36C25018B0675-003.pdf

PDF 23 MB Posted

Attached to
Expand TCU and Palliative Care SDVOSB Set-Aside VAMC Cleveland, OH
Solicitation number
36C25018B0675
Issued by

About this file

36C25018B0675 S02 Drawings.pdf

View the file

Other files

File Type Posted
36C25018B0675-0001001.pdf PDF
36C25018B0675-0001005.pdf PDF
36C25018B0675-0001004.pdf PDF
36C25018B0675-0001003.png PNG image
36C25018B0675-0001002.pdf PDF
36C25018B0675-0001000.docx DOCX document
36C25018B0675-005.pdf PDF
36C25018B0675-004.pdf PDF
36C25018B0675-010.pdf PDF
36C25018B0675-011.pdf PDF
36C25018B0675-006.pdf PDF
36C25018B0675-002.pdf PDF
36C25018B0675-001.docx DOCX document
36C25018B0675-012.pdf PDF
36C25018B0675-009.pdf PDF
36C25018B0675-007.pdf PDF
36C25018B0675-008.pdf PDF
36C25018B0675-000.docx DOCX document
Show all 18

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

GI-1

TITLE SHEET & DRAWING

INDEX

SITE KEY PLAN

NTS

10701 EAST BLVD. CLEVELAND, OH. 44106

DEPARTMENT OF VETERANS AFFAIRS MEDICAL CENTER - WADE PARK

Cleveland Veterans Affairs

Medical Center

PALLIATIVE CARE/TCU EXPANSION PROJECT

DRAWING INDEX

PROJECT NO. 541-18-503

GI-1 TITLE SHEET & DRAWING INDEX

ARCHITECTURAL

1-AS-0.1 THIRD FLOOR INTERIM LIFE SAFETY PLAN - PHASE I

1-AS-0.2 THIRD FLOOR INTERIM LIFE SAFETY PLAN - PHASE II

1-AS-3.0 THIRD FLOOR EXISTING CONDITIONS PLAN

1-AS-3.1 THIRD FLOOR DEMOLITION PLANS - PHASES I & II

1-AS-3.2 THIRD FLOOR IMPROVEMENT PLANS - PHASES I & II

1-AS-3.3 THIRD FLOOR REFLECTED CEILING PLANS - PHASES I & II

1-AS-4.0 FOURTH FLOOR EXISTING CONDITIONS PLAN

1-AS-4.1 FOURTH FLOOR DEMOLITION & IMPROVEMENT PLANS - PHASE I

1-AS-5.0 NEW LIVING/DINING ROOF ENCLOSURE - EXTERIOR ELEVATIONS

1-AS-5.1 NEW LIVING/DINING ROOF ENCLOSURE - BUILDING & WALL SECTIONS

1-AS-5.2 ENLARGED PLAN AND SECTION DETAILS

1-AS-6.0 INTERIOR ELEVATIONS

1-AS-6.1 INTERIOR ELEVATIONS & ENLARGED DETAILS

1-AS-6.2 ENLARGED MILLWORK DETAILS

1-AS-7.0 DOOR SCHEDULE, WALL TYPES, & DETAILS

1-AS-7.1 FINISH PLANS AND SCHEDULE

STRUCTURAL

S-1.00 GENERAL NOTES & SPECIFICATIONS

S-1.01 GENERAL NOTES & SPECIFICATIONS

S-1.02 PARTIAL ROOF FRAMING PLAN & SECTIONS

MECHANICAL/HVAC

M-0.1 HVAC GENERAL NOTES, SYMBOL LEGENDS, AND SCHEDULES

M-1.1 DEMOLITION - PARTIAL THIRD FLOOR PLANS - HVAC DUCTWORK

M-1.2 DEMOLITION - PARTIAL THIRD FLOOR PLANS - HVAC PIPING

M-2.1 NEW WORK - PARTIAL THIRD FLOOR PLANS - HVAC DUCTWORK

M-2.2 NEW WORK - PARTIAL THIRD FLOOR PLANS - HVAC PIPING

M-3.1 HVAC DETAILS AND TEMPERATURE CONTROLS

100% CD'S SUBMISSION

4.4.18

CLEVELAND VAMC

BUILDING MASTER KEY PLAN

NTS

THIRD FLOORNORTH NORTH

PROJECT SITE

2857 SF

I. PROJECT LOCATION: CLEVELAND VETERANS AFFAIRS MEDICAL CENTER

10701 EAST BLVD.

CLEVELAND, OHIO

II. DESCRIPTION & USER GROUP CLASSIFICATION OF BLDG

A. NATURE OF PROJECT: INTERIOR RENOVATIONS OF EXISTING 3RD FLOOR

EXTERIOR EXPANSION OF EXISTING 3RD FLOOR

B. DESIGN CODES: 2015 NPFA LIFE SAFETY CODE 101, IBC 2015

C. USE GROUP: I-2 - HEALTH CARE - NO CHANGE PROPOSED

D. CONSTRUCTION TYPE: TYPE I -332, IB - NON-COMBUSTIBLE, PROTECTED

FIRE RATED CONSTRUCTION (LSC A.8.2.1.2)

EXTERIOR BEARING WALLS 3 HRS

INTERIOR BEARING WALLS 3 HRS

STRUCTURAL COLUMNS 3 HRS (SUPPORTING > 1 FLOOR)

2 HRS (SUPPORTING 1 FLOOR ONLY)

2 HRS (SUPPORTING ROOF ONLY)

BEAMS, GIRDERS, TRUSSES 3 HRS (SUPPORTING > 1 FLOOR, COLS., OR BEARING

WALLS

2 HRS (ALL OTHERS)

FLOOR-CEILING ASSEMBLIES 2 HRS

ROOF-CEILING ASSEMBLIES 1

HRS

INTERIOR NON-BEARING WALLS 0 HRS

EXTERIOR NON-BEARING WALLS 0 HRS

WALL ASSEMBLIES

EXIT ACCESS CORRIDOR WALLS 0 HR SMOKE PARTITIONS

E. PROJECT AREA: 3RD FLOOR: 2857 GSF

4TH FLOOR: 867 GSF

E. PROJECT AREA OCCUPANT LOAD: PHASE I AREAS: 42 OCCUPANTS

PHASE II AREAS: 66 OCCUPANTS

F. FIRE PROTECTION: EXISTING BUILDING FULLY SPRINKLED. MODIFICATIONS AS REQUIRED

PER NEW IMPROVEMENTS PROPOSED

CODE INFORMATION

Revisions: Date

DD SUBMISSION 12.1.17

DAKCJK4.4.18

Drawing Title

Approved: Project Director

Project Title

Date

Location

Checked

Building Number

Project Number

Drawing Number

Drawn

CONSULTANTS: ARCHITECT/ENGINEERS:

Office of

Construction and Facilities

Management

1468 WEST 9TH STREET #400 CLEVELAND, OH 44113

P. 216.687.1555 F. 216.687.1558

Stanley J. Kaczmar, License #4988

Expiration Date: 12/31/2019

N

O

T

F

R

C

N

S

T

R

U

C

T

I

O

N

VETERANS AFFAIRS MEDICAL CENTER

PALLIATIVE CARE - TCU EXPANSION

THIRD FLOOR

10701 EAST BLVD. CLEVELAND, OHIO

541-18-503

MECHANICAL/ELECTRICAL/PLUMBING ENGINEERING:

SCHEESER BUCKLEY MAYFIELD, LLC

1540 CORPORATE WOODS PKWY. UNIONTOWN, OH 44685

P. 330.526.2700

COST ESTIMATING:

MCGUINESS UNLIMITED, INC.

15724 STILLWOOD AVE. CLEVELAND, OH 44111

P. 440.667.5120

FULLY SPRINKLERED

STRUCTURAL ENGINEERING:

THORSON BAKER + ASSOCIATES

3030 WEST STREESTBORO RD. RICHFIELD, OH 44286

P. 330.659.6688

HAZARDOUS MATERIALS ABATEMENT:

STEPHEN J. SEBESTA & ASSOCIATES, INC.

30628 DETROIT RD., NO. 258 WESTLAKE, OH 44145

P. 216.781.0060

PLUMBING

P-0.1 PLUMBING GENERAL NOTES, SCHEDULES, & DETAILS

P-1.1 DEMOLITION - PARTIAL THIRD FLOOR PLANS - PLUMBING WASTE/VENT

P-1.2 DEMOLITION - PARTIAL THIRD FLOOR PLANS - PLUMBING PIPING

P-2.1 NEW WORK - PARTIAL THIRD FLOOR PLANS - PLUMBING WASTE/VENT

P-2.2 NEW WORK - PARTIAL THIRD FLOOR PLANS - PLUMBING PIPING

ELECTRICAL

E-0.1 ELECTRICAL SYMBOL LEGEND AND GENERAL NOTES

E-0.2 LIGHTING FIXTURE SCHEDULE AND LIGHTING DETAILS

E-1.1 DEMOLITION - PARTIAL THIRD FLOOR PLANS - ELECTRICAL

E-2.1 LIGHTING - PARTIAL THIRD FLOOR PLANS - ELECTRICAL

E-2.2 POWER - PARTIAL THIRD FLOOR PLANS - ELECTRICAL

E-2.3 SYSTEMS - PARTIAL THIRD FLOOR PLANS - ELECTRICAL

E-3.1 ELECTRICAL DETAILS

FIRE PROTECTION

FP-0.1 FIRE PROTECTION GENERAL NOTES & SYMBOL LEGEND

FP-1.1 NEW WORK - PARTIAL THIRD FLOOR PLANS - FIRE PROTECTION

ASBESTOS ABATEMENT

1-AA-1 3RD FLOOR ASBESTOS ABATEMENT PLAN - PHASES I & II

1-AA-2 ASBESTOS ABATEMENT STANDARD DETAILS

65% CD'S SUBMISSION 2.9.18

100% CD'S SUBMISSION 4.4.18

BID ISSUE SUBMISSION 3.2.18

4.4.18 CJK DAK

1-AS-0.1

THIRD FLOOR INTERIM LIFE SAFETY

PLAN - PHASE I

62'-3" COMMON PATH OF

TRAVEL/EXIT TRAVEL

DISTANCE

Revisions: Date

Drawing Title

Approved: Project Director

Project Title

Date

Location

Checked

Building Number

Project Number

Drawing Number

Drawn

CONSULTANTS: ARCHITECT/ENGINEERS:

Office of

Construction and Facilities

Management

N

N

S

T

R

U

C

T

I

O

N

VETERANS AFFAIRS MEDICAL CENTER

PALLIATIVE CARE - TCU EXPANSION

THIRD FLOOR

10701 EAST BLVD. CLEVELAND, OHIO

541-18-503

MECHANICAL/ELECTRICAL/PLUMBING ENGINEERING:

SCHEESER BUCKLEY MAYFIELD, LLC

1540 CORPORATE WOODS PKWY. UNIONTOWN, OH 44685

P. 330.526.2700

COST ESTIMATING:

MCGUINESS UNLIMITED, INC.

15724 STILLWOOD AVE. CLEVELAND, OH 44111

P. 440.667.5120

FULLY SPRINKLERED

STRUCTURAL ENGINEERING:

THORSON BAKER + ASSOCIATES

3030 WEST STREESTBORO RD. RICHFIELD, OH 44286

P. 330.659.6688

HAZARDOUS MATERIALS ABATEMENT:

STEPHEN J. SEBESTA & ASSOCIATES, INC.

