36C25019B0014-005.pdf
PDF 7 MB Posted
- Solicitation number
- 36C25019B0014
About this file
36C25019B0014 S02 - Pneumatic Tube Final CD Drawings 3.pdf
View the file
Other files
| File | Type | Posted |
|---|---|---|
| 36C25019B0014-0003001.pdf | ||
| 36C25019B0014-0003000.docx | DOCX document | |
| 36C25019B0014-0002000.docx | DOCX document | |
| 36C25019B0014-0001000.docx | DOCX document | |
| 36C25019B0014-018.pdf | ||
| 36C25019B0014-017.docx | DOCX document | |
| 36C25019B0014-006.pdf | ||
| 36C25019B0014-002.pdf | ||
| 36C25019B0014-009.docx | DOCX document | |
| 36C25019B0014-003.pdf | ||
| 36C25019B0014-004.pdf | ||
| 36C25019B0014-001.docx | DOCX document | |
| 36C25019B0014-008.docx | DOCX document | |
| 36C25019B0014-007.pdf | ||
| 36C25019B0014-000.docx | DOCX document |
Show all 15
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
WIRE SIZE
(MIN. #12AWG)
NO. OF CCTS
IN CONDUIT
PHASE
CONDUCTORS
NEUTRALS
GROUND
BRANCH CIRCUIT WIRING
POWER DISTRIBUTION EQUIPMENT (FLOOR PLAN VIEW)
WIRING TERMINATIONS
GENERAL ELECTRICAL INSTALLATION NOTES:
1-E01
ABBREVIATIONS
GENERAL LEGEND
1-SF
FACILITY HOURS OF OPERATION:
A. FIRMS A & B HOURS M-F 7 A.M. - 4:30 P.M.
B. 1ST FLOOR - BLOOD DRAW HOURS M,T,W,F 6:00 A.M. - 5:30 P.M. TH 6:00 A.M. - 6:30 P.M.
C. 2ND FLOOR SICU & MICU HOURS 365/24/7.
D. FACILITY NORMAL HOURS: 8 A.M. - 4:30 P.M.
Drawing Title
Approved: Project Director
Project Title
Date
Location
Checked
Building Number
Project Number
Drawing Number
Drawn
Dwg. of
CONSULTANTS: ARCHITECT:
o n e e ig h th in c h o n e fo o t th re e in c h e s o n e fo o t o n e a n d o n e h a lf in c h e s o n e fo o t o n e in c h o n e fo o t th re e q u a rt e rs in c h o n e fo o t o n e h a lf in c h o n e fo o t th re e e ig h th s in c h o n e fo o t o n e q u a rt e r in c h o n e fo o t
VA FORM 08-6231, OCT 1978
1 2 3 4 5 6 87 9
F
E
D
C
B
A
97 8654321 10
F
E
D
C
B
A
Revisions: Date
VAMC - WADE PARK
Office of Facilities
ManagementDESIGN AND CONSTRUCTION DOCUMENTS AS
INSTRUMENTS OF SERVICE ARE GIVEN IN
CONFIDENCE AND REMAIN THE PROPERTY OF
PERSPECTUS ARCHITECTURE. THE USE OF THIS
DESIGN AND THESE CONSTRUCTION DOCUMENTS
FOR PURPOSES OTHER THAN THE SPECIFIC
PROJECT NAMED HEREIN IS STRICTLY PROHIBITED
WITHOUT THE EXPRESSED WRITTEN CONSENT OF
PERSPECTUS ARCHITECTURE.13212 Shaker Square Suite 204 Cleveland, Ohio 44120
P. 216.752.1800 F.216.752.3833
PNEUMATIC TUBE
STATION FOR SICU AND
BLOOD DRAW
11-15-2018
541-19-503
Revisions: Date
Final Construction Document Submission 11/15/18
S
59459
M.P. LONG
R
ES
O F
I R
GE
NOI
S
P
E
N E
DERT
L EA
E I N
G
R
TS
TEA HF OO
IO
JRDMPL
ELECTRICAL LEGEND AND
