36C25018B0675-003.pdf
PDF 23 MB Posted
- Solicitation number
- 36C25018B0675
About this file
36C25018B0675 S02 Drawings.pdf
View the file
Other files
| File | Type | Posted |
|---|---|---|
| 36C25018B0675-0001001.pdf | ||
| 36C25018B0675-0001005.pdf | ||
| 36C25018B0675-0001004.pdf | ||
| 36C25018B0675-0001003.png | PNG image | |
| 36C25018B0675-0001002.pdf | ||
| 36C25018B0675-0001000.docx | DOCX document | |
| 36C25018B0675-005.pdf | ||
| 36C25018B0675-004.pdf | ||
| 36C25018B0675-010.pdf | ||
| 36C25018B0675-011.pdf | ||
| 36C25018B0675-006.pdf | ||
| 36C25018B0675-002.pdf | ||
| 36C25018B0675-001.docx | DOCX document | |
| 36C25018B0675-012.pdf | ||
| 36C25018B0675-009.pdf | ||
| 36C25018B0675-007.pdf | ||
| 36C25018B0675-008.pdf | ||
| 36C25018B0675-000.docx | DOCX document |
Show all 18
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
GI-1
TITLE SHEET & DRAWING
INDEX
SITE KEY PLAN
NTS
10701 EAST BLVD. CLEVELAND, OH. 44106
DEPARTMENT OF VETERANS AFFAIRS MEDICAL CENTER - WADE PARK
Cleveland Veterans Affairs
Medical Center
PALLIATIVE CARE/TCU EXPANSION PROJECT
DRAWING INDEX
PROJECT NO. 541-18-503
GI-1 TITLE SHEET & DRAWING INDEX
ARCHITECTURAL
1-AS-0.1 THIRD FLOOR INTERIM LIFE SAFETY PLAN - PHASE I
1-AS-0.2 THIRD FLOOR INTERIM LIFE SAFETY PLAN - PHASE II
1-AS-3.0 THIRD FLOOR EXISTING CONDITIONS PLAN
1-AS-3.1 THIRD FLOOR DEMOLITION PLANS - PHASES I & II
1-AS-3.2 THIRD FLOOR IMPROVEMENT PLANS - PHASES I & II
1-AS-3.3 THIRD FLOOR REFLECTED CEILING PLANS - PHASES I & II
1-AS-4.0 FOURTH FLOOR EXISTING CONDITIONS PLAN
1-AS-4.1 FOURTH FLOOR DEMOLITION & IMPROVEMENT PLANS - PHASE I
1-AS-5.0 NEW LIVING/DINING ROOF ENCLOSURE - EXTERIOR ELEVATIONS
1-AS-5.1 NEW LIVING/DINING ROOF ENCLOSURE - BUILDING & WALL SECTIONS
1-AS-5.2 ENLARGED PLAN AND SECTION DETAILS
1-AS-6.0 INTERIOR ELEVATIONS
1-AS-6.1 INTERIOR ELEVATIONS & ENLARGED DETAILS
1-AS-6.2 ENLARGED MILLWORK DETAILS
1-AS-7.0 DOOR SCHEDULE, WALL TYPES, & DETAILS
1-AS-7.1 FINISH PLANS AND SCHEDULE
STRUCTURAL
S-1.00 GENERAL NOTES & SPECIFICATIONS
S-1.01 GENERAL NOTES & SPECIFICATIONS
S-1.02 PARTIAL ROOF FRAMING PLAN & SECTIONS
MECHANICAL/HVAC
M-0.1 HVAC GENERAL NOTES, SYMBOL LEGENDS, AND SCHEDULES
M-1.1 DEMOLITION - PARTIAL THIRD FLOOR PLANS - HVAC DUCTWORK
M-1.2 DEMOLITION - PARTIAL THIRD FLOOR PLANS - HVAC PIPING
M-2.1 NEW WORK - PARTIAL THIRD FLOOR PLANS - HVAC DUCTWORK
M-2.2 NEW WORK - PARTIAL THIRD FLOOR PLANS - HVAC PIPING
M-3.1 HVAC DETAILS AND TEMPERATURE CONTROLS
100% CD'S SUBMISSION
4.4.18
CLEVELAND VAMC
BUILDING MASTER KEY PLAN
NTS
THIRD FLOORNORTH NORTH
PROJECT SITE
2857 SF
I. PROJECT LOCATION: CLEVELAND VETERANS AFFAIRS MEDICAL CENTER
10701 EAST BLVD.
CLEVELAND, OHIO
II. DESCRIPTION & USER GROUP CLASSIFICATION OF BLDG
A. NATURE OF PROJECT: INTERIOR RENOVATIONS OF EXISTING 3RD FLOOR
EXTERIOR EXPANSION OF EXISTING 3RD FLOOR
B. DESIGN CODES: 2015 NPFA LIFE SAFETY CODE 101, IBC 2015
C. USE GROUP: I-2 - HEALTH CARE - NO CHANGE PROPOSED
D. CONSTRUCTION TYPE: TYPE I -332, IB - NON-COMBUSTIBLE, PROTECTED
FIRE RATED CONSTRUCTION (LSC A.8.2.1.2)
EXTERIOR BEARING WALLS 3 HRS
INTERIOR BEARING WALLS 3 HRS
STRUCTURAL COLUMNS 3 HRS (SUPPORTING > 1 FLOOR)
2 HRS (SUPPORTING 1 FLOOR ONLY)
2 HRS (SUPPORTING ROOF ONLY)
BEAMS, GIRDERS, TRUSSES 3 HRS (SUPPORTING > 1 FLOOR, COLS., OR BEARING
WALLS
2 HRS (ALL OTHERS)
FLOOR-CEILING ASSEMBLIES 2 HRS
ROOF-CEILING ASSEMBLIES 1
HRS
INTERIOR NON-BEARING WALLS 0 HRS
EXTERIOR NON-BEARING WALLS 0 HRS
WALL ASSEMBLIES
EXIT ACCESS CORRIDOR WALLS 0 HR SMOKE PARTITIONS
E. PROJECT AREA: 3RD FLOOR: 2857 GSF
4TH FLOOR: 867 GSF
E. PROJECT AREA OCCUPANT LOAD: PHASE I AREAS: 42 OCCUPANTS
PHASE II AREAS: 66 OCCUPANTS
F. FIRE PROTECTION: EXISTING BUILDING FULLY SPRINKLED. MODIFICATIONS AS REQUIRED
PER NEW IMPROVEMENTS PROPOSED
CODE INFORMATION
Revisions: Date
DD SUBMISSION 12.1.17
DAKCJK4.4.18
Drawing Title
Approved: Project Director
Project Title
Date
Location
Checked
Building Number
Project Number
Drawing Number
Drawn
CONSULTANTS: ARCHITECT/ENGINEERS:
Office of
Construction and Facilities
Management
1468 WEST 9TH STREET #400 CLEVELAND, OH 44113
P. 216.687.1555 F. 216.687.1558
Stanley J. Kaczmar, License #4988
Expiration Date: 12/31/2019
N
O
T
F
R
C
N
S
T
R
U
C
T
I
O
N
VETERANS AFFAIRS MEDICAL CENTER
PALLIATIVE CARE - TCU EXPANSION
THIRD FLOOR
10701 EAST BLVD. CLEVELAND, OHIO
541-18-503
MECHANICAL/ELECTRICAL/PLUMBING ENGINEERING:
SCHEESER BUCKLEY MAYFIELD, LLC
1540 CORPORATE WOODS PKWY. UNIONTOWN, OH 44685
P. 330.526.2700
COST ESTIMATING:
MCGUINESS UNLIMITED, INC.