30628 DETROIT RD., NO. 258 WESTLAKE, OH 44145

P. 216.781.0060

DD SUBMISSION 12.1.17

LIFE SAFETY LEGEND

PROJECT SCOPE BOUNDARY

EXIT

E

EXISTING/NEW SMOKE PARTITIONS - 0 HR RATED

EXISTING 2 HOUR FIRE WALL

EXISTING 1 HOUR FIRE WALL

EXISTING 1 HOUR FIRE WALL/SMOKE

BARRIER

F.E.C.

EXISTING FIRE EXTINGUISHER

LOCATION

EXIT SIGN LOCATION (DIRECTIONAL ARROWS &

DOUBLE-SIDED SIGNS MAY OCCUR, SEE PLAN)

1/8" = 1'-0"

INTERIM LIFE SAFETY PLAN

THIRD FLOOR - PHASE I

SCOPE OF WORK

S C

O P

E

O

F

W

O R

K

S C

O P

E

O

F

W

O R

K

E

E

E

F.E.C.

F.E.C.

F.E.C.

F.E.C.

EXISTING PATIENT

BEDROOM EGRESS

ACCESS PATH (AND ALL

OTHER AREAS ON

FLOOR) REMAIN

UNAFFECTED BY

PROPOSED

IMPROVEMENTS

TEMPORARY PARTITION

W/CONTRACTOR

ACCESS

TEMPORARY ZIPWALL

ENCLOSURES

W/CONTRACTOR

ACCESS

PROJECT AREA OCCUPANT LOAD

65% CD'S SUBMISSION 2.9.18

3B-121A

RESTROOM

STAFF

3B-121

OFFICE

NURSE MGR.

3B-122

OFFICE

DICTATION

STAFF

3B-122B

DINING ROOM

TCU PATIENT

3B-122A

LIVING ROOM

TCU PATIENT

PATIENT

DINING

ROOM

MEDICAL

STOR. ROOM

STAFF

DICTATION

ROOM

MEDICAL

STOR. ROOM

STAFF

RESTROOM

NOURISHMENT

STATION

3B-115

ALCOVE

OPEN

PATIENT

BEDROOM

PATIENT

BEDROOM

SLEEP LAB

CONTROL ROOM

SLEEP LAB

BEDROOM

PATIENT

BEDROOM

PATIENT

SPA/BATHING

SUITE

STAFF

OFFICE

PATIENT

BEDROOM

PATIENT

BEDROOM

PATIENT

BEDROOM

PATIENT

BEDROOM

PATIENT

BEDROOM

PATIENT

BEDROOM PATIENT

DINING

FAMILY

LOUNGE

EMS

CHUTE

CHUTE

EMS

NURSE

STATION

OIT

TELECOM/DATA

CLOSET

PATIENT

BEDROOM

PATIENT

BEDROOM

PSYCH.

ON-CALL ROOM

PATIENT

BEDROOM

PATIENT

BEDROOM

ELEC.

PATIENT

BEDROOM

PATIENT

BEDROOM

PATIENT

BEDROOM

PATIENT

BEDROOM*

PATIENT

BEDROOM

PATIENT

BEDROOM

PATIENT

BEDROOM

PATIENT

BEDROOM

RESPIRATORY

THERAPY

EQUIPMENT

STOR. ROOM

PATIENT

BEDROOM

HOSPICE

EQUIPMENT

STORAGE ROOM

ELEC./COMM.

LINEN ROOM

CONFERENCE

ROOM

EQUIP. STOR.

ELEC.

ELEC.

STAFF WORK

AREA

STAFF

OFFICE

STAFF

OFFICE

STAFF

OFFICE

ENTRY

DESK

SOILED

UTILITY

CLEAN

UTILITY

EQUIP.

STORAGE

STAFF

OFFICE

NOUR.

STATION

ELEC.

MECHANICAL

PENTHOUSE

ANTEROOM

RESTROOM

SCOPE OF WORK

TEMPORARY

PARTITION

PERMANENT PARTITION TO

DOUBLE AS TEMPORARY

PARTITION W/CONTRACTOR

ACCESS

3B-105A

STORAGE

TCU MED.

THREE (3) AREAS OF

CONSTRUCTION WITHIN THESE

BOUNDARIES SHALL BE

INCLUDED IN BASE BID.

DEDUCT ALTERNATE #2 SHALL

FULLY REMOVE

CONSTRUCTION SCOPE FROM

PROJECT

SPECIAL ALTERNATE NOTE:

*NOTE: VA SHALL TEMPORARILY

VACATE EXISTING PATIENT

BEDROOM DURING FOR THE

ENTIRETY OF PHASE I

CONSTRUCTION. GC SHALL BE

RESPONSIBLE FOR ALL

POST-CONSTRUCTION

CLEANING AS REQUIRED BY THE

VA

S C

O P

E

O

F

W O

R K

FP

EXISTING FIRE ALARM PULL STATION TO

REMAIN AND BE ACCESSIBLE TO HOSPITAL

SIDE OF CONSTRUCTION PARTITION.

CONSTRUCT PARTITION AS SHOWN TO

MAINTAIN ACCESS

NEW 1 HR FIRE BARRIER

BETWEEN EX. MECH.

PENTHOUSE AND

LIVING/DINING

ENCLOSURE

3B-100N

STATION

NOURISHMENT

100% CD'S SUBMISSION 4.4.18

SLEEP LAB

BEDROOM

LIFE SAFETY GENERAL NOTES

1. SEE COVER SHEET FOR APPLICABLE CODE INFORMATION

2. PROJECT SCOPE LINE IS INDICATED FOR GENERAL INTENT ONLY.

CONTRACTOR WILL COMPLETE ALL WORK REGARDLESS IF IT IS LOCATED

OUTSIDE OF PROJECT SCOPE AREA AS INDICATED ON ANY DRAWING

3. CONTRACTOR TO COVER OR ALTER EXIT SIGNS WHICH, DUE TO

CONSTRUCTION, TEMPORARILY DO NOT DEPICT EXIT PATHS (TYP. OF ALL

EXIT SIGNS IN OR BEYOND PROJECT AREA)

4. TRAVEL DISTANCES OVER 200' WILL REQUIRE INTERIM LIFE SAFETY

MEASURES. COORDINATE WITH VA

5. EXISTING FLOOR SLABS ARE 2 HR FIRE RATED. FOR ALL NEW CORE

DRILLS/UTILITY PENETRATIONS, GC SHALL UTILIZE GROUND PENETRATING

RADAR TO X-RAY EXISTING FLOOR SLAB AT PROPOSED, NEW PENETRATION

LOCATION TO ENSURE THAT FLOOR SLAB REBAR STRUCTURE WILL NOT BE

COMPROMISED, AND SHALL NOTIFY COR AND A/E TEAM OF ANY ISSUES

DISCOVERED IN FIELD. GC SHALL PROVIDE NEW 2 HR RATED THRU-SLAB

FIRESTOP ASSEMBLIES AT ALL PENETRATIONS. FOR EXISTING THRU-SLAB

UTILITIES THAT ARE REMOVED AS A PART OF DEMOLITION SCOPE, GC SHALL

PATCH CONC. SLAB FULLY WITH NEW CONCRETE TO MATCH EXISTING.

6. PROVIDE FIRESTOPPING AT ALL PENETRATIONS THROUGH NEW AND

EXISTING FIRE/SMOKE RATED BARRIER WALLS AND FLOOR SLABS TO COMPLY

WITH THE REQUIRED BARRIER RATINGS. PROVIDE FIRESTOPPING AROUND

TEN (10) PENETRATIONS LESS THAN 6 SQUARE INCHES AND FOUR (4)

PENETRATIONS BETWEEN 16 AND 36 SQUARE INCHES TO COMPLY WITH

REQUIRED RATING NOT ASSOCIATED WITH NEW WORK. LARGER OPENINGS

SHALL BE BROUGHT TO THE ATTENTION OF THE COR. GC SHALL SUBMIT UL

LISTED METHODS FOR PATCHING ALL FIRE BARRIERS THAT MEET THE

MINIMUM FIRE RATING REQUIREMENTS OF THE PENETRATED BARRIER AND

ARE IN COMPLIANCE WITH THE OPENING SIZE AS DICTATED BY THE

ASSEMBLY.

7. TEMPORARY FIRE ALARMS IN CONSTRUCTION AREAS: GC SHALL PROVIDE

TEMPORARY FIRE ALARMS IN ALL CONSTRUCTION AREAS THROUGHOUT THE

CONSTRUCTION DURATION UNTIL SUCH TIME THAT NEW FIRE ALARM SYSTEM

DEVICES ARE INSTALLED, TESTED, AND IN FULL OPERATION. HEAT

DETECTION DEVICES SHALL BE UTILIZED AND SHALL BE CONNECTED TO THE

BUILDING FIRE ALARM SYSTEM AND COORDINATED THROUGH THE VA

ELECTRICAL SHOP. GC SHALL COORDINATE WITH VA SAFETY DEPARTMENT

FOR ALL TEMPORARY FIRE ALARM INSTALLATIONS TO ENSURE COMPLIANCE

WITH SAFETY STANDARDS.

1-AS-0.2

THIRD FLOOR INTERIM LIFE SAFETY

PLAN - PHASE II

135'-9" EXIT TRAVEL

DISTANCE

Revisions: Date

Drawing Title

Approved: Project Director

Project Title

Date

Location

Checked

Building Number

Project Number

Drawing Number

Drawn

CONSULTANTS: ARCHITECT/ENGINEERS:

Office of

Construction and Facilities

Management

N

N

S

T

R

U

C

T

I

O

N

VETERANS AFFAIRS MEDICAL CENTER

PALLIATIVE CARE - TCU EXPANSION

THIRD FLOOR

10701 EAST BLVD. CLEVELAND, OHIO

541-18-503

MECHANICAL/ELECTRICAL/PLUMBING ENGINEERING:

SCHEESER BUCKLEY MAYFIELD, LLC

1540 CORPORATE WOODS PKWY. UNIONTOWN, OH 44685

P. 330.526.2700

COST ESTIMATING:

MCGUINESS UNLIMITED, INC.

15724 STILLWOOD AVE. CLEVELAND, OH 44111

P. 440.667.5120

FULLY SPRINKLERED

STRUCTURAL ENGINEERING:

THORSON BAKER + ASSOCIATES

3030 WEST STREESTBORO RD. RICHFIELD, OH 44286

P. 330.659.6688

HAZARDOUS MATERIALS ABATEMENT:

STEPHEN J. SEBESTA & ASSOCIATES, INC.

30628 DETROIT RD., NO. 258 WESTLAKE, OH 44145

P. 216.781.0060

DD SUBMISSION 12.1.17

LIFE SAFETY LEGEND

PROJECT SCOPE BOUNDARY

EXIT

E

EXISTING/NEW SMOKE PARTITIONS - 0 HR RATED

EXISTING 2 HOUR FIRE WALL

EXISTING 1 HOUR FIRE WALL

EXISTING 1 HOUR FIRE WALL/SMOKE

BARRIER

F.E.C.

EXISTING FIRE EXTINGUISHER

LOCATION

EXIT SIGN LOCATION (DIRECTIONAL ARROWS &

DOUBLE-SIDED SIGNS MAY OCCUR, SEE PLAN)

1/8" = 1'-0"

INTERIM LIFE SAFETY PLAN

THIRD FLOOR - PHASE II

SCOPE OF WORK

E

E

E

F.E.C.

F.E.C.

F.E.C.

F.E.C.