GENERAL NOTES
1-E0.1
B416
BB410
BB411
BB412
BA142
BA140
BA139 BA109
BA145B
BB410A
C21H1
C14
BB402
BB401
BAC322
BAC324
BAC311
BAC307
BAC306
BAC314
BAC302
BAC301
BAC312
BAC326
BAC313
BA109B
BA151A
STAIR B
C15B
C15C
C15D
C15A
C16
XXXX
XXXX
XXXXX
B334 BB332
BB322
BB308
B333 BB313 BB312
BB311
BB310 AC
AC-51
BAC270C
BAC270B
BAC270A
BAC280
BAC281
BAC282
BAC283
OIT Telecom/
Data Closet
BB222
BB220
BB219
BB218
BB217
BB216
BAC270A1
BAC269
BAC268
BAC272
BAC274
BAC275
BAC273
BAC271
BAC260
BAC261
BAC265
BAC266
BAC264
BAC262
BAC286
BB331
XXXXXX
BAC250
BAC251
BAC252
BAC253
BAC254
BAC255
BAC259
BAC258
BAC257
BAC256
J
TRANSFER
UNIT
SUBSTATION 'H1'
EQDPAC-1 MBMCC-2
BA-151
X
X
X
X
X
X X
X
X
X
X X
X
X
X
X
X
X
X
X
X
X X
X X
X X
X X
X X
XX
X
STAIR B
STAIR A
STAIR C
STAIR 9
STAIR 11
STAIR S2
STAIR S3
STAIR S1
STAIR 1
STAIR 3
STAIR 2
STAIR 6
STAIR 5
SE1 SE2
PE3 PE4 PE5 PE6
PE7 PE8
BFC06F
S1
S2
S3
P1 P2 P3
SE1
SE2
PE1
STAIR A
STAIR B
AC-26
AC-31
AC-32
EXIT
EXIT
EXIT
EXIT
AC-53
AC-52
AC-51
TRANSFORMER
TRANSFORMER
AC-2
OLD
AC-12
AC-35
AC-28
AC-28
AC-24
AC-50
DN
PROJECT AREA
L
L2
P
L3
K
J
H
G1
391 2 3 44642 47
Drawing Title
Approved: Project Director
Project Title
Date
Location
Checked
Building Number
Project Number
Drawing Number
Drawn
Dwg. of
CONSULTANTS: ARCHITECT:
o n e e ig h th in c h o n e fo o t th re e in c h e s o n e fo o t o n e a n d o n e h a lf in c h e s o n e fo o t o n e in c h o n e fo o t th re e q u a rt e rs in c h o n e fo o t o n e h a lf in c h o n e fo o t th re e e ig h th s in c h o n e fo o t o n e q u a rt e r in c h o n e fo o t
VA FORM 08-6231, OCT 1978
1 2 3 4 5 6 87 9
F
E
D
C
B
A
97 8654321 10
F
E
D
C
B
A
Revisions: Date
VAMC - WADE PARK
Office of Facilities
ManagementDESIGN AND CONSTRUCTION DOCUMENTS AS
INSTRUMENTS OF SERVICE ARE GIVEN IN
CONFIDENCE AND REMAIN THE PROPERTY OF
PERSPECTUS ARCHITECTURE. THE USE OF THIS
DESIGN AND THESE CONSTRUCTION DOCUMENTS
FOR PURPOSES OTHER THAN THE SPECIFIC
PROJECT NAMED HEREIN IS STRICTLY PROHIBITED
WITHOUT THE EXPRESSED WRITTEN CONSENT OF
PERSPECTUS ARCHITECTURE.13212 Shaker Square Suite 204 Cleveland, Ohio 44120
P. 216.752.1800 F.216.752.3833
PNEUMATIC TUBE
STATION FOR SICU AND
BLOOD DRAW
11-15-2018
541-19-503
Revisions: Date
Final Construction Document Submission 11/15/18
S
59459
M.P. LONG
R
ES
O F
I R
GE
NOI
S
P
E
N E
DERT
L EA
E I N
G
R
TS
TEA HF OO
IO
0'
SCALE: 1/8" = 1'0"
4' 8' 16' 32'
PARTIAL BASEMENT FLOOR ELECTRICAL PLAN
NOT TO SCALE
BASEMENT KEY PLAN
JRDMPL
PARTIAL BASEMENT
ELECTRICAL PLAN
1-E1.0
1. PRIOR TO INSTALLATION, VERIFY PRECISE LOCATION OF NEW OR RELOCATED WALL OR CEILING
MOUNTED DEVICES WITH ARCHITECTURAL ELEVATIONS.