15724 STILLWOOD AVE. CLEVELAND, OH 44111
P. 440.667.5120
FULLY SPRINKLERED
STRUCTURAL ENGINEERING:
THORSON BAKER + ASSOCIATES
3030 WEST STREESTBORO RD. RICHFIELD, OH 44286
P. 330.659.6688
HAZARDOUS MATERIALS ABATEMENT:
STEPHEN J. SEBESTA & ASSOCIATES, INC.
30628 DETROIT RD., NO. 258 WESTLAKE, OH 44145
P. 216.781.0060
PLUMBING
P-0.1 PLUMBING GENERAL NOTES, SCHEDULES, & DETAILS
P-1.1 DEMOLITION - PARTIAL THIRD FLOOR PLANS - PLUMBING WASTE/VENT
P-1.2 DEMOLITION - PARTIAL THIRD FLOOR PLANS - PLUMBING PIPING
P-2.1 NEW WORK - PARTIAL THIRD FLOOR PLANS - PLUMBING WASTE/VENT
P-2.2 NEW WORK - PARTIAL THIRD FLOOR PLANS - PLUMBING PIPING
ELECTRICAL
E-0.1 ELECTRICAL SYMBOL LEGEND AND GENERAL NOTES
E-0.2 LIGHTING FIXTURE SCHEDULE AND LIGHTING DETAILS
E-1.1 DEMOLITION - PARTIAL THIRD FLOOR PLANS - ELECTRICAL
E-2.1 LIGHTING - PARTIAL THIRD FLOOR PLANS - ELECTRICAL
E-2.2 POWER - PARTIAL THIRD FLOOR PLANS - ELECTRICAL
E-2.3 SYSTEMS - PARTIAL THIRD FLOOR PLANS - ELECTRICAL
E-3.1 ELECTRICAL DETAILS
FIRE PROTECTION
FP-0.1 FIRE PROTECTION GENERAL NOTES & SYMBOL LEGEND
FP-1.1 NEW WORK - PARTIAL THIRD FLOOR PLANS - FIRE PROTECTION
ASBESTOS ABATEMENT
1-AA-1 3RD FLOOR ASBESTOS ABATEMENT PLAN - PHASES I & II
1-AA-2 ASBESTOS ABATEMENT STANDARD DETAILS
65% CD'S SUBMISSION 2.9.18
100% CD'S SUBMISSION 4.4.18
BID ISSUE SUBMISSION 3.2.18
4.4.18 CJK DAK
1-AS-0.1
THIRD FLOOR INTERIM LIFE SAFETY
PLAN - PHASE I
62'-3" COMMON PATH OF
TRAVEL/EXIT TRAVEL
DISTANCE
Revisions: Date
Drawing Title
Approved: Project Director
Project Title
Date
Location
Checked
Building Number
Project Number
Drawing Number
Drawn
CONSULTANTS: ARCHITECT/ENGINEERS:
Office of
Construction and Facilities
Management
N
N
S
T
R
U
C
T
I
O
N
VETERANS AFFAIRS MEDICAL CENTER
PALLIATIVE CARE - TCU EXPANSION
THIRD FLOOR
10701 EAST BLVD. CLEVELAND, OHIO
541-18-503
MECHANICAL/ELECTRICAL/PLUMBING ENGINEERING:
SCHEESER BUCKLEY MAYFIELD, LLC
1540 CORPORATE WOODS PKWY. UNIONTOWN, OH 44685
P. 330.526.2700
COST ESTIMATING:
MCGUINESS UNLIMITED, INC.
15724 STILLWOOD AVE. CLEVELAND, OH 44111
P. 440.667.5120
FULLY SPRINKLERED
STRUCTURAL ENGINEERING:
THORSON BAKER + ASSOCIATES
3030 WEST STREESTBORO RD. RICHFIELD, OH 44286
P. 330.659.6688
HAZARDOUS MATERIALS ABATEMENT:
STEPHEN J. SEBESTA & ASSOCIATES, INC.
30628 DETROIT RD., NO. 258 WESTLAKE, OH 44145
P. 216.781.0060
DD SUBMISSION 12.1.17
LIFE SAFETY LEGEND
PROJECT SCOPE BOUNDARY
EXIT
E
EXISTING/NEW SMOKE PARTITIONS - 0 HR RATED
EXISTING 2 HOUR FIRE WALL
EXISTING 1 HOUR FIRE WALL
EXISTING 1 HOUR FIRE WALL/SMOKE
BARRIER
F.E.C.
EXISTING FIRE EXTINGUISHER
LOCATION
EXIT SIGN LOCATION (DIRECTIONAL ARROWS &
DOUBLE-SIDED SIGNS MAY OCCUR, SEE PLAN)
1/8" = 1'-0"
INTERIM LIFE SAFETY PLAN
THIRD FLOOR - PHASE I
SCOPE OF WORK
S C
O P
E
O
F
W
O R
K
S C
O P
E
O
F
W
O R
K
E
E
E
F.E.C.
F.E.C.
F.E.C.
F.E.C.
