion thereof. In addition, Contractor shall notify the COR two weeks in advance for final approval of the proposed date of starting work in each specific area of the site, building or portion thereof. Arrange such dates to ensure accomplishment of this work in successive phases mutually agreeable to COR and Contractor. Final inspection of each phase before moving to the next phase will be required through the Contracting Officer and COR.
2. The Medical Center must maintain its operation 24 hours a day 7 days a week. Therefore, any interruption in service must be scheduled and coordinated with the COR to ensure that no lapses in operation occur.
It is the CONTRACTOR'S responsibility to develop a work plan and schedule, detailing, at a minimum, the procedures to be employed, the equipment and materials to be used, the interim life safety measure to be used during the work, and a schedule defining the duration of the work with milestone subtasks.
a. Work activities which generate excessive noise, vibrations, odors, or other conditions which are considered disruptive to the operation of the Medical Center as determined by the COR, shall be restricted to hours which will not be disruptive.
3. To insure proper execution of the Work, Contractor shall furnish the
COR with a schedule of approximate milestone dates on which the
Contractor intends to accomplish work in each specific area of the
01 00 00 - 8 site, building or portion thereof. In addition, Contractor shall notify the COR two weeks in advance of the proposed date of starting work in each specific area of the site, building or portion thereof.
J. When a section of the building is turned over to Contractor, Contractor shall accept entire responsibility therefore.
1. Contractor shall maintain in operating condition existing fire protection and alarm equipment. In connection with fire alarm equipment, Contractor shall make arrangements for pre-inspection of site with Fire Department or Company (Department of Veterans Affairs or municipal) whichever will be required to respond to an alarm from
Contractor's employee or watchman.
2. Contractor shall take all measures and provide all material necessary for protecting existing equipment and property in affected areas of construction against dust and debris, so that equipment and affected areas to be used in the Medical Centers operations will not be hindered. Contractor shall permit access to Department of Veterans
Affairs personnel and patients through other construction areas which serve as routes of access to such affected areas and equipment.
These routes whether access or egress shall be isolated from the construction area by temporary partitions and have walking surfaces, lighting etc to facilitate patient and staff access. Coordinate alteration work in areas occupied by Department of Veterans Affairs so that Medical Center operations will continue during the construction period.
K. Utilities Services: Maintain existing utility services for Medical
Center at all times. Provide temporary facilities, labor, materials, equipment, connections, and utilities to assure uninterrupted services.
Where necessary to cut existing water, steam, gases, sewer or air pipes, or conduits, wires, cables, etc. of utility services or of fire protection systems and communications systems (including telephone), they shall be cut and capped at suitable places where shown; or, in absence of such indication, where directed by COR.
1. No utility service such as water, gas, medical gases, steam, sewers or electricity, or fire protection systems and communications systems may be interrupted without prior approval of COR. Electrical work shall be accomplished with all affected circuits or equipment de-energized. When an electrical outage cannot be accomplished, work on any energized circuits or equipment shall not commence without the
Medical Center Director’s prior knowledge and written approval.
2. Contractor shall submit a request to interrupt any such services to
COR, in writing, three (3) work/business days in advance of a minor
01 00 00 - 9 shut down and two (2) weeks in advance of a major interruption.
Request shall state reason, date, exact time of, and approximate duration of such interruption.
3. Contractor will be advised (in writing) of approval of request, or of which other date and/or time such interruption will cause least inconvenience to operations of Medical Center. Interruption time approved by Medical Center may occur at other than Contractor's normal working hours.
4. Major interruptions of any system, including crane and dock usage, must be requested, in writing, at least 14 calendar days prior to the desired time and shall be performed as directed by the COR.
5. In case of a contract construction emergency, service will be interrupted on approval of COR. Such approval will be confirmed in writing as soon as practical.
6. All utility service shutdowns such as water, gas, medical gasses, steam, sewers, electricity, or fire protection shall occur during off-hours or weekends at no additional cost to the Government.