2. COORDINATE ALL SHUT-DOWNS OF EXISTING ELECTRICAL SYSTEMS WITH OWNER A MINIMUM OF
FOURTEEN WORKING DAYS IN ADVANCE.
3. ALL NOISE GENERATING OPERATIONS, INCLUDING CUTTING OF CEILINGS, WALLS AND FLOORS, CORING, DRILLING, ETC. SHALL BE SCHEDULED ON WEEKENDS OR DURING "OFF-HOURS" (REFER TO FACILITY
HOURS OF OPERATION ON ELECTRICAL LEGEND). INCLUDE ALL PREMIUM TIME CHARGES IN BID.
4. ELECTRICAL CONTRACTOR IS RESPONSIBLE FOR REMOVAL AND REPLACEMENT OF CEILINGS REQUIRED
FOR ELECTRICAL WORK. ELECTRICAL CONTRACTOR SHALL REPLACE ANY DAMAGED CEILING TILES.
5. ALL NEW WALL MOUNTED ELECTRICAL DEVICES ARE TO BE INSTALLED FLUSH IN WALL UNLESS
OTHERWISE NOTED. ALL ELECTRICAL CONDUIT SHALL BE CONCEALED BEHIND FINISHED WALLS AND
ABOVE FINISHED CEILING UNLESS OTHERWISE NOTED. THE COST TO CUT AND PATCH WALLS SHALL BE
THE RESPONSIBILITY OF THE TRADE REQUIRING THE CUTTING.
6. ALL WORK IN MICU/SICU AREAS SHALL BE DONE IN A HEPA TENT.
CODED NOTES:
1 PROVIDE 120V-1ø-20A CIRCUIT FOR PNEUMATIC TUBE TRANSFER STATION AND CONNECT COMPLETE TO
20A-1P SPARE CIRCUIT BREAKER IN PANEL 'EQDPAC-1' VIA 3/4"C-2#12 AND 1#12EG.
GENERAL ELECTRICAL INSTALLATION NOTES
SE1 SE2
PE3 PE4 PE5 PE6
PE7 PE8
S1
S2
S3
STAIR S1
P1 P2 P3
STAIR S2
STAIR S3
ONML
K
J I H G
F
E
B A
A
B
L
D
GH
F
JK
CD
STAIR 8
STAIR A
STAIR 11
STAIR A
STAIR B
STAIR C
STAIR 2
STAIR 9
STAIR 2STAIR 13
STAIR 4
STAIR 5
STAIR 6
STAIR 2
STAIR 1
STAIR 3
STAIR 2
STAIR A
STAIR B
PE1
STAIR D
A B C D E F
L K J
N M I
P O H
R Q G
S T U
X
W V
Y Z
A
B
CD
E F
G
H
I
J
A B C
DEF
K
A
B
B
C
D
E
F
A
D
EF
AC-63
SF-4
1 2 3
COOLING
TOWER 1
COOLING
TOWER 4
COOLING
TOWER 3
COOLING
TOWER 2COOLING
TOWER 5
BCD
C
E
I
PROJECT AREA
1B446 1B4421B441
1B419 1B418
1B417
1B416
1B430
1B414
1B415
1B411
1B410
1B413
1B420
1B495
1B187
1C401
1B496
1B497
STAIR 8
STAIR A
1B466
OIT Telecom/
Data Closet
OIT Telecom/
Data Closet
1B476
1B474
1B471
1B473
1B475
1B463
1B461 1B472
1B477
1B498
1B499 1B479 1B469
1B478 1B468
1B462
1B464
1B465
1B467
1B468A
1B431
J
PT
LF11CR
RF11CR
X
X
X
X
X
X
X
X
X
X
XX
LF11-CR-41
B
N3
A
N
P
Q
R1
T
391 2 42 43
Drawing Title
Approved: Project Director
Project Title
Date
Location
Checked
Building Number
Project Number
Drawing Number
Drawn
Dwg. of
CONSULTANTS: ARCHITECT:
o n e e ig h th in c h o n e fo o t th re e in c h e s o n e fo o t o n e a n d o n e h a lf in c h e s o n e fo o t o n e in c h o n e fo o t th re e q u a rt e rs in c h o n e fo o t o n e h a lf in c h o n e fo o t th re e e ig h th s in c h o n e fo o t o n e q u a rt e r in c h o n e fo o t