EXISTING PATIENT
BEDROOM EGRESS
ACCESS PATH (AND ALL
OTHER AREAS ON
FLOOR) REMAIN
UNAFFECTED BY
PROPOSED
IMPROVEMENTS
TEMPORARY PARTITION
W/CONTRACTOR
ACCESS
TEMPORARY ZIPWALL
ENCLOSURES
W/CONTRACTOR
ACCESS
PROJECT AREA OCCUPANT LOAD
65% CD'S SUBMISSION 2.9.18
3B-121A
RESTROOM
STAFF
3B-121
OFFICE
NURSE MGR.
3B-122
OFFICE
DICTATION
STAFF
3B-122B
DINING ROOM
TCU PATIENT
3B-122A
LIVING ROOM
TCU PATIENT
PATIENT
DINING
ROOM
MEDICAL
STOR. ROOM
STAFF
DICTATION
ROOM
MEDICAL
STOR. ROOM
STAFF
RESTROOM
NOURISHMENT
STATION
3B-115
ALCOVE
OPEN
PATIENT
BEDROOM
PATIENT
BEDROOM
SLEEP LAB
CONTROL ROOM
SLEEP LAB
BEDROOM
PATIENT
BEDROOM
PATIENT
SPA/BATHING
SUITE
STAFF
OFFICE
PATIENT
BEDROOM
PATIENT
BEDROOM
PATIENT
BEDROOM
PATIENT
BEDROOM
PATIENT
BEDROOM
PATIENT
BEDROOM PATIENT
DINING
FAMILY
LOUNGE
EMS
CHUTE
CHUTE
EMS
NURSE
STATION
OIT
TELECOM/DATA
CLOSET
PATIENT
BEDROOM
PATIENT
BEDROOM
PSYCH.
ON-CALL ROOM
PATIENT
BEDROOM
PATIENT
BEDROOM
ELEC.
PATIENT
BEDROOM
PATIENT
BEDROOM
PATIENT
BEDROOM
PATIENT
BEDROOM*
PATIENT
BEDROOM
PATIENT
BEDROOM
PATIENT
BEDROOM
PATIENT
BEDROOM
RESPIRATORY
THERAPY
EQUIPMENT
STOR. ROOM
PATIENT
BEDROOM
HOSPICE
EQUIPMENT
STORAGE ROOM
ELEC./COMM.
LINEN ROOM
CONFERENCE
ROOM
EQUIP. STOR.
ELEC.
ELEC.
STAFF WORK
AREA
STAFF
OFFICE
STAFF
OFFICE
STAFF
OFFICE
ENTRY
DESK
SOILED
UTILITY
CLEAN
UTILITY
EQUIP.
STORAGE
STAFF
OFFICE
NOUR.
STATION
ELEC.
MECHANICAL
PENTHOUSE
ANTEROOM
RESTROOM
SCOPE OF WORK
TEMPORARY
PARTITION
PERMANENT PARTITION TO
DOUBLE AS TEMPORARY
PARTITION W/CONTRACTOR
ACCESS
3B-105A
STORAGE
TCU MED.
THREE (3) AREAS OF
CONSTRUCTION WITHIN THESE
BOUNDARIES SHALL BE
INCLUDED IN BASE BID.
DEDUCT ALTERNATE #2 SHALL
FULLY REMOVE
CONSTRUCTION SCOPE FROM
PROJECT
SPECIAL ALTERNATE NOTE:
*NOTE: VA SHALL TEMPORARILY
VACATE EXISTING PATIENT
BEDROOM DURING FOR THE
ENTIRETY OF PHASE I
CONSTRUCTION. GC SHALL BE
RESPONSIBLE FOR ALL
POST-CONSTRUCTION
CLEANING AS REQUIRED BY THE
VA
S C
O P
E
O
F
W O
R K
FP
EXISTING FIRE ALARM PULL STATION TO
REMAIN AND BE ACCESSIBLE TO HOSPITAL
SIDE OF CONSTRUCTION PARTITION.
CONSTRUCT PARTITION AS SHOWN TO
MAINTAIN ACCESS
NEW 1 HR FIRE BARRIER
BETWEEN EX. MECH.
PENTHOUSE AND
LIVING/DINING
ENCLOSURE
3B-100N
STATION
NOURISHMENT
100% CD'S SUBMISSION 4.4.18
SLEEP LAB
BEDROOM
LIFE SAFETY GENERAL NOTES
1. SEE COVER SHEET FOR APPLICABLE CODE INFORMATION
2. PROJECT SCOPE LINE IS INDICATED FOR GENERAL INTENT ONLY.
CONTRACTOR WILL COMPLETE ALL WORK REGARDLESS IF IT IS LOCATED
OUTSIDE OF PROJECT SCOPE AREA AS INDICATED ON ANY DRAWING
3. CONTRACTOR TO COVER OR ALTER EXIT SIGNS WHICH, DUE TO
CONSTRUCTION, TEMPORARILY DO NOT DEPICT EXIT PATHS (TYP. OF ALL
EXIT SIGNS IN OR BEYOND PROJECT AREA)
4. TRAVEL DISTANCES OVER 200' WILL REQUIRE INTERIM LIFE SAFETY
MEASURES. COORDINATE WITH VA
5. EXISTING FLOOR SLABS ARE 2 HR FIRE RATED. FOR ALL NEW CORE
DRILLS/UTILITY PENETRATIONS, GC SHALL UTILIZE GROUND PENETRATING
RADAR TO X-RAY EXISTING FLOOR SLAB AT PROPOSED, NEW PENETRATION
LOCATION TO ENSURE THAT FLOOR SLAB REBAR STRUCTURE WILL NOT BE
COMPROMISED, AND SHALL NOTIFY COR AND A/E TEAM OF ANY ISSUES
DISCOVERED IN FIELD. GC SHALL PROVIDE NEW 2 HR RATED THRU-SLAB
FIRESTOP ASSEMBLIES AT ALL PENETRATIONS. FOR EXISTING THRU-SLAB
UTILITIES THAT ARE REMOVED AS A PART OF DEMOLITION SCOPE, GC SHALL
PATCH CONC. SLAB FULLY WITH NEW CONCRETE TO MATCH EXISTING.
6. PROVIDE FIRESTOPPING AT ALL PENETRATIONS THROUGH NEW AND
EXISTING FIRE/SMOKE RATED BARRIER WALLS AND FLOOR SLABS TO COMPLY
WITH THE REQUIRED BARRIER RATINGS. PROVIDE FIRESTOPPING AROUND
TEN (10) PENETRATIONS LESS THAN 6 SQUARE INCHES AND FOUR (4)
PENETRATIONS BETWEEN 16 AND 36 SQUARE INCHES TO COMPLY WITH
REQUIRED RATING NOT ASSOCIATED WITH NEW WORK. LARGER OPENINGS
SHALL BE BROUGHT TO THE ATTENTION OF THE COR. GC SHALL SUBMIT UL
LISTED METHODS FOR PATCHING ALL FIRE BARRIERS THAT MEET THE
MINIMUM FIRE RATING REQUIREMENTS OF THE PENETRATED BARRIER AND
ARE IN COMPLIANCE WITH THE OPENING SIZE AS DICTATED BY THE
ASSEMBLY.
7. TEMPORARY FIRE ALARMS IN CONSTRUCTION AREAS: GC SHALL PROVIDE
TEMPORARY FIRE ALARMS IN ALL CONSTRUCTION AREAS THROUGHOUT THE
CONSTRUCTION DURATION UNTIL SUCH TIME THAT NEW FIRE ALARM SYSTEM
DEVICES ARE INSTALLED, TESTED, AND IN FULL OPERATION. HEAT
DETECTION DEVICES SHALL BE UTILIZED AND SHALL BE CONNECTED TO THE
BUILDING FIRE ALARM SYSTEM AND COORDINATED THROUGH THE VA
ELECTRICAL SHOP. GC SHALL COORDINATE WITH VA SAFETY DEPARTMENT
FOR ALL TEMPORARY FIRE ALARM INSTALLATIONS TO ENSURE COMPLIANCE
WITH SAFETY STANDARDS.
1-AS-0.2
THIRD FLOOR INTERIM LIFE SAFETY
PLAN - PHASE II
135'-9" EXIT TRAVEL
DISTANCE
Revisions: Date
Drawing Title
Approved: Project Director
Project Title
Date
Location
Checked
Building Number
Project Number
Drawing Number
Drawn
CONSULTANTS: ARCHITECT/ENGINEERS:
Office of
Construction and Facilities
Management
N
N
S
T
R
U
C
T
I
O
N
VETERANS AFFAIRS MEDICAL CENTER
PALLIATIVE CARE - TCU EXPANSION
THIRD FLOOR
10701 EAST BLVD. CLEVELAND, OHIO
541-18-503
MECHANICAL/ELECTRICAL/PLUMBING ENGINEERING:
SCHEESER BUCKLEY MAYFIELD, LLC
1540 CORPORATE WOODS PKWY. UNIONTOWN, OH 44685
P. 330.526.2700
COST ESTIMATING:
MCGUINESS UNLIMITED, INC.
15724 STILLWOOD AVE. CLEVELAND, OH 44111
P. 440.667.5120
FULLY SPRINKLERED
STRUCTURAL ENGINEERING:
THORSON BAKER + ASSOCIATES
3030 WEST STREESTBORO RD. RICHFIELD, OH 44286
P. 330.659.6688
HAZARDOUS MATERIALS ABATEMENT:
STEPHEN J. SEBESTA & ASSOCIATES, INC.
30628 DETROIT RD., NO. 258 WESTLAKE, OH 44145
P. 216.781.0060
DD SUBMISSION 12.1.17
LIFE SAFETY LEGEND
PROJECT SCOPE BOUNDARY
EXIT
E
EXISTING/NEW SMOKE PARTITIONS - 0 HR RATED
EXISTING 2 HOUR FIRE WALL
EXISTING 1 HOUR FIRE WALL
EXISTING 1 HOUR FIRE WALL/SMOKE
BARRIER
F.E.C.
EXISTING FIRE EXTINGUISHER
LOCATION
EXIT SIGN LOCATION (DIRECTIONAL ARROWS &
DOUBLE-SIDED SIGNS MAY OCCUR, SEE PLAN)
1/8" = 1'-0"
INTERIM LIFE SAFETY PLAN
THIRD FLOOR - PHASE II
SCOPE OF WORK
E
E
E
F.E.C.
F.E.C.
F.E.C.
F.E.C.
EXISTING PATIENT
BEDROOM EGRESS
ACCESS PATH (AND ALL
OTHER AREAS ON
FLOOR) REMAIN
UNAFFECTED BY
PROPOSED
IMPROVEMENTS
TEMPORARY
PARTITION
W/CONTRACTOR
ACCESS
SCOPE OF WORK
PROJECT AREA OCCUPANT LOAD
TEMPORARY PARTITION
W/CONTRACTOR
ACCESS
EGRESS PATH
THROUGH EXISTING
EGRESS CORRIDORS
REMAINS UNAFFECTED
BY IMPROVEMENTS OR
CONSTRUCTION
EGRESS PATH
THROUGH EXISTING
EGRESS CORRIDORS
REMAINS UNAFFECTED
BY IMPROVEMENTS OR
CONSTRUCTION
3B-121A
RESTROOM
STAFF
3B-121
OFFICE
NURSE MGR.
3B-122
OFFICE
DICTATION
STAFF
3B-122B
DINING ROOM
TCU PATIENT
3B-122A
LIVING ROOM
TCU PATIENT
3B-115
ALCOVE
OPEN
3B-111A
LIVING ROOM
RESIDENT
3B-111
DINING ROOM
RESIDENT
3B-111B
ROOM
STORAGE
3B-110
LOUNGE
FAMILY
B
F
C O
R R
I D
O R
E X
I S
T I N
G
3B-127
WORK AREA
DICTATION
TCU
MEDICAL
STOR. ROOM
PATIENT
BEDROOM
PATIENT
BEDROOM
PATIENT
BEDROOM
PATIENT
SPA/BATHING
SUITE
STAFF
OFFICE
PATIENT
BEDROOM
PATIENT
BEDROOM
PATIENT
BEDROOM
PATIENT
BEDROOM
PATIENT
BEDROOM
PATIENT
BEDROOM PATIENT
DINING
FAMILY
LOUNGE
EMS
CHUTE
CHUTE
EMS
NURSE
STATION
OIT
TELECOM/DATA
CLOSET
PATIENT
BEDROOM
PATIENT
BEDROOM
PATIENT
BEDROOM
PATIENT
BEDROOM
ELEC.
PATIENT
BEDROOM
PATIENT
BEDROOM
PATIENT
BEDROOM
PATIENT
BEDROOM
PATIENT
BEDROOM
PATIENT
BEDROOM
PATIENT
BEDROOM
PATIENT
BEDROOM
PATIENT
BEDROOM
ELEC./COMM.
CONFERENCE
ROOM
EQUIP. STOR.
ELEC.
STAFF WORK
AREA
STAFF
OFFICE
STAFF
OFFICE
STAFF
OFFICE
ENTRY
DESK
SOILED
UTILITY
CLEAN
UTILITY
EQUIP.
STORAGE
STAFF
OFFICE
NOUR.
STATION
ELEC.
MECHANICAL
PENTHOUSE
ANTEROOM
RESTROOM
65% CD'S SUBMISSION 2.9.18
PERMANENT
PARTITIONS TO
DOUBLE AS
TEMPORARY
PARTITIONS
PERMANENT PARTITION
TO DOUBLE AS
TEMPORARY PARTITION
3B-105A
STORAGE
TCU MED.
NEW 1 HR FIRE BARRIER
BETWEEN EX. MECH.
PENTHOUSE AND
LIVING/DINING
ENCLOSURE
3B-100N
STATION
NOURISHMENT
100% CD'S SUBMISSION 4.4.18
SLEEP LAB
CONTROL ROOM
SLEEP LAB
BEDROOM
PSYCH.
ON-CALL ROOM
RESPIRATORY
THERAPY
EQUIPMENT
STOR. ROOM
SLEEP LAB
BEDROOM
LINEN ROOM
NOTE: 7'-0" MIN. CLEAR MUST BE
MAINTAINED THROUGHOUT
CONSTRUCTION AND IN GENERAL,
AT LEAST ONE (1) OF THE MAIN
EAST-WEST CORRIDORS MUST BE
PROVIDED WITH 7'-0" CLEAR TO
THE TEMPORARY PARTITION FACE.
GC SHALL COORDINATE PHASING
OF TEMPORARY PARTITION
CONSTRUCTION WITH VA TO
ENSURE THAT MINIMUM
DIMENSION IS MAINTAINED
HOSPICE
EQUIPMENT
STORAGE ROOM
LIFE SAFETY GENERAL NOTES
1. SEE COVER SHEET FOR APPLICABLE CODE INFORMATION
2. PROJECT SCOPE LINE IS INDICATED FOR GENERAL INTENT ONLY.
CONTRACTOR WILL COMPLETE ALL WORK REGARDLESS IF IT IS LOCATED
OUTSIDE OF PROJECT SCOPE AREA AS INDICATED ON ANY DRAWING
3. CONTRACTOR TO COVER OR ALTER EXIT SIGNS WHICH, DUE TO
CONSTRUCTION, TEMPORARILY DO NOT DEPICT EXIT PATHS (TYP. OF ALL
EXIT SIGNS IN OR BEYOND PROJECT AREA)
4. TRAVEL DISTANCES OVER 200' WILL REQUIRE INTERIM LIFE SAFETY
MEASURES. COORDINATE WITH VA
5. EXISTING FLOOR SLABS ARE 2 HR FIRE RATED. FOR ALL NEW CORE
DRILLS/UTILITY PENETRATIONS, GC SHALL UTILIZE GROUND PENETRATING
RADAR TO X-RAY EXISTING FLOOR SLAB AT PROPOSED, NEW PENETRATION
LOCATION TO ENSURE THAT FLOOR SLAB REBAR STRUCTURE WILL NOT BE
COMPROMISED, AND SHALL NOTIFY COR AND A/E TEAM OF ANY ISSUES
DISCOVERED IN FIELD. GC SHALL PROVIDE NEW 2 HR RATED THRU-SLAB
FIRESTOP ASSEMBLIES AT ALL PENETRATIONS. FOR EXISTING THRU-SLAB
UTILITIES THAT ARE REMOVED AS A PART OF DEMOLITION SCOPE, GC SHALL
PATCH CONC. SLAB FULLY WITH NEW CONCRETE TO MATCH EXISTING.
6. PROVIDE FIRESTOPPING AT ALL PENETRATIONS THROUGH NEW AND
EXISTING FIRE/SMOKE RATED BARRIER WALLS AND FLOOR SLABS TO COMPLY
WITH THE REQUIRED BARRIER RATINGS. PROVIDE FIRESTOPPING AROUND
TEN (10) PENETRATIONS LESS THAN 6 SQUARE INCHES AND FOUR (4)
PENETRATIONS BETWEEN 16 AND 36 SQUARE INCHES TO COMPLY WITH
REQUIRED RATING NOT ASSOCIATED WITH NEW WORK. LARGER OPENINGS
SHALL BE BROUGHT TO THE ATTENTION OF THE COR. GC SHALL SUBMIT UL
LISTED METHODS FOR PATCHING ALL FIRE BARRIERS THAT MEET THE
MINIMUM FIRE RATING REQUIREMENTS OF THE PENETRATED BARRIER AND
ARE IN COMPLIANCE WITH THE OPENING SIZE AS DICTATED BY THE
ASSEMBLY.
7. TEMPORARY FIRE ALARMS IN CONSTRUCTION AREAS: GC SHALL PROVIDE
TEMPORARY FIRE ALARMS IN ALL CONSTRUCTION AREAS THROUGHOUT THE
CONSTRUCTION DURATION UNTIL SUCH TIME THAT NEW FIRE ALARM SYSTEM
DEVICES ARE INSTALLED, TESTED, AND IN FULL OPERATION. HEAT
DETECTION DEVICES SHALL BE UTILIZED AND SHALL BE CONNECTED TO THE
BUILDING FIRE ALARM SYSTEM AND COORDINATED THROUGH THE VA
ELECTRICAL SHOP. GC SHALL COORDINATE WITH VA SAFETY DEPARTMENT
FOR ALL TEMPORARY FIRE ALARM INSTALLATIONS TO ENSURE COMPLIANCE
WITH SAFETY STANDARDS.
3B134 3B132 3B130 3B128 3B126 3B124
3B136
3B138
3B140
3B142
3B144
3B146
3B141
3B139
3B137 3B135
3B125 3B127
3B129 3B131
3B133
3B145 3B1473B143
3B148
3B111B
3B111A
3B110
3B123
3B001
3B121
3B120
3B118
3B116
3B115
3B114
3B112
3B108
3B109
3B106 3B104 3B102
3C105
3B107
3B105
3B103
3B101
3B149
3B150
3B152 3B154
3B156
3B158
3B160
3B002
3B161
3B163
3B164
3B166
3B168
3B170 3B174
3B172
3C180
3C178
3C104
3B100
3B162B
3B162A
3B134A
3B132A 3B130A
3B128A
3B126A
3B124A
3B123A
3B121A
3B120A
3B118A
3B116A
3B108A
3B106A
3B104A
3B102A
3B100A
3B174A
3B172A
3B170A
3B168A 3B166A
3B161A
3B163A
3B160A
3B156A
3B154A3B152A3B146A
3B144A
3B142A
3B100B
3B100C
3B100D
3B100E
3B
0F
3B100G
3B100J
3B100K
3B100L
STAIR 15
STAIR 19
STAIR 18
OIT Telecom/ Data Closet
R316
3B165
3B138A
3B136A
3B111
3B158A
3B100H
3B151
3B101A
3B167
3B169
3B105A
3B100M
3B169
3B100N
3B100O
3B100P
3C105
3B176
3C104
3C106
3C107
R302
STAIR 15
K
J
H
1 2 3
2 3
4 6 7 8
6 7
11A9
F
D
15A 16
16A
17 17A 18 18A
N
Q
T
V
L1
L
W
8 1210
Q
T
P
N1
R
V
V1
W
W1
X
R2 3C111
3C113
3C112
3C114
STAIR 14
3C107A
3C107B
K304
R319
M
3C108
3C115
3C115B 3C115D 3C115F 3C115H
3C115G3C115E3C115C3C115A
3C110
3C109
3C100
3C101
3C102
3C103
3A167
3A171
3A169
3A165
3A101
3A103
3A163 3A161
L1
3A159A
3A161A
3C100A
3C100B
3C100C
3A100A
R205
OIT Telecom/ Data Closet
4.4.18 CJK DAK
1-AS-3.0
THIRD FLOOR EXISTING
CONDITIONS PLAN
1" = 10'-0"
EXISTING CONDITIONS PLAN
THIRD FLOOR - OVERALL
Revisions: Date
Drawing Title
Approved: Project Director
Project Title
Date
Location
Checked
Building Number
Project Number
Drawing Number
Drawn
CONSULTANTS: ARCHITECT:
Office of
Construction and Facilities
Management
N
N
S
T
R
U
C
T
I
O
N
VETERANS AFFAIRS MEDICAL CENTER
PALLIATIVE CARE - TCU EXPANSION
THIRD FLOOR
10701 EAST BLVD. CLEVELAND, OHIO
541-18-503
MECHANICAL/ELECTRICAL/PLUMBING ENGINEERING:
SCHEESER BUCKLEY MAYFIELD, LLC
1540 CORPORATE WOODS PKWY. UNIONTOWN, OH 44685
P. 330.526.2700
COST ESTIMATING:
MCGUINESS UNLIMITED, INC.
15724 STILLWOOD AVE. CLEVELAND, OH 44111
P. 440.667.5120
FULLY SPRINKLERED
STRUCTURAL ENGINEERING:
THORSON BAKER + ASSOCIATES
3030 WEST STREESTBORO RD. RICHFIELD, OH 44286
P. 330.659.6688
HAZARDOUS MATERIALS ABATEMENT:
STEPHEN J. SEBESTA & ASSOCIATES, INC.
30628 DETROIT RD., NO. 258 WESTLAKE, OH 44145
P. 216.781.0060
DD SUBMISSION 12.1.17
PHASE I SCOPE OF WORK
P H
A S
E
I
S
C O
P E
W
O R
K
P H
A S
E
I
S
C O
W
O R
K
PHASE II SCOPE OF WORK
PHASE II SCOPE OF WORK
P H
A S
E
I I
EXISTING EXTERIOR
ROOF PATIO WITH
STEEL "CAGE"/MESH
PANEL ROOF AND WALL
ENCLOSURE ASSEMBLY
MECHANICAL
PENTHOUSE
PATIENT
LIVING
ROOM
PATIENT
BEDROOM
PATIENT
DINING
ROOM
MEDICAL
STOR. ROOM
STAFF
DICTATION
ROOM
MEDICAL
STOR. ROOM
STAFF
ADMIN.
DESK
STAFF
RESTROOM
NOURISHMENT
STATION
O P
N
S
A
T I N
G
STORAGE ROOM
CONSTRUCTION PROTECTION NOTE:
EXISTING LARGE FRESH AIR INTAKE
LOUVER OCCURS AT THIS LOCATION,
DIRECTLY ADJACENT TO
CONSTRUCTION AREA. GC SHALL
PROTECT LOUVER/ENCLOSE
CONSTRUCTION AREAS PER VA
REQUIREMENTS TO PREVENT
TRANSMISSION OF HAZARDOUS FUMES
AND DUST
THREE (3) AREAS OF CONSTRUCTION WITHIN
THESE BOUNDARIES SHALL BE INCLUDED IN
PHASE I BASE BID. DEDUCT ALTERNATE #2
SHALL FULLY REMOVE CONSTRUCTION SCOPE
FROM PROJECT
PHASE I SCOPE OF WORK:
P H
A S
E
I
PHASE I
P H
A S
E
I
PATIENT
BEDROOM
PATIENT
BEDROOM
PATIENT
BEDROOM
ELEC./COMM.
ELEC.
PATIENT
BEDROOM
LINEN
ROOM
PATIENT
BEDROOM
PATIENT
BEDROOM
CONFERENCE
ROOM
PATIENT
DINING
ROOM
PATIENT
BEDROOM
PATIENT
BEDROOM
PATIENT
BEDROOM
SOILED
UTILITY
65% CD'S SUBMISSION 2.9.18
HATCH LEGEND:
HATCHED AREA OUTSIDE OF PROJECT SCOPE.
ACCESS INTO CEILING SPACES MAY OCCUR, REFER
TO MEP DWGS.
UNSHADED AREA IN WHITE INDICATES PROJECT
SCOPE AREAS
STAIR 19
24'-3"
1'-0"
H
7'-0"
7'-0"
2'-6" +/-
15'-9" - BRICK REMOVAL ONLY
SEE ELEVATION
1'-0"
SD
M
I
N
15'-2" - EX. CMU BACKUP WALL
TO REMAIN BEHIND BRICK
OIT Telecom/ Data Closet
L1
S
11'-1" +/-
9'-4"
@ 7'-2" H
2'-6"8'-0"
@ 6'-9" H
5'-4"
@ 7'-2" H
8'-0"
@ 6'-9" H
EQ.
EQ.