L. Abandoned Lines: All service lines such as wires, cables, conduits, ducts, pipes and the like, and their hangers or supports, which are to be abandoned but are not required to be entirely removed, shall be sealed, capped or plugged 6" beyond the project boundary line. The lines shall not be capped in finished areas, but shall be removed and sealed, capped or plugged in ceilings, or in unfinished areas; so that they are completely behind the finished surfaces.
M. To minimize interference of construction activities with flow of Medical
Center traffic, comply with the following:
1. Keep roads, walks and entrances to grounds, to parking and to occupied areas of buildings clear of construction materials, debris and standing construction equipment and vehicles.
2. Method and scheduling of required cutting, altering and removal of existing roads, walks and entrances must be approved by the COR.
N. Coordinate the work for this contract with other construction operations as directed by COR. This includes the scheduling of traffic and the use of roadways, as specified in Article, USE OF ROADWAYS.
O. Contractor shall submit a site utilization plan in accordance with
Section 01 33 23, SHOP DRAWINGS, PRODUCT DATA, and SAMPLES.
1. Include crane location and staging area for materials.
2. Include all other facilities necessary to complete the Work, including but not limited to enclosure fence, storage sheds, temporary sanitary facilities, and hazardous or flammable material storage.
01 00 00 - 10
1.7 DISPOSAL AND RETENTION
A. Materials and equipment accruing from work removed and from demolition of buildings or structures, or parts thereof, shall be disposed of as follows:
1. Reserved items which are to remain property of the Government are identified by attached tags or noted on drawings or in specifications as items to be stored. Items that remain property of the Government shall be removed or dislodged from present locations in such a manner as to prevent damage which would be detrimental to re-installation and reuse. Store such items where directed by COR.
2. Items not reserved shall become property of the Contractor and be removed by Contractor from Medical Center.
3. Items of portable equipment and furnishings located in areas in which work is to be done under this contract shall remain the property of the Government. When rooms and spaces are vacated by the Department of Veterans Affairs during the alteration period, such items which are NOT required by drawings and specifications to be either relocated or reused will be removed by the Government in advance of work to avoid interfering with Contractor's operation.
4. PCB Transformers and Capacitors: The Contractor shall be responsible for disposal of the Polychlorinated Biphenyl (PCB) transformers and capacitors. The transformers and capacitors shall be taken out of service and handled in accordance with the procedures of the
Environmental Protection Agency (EPA) and the Department of
Transportation (DOT) as outlined in Code of Federal Regulation (CFR), Titled 40 and 49 respectively. The EPA's Toxic Substance Control Act
(TSCA) Compliance Program Policy Nos. 6-PCB-6 and 6-PCB-7 also apply.
Upon removal of PCB transformers and capacitors for disposal, the
"originator" copy of the Uniform Hazardous Waste Manifest (EPA Form
8700-22), along with the Uniform Hazardous Waste Manifest
Continuation Sheet (EPA Form 8700-22A) shall be returned to the
Contracting Officer who will annotate the contract file and transmit the Manifest to the COR.
a. Copies of the following listed CFR titles may be obtained from the
Government Printing Office:
40 CFR 261........Identification and Listing of Hazardous Waste
40 CFR 262........Standards Applicable to Generators of Hazardous
Waste
40 CFR 263........Standards Applicable to Transporters of
Hazardous Waste
01 00 00 - 11
40 CFR 761........PCB Manufacturing, Processing, Distribution in
Commerce, and use Prohibitions
49 CFR 172........Hazardous Material tables and Hazardous Material
Communications Regulations
49 CFR 173........Shippers - General Requirements for Shipments and Packaging
49 CRR 173........Subpart A General
49 CFR 173........Subpart B Preparation of Hazardous Material for
Transportation
49 CFR 173........Subpart J Other Regulated Material; Definitions and Preparation
TSCA..............Compliance Program Policy Nos. 6-PCB-6 and 6-
PCB-7
1.8 PROTECTION OF EXISTING VEGETATION, STRUCTURES, EQUIPMENT, UTILITIES, AND
IMPROVEMENTS
A. The Contractor shall preserve and protect all structures, equipment, and vegetation (such as trees, shrubs, and grass) on or adjacent to the work site, which are not to be removed and which do not unreasonably interfere with the work required under this contract. The Contractor shall avoid damaging vegetation that will remain in place. If any limbs or branches of trees are broken during contract performance, or by the careless operation of equipment, or by workmen, the Contractor shall trim those limbs or branches with a clean cut and paint the cut with a tree-pruning compound as directed by the Contracting Officer.