EXISTING PATIENT

BEDROOM EGRESS

ACCESS PATH (AND ALL

OTHER AREAS ON

FLOOR) REMAIN

UNAFFECTED BY

PROPOSED

IMPROVEMENTS

TEMPORARY

PARTITION

W/CONTRACTOR

ACCESS

SCOPE OF WORK

PROJECT AREA OCCUPANT LOAD

TEMPORARY PARTITION

W/CONTRACTOR

ACCESS

EGRESS PATH

THROUGH EXISTING

EGRESS CORRIDORS

REMAINS UNAFFECTED

BY IMPROVEMENTS OR

CONSTRUCTION

EGRESS PATH

THROUGH EXISTING

EGRESS CORRIDORS

REMAINS UNAFFECTED

BY IMPROVEMENTS OR

CONSTRUCTION

3B-121A

RESTROOM

STAFF

3B-121

OFFICE

NURSE MGR.

3B-122

OFFICE

DICTATION

STAFF

3B-122B

DINING ROOM

TCU PATIENT

3B-122A

LIVING ROOM

TCU PATIENT

3B-115

ALCOVE

OPEN

3B-111A

LIVING ROOM

RESIDENT

3B-111

DINING ROOM

RESIDENT

3B-111B

ROOM

STORAGE

3B-110

LOUNGE

FAMILY

B

F

C O

R R

I D

O R

E X

I S

T I N

G

3B-127

WORK AREA

DICTATION

TCU

MEDICAL

STOR. ROOM

PATIENT

BEDROOM

PATIENT

BEDROOM

PATIENT

BEDROOM

PATIENT

SPA/BATHING

SUITE

STAFF

OFFICE

PATIENT

BEDROOM

PATIENT

BEDROOM

PATIENT

BEDROOM

PATIENT

BEDROOM

PATIENT

BEDROOM

PATIENT

BEDROOM PATIENT

DINING

FAMILY

LOUNGE

EMS

CHUTE

CHUTE

EMS

NURSE

STATION

OIT

TELECOM/DATA

CLOSET

PATIENT

BEDROOM

PATIENT

BEDROOM

PATIENT

BEDROOM

PATIENT

BEDROOM

ELEC.

PATIENT

BEDROOM

PATIENT

BEDROOM

PATIENT

BEDROOM

PATIENT

BEDROOM

PATIENT

BEDROOM

PATIENT

BEDROOM

PATIENT

BEDROOM

PATIENT

BEDROOM

PATIENT

BEDROOM

ELEC./COMM.

CONFERENCE

ROOM

EQUIP. STOR.

ELEC.

STAFF WORK

AREA

STAFF

OFFICE

STAFF

OFFICE

STAFF

OFFICE

ENTRY

DESK

SOILED

UTILITY

CLEAN

UTILITY

EQUIP.

STORAGE

STAFF

OFFICE

NOUR.

STATION

ELEC.

MECHANICAL

PENTHOUSE

ANTEROOM

RESTROOM

65% CD'S SUBMISSION 2.9.18

PERMANENT

PARTITIONS TO

DOUBLE AS

TEMPORARY

PARTITIONS

PERMANENT PARTITION

TO DOUBLE AS

TEMPORARY PARTITION

3B-105A

STORAGE

TCU MED.

NEW 1 HR FIRE BARRIER

BETWEEN EX. MECH.

PENTHOUSE AND

LIVING/DINING

ENCLOSURE

3B-100N

STATION

NOURISHMENT

100% CD'S SUBMISSION 4.4.18

SLEEP LAB

CONTROL ROOM

SLEEP LAB

BEDROOM

PSYCH.

ON-CALL ROOM

RESPIRATORY

THERAPY

EQUIPMENT

STOR. ROOM

SLEEP LAB

BEDROOM

LINEN ROOM

NOTE: 7'-0" MIN. CLEAR MUST BE

MAINTAINED THROUGHOUT

CONSTRUCTION AND IN GENERAL,

AT LEAST ONE (1) OF THE MAIN

EAST-WEST CORRIDORS MUST BE

PROVIDED WITH 7'-0" CLEAR TO

THE TEMPORARY PARTITION FACE.

GC SHALL COORDINATE PHASING

OF TEMPORARY PARTITION

CONSTRUCTION WITH VA TO

ENSURE THAT MINIMUM

DIMENSION IS MAINTAINED

HOSPICE

EQUIPMENT

STORAGE ROOM

LIFE SAFETY GENERAL NOTES

1. SEE COVER SHEET FOR APPLICABLE CODE INFORMATION

2. PROJECT SCOPE LINE IS INDICATED FOR GENERAL INTENT ONLY.

CONTRACTOR WILL COMPLETE ALL WORK REGARDLESS IF IT IS LOCATED

OUTSIDE OF PROJECT SCOPE AREA AS INDICATED ON ANY DRAWING

3. CONTRACTOR TO COVER OR ALTER EXIT SIGNS WHICH, DUE TO

CONSTRUCTION, TEMPORARILY DO NOT DEPICT EXIT PATHS (TYP. OF ALL

EXIT SIGNS IN OR BEYOND PROJECT AREA)

4. TRAVEL DISTANCES OVER 200' WILL REQUIRE INTERIM LIFE SAFETY

MEASURES. COORDINATE WITH VA

5. EXISTING FLOOR SLABS ARE 2 HR FIRE RATED. FOR ALL NEW CORE

DRILLS/UTILITY PENETRATIONS, GC SHALL UTILIZE GROUND PENETRATING

RADAR TO X-RAY EXISTING FLOOR SLAB AT PROPOSED, NEW PENETRATION

LOCATION TO ENSURE THAT FLOOR SLAB REBAR STRUCTURE WILL NOT BE

COMPROMISED, AND SHALL NOTIFY COR AND A/E TEAM OF ANY ISSUES

DISCOVERED IN FIELD. GC SHALL PROVIDE NEW 2 HR RATED THRU-SLAB

FIRESTOP ASSEMBLIES AT ALL PENETRATIONS. FOR EXISTING THRU-SLAB

UTILITIES THAT ARE REMOVED AS A PART OF DEMOLITION SCOPE, GC SHALL

PATCH CONC. SLAB FULLY WITH NEW CONCRETE TO MATCH EXISTING.

6. PROVIDE FIRESTOPPING AT ALL PENETRATIONS THROUGH NEW AND

EXISTING FIRE/SMOKE RATED BARRIER WALLS AND FLOOR SLABS TO COMPLY

WITH THE REQUIRED BARRIER RATINGS. PROVIDE FIRESTOPPING AROUND

TEN (10) PENETRATIONS LESS THAN 6 SQUARE INCHES AND FOUR (4)

PENETRATIONS BETWEEN 16 AND 36 SQUARE INCHES TO COMPLY WITH

REQUIRED RATING NOT ASSOCIATED WITH NEW WORK. LARGER OPENINGS

SHALL BE BROUGHT TO THE ATTENTION OF THE COR. GC SHALL SUBMIT UL

LISTED METHODS FOR PATCHING ALL FIRE BARRIERS THAT MEET THE

MINIMUM FIRE RATING REQUIREMENTS OF THE PENETRATED BARRIER AND

ARE IN COMPLIANCE WITH THE OPENING SIZE AS DICTATED BY THE

ASSEMBLY.

7. TEMPORARY FIRE ALARMS IN CONSTRUCTION AREAS: GC SHALL PROVIDE

TEMPORARY FIRE ALARMS IN ALL CONSTRUCTION AREAS THROUGHOUT THE

CONSTRUCTION DURATION UNTIL SUCH TIME THAT NEW FIRE ALARM SYSTEM

DEVICES ARE INSTALLED, TESTED, AND IN FULL OPERATION. HEAT

DETECTION DEVICES SHALL BE UTILIZED AND SHALL BE CONNECTED TO THE

BUILDING FIRE ALARM SYSTEM AND COORDINATED THROUGH THE VA

ELECTRICAL SHOP. GC SHALL COORDINATE WITH VA SAFETY DEPARTMENT

FOR ALL TEMPORARY FIRE ALARM INSTALLATIONS TO ENSURE COMPLIANCE

WITH SAFETY STANDARDS.

3B134 3B132 3B130 3B128 3B126 3B124

3B136

3B138

3B140

3B142

3B144

3B146

3B141

3B139

3B137 3B135

3B125 3B127

3B129 3B131

3B133

3B145 3B1473B143

3B148

3B111B

3B111A

3B110

3B123

3B001

3B121

3B120

3B118

3B116

3B115

3B114

3B112

3B108

3B109

3B106 3B104 3B102

3C105

3B107

3B105

3B103

3B101

3B149

3B150

3B152 3B154

3B156

3B158

3B160

3B002

3B161

3B163

3B164

3B166

3B168

3B170 3B174

3B172

3C180

3C178

3C104

3B100

3B162B

3B162A

3B134A

3B132A 3B130A

3B128A

3B126A

3B124A

3B123A

3B121A

3B120A

3B118A

3B116A

3B108A

3B106A

3B104A

3B102A

3B100A

3B174A

3B172A

3B170A

3B168A 3B166A

3B161A

3B163A

3B160A

3B156A

3B154A3B152A3B146A

3B144A

3B142A

3B100B

3B100C

3B100D

3B100E

3B

0F

3B100G

3B100J

3B100K

3B100L

STAIR 15

STAIR 19

STAIR 18

OIT Telecom/ Data Closet

R316

3B165

3B138A

3B136A

3B111

3B158A

3B100H

3B151

3B101A

3B167

3B169

3B105A

3B100M

3B169

3B100N

3B100O

3B100P

3C105

3B176

3C104

3C106

3C107

R302

STAIR 15

K

J

H

1 2 3

2 3

4 6 7 8

6 7

11A9

F

D

15A 16

16A

17 17A 18 18A

N

Q

T

V

L1

L

W

8 1210

Q

T

P

N1

R

V

V1

W

W1

X

R2 3C111

3C113

3C112

3C114

STAIR 14

3C107A

3C107B

K304

R319

M

3C108

3C115

3C115B 3C115D 3C115F 3C115H

3C115G3C115E3C115C3C115A

3C110

3C109

3C100

3C101

3C102

3C103

3A167

3A171

3A169

3A165

3A101

3A103

3A163 3A161

L1

3A159A

3A161A

3C100A

3C100B

3C100C

3A100A

R205

OIT Telecom/ Data Closet

4.4.18 CJK DAK

1-AS-3.0

THIRD FLOOR EXISTING

CONDITIONS PLAN

1" = 10'-0"

EXISTING CONDITIONS PLAN

THIRD FLOOR - OVERALL

Revisions: Date

Drawing Title

Approved: Project Director

Project Title

Date

Location

Checked

Building Number

Project Number

Drawing Number

Drawn

CONSULTANTS: ARCHITECT:

Office of

Construction and Facilities

Management

N

N

S

T

R

U

C

T

I

O

N

VETERANS AFFAIRS MEDICAL CENTER

PALLIATIVE CARE - TCU EXPANSION

THIRD FLOOR

10701 EAST BLVD. CLEVELAND, OHIO

541-18-503

MECHANICAL/ELECTRICAL/PLUMBING ENGINEERING:

SCHEESER BUCKLEY MAYFIELD, LLC

1540 CORPORATE WOODS PKWY. UNIONTOWN, OH 44685

P. 330.526.2700

COST ESTIMATING:

MCGUINESS UNLIMITED, INC.

15724 STILLWOOD AVE. CLEVELAND, OH 44111

P. 440.667.5120

FULLY SPRINKLERED

STRUCTURAL ENGINEERING:

THORSON BAKER + ASSOCIATES

3030 WEST STREESTBORO RD. RICHFIELD, OH 44286

P. 330.659.6688

HAZARDOUS MATERIALS ABATEMENT:

STEPHEN J. SEBESTA & ASSOCIATES, INC.

30628 DETROIT RD., NO. 258 WESTLAKE, OH 44145

P. 216.781.0060

DD SUBMISSION 12.1.17

PHASE I SCOPE OF WORK

P H

A S

E

I

S

C O

P E

W

O R

K

P H

A S

E

I

S

C O

W

O R

K

PHASE II SCOPE OF WORK

PHASE II SCOPE OF WORK

P H

A S

E

I I

EXISTING EXTERIOR

ROOF PATIO WITH

STEEL "CAGE"/MESH

PANEL ROOF AND WALL

ENCLOSURE ASSEMBLY

MECHANICAL

PENTHOUSE

PATIENT

LIVING

ROOM

PATIENT

BEDROOM

PATIENT

DINING

ROOM

MEDICAL

STOR. ROOM

STAFF

DICTATION

ROOM

MEDICAL

STOR. ROOM

STAFF

ADMIN.

DESK

STAFF

RESTROOM

NOURISHMENT

STATION

O P

N

S

A

T I N

G

STORAGE ROOM

CONSTRUCTION PROTECTION NOTE:

EXISTING LARGE FRESH AIR INTAKE

LOUVER OCCURS AT THIS LOCATION,

DIRECTLY ADJACENT TO

CONSTRUCTION AREA. GC SHALL

PROTECT LOUVER/ENCLOSE

CONSTRUCTION AREAS PER VA

REQUIREMENTS TO PREVENT

TRANSMISSION OF HAZARDOUS FUMES

AND DUST

THREE (3) AREAS OF CONSTRUCTION WITHIN

THESE BOUNDARIES SHALL BE INCLUDED IN

PHASE I BASE BID. DEDUCT ALTERNATE #2

SHALL FULLY REMOVE CONSTRUCTION SCOPE

FROM PROJECT

PHASE I SCOPE OF WORK:

P H

A S

E

I

PHASE I

P H

A S

E

I

PATIENT

BEDROOM

PATIENT

BEDROOM

PATIENT

BEDROOM

ELEC./COMM.

ELEC.

PATIENT

BEDROOM

LINEN

ROOM

PATIENT

BEDROOM

PATIENT

BEDROOM

CONFERENCE

ROOM

PATIENT

DINING

ROOM

PATIENT

BEDROOM

PATIENT

BEDROOM

PATIENT

BEDROOM

SOILED

UTILITY

65% CD'S SUBMISSION 2.9.18

HATCH LEGEND:

HATCHED AREA OUTSIDE OF PROJECT SCOPE.

ACCESS INTO CEILING SPACES MAY OCCUR, REFER

TO MEP DWGS.

UNSHADED AREA IN WHITE INDICATES PROJECT

SCOPE AREAS

STAIR 19

24'-3"

1'-0"

H

7'-0"

7'-0"

2'-6" +/-

15'-9" - BRICK REMOVAL ONLY

SEE ELEVATION

1'-0"

SD

M

I

N

15'-2" - EX. CMU BACKUP WALL

TO REMAIN BEHIND BRICK

OIT Telecom/ Data Closet

L1

S

11'-1" +/-

9'-4"

@ 7'-2" H

2'-6"8'-0"

@ 6'-9" H

5'-4"

@ 7'-2" H

8'-0"

@ 6'-9" H

EQ.

EQ.

2'-8"

WALL BASE ONLY WALL BASE ONLY

EX. BASE

TO REMAIN

SD

SD

15'-2" - EXISTING MASONRY BACK-UP WALL

BEHIND BRICK TO REMAIN (DIAG. HATCH BOUNDARY)

1'-0" 1'-0"

4.4.18 CJK DAK

1-AS-3.1

THIRD FLOOR DEMOLITION

PLANS - PHASES I & II

Revisions: Date

Drawing Title

Approved: Project Director

Project Title

Date

Location

Checked

Building Number

Project Number

Drawing Number

Drawn

CONSULTANTS: ARCHITECT:

Office of

Construction and Facilities

Management

VETERANS AFFAIRS MEDICAL CENTER

PALLIATIVE CARE - TCU EXPANSION

THIRD FLOOR

10701 EAST BLVD. CLEVELAND, OHIO

541-18-503

MECHANICAL/ELECTRICAL/PLUMBING ENGINEERING:

SCHEESER BUCKLEY MAYFIELD, LLC

1540 CORPORATE WOODS PKWY. UNIONTOWN, OH 44685

P. 330.526.2700

COST ESTIMATING:

MCGUINESS UNLIMITED, INC.

15724 STILLWOOD AVE. CLEVELAND, OH 44111

P. 440.667.5120

FULLY SPRINKLERED

STRUCTURAL ENGINEERING:

THORSON BAKER + ASSOCIATES

3030 WEST STREESTBORO RD. RICHFIELD, OH 44286

P. 330.659.6688

HAZARDOUS MATERIALS ABATEMENT:

STEPHEN J. SEBESTA & ASSOCIATES, INC.

30628 DETROIT RD., NO. 258 WESTLAKE, OH 44145

P. 216.781.0060

DD SUBMISSION 12.1.17

3/16" = 1'-0"

DEMOLITION PLAN

THIRD FLOOR - PHASE I

3/16" = 1'-0"

DEMOLITION PLAN

THIRD FLOOR - PHASE II

5. WHERE NEW UTILITIES ARE INSTALLED IN EXISTING PARTITIONS, ALL SUB-CONTRACTORS SHALL

REMOVE EXISTING DRYWALL AS REQUIRED FOR INSTALLATION OF SAME, AND PATCH AND

REPAIR WITH NEW TO MATCH EXISTING CONDITIONS.

GENERAL NOTES:

EXISTING WALLS TO REMAIN

INDICATES NEW DOOR

INDICATES EXISTING DOORS

NEW WALLS

1. CONSIDER ALL AREAS OWNER-OCCUPIED, UNLESS OTHERWISE NOTED.

2. ALL WALLS ARE DRAWN AND DIMENSIONED TO A 5" NOMINAL WIDTH TYPICAL UNLESS

OTHERWISE NOTED. ALL DIMENSIONS ARE CLEAR DIMENSIONS FROM FACE OF GYPSUM BOARD

TO FACE OF GYPSUM BOARD

3. ALL SUB-CONTRACTORS (I.E. FIRE PROTECTION, HVAC FIRE ALARM, ELECTRICAL, ETC.) TO

DESIGN AND INSTALL SYSTEM PER OWNER REQUIREMENTS AND IN STRICT ACCORDANCE WITH

THE REQUIREMENTS OF ALL APPLICABLE CODES.

4. PATCH AND REPAIR ALL EXISTING AREAS TO REMAIN AS REQUIRED TO MATCH EXISTING

CONDITIONS.

6. ALL DAMAGE TO EXISTING AREAS OCCURING AS A RESULT OF CONSTRUCTION SHALL BE

REPAIRED AS REQUIRED BY TRADE CAUSING IT. CONTRACTOR SHALL PROTECT ALL EXISTING

WALL, CEILING, AND FLOOR FINISHES IN EACH AREA. ANY SURFACES DAMAGED BY

CONTRACTOR SHALL BE REPLACED BY THE CONTRACTOR AT NO ADDITIONAL COST TO OWNER.

7. ALL NEW PENETRATIONS IN FIRE RATED ASSEMBLIES TO MAINTAIN FIRE RATING OF ASSEMBLY

AS REQUIRED.

15. ALL FLOOR, WALL, CEILING, AND MISC. FIRE RESISTIVE ASSEMBLIES AND CONSTRUCTION SHALL

BE OF THE FIRE RATING CALLED FOR ON THE DRAWINGS AND / OR AS REQUIRED BY CODE. ALL

EXISTING FIRE RESISTIVE ASSEMBLIES SHALL BE MAINTAINED AND THE RATING NOT

COMPROMISED. FIRE RATED ASSEMBLIES AND CONSTRUCTION INCLUDING ALL FIRE STOPPING,

FIRE RATED DOORS AND MISC. FIRE RESISTIVE REQUIREMENTS SHALL BE LEFT UNCONCEALED

AS REQUIRED FOR INSPECTION BY THE BUILDING OFFICIAL.

8. FURNITURE SHOWN FOR REFERENCE ONLY, BY OWNER. THE OWNER SHALL REMOVED, PRIOR

TO CONSTRUCTION, ALL ITEMS THAT THE OWNER DESIRES TO SALVAGE. ALL REMAINING ITEMS

INDICATED TO BE DEMOLISHED SHALL BE REMOVED BY THE CONTRACTOR AND LEGALLY

DISPOSED OF IN ACCORDANCE WITH THE PROJECT SPECIFICATIONS. ALL ITEMS TO REMAIN IN

SPACE SHALL BE PROTECTED BY THE CONTRACTOR THROUGHOUT CONSTRUCTION.

WALLS TO BE REMOVED FULL HEIGHT U.N.O.

DASHED LINES INDICATE ITEMS TO BE DEMOLISHED

9. CONTRACTOR SHALL PROVIDE DUST REMOVING WALK-OFF MATS (TACKY MAT) AT ALL

CONSTRUCTION ENTRY POINTS

10. CONTRACTOR SHALL PROVIDE HEPA FILTERED NEGATIVE AIR MACHINE(S) TO MAINTAIN

NEGATIVE PRESSURE IN WORK AREA ENSURING NO DUST OR FUMES WILL BE TRANSFERRED TO

OCCUPIED AREAS. PROVIDE VISUAL PRESSURE MONITORING DEVICE AT DUST PROOF

BARRICADE TO CONFIRM PRESSURE. DUST MONITORING SHALL BE BY OWNER. SEE

SPECIFICATION 01 00 00 "GENERAL REQUIREMENTS" ATTACHMENT AND 01 35 26 "SAFETY

REQUIREMENTS" FOR ADDITIONAL REQUIREMENTS.

11. ALL DEMOLITION WORK BEING DONE OUTSIDE TEMPORARY PARTITIONS IS TO BE

APPROPRIATELY SEALED OFF TO PREVENT THE TRANSMISSION OF DUST AND DEBRIS. WORK

SHALL BE DONE TO MINIMIZE DISRUPTION TO VISITORS, PATIENTS, AND STAFF. COORDINATE

LOCATION OF BARRIERS WITH OWNER.

12. THE HOSPITAL'S SMOKE AND FIRE SUPPRESSION SYSTEM SHALL REMAIN IN OPERATION WITHIN

THE PROJECT AREA DURING THE ENTIRE CONSTRUCTION PHASE.

13. FIELD VERIFY LOCATION OF ALL EXISTING CONDITIONS. NOTIFY COR OF ANY DISCREPANCIES.

14. WHERE NEW DOORS ARE INDICATED IN EXISTING WALL ASSEMBLIES, CUT OPENINGS IN

EXISTING WALL. REFER TO DOOR SCHEDULE FOR DIMENSIONS. PREPARE OPENINGS FOR

NEW DOOR, INCLUSIVE OF THE ADDITION OF JAMB AND HEAD STUD REINFORCEMENT (I.E.

DOUBLE STUDS, HEADERS) AND PATCH ADJACENT WALLS TO MATCH EXISTING.

16. DEBRIS REMOVAL SHALL NOT INTERFERE WITH OWNER'S OPERATIONS AND SHALL OCCUR

DURING OFF HOURS AS DETERMINED BY THE COR. SEE ALSO SPECIFICATION SECTION 01 35 26

"SAFETY REQUIREMENTS" FOR ADDITIONAL REQUIREMENTS REGARDING THE HAULING OF

DEBRIS FROM THE PROJECT AREA.

TEMPORARY PARTITION WALL W/3'-0" X 7'-0" SCWD

DOOR FOR CONTRACTOR ACCESS ONLY. WALL AND

DOOR TO BE REMOVED UPON COMPLETION OF WORK

U.N.O. PATCH REPAIR EXISTING CONDITIONS AS

REQUIRED UPON REMOVAL OF ALL TEMPORARY

CONSTRUCTION. REFER TO TYPICAL TEMPORARY

PARTITION DETAIL ON SHEET 1-AS-7.0. SCHEDULE

NOTE: CONSTRUCTION OF TEMPORARY BARRIERS

SHALL BE PERFORMED AFTER NORMAL BUSINESS

HOURS UNLESS OTHERWISE APPROVED BY THE COR.

PHASING DURATION:

PHASING DURATION DURING THE CONSTRUCTION PERIOD

SHOULD BE AS FOLLOWS:

PRECONSTRUCTION - 30 DAYS

PHASE I - 90 DAYS

ACTIVATION OF PHASE I - 30 DAYS

PHASE II - 90 DAYS

TOTAL PROJECT TIMEFRAME - 240 DAYS

SYMBOL LEGEND:

TEMPORARY ZIP WALL PROTECTION TO BE PROVIDED

AROUND CONSTRUCTION AREA PER VA SAFETY

STANDARDS

18. EXISTING FLOOR SLABS ARE 2 HR FIRE RATED. FOR ALL NEW CORE DRILLS/UTILITY

PENETRATIONS, GC SHALL UTILIZE GROUND PENETRATING RADAR TO X-RAY EXISTING FLOOR

SLAB AT PROPOSED, NEW PENETRATION LOCATION TO ENSURE THAT FLOOR SLAB REBAR

STRUCTURE WILL NOT BE COMPROMISED, AND SHALL NOTIFY COR AND A/E TEAM OF ANY ISSUES

DISCOVERED IN FIELD. GC SHALL PROVIDE NEW 2 HR RATED THRU-SLAB FIRESTOP ASSEMBLIES

AT ALL PENETRATIONS. FOR EXISTING THRU-SLAB UTILITIES THAT ARE REMOVED AS A PART OF

DEMOLITION SCOPE, GC SHALL PATCH CONC. SLAB FULLY WITH NEW CONCRETE TO MATCH

EXISTING.

HATCHED AREA OUTSIDE OF PROJECT SCOPE.

ACCESS INTO CEILING SPACES MAY OCCUR, REFER

TO MEP DWGS.

DEMOLITION NOTES:

EXISTING PARTITION WALL TO BE DEMOLISHED, FULL HEIGHT.

EXISTING DOOR AND FRAME TO BE REMOVED.

EXISTING CEILING TO BE REMOVED, INCLUDING LIGHTS, DIFFUSERS, AND OTHER CLG. MTD. ITEMS.

PROTECT SURROUNDING CEILING SYSTEM TO REMAIN AS REQUIRED DURING CONSTRUCTION

DEMOLITION NOTES ON THIS SHEET ARE INTENDED TO COVER ARCHITECTURAL ITEMS ONLY.

REFER TO MEP DRAWINGS FOR ADDITIONAL DEMOLITION SCOPE.

EXISTING BRICK MASONRY, AIRSPACE MATERIALS, AND BACK-UP MASONRY WALL ASSEMBLY TO

BE REMOVED IN THEIR ENTIRETY - FULL HEIGHT. EXISTING STONE COPING ABOVE SHALL REMAIN

AND BE TEMPORARILY SUPPORTED AS REQUIRED UNTIL FINAL BRACING CAN OCCUR. INTENT IS

FOR EXISTING C.I.P. CONC. STRUCTURE TO BE EXPOSED UPON COMPLETION OF DEMOLITION

NEW OPENING TO BE CREATED IN EXISTING PARTITION WALL. HEIGHT INDICATED BELOW

DIMENSION INDICATES FINAL ROUGH HEIGHT OF NEW OPENING. REFER TO ADDITIONAL NOTES

ON PLAN IF PROVIDED

2A

SOLID GRAY HATCHED AREA INDICATES EXISTING 3" +/- HIGHER FLOOR ELEVATION THAT OCCURS

@ EXTERIOR WALL. INTENT IS FOR THIS STEP TO BE GROUND DOWN TO APPROX. 1" BELOW EX.

3RD FINISH FLR. LEVEL AND PREPPED TO RECEIVE NEW CONC. FLOOR TOPPING

EXISTING METAL COPING TO BE REMOVED IN ITS ENTIRETY, INCLUSIVE OF INTERIOR BLOCKING.

INTENT UPON COMPLETION OF DEMOLITION IS FOR THE EXISTING STONE COPING BELOW TO BE

EXPOSED WITH ALL PRIOR ATTACHMENT ELEMENTS REMOVED. STEEL ANGLE @ BASE SHALL

REMAIN

EXISTING ROOFING MATERIAL AND QUARRY TILE SUBSTRATE SHALL BE REMOVED IN THE

ENTIRETY OF THE ROOF FOOTPRINT. EXISTING QUARRY TILE MORTAR TO REMAIN AND BE

PREPPED AS REQ'D. TO RECEIVE NEW CONC. FLOOR TOPPING. IMPORTANT NOTE: FINISHED,

OCCUPIED SPACES EXIST ON THE 2ND FLOOR BELOW AND MUST BE PROTECTED THROUGHOUT

CONSTRUCTION FROM DAMAGE DUE TO CONSTRUCTION ACTIVITIES OR WATER PENETRATION.

GC SHALL COORD. ROOF REMOVAL SCOPE AND PROVIDE ALL TEMPORARY PROTECTION

MEASURES AS REQ'D.

EXISTING ROOF DRAIN TO BE REMOVED AND CAPPED AS REQ'D. SEE PLUMB. DWGS.

FOR REUSE OF EXISTING DRAIN LEADER

STEEL/MESH PANEL CAGED ROOF ENCLOSURE TO BE REMOVED IN ITS ENTIRETY, INCLUDING ALL

SUPPORTING STEEL MEMBERS, MESH PANELS, AND OVERHEAD STEEL BRACING MEMBERS

EXISTING NURSE CALL LIGHT TO BE REMOVED

PORTION OF EXISTING SEGMENTED LINEAR COVE LIGHT IN CORRIDOR TO BE REMOVED BACK

TO NEAREST FULL SEGMENT SEAM IN EXISTING CEILING AREA TO REMAIN. VERIFY FINAL

DEMO POINT IN FIELD WITH EXISTING FIXTURE

EXISTING SUSPENDED LIGHT FIXTURE TO BE REMOVED

EXISTING FLOORING AND BASE MATERIAL IN ENTIRE SPACE (U.N.O.) TO BE REMOVED

CONST. PARTITION NOTE: SOLID FILLED WALLS DEPICTED ON DEMOLITION PLAN INDICATE NEW

WALLS PER THE FINAL IMPROVEMENT PLAN THAT CAN BE BUILT DURING PRE-CONST. PHASE OF

WORK TO SERVE AS CONST. PARTITIONS. GC SHALL PROVIDE ALL TEMPORARY PROTECTIVE

MEASURES (E.G. ZIPWALLS) AROUND OPGS. DURING PARTITION CONST., AND SHALL INCLUDE

PATCHING, REPAIRING, AND FINISHES ON PARTITION INFILLS UPON COMPLETION OF CONST.

DOORS LOCATED WITHIN SUCH PARTITIONS SHALL NOT BE REUSED AND SHALL BE PROVIDED

WITH NEW PER PLAN

EXISTING MILLWORK TO BE REMOVED

EXISTING LIGHT FIXTURE TO BE REMOVED AND SAVED FOR REINSTALLATION IN NEW

IMPROVEMENTS. REFER TO REF. CEILING PLANS FOR LOCATIONS

EXISTING PLUMBING FIXTURE TO BE REMOVED. CAP EXISTING LINES AS REQ'D. TO PROPERLY

ABANDON

EXISTING WINDOW AND WOOD TRIM FRAMING TO BE REMOVED

EXISTING NURSE CALL PULL STATION TO BE REMOVED

HVAC DEMO/NEW WORK TO OCCUR ABOVE CEILINGS IN EXISTING PATIENT

BEDROOMS/BATHROOMS. GC SHALL COORDINATE ALL SCHEDULING AND SCREENING/INFECTION

CONTROL REQUIREMENTS WITH THE VA AHEAD OF CONSTRUCTION TO ENSURE THAT PROPER

PROTOCOLS ARE IN PLACE DURING THIS WORK. REFER TO HVAC DRAWINGS FOR SCOPE.

EXISTING WOOD CRASH RAIL TO BE REMOVED AND SALVAGED. EXISTING RAILS TO BE

CUT/MODIFIED AS REQUIRED TO REINSTALL UNDER NEW IMPROVEMENTS

EXISTING CORNER GUARD TO BE REMOVED. ALL REMOVED CORNER GUARDS SHALL BE

SALVAGED FOR REINSTALLATION IN NEW LOCATIONS WHERE POSSIBLE

EXISTING GYP. BD. SOFFIT TO BE DEMOLISHED

HEAVY DASHED LINE INDICATES WALLS ON WHICH EXISTING WALLCOVERING MATERIAL SHALL BE

REMOVED, FULL HEIGHT

EXISTING WALL TILE TO BE REMOVED IN ENTIRE ROOM. TEMPORARILY REMOVE EX. GRAB

BARS AND TOILET ACCESSORIES - REINSTALL UPON NEW TILE INSTALLATION, U.N.O. (SEE 27)

HOSPICE DEPT. FLOORING SPECIAL PROTECTION NOTE: GC SHALL FULLY PROTECT EXISTING

CORRIDOR CARPETING DURING CONSTRUCTION OF TEMP. PARTITIONS AND ALL WORK TO

AVOID DAMAGE. EXISTING CARPETING CANNOT BE REPLACED.

EXISTING RECESSED TOILET PAPER DISPENSER TO BE REMOVED. PATCH WALL TO BE FLUSH

W/ADJACENT CONDITIONS

E X

C

E I L I N

G

A B

O V

E

T

O

R E

M A

I N

BRICK DEMO INTENT IS

FOR THE LINE OF

DEMOLITION TO ALIGN

W/CENTERLINE OF EX.

CONC. COLUMN, BOTH

SIDES - VERIFY LOC. IN

FIELD

2A

ENTIRE

LENGTH

DASHED LINES

INDICATE EXTERIOR

WALL BELOW COPING

TO REMAIN

ENTIRE

LENGTH

DASHED LINES

INDICATE EXTERIOR

WALL BELOW COPING

TO REMAIN

ENTIRE

EXISTING

ROOF

FOOTPRINT

EXISTING

ROOF-MOUNTED

INSULATED

DUCTWORK TO

REMAIN THROUGHOUT

PROJECT. PROTECT

AS REQ'D.

DEMO EX. WALL TO

HEIGHT ALIGNING

W/ADJACENT

SOFFIT

E X

C

E I L I N

G

F

L O

O R

I N

G

B A

S

R

E M

A I N

EXISTING MECHANICAL

PENTHOUSE

14 14

2A 2A 2A 2A

EX. GYP. BD.

SOFFIT ABOVE

TO REMAIN

15 15

10 13

ENTIRE

ROOM

INCLUDING

CORRIDOR

10 13

ENTIRE

ROOM

10 13

ENTIRE

ROOM

10 13

ENTIRE

ROOM &

CORRIDOR

10 13

ENTIRE

ROOM

10 13

ENTIRE

ROOM

16 17

E X

C

E I L I N

G

A B

O V

E

T

O

R E

M A

I N

ENTIRE

ROOM

START OPG. @

SILL HEIGHT OF

+ 3'-3 1/2" AFF

START OPG.

@ SILL

HEIGHT OF +

3'-3 1/2" AFF

E X

C

E I L I N

G

A B

O V

E

T

O

R E

M A

I N

GC SHALL COORDINATE

WITH VA FOR

RELOCATION/STORAGE OF

EXISTING FURNITURE IN

THIS AREA

HEAD &

CONTROLS

3B-123

3B-123A

PHASE II

PHASE II

PHASE I

PHASE I

PHASE I

THREE (3) AREAS OF CONSTRUCTION WITHIN

THESE BOUNDARIES SHALL BE INCLUDED IN

PHASE I BASE BID. DEDUCT ALTERNATE #2

SHALL FULLY REMOVE CONSTRUCTION

SCOPE FROM PROJECT

PHASE I SCOPE OF WORK:

EX. CLG.

ABOVE TO

REMAIN

ALIGN

WALLS

FLUSH

ALIGN

WALLS

FLUSH

ALIGN

WALLS

FLUSH

3B001

3B118A

3B120A

3B120

3B118

3B100E

3B116

3B100O

3B116A

3B114

3B112

3B124

3B109

3B108A

3B108

3B124A

3B124

3B126A

3B114

3B112

3B109

3B108A

3B116A

3B100O

3B123A

3B129

3B147

3B156A

3B158A

3B164

A

AS-3.1

1/4"=1'-0"

DEMOLITION SCOPE

EXISTING BLDG. - NORTH ELEVATION

A

AS.3.1

12 89

REMOVE THREE (3) EXISTING

LIGHTS AND ALL

BUILDING-MOUNTED CONDUIT

EXISTING STONE COPING TO REMAIN

AND BE TEMPORARILY SHORED UNTIL

NEW ROOF STRUCTURE IS INSTALLED

EXISTING STONE COPING TO

REMAIN, EXISTING METAL COPING

ON TOP TO BE REMOVED

NOT SHOWN FOR CLARITY:

EXISTING STEEL CAGE STRUCTURE

(WHICH SHALL BE REMOVED IN ITS

ENTIRETY)

EX. BRICK TO

REMAIN

S A

W C

U T

S A

W C

U T

EX. BRICK

TO REMAIN

EX. BRICK FACING TO BE REMOVED IN ITS ENTIRETY, FULL HEIGHT

EXISTING STONE COPING TO REMAIN,

EXISTING METAL COPING ON TOP TO BE

REMOVED

EXISTING DOOR &

FRAME TO BE

REMOVED

EXISTING ROOF CURB &

FLASHING TO BE REMOVED -

ENTIRE WALL LENGTH

LINES OF EX.

C.I.P. CONC.

COLS. & BEAMS

BEYOND TO

REMAIN, TYP.

LINES OF EX.

C.I.P. CONC.

COLS. & BEAMS

BEYOND TO

REMAIN, TYP.

EXISTING MASONRY BACK-UP

WALL BEHIND BRICK TO BE

REMOVED IN ITS ENTIRETY

EXISTING ELEC. CONDUIT CONTINUES ACROSS

ROOF TO SOUTH METAL PANEL WALL ON

PENTHOUSE. THIS CONDUIT AND THE CONDUIT

ON THE PENTHOUSE SHALL ALSO BE REMOVED

PATIENT BEDROOM

PATIENT

BEDROOM

PATIENT

BEDROOM

PATIENT

BEDROOM

PATIENT

BEDROOM

EXISTING

CORRIDOR

ELEC.

ELEC./COMM.

LINEN ROOM

PATIENT

BEDROOM

PATIENT BEDROOM

ELEC.

ELEC./COMM.

ANTEROOM

ELEC.

21 21 21

ENTIRE

WALL

LENGTH

COUNTER,

BASE/UPPER

CABS

COUNTER,

BASE/UPPER

CABS

COUNTER,

BASE/UPPER

CABS

COUNTER,

BASE/UPPER

CABS

WALL BASE

ONLY,

FLOORING TO

REMAIN

EX. WALLCOVERING TO REMAIN

WORKPOINT TO ALIGN WITH EAST EDGE

OF EX. DOOR FRAME, AS SHOWN. GC

SHALL CAREFULLY CUT EX.

WALLCOVERING TO LEAVE CLEAN LINE

*WALL BASE ONLY

ENTIRE DASHED

WALL, FLOORING

TO REMAIN

21 24

*WALL

BASE

ONLY,

FLOORING

TO

REMAIN

EX. WALL BASE TO REMAIN

13 13

VA TO

REMOVE/RELOCATE

EXISTING TV

ENTIRE

ROOM

65% CD'S SUBMISSION 2.9.18

B

AS-4.1

REFER TO 4TH FLOOR PLAN FOR

METAL PANEL TEMPORARY

REMOVAL SCOPE

8 9 10

11A

V

T

VA SHALL

REMOVE ALL

LOCKERS

PRIOR TO

CONSTRUCTION

3B105A

3B115

3B121A

3B121

R316

3B127

3B125

3B111

3B115A

3B115B

3B110

3B100F

3B105A

3B127

3B111

3B110

3B125

3B100N

3B115

ENTIRE

CORRIDOR

ENTIRE

CORRIDOR

8 9 10 12

11A

L

K

J

Q

100% CD'S SUBMISSION 4.4.18

17. ALL NOISE-GENERATING OPERATIONS SHALL BE SCHEDULED SO AS NOT TO IMPEDE

OWNER'S OPERATIONS AS DETERMINED BY THE COR. ALL WORK IN PUBLIC CORRIDORS

SHALL BE PERFORMED "OFF HOURS" UNLESS OTHERWISE APPROVED BY THE COR.

V

E R

I F

Y

E

L D

14'-2" +/- 5'-6"

1'-8"

5'-0" 5'-6"

1'-6"

15'-5"

1'-8"

EQ.

12'-0"

EQ.

1'-0" +/- 8'-0" CLR.

7'-0" 6'-2"

9'-9"

EQ. EQ.

3'-3"3'-3"

1'-0"

OIT Telecom/ Data Closet

L1

EQ. 1'-8"

5'-0" 1'-8"

EQ.

8'-0" 8'-0"

6'-10 1/2" 4'-0"

14'-5" +/-

1'-0"

1'-7"

4.4.18 CJK DAK

1-AS-3.2

THIRD FLOOR IMPROVEMENT

PLANS - PHASES I & II

Revisions: Date

Drawing Title

Approved: Project Director

Project Title

Date

Location

Checked

Building Number

Project Number

Drawing Number

Drawn

CONSULTANTS: ARCHITECT:

Office of

Construction and Facilities

Management

N

N

S

T

R

U

C

T

I

O

N

VETERANS AFFAIRS MEDICAL CENTER

PALLIATIVE CARE - TCU EXPANSION

THIRD FLOOR

10701 EAST BLVD. CLEVELAND, OHIO

541-18-503

MECHANICAL/ELECTRICAL/PLUMBING ENGINEERING:

SCHEESER BUCKLEY MAYFIELD, LLC

1540 CORPORATE WOODS PKWY. UNIONTOWN, OH 44685

P. 330.526.2700

COST ESTIMATING:

MCGUINESS UNLIMITED, INC.

15724 STILLWOOD AVE. CLEVELAND, OH 44111

P. 440.667.5120

FULLY SPRINKLERED

STRUCTURAL ENGINEERING:

THORSON BAKER + ASSOCIATES

3030 WEST STREESTBORO RD. RICHFIELD, OH 44286

P. 330.659.6688

HAZARDOUS MATERIALS ABATEMENT:

STEPHEN J. SEBESTA & ASSOCIATES, INC.

30628 DETROIT RD., NO. 258 WESTLAKE, OH 44145

P. 216.781.0060

DD SUBMISSION 12.1.17

3/16" = 1'-0"

IMPROVEMENT PLAN

THIRD FLOOR - PHASE I

3/16" = 1'-0"

IMPROVEMENT PLAN

THIRD FLOOR - PHASE II

CONSTRUCTION NOTES:

SOLID GRAY AREA INDICATES NEW 1" +/- SELF-LEVELING LIGHTWEIGHT

CONCRETE FLOOR TOPPING TO BE PROVIDED ON TOP OF EXISTING

ROOF AREA TO BRING THE AREA FLUSH WITH THE EXISTING 3RD FLOOR

FINISHED ELEVATION. VERIFY FINAL CONCRETE TOPPING THICKNESS IN

FIELD WITH EXISTING FLOOR ELEVATION. FLOOR TOPPING SHALL BE IN

COMPLIANCE WITH FINISHING FLOORING MANUFACTURER'S

REQUIREMENTS FOR MAXIMIUM MOISTURE LEVEL AND pH

REQUIREMENTS. FLOOR TOPPING SHALL MEET OR EXCEED A MINIMUM

OF 3,000 PSI UPON FINAL CURING.

EXISTING MECHANICAL PENTHOUSE STRUCTURAL COLUMN TO RECEIVE NEW 2-HR RATED

FIREPROOF SPRAY ASSEMBLY PER UL DES X772. PREP EXISTING STEEL SURFACE AS REQ'D.

TO RECEIVE FIREPROOF SPRAY

DASHED LINES INDICATE NEW STEEL BEAMS TO ATTACH TO EXISTING COLUMNS. BEAMS

SHALL RECEIVE 2-HR RATED FIREPROOF SPRAY ASSEMBLY PER UL DES X772. REFER TO

STRUCTURAL DRAWINGS FOR SCOPE OF EXISTING, FABRICATED STEEL TO BE INSTALLED AS

A PART OF THIS PROJECT AND FOR EXISTING STEEL SURFACE PREPARATION

REQUIREMENTS NECESSARY TO RECEIVE FIREPROOF SPRAY

EXISTING PELLA ARCHITECT SERIES WINDOW TO BE INSTALLED IN NEW EXTERIOR WALL.

NOTE: EXISTING WINDOWS ARE CURRENTLY STORED AT THE VA BRECKSVILLE CAMPUS. GC

SHALL PICK UP AND DELIVER WINDOWS TO THE JOB SITE. REFER TO ELEVATIONS FOR

GLASS REPAIR REQUIREMENT IN ONE WINDOW UNIT. VERIFY ALL ROUGH OPENING SIZES

WITH EXISTING WINDOWS PRIOR TO EXTERIOR WALL FRAMING

QUARTZ COUNTERTOP ATOP LOW WALL ASSEMBLY OR MILLWORK CABINET WITH

RECESSED TV BELOW - SEE INT. ELEVATIONS & MILLWORK DETAILS

WALL-MOUNTED FLAT PANEL TV, FURNISHED AND INSTALLED BY OWNER. GC SHALL

PROVIDE FRTW PLYWD. BLOCKING IN STUD WALL AND POWER/DATA/CABLE. SEE INT.

ELEVATIONS FOR MOUNTING HEIGHT

QUARTZ COUNTERTOP @ 2'-10" AFF WITH BASE CABINETS BELOW AND WALL CABINETS

ABOVE. SEE INT. ELEVATION

BASE BID: NEW NOURISHMENT STATION: QUARTZ COUNTERTOP @ 2'-10" AFF WITH BASE

CABINETS BELOW AND WALL CABINETS ABOVE. SEE INT. ELEVATION FOR ADDITIONAL

EQUIPMENT INFORMATION AND DETAILS.

DEDUCT ALTERNATE #2: NOURISHMENT STATION TO BE REMOVED FROM SCOPE.

BASE BID: EXISTING ADJACENT CORRIDOR FLOOR, WALL, AND BASE FINISHES SHALL BE

EXTENDED INTO NEW ALCOVE. SEE FINISH PLAN AND SCHEDULE

DEDUCT ALTERNATE #2: ALCOVE CONSTRUCTION WORK TO BE REMOVED FROM SCOPE.

CONTINUOUS QUARTZ SILL ASSEMBLY ATOP EXISTING STONE COPING - SEE SECTION

& DETAILS

" TEMP. SAFETY GLASS STAINED WOOD WINDOW ASSEMBLY WITH STAINED WOOD

PERIMETER TRIM ON BOTH SIDES - SEE INT. ELEVATIONS & DETAILS

FULL HT. REFRIGERATOR TO BE FURNISHED & INSTALLED BY VA. GC TO INSTALL POWER &

PLUMBING, SEE MEP DWGS.

COUNTERTOP-SEATED WATER/ICE MACHINE TO BE FURNISHED & INSTALLED BY VA. GC TO

INSTALL POWER & PLUMBING, SEE MEP DWGS.

15 HI-LO QUARTZ COUNTER STAFF WORKSTATION. SEE INTERIOR ELEVATIONS AND DETAILS

UNDERCOUNTER-MOUNT STAINLESS STEEL DOUBLE BOWL SINK, SEE MECH. DWGS. VERIFY

COUNTERTOP CUTOUT SIZE WITH SINK MANUF. PRIOR TO CUTTING OPENING

COUNTERTOP-SEATED COFFEE MACHINE TO BE FURNISHED & INSTALLED BY VA. GC TO

INSTALL POWER & PLUMBING, SEE MEP DWGS.

MICROWAVE AND TOASTER OVEN (ABOVE) TO BE FURNISHED & INSTALLED BY VA. GC TO

INSTALL POWER, SEE ELEC. DWGS.

SYSTEMS FURNITURE TO BE FURNISHED & INSTALLED BY VA. GC TO INSTALL POWER/DATA,

SEE ELEC. DWGS.

20 ADA PUSH PAD LOCATION FOR ENTRY DOOR, SEE ELEC. DWGS.

NOT USED.

QUARTZ COUNTERTOP ATOP RESIDENTIAL-STYLE MILLWORK BASE CABINETS - SEE INT.

ELEVATIONS & MILLWORK DETAILS

5. WHERE NEW UTILITIES ARE INSTALLED IN EXISTING PARTITIONS, ALL SUB-CONTRACTORS

SHALL REMOVE EXISTING DRYWALL AS REQUIRED FOR INSTALLATION OF SAME, AND PATCH

AND REPAIR WITH NEW TO MATCH EXISTING CONDITIONS.

GENERAL NOTES:

EXISTING WALLS TO REMAIN

INDICATES NEW DOOR

INDICATES EXISTING DOORS

NEW WALLS

1. CONSIDER ALL AREAS OWNER-OCCUPIED, UNLESS OTHERWISE NOTED.

2. ALL WALLS ARE DRAWN AND DIMENSIONED TO A 5" NOMINAL WIDTH TYPICAL UNLESS

OTHERWISE NOTED. ALL DIMENSIONS ARE CLEAR DIMENSIONS FROM FACE OF GYPSUM

BOARD TO FACE OF GYPSUM BOARD

3. ALL SUB-CONTRACTORS (I.E. FIRE PROTECTION, HVAC FIRE ALARM, ELECTRICAL, ETC.) TO

DESIGN AND INSTALL SYSTEM PER OWNER REQUIREMENTS AND IN STRICT ACCORDANCE

WITH THE REQUIREMENTS OF ALL APPLICABLE CODES.

4. PATCH AND REPAIR ALL EXISTING AREAS TO REMAIN AS REQUIRED TO MATCH EXISTING

CONDITIONS.

6. ALL DAMAGE TO EXISTING AREAS OCCURING AS A RESULT OF CONSTRUCTION SHALL BE

REPAIRED AS REQUIRED BY TRADE CAUSING IT. CONTRACTOR SHALL PROTECT ALL

EXISTING WALL, CEILING, AND FLOOR FINISHES IN EACH AREA. ANY SURFACES DAMAGED

BY CONTRACTOR SHALL BE REPLACED BY THE CONTRACTOR AT NO ADDITIONAL COST TO

OWNER.

7. ALL NEW PENETRATIONS IN FIRE RATED ASSEMBLIES TO MAINTAIN FIRE RATING OF

ASSEMBLY AS REQUIRED.

15. ALL FLOOR, WALL, CEILING, AND MISC. FIRE RESISTIVE ASSEMBLIES AND CONSTRUCTION

SHALL BE OF THE FIRE RATING CALLED FOR ON THE DRAWINGS AND / OR AS REQUIRED BY

CODE. ALL EXISTING FIRE RESISTIVE ASSEMBLIES SHALL BE MAINTAINED AND THE RATING

NOT COMPROMISED. FIRE RATED ASSEMBLIES AND CONSTRUCTION INCLUDING ALL FIRE

STOPPING, FIRE RATED DOORS AND MISC. FIRE RESISTIVE REQUIREMENTS SHALL BE LEFT

UNCONCEALED AS REQUIRED FOR INSPECTION BY THE BUILDING OFFICIAL.

8. FURNITURE SHOWN FOR REFERENCE ONLY, BY OWNER. THE OWNER SHALL REMOVED,

PRIOR TO CONSTRUCTION, ALL ITEMS THAT THE OWNER DESIRES TO SALVAGE. ALL

REMAINING ITEMS INDICATED TO BE DEMOLISHED SHALL BE REMOVED BY THE

CONTRACTOR AND LEGALLY DISPOSED OF IN ACCORDANCE WITH THE PROJECT

SPECIFICATIONS. ALL ITEMS TO REMAIN IN SPACE SHALL BE PROTECTED BY THE

CONTRACTOR THROUGHOUT CONSTRUCTION.

WALLS TO BE REMOVED FULL HEIGHT U.N.O.

DASHED LINES INDICATE ITEMS TO BE DEMOLISHED

9. CONTRACTOR SHALL PROVIDE DUST REMOVING WALK-OFF MATS (TACKY MAT) AT

ALL CONSTRUCTION ENTRY POINTS

10. CONTRACTOR SHALL PROVIDE HEPA FILTERED NEGATIVE AIR MACHINE(S) TO MAINTAIN

NEGATIVE PRESSURE IN WORK AREA ENSURING NO DUST OR FUMES WILL BE

TRANSFERRED TO OCCUPIED AREAS. PROVIDE VISUAL PRESSURE MONITORING DEVICE AT

DUST PROOF BARRICADE TO CONFIRM PRESSURE. DUST MONITORING SHALL BE BY

OWNER. SEE SPECIFICATION 01 00 00 "GENERAL REQUIREMENTS" ATTACHMENT AND 01 35

26 "SAFETY REQUIREMENTS" FOR ADDITIONAL REQUIREMENTS.

11. ALL DEMOLITION WORK BEING DONE OUTSIDE TEMPORARY PARTITIONS IS TO BE

APPROPRIATELY SEALED OFF TO PREVENT THE TRANSMISSION OF DUST AND DEBRIS.

WORK SHALL BE DONE TO MINIMIZE DISRUPTION TO VISITORS, PATIENTS, AND STAFF.

COORDINATE LOCATION OF BARRIERS WITH OWNER.

12. THE HOSPITAL'S SMOKE AND FIRE SUPPRESSION SYSTEM SHALL REMAIN IN OPERATION

WITHIN THE PROJECT AREA DURING THE ENTIRE CONSTRUCTION PHASE.

13. FIELD VERIFY LOCATION OF ALL EXISTING CONDITIONS. NOTIFY COR OF ANY

DISCREPANCIES.

14. WHERE NEW DOORS ARE INDICATED IN EXISTING WALL ASSEMBLIES, CUT OPENINGS IN

EXISTING WALL. REFER TO DOOR SCHEDULE FOR DIMENSIONS. PREPARE OPENINGS FOR

NEW DOOR, INCLUSIVE OF THE ADDITION OF JAMB AND HEAD STUD REINFORCEMENT (I.E.

DOUBLE STUDS, HEADERS) AND PATCH ADJACENT WALLS TO MATCH EXISTING.

16. DEBRIS REMOVAL SHALL NOT INTERFERE WITH OWNER'S OPERATIONS AND SHALL OCCUR

DURING OFF HOURS AS DETERMINED BY THE COR. SEE ALSO SPECIFICATION SECTION 01

35 26 "SAFETY REQUIREMENTS" FOR ADDITIONAL REQUIREMENTS REGARDING THE HAULING

OF DEBRIS FROM THE PROJECT AREA.

17. ALL NOISE-GENERATING OPERATIONS SHALL BE SCHEDULED SO AS NOT TO IMPEDE

OWNER'S OPERATIONS AS DETERMINED BY THE COR. ALL WORK IN PUBLIC CORRIDORS

SHALL BE PERFORMED "OFF HOURS" UNLESS OTHERWISE APPROVED BY THE COR.

SYMBOL LEGEND:

18. EXISTING FLOOR SLABS ARE 2 HR FIRE RATED. FOR ALL NEW CORE DRILLS/UTILITY

PENETRATIONS, GC SHALL UTILIZE GROUND PENETRATING RADAR TO X-RAY EXISTING

FLOOR SLAB AT PROPOSED, NEW PENETRATION LOCATION TO ENSURE THAT FLOOR SLAB

REBAR STRUCTURE WILL NOT BE COMPROMISED, AND SHALL NOTIFY COR AND A/E TEAM OF

ANY ISSUES DISCOVERED IN FIELD. GC SHALL PROVIDE NEW 2 HR RATED THRU-SLAB

FIRESTOP ASSEMBLIES AT ALL PENETRATIONS. FOR EXISTING THRU-SLAB UTILITIES THAT

ARE REMOVED AS A PART OF DEMOLITION SCOPE, GC SHALL PATCH CONC. SLAB FULLY

WITH NEW CONCRETE TO MATCH EXISTING.

HATCHED AREA OUTSIDE OF PROJECT SCOPE.

ACCESS INTO CEILING SPACES MAY OCCUR, REFER

TO MEP DWGS.

TEMPORARY PARTITION WALL W/3'-0" X 7'-0" SCWD

DOOR FOR CONTRACTOR ACCESS ONLY. WALL AND

DOOR TO BE REMOVED UPON COMPLETION OF WORK

U.N.O. PATCH REPAIR EXISTING CONDITIONS AS

REQUIRED UPON REMOVAL OF ALL TEMPORARY

CONSTRUCTION. REFER TO TYPICAL TEMPORARY

PARTITION DETAIL ON SHEET 1-AS-7.0. SCHEDULE

NOTE: CONSTRUCTION OF TEMPORARY BARRIERS

SHALL BE PERFORMED AFTER NORMAL BUSINESS

HOURS UNLESS OTHERWISE APPROVED BY THE COR.

PHASING DURATION:

PHASING DURATION DURING THE CONSTRUCTION PERIOD

SHOULD BE AS FOLLOWS:

PRECONSTRUCTION - 30 DAYS

PHASE I - 90 DAYS

ACTIVATION OF PHASE I - 30 DAYS

PHASE II - 90 DAYS

TOTAL PROJECT TIMEFRAME - 240 DAYS

TEMPORARY ZIP WALL PROTECTION TO BE PROVIDED

AROUND CONSTRUCTION AREA PER VA SAFETY

STANDARDS

AS-5.1

A

A

AS-5.0

B

AS-5.0

A S

B

H

AS-6.0

3B-

3B-

122A

3B-

121A

3B-

111B

3B-

3B-

3B-

105A

F

AS-6.0

G

AS-6.0

J

AS-6.0

K

AS-6.0

SOLID GRAY

AREA

F L U

S H

F L U

S H

F L U

S H

F L U

S H

2 23

2 2

LINE OF EXISTING

STONE COPING TO

REMAIN - SEE SECTION

E X

I S

T I N

G

M E

C H

A N

I C

A L

P E

N T

H O

U S

E

E X

I S

T I N

G

M E

C H

A N

I C

A L

P E

N T

H O

U S

E

1-AS-6.1

M

N

O

L

ALIGN WALLS

FLUSH

ALIGN

WALLS

FLUSH

1-AS-5.2

1-AS-5.2

1B

1A

1A

1A

1A

1A

1A

1A

3B-

100F

1C

1C

3B-111A

LIVING ROOM

RESIDENT

3B-111

DINING ROOM

RESIDENT

3B-111B

ROOM

STORAGE

3B-110

LOUNGE

FAMILY

3B-105A

STORAGE

TCU MED.

3B-100F

CORRIDOR

EXISTING

3B-127

WORK AREA

DICTATION

TCU

3B-121A

RESTROOM

STAFF

3B-121

OFFICE

NURSE MGR.

3B-122

OFFICE

DICTATION

STAFF

3B-122B

DINING ROOM

TCU PATIENT

3B-122A

LIVING ROOM

TCU PATIENT

3B-115

ALCOVE

OPEN

1-AS-5.2

1-AS-5.2

E

AS-6.0

3B-

PHASE II

PHASE II

1A

1A

1A

1B

ALIGN WALLS FLUSH

1A

PHASE I

PHASE I

PHASE I

ALIGN

WALLS

FLUSH

ALIGN

WALLS

FLUSH

1A

NOTE: TEMPORARY

CONTRACTOR DOOR SHALL BE

PROVIDED IN THIS OPENING

UNTIL FINAL, FINISHED DOOR

IS INSTALLED

SET FACE OF DESK

STUD WALL 1" BACK

FROM FACE OF PIER

1-AS-6.0

B

A

THREE (3) AREAS OF CONSTRUCTION WITHIN

THESE BOUNDARIES SHALL BE INCLUDED IN

PHASE I BASE BID. DEDUCT ALTERNATE #2

SHALL FULLY REMOVE CONSTRUCTION

SCOPE FROM PROJECT

PHASE I SCOPE OF WORK:

3B-100N

STATION

NOURISHMENT

ALIGN

WALLS

FLUSH

ALIGN WALLS

FLUSH

716 1817

3B-100C

CORRIDOR

EXISTING

3B-100C

CORRIDOR

EXISTING

3B-100D

CORRIDOR

EXISTING

3B-100E

CORRIDOR

EXISTING

3B-123

3B-123A

3B001

3B118A

3B120A

3B120

3B118

3B100E

3B116

3B100O

3B116A

3B114

3B112

3B124

3B109

3B108A

3B108

PATIENT BEDROOM

PATIENT

BEDROOM

PATIENT

BEDROOM

PATIENT

BEDROOM

PATIENT

BEDROOM

EXISTING

CORRIDOR

ELEC.

ELEC./COMM.

LINEN ROOM

PATIENT

BEDROOM

3B124A

3B124

3B126A

3B114

3B112

3B109

3B108A

3B116A

3B100O

3B123A

3B129

3B147

3B156A

3B158A

PATIENT BEDROOM

ELEC.

ELEC./COMM.

ANTEROOM

ELEC.

1C

1C

1C

1-AS-6.0

C D

P

AS-6.1

65% CD'S SUBMISSION 2.9.18

1-AS-5.2

1-AS-5.2

8 9 10 11A 12

V

T

1A/1B

1-AS-6.1

1A/1B

1-AS-6.1

3B115

3B100N

3B100F 3B105A

8 9 10 12

11A

L

K

J

Q

100% CD'S SUBMISSION 4.4.18

F

1-AS-7.0

S

S

S

S

14'-0" 3'-5" +/-15'-6 1/2" 4'-6 1/4"3'-3"

EQ. EQ.

EQ. EQ.

EQ. EQ.

EQ. EQ.

EQ.

EQ.

E Q

E

Q

EQ. EQ.

E Q

E

Q

EQ. EQ.

9'-9"

1'-0"

5"

EQ. EQ.

SD

OIT Telecom/ Data Closet

L1

S

S

EQ. EQ.

E Q

E

Q

2'-0"

19'-7 1/2"

2'-0"

13'-0" +/-

EQ. EQ.

E

Q

E Q

8'-0"

1'-3" 2'-3" 2'-3"

4.4.18 CJK DAK

1-AS-3.3

THIRD FLOOR REF. CEILING

PLANS - PHASES I & II

Revisions: Date

Drawing Title

Approved: Project Director

Project Title

Date

Location

Checked

Building Number

Project Number

Drawing Number

Drawn

CONSULTANTS: ARCHITECT:

Office of

Construction and Facilities

Management

N

N

S

T

R

U

C

T

I

O

N

VETERANS AFFAIRS MEDICAL CENTER

PALLIATIVE CARE - TCU EXPANSION

THIRD FLOOR

10701 EAST BLVD. CLEVELAND, OHIO

541-18-503

MECHANICAL/ELECTRICAL/PLUMBING ENGINEERING:

SCHEESER BUCKLEY MAYFIELD, LLC

1540 CORPORATE WOODS PKWY. UNIONTOWN, OH 44685

P. 330.526.2700

COST ESTIMATING:

MCGUINESS UNLIMITED, INC.

15724 STILLWOOD AVE. CLEVELAND, OH 44111

P. 440.667.5120

FULLY SPRINKLERED

STRUCTURAL ENGINEERING:

THORSON BAKER + ASSOCIATES

3030 WEST STREESTBORO RD. RICHFIELD, OH 44286

P. 330.659.6688

HAZARDOUS MATERIALS ABATEMENT:

STEPHEN J. SEBESTA & ASSOCIATES, INC.

30628 DETROIT RD., NO. 258 WESTLAKE, OH 44145

P. 216.781.0060

DD SUBMISSION 12.1.17

3/16" = 1'-0"

REFLECTED CEILING PLAN

THIRD FLOOR - PHASE I

3/16" = 1'-0"

REFLECTED CEILING PLAN

THIRD FLOOR - PHASE II

5. WHERE NEW UTILITIES ARE INSTALLED IN EXISTING PARTITIONS, ALL SUB-CONTRACTORS

SHALL REMOVE EXISTING DRYWALL AS REQUIRED FOR INSTALLATION OF SAME, AND PATCH

AND REPAIR WITH NEW TO MATCH EXISTING CONDITIONS.

GENERAL NOTES:

EXISTING WALLS TO REMAIN

INDICATES NEW DOOR

INDICATES EXISTING DOORS

NEW WALLS

1. CONSIDER ALL AREAS OWNER-OCCUPIED, UNLESS OTHERWISE NOTED.

2. ALL WALLS ARE DRAWN AND DIMENSIONED TO A 5" NOMINAL WIDTH TYPICAL UNLESS

OTHERWISE NOTED. ALL DIMENSIONS ARE CLEAR DIMENSIONS FROM FACE OF GYPSUM

BOARD TO FACE OF GYPSUM BOARD

3. ALL SUB-CONTRACTORS (I.E. FIRE PROTECTION, HVAC FIRE ALARM, ELECTRICAL, ETC.) TO

DESIGN AND INSTALL SYSTEM PER OWNER REQUIREMENTS AND IN STRICT ACCORDANCE

WITH THE REQUIREMENTS OF ALL APPLICABLE CODES.

4. PATCH AND REPAIR ALL EXISTING AREAS TO REMAIN AS REQUIRED TO MATCH EXISTING

CONDITIONS.

6. ALL DAMAGE TO EXISTING AREAS OCCURING AS A RESULT OF CONSTRUCTION SHALL BE

REPAIRED AS REQUIRED BY TRADE CAUSING IT. CONTRACTOR SHALL PROTECT ALL

EXISTING WALL, CEILING, AND FLOOR FINISHES IN EACH AREA. ANY SURFACES DAMAGED

BY CONTRACTOR SHALL BE REPLACED BY THE CONTRACTOR AT NO ADDITIONAL COST TO

OWNER.

7. ALL NEW PENETRATIONS IN FIRE RATED ASSEMBLIES TO MAINTAIN FIRE RATING OF

ASSEMBLY AS REQUIRED.

15. ALL FLOOR, WALL, CEILING, AND MISC. FIRE RESISTIVE ASSEMBLIES AND CONSTRUCTION

SHALL BE OF THE FIRE RATING CALLED FOR ON THE DRAWINGS AND / OR AS REQUIRED BY

CODE. ALL EXISTING FIRE RESISTIVE ASSEMBLIES SHALL BE MAINTAINED AND THE RATING

NOT COMPROMISED. FIRE RATED ASSEMBLIES AND CONSTRUCTION INCLUDING ALL FIRE

STOPPING, FIRE RATED DOORS AND MISC. FIRE RESISTIVE REQUIREMENTS SHALL BE LEFT

UNCONCEALED AS REQUIRED FOR INSPECTION BY THE BUILDING OFFICIAL.

8. FURNITURE SHOWN FOR REFERENCE ONLY, BY OWNER. THE OWNER SHALL REMOVED,

PRIOR TO CONSTRUCTION, ALL ITEMS THAT THE OWNER DESIRES TO SALVAGE. ALL

REMAINING ITEMS INDICATED TO BE DEMOLISHED SHALL BE REMOVED BY THE

CONTRACTOR AND LEGALLY DISPOSED OF IN ACCORDANCE WITH THE PROJECT

SPECIFICATIONS. ALL ITEMS TO REMAIN IN SPACE SHALL BE PROTECTED BY THE

CONTRACTOR THROUGHOUT CONSTRUCTION.

WALLS TO BE REMOVED FULL HEIGHT U.N.O.

DASHED LINES INDICATE ITEMS TO BE DEMOLISHED

9. CONTRACTOR SHALL PROVIDE DUST REMOVING WALK-OFF MATS (TACKY MAT) AT

ALL CONSTRUCTION ENTRY POINTS

10. CONTRACTOR SHALL PROVIDE HEPA FILTERED NEGATIVE AIR MACHINE(S) TO MAINTAIN

NEGATIVE PRESSURE IN WORK AREA ENSURING NO DUST OR FUMES WILL BE

TRANSFERRED TO OCCUPIED AREAS. PROVIDE VISUAL PRESSURE MONITORING DEVICE AT

DUST PROOF BARRICADE TO CONFIRM PRESSURE. DUST MONITORING SHALL BE BY

OWNER. SEE SPECIFICATION 01 00 00 "GENERAL REQUIREMENTS" ATTACHMENT AND 01 35

26 "SAFETY REQUIREMENTS" FOR ADDITIONAL REQUIREMENTS.

11. ALL DEMOLITION WORK BEING DONE OUTSIDE TEMPORARY PARTITIONS IS TO BE

APPROPRIATELY SEALED OFF TO PREVENT THE TRANSMISSION OF DUST AND DEBRIS.

WORK SHALL BE DONE TO MINIMIZE DISRUPTION TO VISITORS, PATIENTS, AND STAFF.

COORDINATE LOCATION OF BARRIERS WITH OWNER.

12. THE HOSPITAL'S SMOKE AND FIRE SUPPRESSION SYSTEM SHALL REMAIN IN OPERATION

WITHIN THE PROJECT AREA DURING THE ENTIRE CONSTRUCTION PHASE.

13. FIELD VERIFY LOCATION OF ALL EXISTING CONDITIONS. NOTIFY COR OF ANY

DISCREPANCIES.

14. WHERE NEW DOORS ARE INDICATED IN EXISTING WALL ASSEMBLIES, CUT OPENINGS IN

EXISTING WALL. REFER TO DOOR SCHEDULE FOR DIMENSIONS. PREPARE OPENINGS FOR

NEW DOOR, INCLUSIVE OF THE ADDITION OF JAMB AND HEAD…

This is the start of the file's text. The full file is on GovTribe.