VA FORM 08-6231, OCT 1978
1 2 3 4 5 6 87 9
F
E
D
C
B
A
97 8654321 10
F
E
D
C
B
A
Revisions: Date
VAMC - WADE PARK
Office of Facilities
ManagementDESIGN AND CONSTRUCTION DOCUMENTS AS
INSTRUMENTS OF SERVICE ARE GIVEN IN
CONFIDENCE AND REMAIN THE PROPERTY OF
PERSPECTUS ARCHITECTURE. THE USE OF THIS
DESIGN AND THESE CONSTRUCTION DOCUMENTS
FOR PURPOSES OTHER THAN THE SPECIFIC
PROJECT NAMED HEREIN IS STRICTLY PROHIBITED
WITHOUT THE EXPRESSED WRITTEN CONSENT OF
PERSPECTUS ARCHITECTURE.13212 Shaker Square Suite 204 Cleveland, Ohio 44120
P. 216.752.1800 F.216.752.3833
PNEUMATIC TUBE
STATION FOR SICU AND
BLOOD DRAW
11-15-2018
541-19-503
Revisions: Date
Final Construction Document Submission 11/15/18
S
59459
M.P. LONG
R
ES
O F
I R
GE
NOI
S
P
E
N E
DERT
L EA
E I N
G
R
TS
TEA HF OO
IO
NOT TO SCALE
FIRST FLOOR - KEY PLAN
0'
SCALE: 1/8" = 1'0"
4' 8' 16' 32'
PARTIAL FIRST FLOOR ELECTRICAL PLAN
JRDMPL
PARTIAL FIRST FLOOR
ELECTRICAL PLAN
1-E1.1
CODED NOTES:
PROVIDE 120V-1ø-20A CIRCUIT FOR PNEUMATIC TUBE STATION AND CONNECT COMPLETE TO NEW
20A-1P CIRCUIT IN PANEL 'LF11-CR' VIA 3/4"C-2#12 AND 1#12EG.
1. PRIOR TO INSTALLATION, VERIFY PRECISE LOCATION OF NEW OR RELOCATED WALL OR CEILING
MOUNTED DEVICES WITH ARCHITECTURAL ELEVATIONS.
2. COORDINATE ALL SHUT-DOWNS OF EXISTING ELECTRICAL SYSTEMS WITH OWNER A MINIMUM OF
FOURTEEN WORKING DAYS IN ADVANCE.
3. ALL NOISE GENERATING OPERATIONS, INCLUDING CUTTING OF CEILINGS, WALLS AND FLOORS, CORING, DRILLING, ETC. SHALL BE SCHEDULED ON WEEKENDS OR DURING "OFF-HOURS" (REFER TO FACILITY
HOURS OF OPERATION ON ELECTRICAL LEGEND). INCLUDE ALL PREMIUM TIME CHARGES IN BID.
4. ELECTRICAL CONTRACTOR IS RESPONSIBLE FOR REMOVAL AND REPLACEMENT OF CEILINGS REQUIRED
FOR ELECTRICAL WORK. ELECTRICAL CONTRACTOR SHALL REPLACE ANY DAMAGED CEILING TILES.
5. ALL NEW WALL MOUNTED ELECTRICAL DEVICES ARE TO BE INSTALLED FLUSH IN WALL UNLESS
OTHERWISE NOTED. ALL ELECTRICAL CONDUIT SHALL BE CONCEALED BEHIND FINISHED WALLS AND
ABOVE FINISHED CEILING UNLESS OTHERWISE NOTED. THE COST TO CUT AND PATCH WALLS SHALL BE
THE RESPONSIBILITY OF THE TRADE REQUIRING THE CUTTING.
6. ALL WORK IN MICU/SICU AREAS SHALL BE DONE IN A HEPA TENT.
PROJECT AREA
2D180 2D181 2D182
2D183 2D184 2D185 2D179
2D178
2D177
2D176
2D175
2D172 2D170 2D168 2D167
2D174 2D171 2D169 2D166
2D179A
2D146
2D145
2D139
2D144
2D140
2D143
2D142
2D141
2D166A2D1732D174A
2E352
2E353
2E354
2D166
2D114
PATIENT
RM 7
2D115
PATIENT
RM 8
2D116
PATIENT
RM 9
2D118
ADMIN CEN
2D117
CLEAN
UTILITY
2D123
MEDS
2D124
SOILED
UTILITY
2D133
STAFF TLT.
