36C25019B0037-002.docx

DOCX document 13 KB Posted

Attached to
Building 1 Sprinkler Replacement 655-14-110
Solicitation number
36C25019B0037
Issued by

About this file

36C25019B0037 655-14-110 STATEMENT of WORK - FINAL.docx

View the file

Other files

File Type Posted
36C25019B0037-0003000.docx DOCX document
36C25019B0037-0002003.pdf PDF
36C25019B0037-0002001.pdf PDF
36C25019B0037-0002000.docx DOCX document
36C25019B0037-0002002.pdf PDF
36C25019B0037-0001000.docx DOCX document
36C25019B0037-004.pdf PDF
36C25019B0037-007.pdf PDF
36C25019B0037-005.pdf PDF
36C25019B0037-006.pdf PDF
36C25019B0037-001.docx DOCX document
36C25019B0037-009.docx DOCX document
36C25019B0037-003.pdf PDF
36C25019B0037-008.docx DOCX document
36C25019B0037-000.docx DOCX document
Show all 15

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

655-14-110 Building 1 Sprinkler Replacement

STATEMENT of WORK

This project is located at the Aleda E. Lutz VA Medical Center, 1500 Weiss Street – Saginaw, Michigan. Contractor shall completely provide and install fire protection sprinklers per the specifications and drawings; including demolition work, fire protection piping, sprinkler heads, fire alarm work, computer room extinguishing system, complete sprinkler system testing and training. Work shall include demolition, acquisition, installation, supervision and testing of all components/ equipment, construction materials and tools required to complete the work described in the drawings and specifications. Period of performance is 240 calendar days.

File details come from the government source that posted it.