1. Contractor shall immediately restore to its original condition any landscaping or site elements damaged as a result of any contractor activities.
B. The Contractor shall protect from damage all existing improvements and utilities at or near the work site and on adjacent property of a third party, the locations of which are made known to or should be known by the Contractor. The Contractor shall repair any damage to those facilities, including those that are the property of a third party, resulting from failure to comply with the requirements of this contract or failure to exercise reasonable care in performing the work. If the
Contractor fails or refuses to repair the damage promptly, the
Contracting Officer may have the necessary work performed and charge the cost to the Contractor.
1.9 RESTORATION
A. Remove, cut, alter, replace, patch and repair existing work as necessary to install new work. Except as otherwise shown or specified, do not cut, alter or remove any structural work, and do not disturb any ducts, 01 00 00 - 12 plumbing, steam, gas, or electric work without approval of the COR.
Existing work to be altered or extended and that is found to be defective in any way, shall be reported to the COR before it is disturbed. Materials and workmanship used in restoring work, shall conform in type and quality to that of original existing construction, except as otherwise shown or specified.
B. Upon completion of contract, deliver work complete and undamaged.
Existing work (walls, ceilings, partitions, floors, mechanical and electrical work, lawns, paving, roads, walks, etc.) disturbed or removed as a result of performing required new work, shall be patched, repaired, reinstalled, or replaced with new work, and refinished and left in as good of better condition as existed before commencing work.
C. At Contractor's own expense, Contractor shall immediately restore to service and repair any damage caused by Contractor's workmen to existing landscaping, piping and conduits, wires, cables, etc., of utility services or of fire protection systems and communications systems
(including telephone) which are indicated on drawings and which are not scheduled for discontinuance or abandonment.
D. Expense of repairs to such utilities and systems not shown on drawings or locations of which are unknown will be covered by adjustment to contract time and price in accordance with Bid Solicitation GENERAL
CONDITIONS.
1.10 LAYOUT OF WORK
A. The Contractor shall lay out the work indicated on the drawings, and shall be responsible for all measurements in connection with the layout.
The Contractor shall furnish, at Contractor's own expense, all templates, platforms, equipment, tools, materials, and labor required to lay out any part of the work. The Contractor shall be responsible for executing the work to the lines and grades that may be established or indicated by the Contracting Officer. The Contractor shall also be responsible for maintaining and preserving all marks established by the
Contracting Officer until authorized to remove them. If such marks are destroyed by the Contractor or through Contractor's negligence before their removal is authorized, the Contracting Officer may replace them and deduct the expense of the replacement from any amounts due or to become due to the Contractor.
B. Establish and plainly mark lines that are reasonably necessary to properly assure that location, orientation, and elevations established are in accordance with lines and elevations shown on contract drawings.
01 00 00 - 13
1.11 AS-BUILT DRAWINGS
A. The contractor shall maintain two full size sets of as-built drawings which will be kept current during construction of the project, to include all contract changes, modifications and clarifications.
B. All variations shall be shown in the same general detail as used in the contract drawings. To ensure compliance, as-built drawings shall be made available for the Architect's or COR's review, as often as requested.
C. Contractor shall submit two full size, approved, completed sets of as-built drawings within 14 calendar days after the acceptance of the project by the COR, in accordance with Section 01 33 23, SHOP DRAWINGS, PRODUCT DATA, AND SAMPLES, except that as-built drawings shall not be submitted electronically.