2'-8"
WALL BASE ONLY WALL BASE ONLY
EX. BASE
TO REMAIN
SD
SD
15'-2" - EXISTING MASONRY BACK-UP WALL
BEHIND BRICK TO REMAIN (DIAG. HATCH BOUNDARY)
1'-0" 1'-0"
4.4.18 CJK DAK
1-AS-3.1
THIRD FLOOR DEMOLITION
PLANS - PHASES I & II
Revisions: Date
Drawing Title
Approved: Project Director
Project Title
Date
Location
Checked
Building Number
Project Number
Drawing Number
Drawn
CONSULTANTS: ARCHITECT:
Office of
Construction and Facilities
Management
VETERANS AFFAIRS MEDICAL CENTER
PALLIATIVE CARE - TCU EXPANSION
THIRD FLOOR
10701 EAST BLVD. CLEVELAND, OHIO
541-18-503
MECHANICAL/ELECTRICAL/PLUMBING ENGINEERING:
SCHEESER BUCKLEY MAYFIELD, LLC
1540 CORPORATE WOODS PKWY. UNIONTOWN, OH 44685
P. 330.526.2700
COST ESTIMATING:
MCGUINESS UNLIMITED, INC.
15724 STILLWOOD AVE. CLEVELAND, OH 44111
P. 440.667.5120
FULLY SPRINKLERED
STRUCTURAL ENGINEERING:
THORSON BAKER + ASSOCIATES
3030 WEST STREESTBORO RD. RICHFIELD, OH 44286
P. 330.659.6688
HAZARDOUS MATERIALS ABATEMENT:
STEPHEN J. SEBESTA & ASSOCIATES, INC.
30628 DETROIT RD., NO. 258 WESTLAKE, OH 44145
P. 216.781.0060
DD SUBMISSION 12.1.17
3/16" = 1'-0"
DEMOLITION PLAN
THIRD FLOOR - PHASE I
3/16" = 1'-0"
DEMOLITION PLAN
THIRD FLOOR - PHASE II
5. WHERE NEW UTILITIES ARE INSTALLED IN EXISTING PARTITIONS, ALL SUB-CONTRACTORS SHALL
REMOVE EXISTING DRYWALL AS REQUIRED FOR INSTALLATION OF SAME, AND PATCH AND
REPAIR WITH NEW TO MATCH EXISTING CONDITIONS.
GENERAL NOTES:
EXISTING WALLS TO REMAIN
INDICATES NEW DOOR
INDICATES EXISTING DOORS
NEW WALLS
1. CONSIDER ALL AREAS OWNER-OCCUPIED, UNLESS OTHERWISE NOTED.
2. ALL WALLS ARE DRAWN AND DIMENSIONED TO A 5" NOMINAL WIDTH TYPICAL UNLESS
OTHERWISE NOTED. ALL DIMENSIONS ARE CLEAR DIMENSIONS FROM FACE OF GYPSUM BOARD
TO FACE OF GYPSUM BOARD
3. ALL SUB-CONTRACTORS (I.E. FIRE PROTECTION, HVAC FIRE ALARM, ELECTRICAL, ETC.) TO
DESIGN AND INSTALL SYSTEM PER OWNER REQUIREMENTS AND IN STRICT ACCORDANCE WITH
THE REQUIREMENTS OF ALL APPLICABLE CODES.
4. PATCH AND REPAIR ALL EXISTING AREAS TO REMAIN AS REQUIRED TO MATCH EXISTING
CONDITIONS.
6. ALL DAMAGE TO EXISTING AREAS OCCURING AS A RESULT OF CONSTRUCTION SHALL BE
REPAIRED AS REQUIRED BY TRADE CAUSING IT. CONTRACTOR SHALL PROTECT ALL EXISTING
WALL, CEILING, AND FLOOR FINISHES IN EACH AREA. ANY SURFACES DAMAGED BY
CONTRACTOR SHALL BE REPLACED BY THE CONTRACTOR AT NO ADDITIONAL COST TO OWNER.
7. ALL NEW PENETRATIONS IN FIRE RATED ASSEMBLIES TO MAINTAIN FIRE RATING OF ASSEMBLY
AS REQUIRED.
15. ALL FLOOR, WALL, CEILING, AND MISC. FIRE RESISTIVE ASSEMBLIES AND CONSTRUCTION SHALL
BE OF THE FIRE RATING CALLED FOR ON THE DRAWINGS AND / OR AS REQUIRED BY CODE. ALL
EXISTING FIRE RESISTIVE ASSEMBLIES SHALL BE MAINTAINED AND THE RATING NOT
COMPROMISED. FIRE RATED ASSEMBLIES AND CONSTRUCTION INCLUDING ALL FIRE STOPPING,
FIRE RATED DOORS AND MISC. FIRE RESISTIVE REQUIREMENTS SHALL BE LEFT UNCONCEALED
AS REQUIRED FOR INSPECTION BY THE BUILDING OFFICIAL.
8. FURNITURE SHOWN FOR REFERENCE ONLY, BY OWNER. THE OWNER SHALL REMOVED, PRIOR
TO CONSTRUCTION, ALL ITEMS THAT THE OWNER DESIRES TO SALVAGE. ALL REMAINING ITEMS
INDICATED TO BE DEMOLISHED SHALL BE REMOVED BY THE CONTRACTOR AND LEGALLY
DISPOSED OF IN ACCORDANCE WITH THE PROJECT SPECIFICATIONS. ALL ITEMS TO REMAIN IN
SPACE SHALL BE PROTECTED BY THE CONTRACTOR THROUGHOUT CONSTRUCTION.
WALLS TO BE REMOVED FULL HEIGHT U.N.O.
DASHED LINES INDICATE ITEMS TO BE DEMOLISHED
9. CONTRACTOR SHALL PROVIDE DUST REMOVING WALK-OFF MATS (TACKY MAT) AT ALL
CONSTRUCTION ENTRY POINTS
10. CONTRACTOR SHALL PROVIDE HEPA FILTERED NEGATIVE AIR MACHINE(S) TO MAINTAIN
NEGATIVE PRESSURE IN WORK AREA ENSURING NO DUST OR FUMES WILL BE TRANSFERRED TO
OCCUPIED AREAS. PROVIDE VISUAL PRESSURE MONITORING DEVICE AT DUST PROOF
BARRICADE TO CONFIRM PRESSURE. DUST MONITORING SHALL BE BY OWNER. SEE
SPECIFICATION 01 00 00 "GENERAL REQUIREMENTS" ATTACHMENT AND 01 35 26 "SAFETY
REQUIREMENTS" FOR ADDITIONAL REQUIREMENTS.