2D266
ON-CALL
2D265
ON-CALL 2D2
TLT/S
2D2
ALC
2D264
CONSULT.
2D258
VEST.
2D257C
WOMEN'S TLT
2D275B
ALCOVE
2D275C
ALCOVE
2D255C
MEN'S TLT.
2D256
VEST.
2D255
MEN'S
LOCKE
2D132
OFFICE
2D134
NURSE
MGR.
2D13
HALLW
2D131
LINEN
STORAGE
2D130A
NOURISH.
2D122
PATIENT
RM 12
2D121
PATIENT
RM 11
2D120
STORAGE
2D119
PATIENT
RM 10
2D101
STAIR 13
2D163
QUIET RM.
2D196A
WAITING RM
2D159
EMS
2D160
OFFICE
2D161
OFFICE
2D198
OFFICE
2D197
BIO-MED
SERVER RM
2D162
STAIR 4
2D196
OFFICE
2D195
TLT.
2D194
LACTATION RM.
2D193
EQUIP.
STORAGE
2D164
MICU BED RM
2D165
MICU BED RM
2D191
ELECT.
2D190
OI&T
2D189
EQUIP.
STORAGE
2D188
ELECT.
2D187
MICU BED RM
2D186A
WORK RM
2D186
ANTE
ROOM
2E368
1 BED
PATIENT RM
2D192
STAFF
LOUNGE
2D192A
WOMEN'S
LOCKERS
2D192C
MEN'S
LOCKERS
2D192A
TLT./
SHWR.
2D192D
TLT./
SHWR.
J
J
PT
TRANSFER
SWITCH
HN22-CR
LN22-CR
HN21
LN23
LN23-CRLN21-CR
X
X X X X X
X
X
LN21
LN22
LN22-CR-17
LN21-CR-39
1 2 3 4 FEDA.1 B 14C12A9A 11B
H
G1
E
A
TT
WW
VV
SS
RR
Drawing Title
Approved: Project Director
Project Title
Date
Location
Checked
Building Number
Project Number
Drawing Number
Drawn
Dwg. of
CONSULTANTS: ARCHITECT:
o n e e ig h th in c h o n e fo o t th re e in c h e s o n e fo o t o n e a n d o n e h a lf in c h e s o n e fo o t o n e in c h o n e fo o t th re e q u a rt e rs in c h o n e fo o t o n e h a lf in c h o n e fo o t th re e e ig h th s in c h o n e fo o t o n e q u a rt e r in c h o n e fo o t
VA FORM 08-6231, OCT 1978
1 2 3 4 5 6 87 9
F
E
D
C
B
A
97 8654321 10
F
E
D
C
B
A
Revisions: Date
VAMC - WADE PARK
Office of Facilities
ManagementDESIGN AND CONSTRUCTION DOCUMENTS AS
INSTRUMENTS OF SERVICE ARE GIVEN IN
CONFIDENCE AND REMAIN THE PROPERTY OF
PERSPECTUS ARCHITECTURE. THE USE OF THIS
DESIGN AND THESE CONSTRUCTION DOCUMENTS
FOR PURPOSES OTHER THAN THE SPECIFIC
PROJECT NAMED HEREIN IS STRICTLY PROHIBITED
WITHOUT THE EXPRESSED WRITTEN CONSENT OF
PERSPECTUS ARCHITECTURE.13212 Shaker Square Suite 204 Cleveland, Ohio 44120
P. 216.752.1800 F.216.752.3833
PNEUMATIC TUBE
STATION FOR SICU AND
BLOOD DRAW
11-15-2018
541-19-503
Revisions: Date
Final Construction Document Submission 11/15/18
S
59459
M.P. LONG
R
ES
O F
I R
GE
NOI
S
P
E
N E
DERT
L EA
E I N
G
R
TS
TEA HF OO
IO
NOT TO SCALE
PARTIAL SECOND FLOOR - KEY PLAN
JRDMPL
PARTIAL SECOND FLOOR
ELECTRICAL PLAN
1-E1.2
0'
SCALE: 1/8" = 1'0"
4' 8' 16' 32'
PARTIAL SECOND FLOOR ELECTRICAL PLAN
CODED NOTES:
1 PROVIDE 120V-1ø-20A CIRCUIT FOR PNEUMATIC TUBE TRANSFER STATION AND CONNECT COMPLETE TO
SPARE 20A-1P CIRCUIT INDICATED IN PANEL 'LN21-CR' VIA 3/4"C-2#12 AND 1#12EG.