1.12 USE OF ROADWAYS
A. For hauling, use only established public roads and roads on Medical
Center property and, when authorized by the COR, such temporary roads which are necessary in the performance of contract work. Temporary roads shall be constructed by the Contractor at Contractor's expense. When necessary to cross curbing, sidewalks, or similar construction, they must be protected by well-constructed bridges and at the conclusion of the construction, contractor shall restore these areas to their original condition.
B. Contractor shall not obstruct public roads and roads on the Medical
Center property without authorization from authorities having jurisdiction, and the COR, respectively.
1.13 TEMPORARY USE OF EXISTING STAIRS AND ELEVATORS
A. Use of existing elevators for handling building materials and
Contractor's personnel will not be permitted unless specifically approved by the COR. Any such granted permission will be subject to following provisions:
1. Contractor makes all arrangements with the COR for use of elevators.
The COR will ascertain that elevators are in proper condition.
Contractor may use elevators for daily use for personnel only between the hours of 7:00 am and 6:00 pm and for special nonrecurring time intervals when permission is granted. Personnel for operating elevators will not be provided by the Department of Veterans Affairs.
2. Contractor to develop a proposed elevator usage plan for review and approval by COR.
3. Contractor covers and provides maximum protection of following elevator components:
a. Entrance jambs, heads soffits and threshold plates.
01 00 00 - 14
b. Entrance columns, canopy, return panels and inside surfaces of car enclosure walls.
c. Finish flooring.
4. If brake lining of elevators are excessively worn or damaged during temporary use, they shall be removed and replaced by new brake lining.
5. All parts of main controller, starter, relay panel, selector, etc., worn or damaged during temporary use shall be removed and replaced with new parts, if recommended by elevator inspector after elevator is released by Contractor.
6. Place elevator in condition equal, less normal wear, to that existing at time it was placed in service of Contractor as approved by
Contracting Officer.
B. Use of Owner's existing stairs will not be permitted.
1.14 TEMPORARY TOILETS
A. Contractor shall provide temporary toilets for use of construction personnel in locations approved by the COR. Use of Owner's existing toilet facilities will not be permitted.
1.15 AVAILABILITY AND USE OF UTILITY SERVICES
A. The Government shall make all reasonably required amounts of utilities available to the Contractor from existing outlets and supplies, as specified in the contract. The amount to be paid by the Contractor for chargeable electrical services shall be the prevailing rates charged to the Government. The Contractor shall carefully conserve any utilities furnished without charge.
B. The Contractor, at Contractor's expense and in a workmanlike manner satisfactory to the Contracting Officer, shall install and maintain all necessary temporary connections and distribution lines, and all meters required to measure the amount of electricity used for the purpose of determining charges. Before final acceptance of the work by the
Government, the Contractor shall remove all the temporary connections, distribution lines, meters, and associated paraphernalia and repair or restore the infrastructure as required.
C. Electricity (for Construction and Testing): Furnish all temporary electric services.
1. Obtain electricity by connecting to the Medical Center electrical distribution system. Electricity is available at no cost to the
Contractor.
D. Water (for Construction and Testing): Furnish temporary water service.
01 00 00 - 15
1. Obtain water by connecting to the Medical Center water distribution system. Provide reduced pressure backflow preventer at each connection. Water is available at no cost to the Contractor.
2. Maintain connections, pipe, fittings and fixtures and conserve water-use so none is wasted. Failure to stop leakage or other wastes will be cause for revocation (at COR's discretion) of use of water from
Medical Center's system.
E. Telephone: Contractor is to provide company cell phone during this contract.
F. Propane Containers: Propane and other fuels cannot be transported within the building or stored overnight on the roofs, unless specifically authorized by the COR.
1.16 TESTS
A. Conduct final tests required in various sections of specifications in presence of an authorized representative of the Contracting Officer.
Contractor shall furnish all labor, materials, equipment, instruments, and forms, to conduct and record such tests.
B.…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .