PNEUMATIC TUBE STATION FOR SICU POSTING SITE VISIT SIGN IN SHEET
Solicitation number
36C25019B0014
Issued by

About this file

36C25019B0014 S02 - Pneumatic Tube Final CD Drawings 3.pdf

View the file

Other files

File Type Posted
36C25019B0014-0003001.pdf PDF
36C25019B0014-0003000.docx DOCX document
36C25019B0014-0002000.docx DOCX document
36C25019B0014-0001000.docx DOCX document
36C25019B0014-018.pdf PDF
36C25019B0014-017.docx DOCX document
36C25019B0014-006.pdf PDF
36C25019B0014-002.pdf PDF
36C25019B0014-009.docx DOCX document
36C25019B0014-003.pdf PDF
36C25019B0014-004.pdf PDF
36C25019B0014-001.docx DOCX document
36C25019B0014-008.docx DOCX document
36C25019B0014-007.pdf PDF
36C25019B0014-000.docx DOCX document
Show all 15

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

WIRE SIZE

(MIN. #12AWG)

NO. OF CCTS

IN CONDUIT

PHASE

CONDUCTORS

NEUTRALS

GROUND

BRANCH CIRCUIT WIRING

POWER DISTRIBUTION EQUIPMENT (FLOOR PLAN VIEW)

WIRING TERMINATIONS

GENERAL ELECTRICAL INSTALLATION NOTES:

1-E01

ABBREVIATIONS

GENERAL LEGEND

1-SF

FACILITY HOURS OF OPERATION:

A. FIRMS A & B HOURS M-F 7 A.M. - 4:30 P.M.

B. 1ST FLOOR - BLOOD DRAW HOURS M,T,W,F 6:00 A.M. - 5:30 P.M. TH 6:00 A.M. - 6:30 P.M.

C. 2ND FLOOR SICU & MICU HOURS 365/24/7.

D. FACILITY NORMAL HOURS: 8 A.M. - 4:30 P.M.

Drawing Title

Approved: Project Director

Project Title

Date

Location

Checked

Building Number

Project Number

Drawing Number

Drawn

Dwg. of

CONSULTANTS: ARCHITECT:

o n e e ig h th in c h o n e fo o t th re e in c h e s o n e fo o t o n e a n d o n e h a lf in c h e s o n e fo o t o n e in c h o n e fo o t th re e q u a rt e rs in c h o n e fo o t o n e h a lf in c h o n e fo o t th re e e ig h th s in c h o n e fo o t o n e q u a rt e r in c h o n e fo o t

VA FORM 08-6231, OCT 1978

1 2 3 4 5 6 87 9

F

E

D

C

B

A

97 8654321 10

F

E

D

C

B

A

Revisions: Date

VAMC - WADE PARK

Office of Facilities

ManagementDESIGN AND CONSTRUCTION DOCUMENTS AS

INSTRUMENTS OF SERVICE ARE GIVEN IN

CONFIDENCE AND REMAIN THE PROPERTY OF

PERSPECTUS ARCHITECTURE. THE USE OF THIS

DESIGN AND THESE CONSTRUCTION DOCUMENTS

FOR PURPOSES OTHER THAN THE SPECIFIC

PROJECT NAMED HEREIN IS STRICTLY PROHIBITED

WITHOUT THE EXPRESSED WRITTEN CONSENT OF

PERSPECTUS ARCHITECTURE.13212 Shaker Square Suite 204 Cleveland, Ohio 44120

P. 216.752.1800 F.216.752.3833

PNEUMATIC TUBE

STATION FOR SICU AND

BLOOD DRAW

11-15-2018

541-19-503

Revisions: Date

Final Construction Document Submission 11/15/18

S

59459

M.P. LONG

R

ES

O F

I R

GE

NOI

S

P

E

N E

DERT

L EA

E I N

G

R

TS

TEA HF OO

IO

JRDMPL

ELECTRICAL LEGEND AND

GENERAL NOTES

1-E0.1

B416

BB410

BB411

BB412

BA142

BA140

BA139 BA109

BA145B

BB410A

C21H1

C14

BB402

BB401

BAC322

BAC324

BAC311

BAC307

BAC306

BAC314

BAC302

BAC301

BAC312

BAC326

BAC313

BA109B

BA151A

STAIR B

C15B

C15C

C15D

C15A

C16

XXXX

XXXX

XXXXX

B334 BB332

BB322

BB308

B333 BB313 BB312

BB311

BB310 AC

AC-51

BAC270C

BAC270B

BAC270A

BAC280

BAC281

BAC282

BAC283

OIT Telecom/

Data Closet

BB222

BB220

BB219

BB218

BB217

BB216

BAC270A1

BAC269

BAC268

BAC272

BAC274

BAC275

BAC273

BAC271

BAC260

BAC261

BAC265

BAC266

BAC264

BAC262

BAC286

BB331

XXXXXX

BAC250

BAC251

BAC252

BAC253

BAC254

BAC255

BAC259

BAC258

BAC257

BAC256

J

TRANSFER

UNIT

SUBSTATION 'H1'

EQDPAC-1 MBMCC-2

BA-151

X

X

X

X

X

X X

X

X

X

X X

X

X

X

X

X

X

X

X

X

X X

X X

X X

X X

X X

XX

X

STAIR B

STAIR A

STAIR C

STAIR 9

STAIR 11

STAIR S2

STAIR S3

STAIR S1

STAIR 1

STAIR 3

STAIR 2

STAIR 6

STAIR 5

SE1 SE2

PE3 PE4 PE5 PE6

PE7 PE8

BFC06F

S1

S2

S3

P1 P2 P3

SE1

SE2

PE1

STAIR A

STAIR B

AC-26

AC-31

AC-32

EXIT

EXIT

EXIT

EXIT

AC-53

AC-52

AC-51

TRANSFORMER

TRANSFORMER

AC-2

OLD

AC-12

AC-35

AC-28

AC-28

AC-24

AC-50

DN

PROJECT AREA

L

L2

P

L3

K

J

H

G1

391 2 3 44642 47

Drawing Title

Approved: Project Director

Project Title

Date

Location

Checked

Building Number

Project Number

Drawing Number

Drawn

Dwg. of

CONSULTANTS: ARCHITECT:

o n e e ig h th in c h o n e fo o t th re e in c h e s o n e fo o t o n e a n d o n e h a lf in c h e s o n e fo o t o n e in c h o n e fo o t th re e q u a rt e rs in c h o n e fo o t o n e h a lf in c h o n e fo o t th re e e ig h th s in c h o n e fo o t o n e q u a rt e r in c h o n e fo o t

VA FORM 08-6231, OCT 1978

1 2 3 4 5 6 87 9

F

E

D

C

B

A

97 8654321 10

F

E

D

C

B

A

Revisions: Date

VAMC - WADE PARK

Office of Facilities

ManagementDESIGN AND CONSTRUCTION DOCUMENTS AS

INSTRUMENTS OF SERVICE ARE GIVEN IN

CONFIDENCE AND REMAIN THE PROPERTY OF

PERSPECTUS ARCHITECTURE. THE USE OF THIS

DESIGN AND THESE CONSTRUCTION DOCUMENTS

FOR PURPOSES OTHER THAN THE SPECIFIC

PROJECT NAMED HEREIN IS STRICTLY PROHIBITED

WITHOUT THE EXPRESSED WRITTEN CONSENT OF

PERSPECTUS ARCHITECTURE.13212 Shaker Square Suite 204 Cleveland, Ohio 44120

P. 216.752.1800 F.216.752.3833

PNEUMATIC TUBE

STATION FOR SICU AND

BLOOD DRAW

11-15-2018

541-19-503

Revisions: Date

Final Construction Document Submission 11/15/18

S

59459

M.P. LONG

R

ES

O F

I R

GE

NOI

S

P

E

N E

DERT

L EA

E I N

G

R

TS

TEA HF OO

IO

0'

SCALE: 1/8" = 1'0"

4' 8' 16' 32'

PARTIAL BASEMENT FLOOR ELECTRICAL PLAN

NOT TO SCALE

BASEMENT KEY PLAN

JRDMPL

PARTIAL BASEMENT

ELECTRICAL PLAN

1-E1.0

1. PRIOR TO INSTALLATION, VERIFY PRECISE LOCATION OF NEW OR RELOCATED WALL OR CEILING

MOUNTED DEVICES WITH ARCHITECTURAL ELEVATIONS.

2. COORDINATE ALL SHUT-DOWNS OF EXISTING ELECTRICAL SYSTEMS WITH OWNER A MINIMUM OF

FOURTEEN WORKING DAYS IN ADVANCE.

3. ALL NOISE GENERATING OPERATIONS, INCLUDING CUTTING OF CEILINGS, WALLS AND FLOORS, CORING, DRILLING, ETC. SHALL BE SCHEDULED ON WEEKENDS OR DURING "OFF-HOURS" (REFER TO FACILITY

HOURS OF OPERATION ON ELECTRICAL LEGEND). INCLUDE ALL PREMIUM TIME CHARGES IN BID.

4. ELECTRICAL CONTRACTOR IS RESPONSIBLE FOR REMOVAL AND REPLACEMENT OF CEILINGS REQUIRED

FOR ELECTRICAL WORK. ELECTRICAL CONTRACTOR SHALL REPLACE ANY DAMAGED CEILING TILES.

5. ALL NEW WALL MOUNTED ELECTRICAL DEVICES ARE TO BE INSTALLED FLUSH IN WALL UNLESS

OTHERWISE NOTED. ALL ELECTRICAL CONDUIT SHALL BE CONCEALED BEHIND FINISHED WALLS AND

ABOVE FINISHED CEILING UNLESS OTHERWISE NOTED. THE COST TO CUT AND PATCH WALLS SHALL BE

THE RESPONSIBILITY OF THE TRADE REQUIRING THE CUTTING.

6. ALL WORK IN MICU/SICU AREAS SHALL BE DONE IN A HEPA TENT.

CODED NOTES:

1 PROVIDE 120V-1ø-20A CIRCUIT FOR PNEUMATIC TUBE TRANSFER STATION AND CONNECT COMPLETE TO

20A-1P SPARE CIRCUIT BREAKER IN PANEL 'EQDPAC-1' VIA 3/4"C-2#12 AND 1#12EG.

GENERAL ELECTRICAL INSTALLATION NOTES

SE1 SE2

PE3 PE4 PE5 PE6

PE7 PE8

S1

S2

S3

STAIR S1

P1 P2 P3

STAIR S2

STAIR S3

ONML

K

J I H G

F

E

B A

A

B

L

D

GH

F

JK

CD

STAIR 8

STAIR A

STAIR 11

STAIR A

STAIR B

STAIR C

STAIR 2

STAIR 9

STAIR 2STAIR 13

STAIR 4

STAIR 5

STAIR 6

STAIR 2

STAIR 1

STAIR 3

STAIR 2

STAIR A

STAIR B

PE1

STAIR D

A B C D E F

L K J

N M I

P O H

R Q G

S T U

X

W V

Y Z

A

B

CD

E F

G

H

I

J

A B C

DEF

K

A

B

B

C

D

E

F

A

D

EF

AC-63

SF-4

1 2 3

COOLING

TOWER 1

COOLING

TOWER 4

COOLING

TOWER 3

COOLING

TOWER 2COOLING

TOWER 5

BCD

C

E

I

PROJECT AREA

1B446 1B4421B441

1B419 1B418

1B417

1B416

1B430

1B414

1B415

1B411

1B410

1B413

1B420

1B495

1B187

1C401

1B496

1B497

STAIR 8

STAIR A

1B466

OIT Telecom/

Data Closet

OIT Telecom/

Data Closet

1B476

1B474

1B471

1B473

1B475

1B463

1B461 1B472

1B477

1B498

1B499 1B479 1B469

1B478 1B468

1B462

1B464

1B465

1B467

1B468A

1B431

J

PT

LF11CR

RF11CR

X

X

X

X

X

X

X

X

X

X

XX

LF11-CR-41

B

N3

A

N

P

Q

R1

T

391 2 42 43

Drawing Title

Approved: Project Director

Project Title

Date

Location

Checked

Building Number

Project Number

Drawing Number

Drawn

Dwg. of

CONSULTANTS: ARCHITECT:

o n e e ig h th in c h o n e fo o t th re e in c h e s o n e fo o t o n e a n d o n e h a lf in c h e s o n e fo o t o n e in c h o n e fo o t th re e q u a rt e rs in c h o n e fo o t o n e h a lf in c h o n e fo o t th re e e ig h th s in c h o n e fo o t o n e q u a rt e r in c h o n e fo o t

VA FORM 08-6231, OCT 1978

1 2 3 4 5 6 87 9

F

E

D

C

B

A

97 8654321 10

F

E

D

C

B

A

Revisions: Date

VAMC - WADE PARK

Office of Facilities

ManagementDESIGN AND CONSTRUCTION DOCUMENTS AS

INSTRUMENTS OF SERVICE ARE GIVEN IN

CONFIDENCE AND REMAIN THE PROPERTY OF

PERSPECTUS ARCHITECTURE. THE USE OF THIS

DESIGN AND THESE CONSTRUCTION DOCUMENTS

FOR PURPOSES OTHER THAN THE SPECIFIC

PROJECT NAMED HEREIN IS STRICTLY PROHIBITED

WITHOUT THE EXPRESSED WRITTEN CONSENT OF

PERSPECTUS ARCHITECTURE.13212 Shaker Square Suite 204 Cleveland, Ohio 44120

P. 216.752.1800 F.216.752.3833

PNEUMATIC TUBE

STATION FOR SICU AND

BLOOD DRAW

11-15-2018

541-19-503

Revisions: Date

Final Construction Document Submission 11/15/18

S

59459

M.P. LONG

R

ES

O F

I R

GE

NOI

S

P

E

N E

DERT

L EA

E I N

G

R

TS

TEA HF OO

IO

NOT TO SCALE

FIRST FLOOR - KEY PLAN

0'

SCALE: 1/8" = 1'0"

4' 8' 16' 32'

PARTIAL FIRST FLOOR ELECTRICAL PLAN

JRDMPL

PARTIAL FIRST FLOOR

ELECTRICAL PLAN

1-E1.1

CODED NOTES:

PROVIDE 120V-1ø-20A CIRCUIT FOR PNEUMATIC TUBE STATION AND CONNECT COMPLETE TO NEW

20A-1P CIRCUIT IN PANEL 'LF11-CR' VIA 3/4"C-2#12 AND 1#12EG.

1. PRIOR TO INSTALLATION, VERIFY PRECISE LOCATION OF NEW OR RELOCATED WALL OR CEILING

MOUNTED DEVICES WITH ARCHITECTURAL ELEVATIONS.

2. COORDINATE ALL SHUT-DOWNS OF EXISTING ELECTRICAL SYSTEMS WITH OWNER A MINIMUM OF

FOURTEEN WORKING DAYS IN ADVANCE.

3. ALL NOISE GENERATING OPERATIONS, INCLUDING CUTTING OF CEILINGS, WALLS AND FLOORS, CORING, DRILLING, ETC. SHALL BE SCHEDULED ON WEEKENDS OR DURING "OFF-HOURS" (REFER TO FACILITY

HOURS OF OPERATION ON ELECTRICAL LEGEND). INCLUDE ALL PREMIUM TIME CHARGES IN BID.

4. ELECTRICAL CONTRACTOR IS RESPONSIBLE FOR REMOVAL AND REPLACEMENT OF CEILINGS REQUIRED

FOR ELECTRICAL WORK. ELECTRICAL CONTRACTOR SHALL REPLACE ANY DAMAGED CEILING TILES.

5. ALL NEW WALL MOUNTED ELECTRICAL DEVICES ARE TO BE INSTALLED FLUSH IN WALL UNLESS

OTHERWISE NOTED. ALL ELECTRICAL CONDUIT SHALL BE CONCEALED BEHIND FINISHED WALLS AND

ABOVE FINISHED CEILING UNLESS OTHERWISE NOTED. THE COST TO CUT AND PATCH WALLS SHALL BE

THE RESPONSIBILITY OF THE TRADE REQUIRING THE CUTTING.

6. ALL WORK IN MICU/SICU AREAS SHALL BE DONE IN A HEPA TENT.

PROJECT AREA

2D180 2D181 2D182

2D183 2D184 2D185 2D179

2D178

2D177

2D176

2D175

2D172 2D170 2D168 2D167

2D174 2D171 2D169 2D166

2D179A

2D146

2D145

2D139

2D144

2D140

2D143

2D142

2D141

2D166A2D1732D174A

2E352

2E353

2E354

2D166

2D114

PATIENT

RM 7

2D115

PATIENT

RM 8

2D116

PATIENT

RM 9

2D118

ADMIN CEN

2D117

CLEAN

UTILITY

2D123

MEDS

2D124

SOILED

UTILITY

2D133

STAFF TLT.

2D266

ON-CALL

2D265

ON-CALL 2D2

TLT/S

2D2

ALC

2D264

CONSULT.

2D258

VEST.

2D257C

WOMEN'S TLT

2D275B

ALCOVE

2D275C

ALCOVE

2D255C

MEN'S TLT.

2D256

VEST.

2D255

MEN'S

LOCKE

2D132

OFFICE

2D134

NURSE

MGR.

2D13

HALLW

2D131

LINEN

STORAGE

2D130A

NOURISH.

2D122

PATIENT

RM 12

2D121

PATIENT

RM 11

2D120

STORAGE

2D119

PATIENT

RM 10

2D101

STAIR 13

2D163

QUIET RM.

2D196A

WAITING RM

2D159

EMS

2D160

OFFICE

2D161

OFFICE

2D198

OFFICE

2D197

BIO-MED

SERVER RM

2D162

STAIR 4

2D196

OFFICE

2D195

TLT.

2D194

LACTATION RM.

2D193

EQUIP.

STORAGE

2D164

MICU BED RM

2D165

MICU BED RM

2D191

ELECT.

2D190

OI&T

2D189

EQUIP.

STORAGE

2D188

ELECT.

2D187

MICU BED RM

2D186A

WORK RM

2D186

ANTE

ROOM

2E368

1 BED

PATIENT RM

2D192

STAFF

LOUNGE

2D192A

WOMEN'S

LOCKERS

2D192C

MEN'S

LOCKERS

2D192A

TLT./

SHWR.

2D192D

TLT./

SHWR.

J

J

PT

TRANSFER

SWITCH

HN22-CR

LN22-CR

HN21

LN23

LN23-CRLN21-CR

X

X X X X X

X

X

LN21

LN22

LN22-CR-17

LN21-CR-39

1 2 3 4 FEDA.1 B 14C12A9A 11B

H

G1

E

A

TT

WW

VV

SS

RR

Drawing Title

Approved: Project Director

Project Title

Date

Location

Checked

Building Number

Project Number

Drawing Number

Drawn

Dwg. of

CONSULTANTS: ARCHITECT:

o n e e ig h th in c h o n e fo o t th re e in c h e s o n e fo o t o n e a n d o n e h a lf in c h e s o n e fo o t o n e in c h o n e fo o t th re e q u a rt e rs in c h o n e fo o t o n e h a lf in c h o n e fo o t th re e e ig h th s in c h o n e fo o t o n e q u a rt e r in c h o n e fo o t

VA FORM 08-6231, OCT 1978

1 2 3 4 5 6 87 9

F

E

D

C

B

A

97 8654321 10

F

E

D

C

B

A

Revisions: Date

VAMC - WADE PARK

Office of Facilities

ManagementDESIGN AND CONSTRUCTION DOCUMENTS AS

INSTRUMENTS OF SERVICE ARE GIVEN IN

CONFIDENCE AND REMAIN THE PROPERTY OF

PERSPECTUS ARCHITECTURE. THE USE OF THIS

DESIGN AND THESE CONSTRUCTION DOCUMENTS

FOR PURPOSES OTHER THAN THE SPECIFIC

PROJECT NAMED HEREIN IS STRICTLY PROHIBITED

WITHOUT THE EXPRESSED WRITTEN CONSENT OF

PERSPECTUS ARCHITECTURE.13212 Shaker Square Suite 204 Cleveland, Ohio 44120

P. 216.752.1800 F.216.752.3833

PNEUMATIC TUBE

STATION FOR SICU AND

BLOOD DRAW

11-15-2018

541-19-503

Revisions: Date

Final Construction Document Submission 11/15/18

S

59459

M.P. LONG

R

ES

O F

I R

GE

NOI

S

P

E

N E

DERT

L EA

E I N

G

R

TS

TEA HF OO

IO

NOT TO SCALE

PARTIAL SECOND FLOOR - KEY PLAN

JRDMPL

PARTIAL SECOND FLOOR

ELECTRICAL PLAN

1-E1.2

0'

SCALE: 1/8" = 1'0"

4' 8' 16' 32'

PARTIAL SECOND FLOOR ELECTRICAL PLAN

CODED NOTES:

1 PROVIDE 120V-1ø-20A CIRCUIT FOR PNEUMATIC TUBE TRANSFER STATION AND CONNECT COMPLETE TO

SPARE 20A-1P CIRCUIT INDICATED IN PANEL 'LN21-CR' VIA 3/4"C-2#12 AND 1#12EG.

PROVIDE 120V-1ø-20A CIRCUIT FOR PNEUMATIC TUBE STATION AND CONNECT COMPLETE TO SPARE

20A-1P CIRCUIT INDICATED IN PANEL 'LN22-CR' VIA 3/4"C-2#12 AND 1#12EG.

1. PRIOR TO INSTALLATION, VERIFY PRECISE LOCATION OF NEW OR RELOCATED WALL OR CEILING

MOUNTED DEVICES WITH ARCHITECTURAL ELEVATIONS.

2. COORDINATE ALL SHUT-DOWNS OF EXISTING ELECTRICAL SYSTEMS WITH OWNER A MINIMUM OF

FOURTEEN WORKING DAYS IN ADVANCE.

3. ALL NOISE GENERATING OPERATIONS, INCLUDING CUTTING OF CEILINGS, WALLS AND FLOORS, CORING, DRILLING, ETC. SHALL BE SCHEDULED ON WEEKENDS OR DURING "OFF-HOURS" (REFER TO FACILITY

HOURS OF OPERATION ON ELECTRICAL LEGEND). INCLUDE ALL PREMIUM TIME CHARGES IN BID.

4. ELECTRICAL CONTRACTOR IS RESPONSIBLE FOR REMOVAL AND REPLACEMENT OF CEILINGS REQUIRED

FOR ELECTRICAL WORK. ELECTRICAL CONTRACTOR SHALL REPLACE ANY DAMAGED CEILING TILES.

5. ALL NEW WALL MOUNTED ELECTRICAL DEVICES ARE TO BE INSTALLED FLUSH IN WALL UNLESS

OTHERWISE NOTED. ALL ELECTRICAL CONDUIT SHALL BE CONCEALED BEHIND FINISHED WALLS AND

ABOVE FINISHED CEILING UNLESS OTHERWISE NOTED. THE COST TO CUT AND PATCH WALLS SHALL BE

THE RESPONSIBILITY OF THE TRADE REQUIRING THE CUTTING.

6. ALL WORK IN MICU/SICU AREAS SHALL BE DONE IN A HEPA TENT.

Binder1
1-A0 REF INFO
1-A1 KEY PLANS
1-A2 PARTIAL PLANS
X.1 COVER
1-FP0.1 - FIRE PROTECTION LEGEND AND GENERAL NOTES
1-FP1.0 - PARTIAL BASEMENT FIRE PROTECTION PLAN
1-FP1.1 - PARTIAL FIRST FLOOR FIRE PROTECTION PLAN
1-FP1.2 - PARTIAL SECOND FLOOR FIRE PROTECTION PLAN
1-H0.1 - MECHANICAL LEGEND, GENERAL NOTES AND DETAILS
1-H1.0 - PARTIAL FIRST FLOOR MECHANICAL PLAN
1-H1.1 - PARTIAL SECOND FLOOR MECHANICAL DEMOLIITON PLAN
1-H1.2 - PARTIAL SECOND FLOOR MECHANICAL PLAN
1-E0.1 - ELECTRICAL LEGEND AND GENERAL NOTE
ELECTRICAL LEGEND AND GENERAL NOTE
1-E0.1 - ELECTRICAL LEGEND AND GENERAL NOTES
1-E1.0 - PARTIAL BASEMENT ELECTRICAL PLAN
PARTIAL BASEMENT ELECTRICAL PLAN
1-E1.0 - PARTIAL BASEMENT ELECTRICAL PLAN
1-E1.1 - PARTIAL FIRST FLOOR ELECTRICAL
PARTIAL FIRST FLOOR ELECTRICAL PLAN
1-E1.1 - PARTIAL FIRST FLOOR ELECTRICAL
1-E1.2 - PARTIAL SECOND FLOOR ELECTRICAL PLAN
PARTIAL SECOND FLOOR ELECTRICAL PLAN
1-E1.2 - PARTIAL SECOND FLOOR ELECTRICAL PLAN