PROVIDE 120V-1ø-20A CIRCUIT FOR PNEUMATIC TUBE STATION AND CONNECT COMPLETE TO SPARE
20A-1P CIRCUIT INDICATED IN PANEL 'LN22-CR' VIA 3/4"C-2#12 AND 1#12EG.
1. PRIOR TO INSTALLATION, VERIFY PRECISE LOCATION OF NEW OR RELOCATED WALL OR CEILING
MOUNTED DEVICES WITH ARCHITECTURAL ELEVATIONS.
2. COORDINATE ALL SHUT-DOWNS OF EXISTING ELECTRICAL SYSTEMS WITH OWNER A MINIMUM OF
FOURTEEN WORKING DAYS IN ADVANCE.
3. ALL NOISE GENERATING OPERATIONS, INCLUDING CUTTING OF CEILINGS, WALLS AND FLOORS, CORING, DRILLING, ETC. SHALL BE SCHEDULED ON WEEKENDS OR DURING "OFF-HOURS" (REFER TO FACILITY
HOURS OF OPERATION ON ELECTRICAL LEGEND). INCLUDE ALL PREMIUM TIME CHARGES IN BID.
4. ELECTRICAL CONTRACTOR IS RESPONSIBLE FOR REMOVAL AND REPLACEMENT OF CEILINGS REQUIRED
FOR ELECTRICAL WORK. ELECTRICAL CONTRACTOR SHALL REPLACE ANY DAMAGED CEILING TILES.
5. ALL NEW WALL MOUNTED ELECTRICAL DEVICES ARE TO BE INSTALLED FLUSH IN WALL UNLESS
OTHERWISE NOTED. ALL ELECTRICAL CONDUIT SHALL BE CONCEALED BEHIND FINISHED WALLS AND
ABOVE FINISHED CEILING UNLESS OTHERWISE NOTED. THE COST TO CUT AND PATCH WALLS SHALL BE
THE RESPONSIBILITY OF THE TRADE REQUIRING THE CUTTING.
6. ALL WORK IN MICU/SICU AREAS SHALL BE DONE IN A HEPA TENT.
| Binder1 |
| 1-A0 REF INFO |
| 1-A1 KEY PLANS |
| 1-A2 PARTIAL PLANS |
| X.1 COVER |
| 1-FP0.1 - FIRE PROTECTION LEGEND AND GENERAL NOTES |
| 1-FP1.0 - PARTIAL BASEMENT FIRE PROTECTION PLAN |
| 1-FP1.1 - PARTIAL FIRST FLOOR FIRE PROTECTION PLAN |
| 1-FP1.2 - PARTIAL SECOND FLOOR FIRE PROTECTION PLAN |
| 1-H0.1 - MECHANICAL LEGEND, GENERAL NOTES AND DETAILS |
| 1-H1.0 - PARTIAL FIRST FLOOR MECHANICAL PLAN |
| 1-H1.1 - PARTIAL SECOND FLOOR MECHANICAL DEMOLIITON PLAN |
| 1-H1.2 - PARTIAL SECOND FLOOR MECHANICAL PLAN |
| 1-E0.1 - ELECTRICAL LEGEND AND GENERAL NOTE |
| ELECTRICAL LEGEND AND GENERAL NOTE |
| 1-E0.1 - ELECTRICAL LEGEND AND GENERAL NOTES |
| 1-E1.0 - PARTIAL BASEMENT ELECTRICAL PLAN |
| PARTIAL BASEMENT ELECTRICAL PLAN |
| 1-E1.0 - PARTIAL BASEMENT ELECTRICAL PLAN |
| 1-E1.1 - PARTIAL FIRST FLOOR ELECTRICAL |
| PARTIAL FIRST FLOOR ELECTRICAL PLAN |
| 1-E1.1 - PARTIAL FIRST FLOOR ELECTRICAL |
| 1-E1.2 - PARTIAL SECOND FLOOR ELECTRICAL PLAN |
| PARTIAL SECOND FLOOR ELECTRICAL PLAN |
| 1-E1.2 - PARTIAL SECOND FLOOR ELECTRICAL PLAN |
File details come from the government source that posted it.