11. ALL DEMOLITION WORK BEING DONE OUTSIDE TEMPORARY PARTITIONS IS TO BE
APPROPRIATELY SEALED OFF TO PREVENT THE TRANSMISSION OF DUST AND DEBRIS. WORK
SHALL BE DONE TO MINIMIZE DISRUPTION TO VISITORS, PATIENTS, AND STAFF. COORDINATE
LOCATION OF BARRIERS WITH OWNER.
12. THE HOSPITAL'S SMOKE AND FIRE SUPPRESSION SYSTEM SHALL REMAIN IN OPERATION WITHIN
THE PROJECT AREA DURING THE ENTIRE CONSTRUCTION PHASE.
13. FIELD VERIFY LOCATION OF ALL EXISTING CONDITIONS. NOTIFY COR OF ANY DISCREPANCIES.
14. WHERE NEW DOORS ARE INDICATED IN EXISTING WALL ASSEMBLIES, CUT OPENINGS IN
EXISTING WALL. REFER TO DOOR SCHEDULE FOR DIMENSIONS. PREPARE OPENINGS FOR
NEW DOOR, INCLUSIVE OF THE ADDITION OF JAMB AND HEAD STUD REINFORCEMENT (I.E.
DOUBLE STUDS, HEADERS) AND PATCH ADJACENT WALLS TO MATCH EXISTING.
16. DEBRIS REMOVAL SHALL NOT INTERFERE WITH OWNER'S OPERATIONS AND SHALL OCCUR
DURING OFF HOURS AS DETERMINED BY THE COR. SEE ALSO SPECIFICATION SECTION 01 35 26
"SAFETY REQUIREMENTS" FOR ADDITIONAL REQUIREMENTS REGARDING THE HAULING OF
DEBRIS FROM THE PROJECT AREA.
TEMPORARY PARTITION WALL W/3'-0" X 7'-0" SCWD
DOOR FOR CONTRACTOR ACCESS ONLY. WALL AND
DOOR TO BE REMOVED UPON COMPLETION OF WORK
U.N.O. PATCH REPAIR EXISTING CONDITIONS AS
REQUIRED UPON REMOVAL OF ALL TEMPORARY
CONSTRUCTION. REFER TO TYPICAL TEMPORARY
PARTITION DETAIL ON SHEET 1-AS-7.0. SCHEDULE
NOTE: CONSTRUCTION OF TEMPORARY BARRIERS
SHALL BE PERFORMED AFTER NORMAL BUSINESS
HOURS UNLESS OTHERWISE APPROVED BY THE COR.
PHASING DURATION:
PHASING DURATION DURING THE CONSTRUCTION PERIOD
SHOULD BE AS FOLLOWS:
PRECONSTRUCTION - 30 DAYS
PHASE I - 90 DAYS
ACTIVATION OF PHASE I - 30 DAYS
PHASE II - 90 DAYS
TOTAL PROJECT TIMEFRAME - 240 DAYS
SYMBOL LEGEND:
TEMPORARY ZIP WALL PROTECTION TO BE PROVIDED
AROUND CONSTRUCTION AREA PER VA SAFETY
STANDARDS
18. EXISTING FLOOR SLABS ARE 2 HR FIRE RATED. FOR ALL NEW CORE DRILLS/UTILITY
PENETRATIONS, GC SHALL UTILIZE GROUND PENETRATING RADAR TO X-RAY EXISTING FLOOR
SLAB AT PROPOSED, NEW PENETRATION LOCATION TO ENSURE THAT FLOOR SLAB REBAR
STRUCTURE WILL NOT BE COMPROMISED, AND SHALL NOTIFY COR AND A/E TEAM OF ANY ISSUES
DISCOVERED IN FIELD. GC SHALL PROVIDE NEW 2 HR RATED THRU-SLAB FIRESTOP ASSEMBLIES
AT ALL PENETRATIONS. FOR EXISTING THRU-SLAB UTILITIES THAT ARE REMOVED AS A PART OF
DEMOLITION SCOPE, GC SHALL PATCH CONC. SLAB FULLY WITH NEW CONCRETE TO MATCH
EXISTING.
HATCHED AREA OUTSIDE OF PROJECT SCOPE.
ACCESS INTO CEILING SPACES MAY OCCUR, REFER
TO MEP DWGS.
DEMOLITION NOTES:
EXISTING PARTITION WALL TO BE DEMOLISHED, FULL HEIGHT.
EXISTING DOOR AND FRAME TO BE REMOVED.
EXISTING CEILING TO BE REMOVED, INCLUDING LIGHTS, DIFFUSERS, AND OTHER CLG. MTD. ITEMS.
PROTECT SURROUNDING CEILING SYSTEM TO REMAIN AS REQUIRED DURING CONSTRUCTION
DEMOLITION NOTES ON THIS SHEET ARE INTENDED TO COVER ARCHITECTURAL ITEMS ONLY.
REFER TO MEP DRAWINGS FOR ADDITIONAL DEMOLITION SCOPE.
EXISTING BRICK MASONRY, AIRSPACE MATERIALS, AND BACK-UP MASONRY WALL ASSEMBLY TO
BE REMOVED IN THEIR ENTIRETY - FULL HEIGHT. EXISTING STONE COPING ABOVE SHALL REMAIN
AND BE TEMPORARILY SUPPORTED AS REQUIRED UNTIL FINAL BRACING CAN OCCUR. INTENT IS
FOR EXISTING C.I.P. CONC. STRUCTURE TO BE EXPOSED UPON COMPLETION OF DEMOLITION
NEW OPENING TO BE CREATED IN EXISTING PARTITION WALL. HEIGHT INDICATED BELOW
DIMENSION INDICATES FINAL ROUGH HEIGHT OF NEW OPENING. REFER TO ADDITIONAL NOTES
ON PLAN IF PROVIDED
2A
SOLID GRAY HATCHED AREA INDICATES EXISTING 3" +/- HIGHER FLOOR ELEVATION THAT OCCURS
@ EXTERIOR WALL. INTENT IS FOR THIS STEP TO BE GROUND DOWN TO APPROX. 1" BELOW EX.
3RD FINISH FLR. LEVEL AND PREPPED TO RECEIVE NEW CONC. FLOOR TOPPING
EXISTING METAL COPING TO BE REMOVED IN ITS ENTIRETY, INCLUSIVE OF INTERIOR BLOCKING.
INTENT UPON COMPLETION OF DEMOLITION IS FOR THE EXISTING STONE COPING BELOW TO BE
EXPOSED WITH ALL PRIOR ATTACHMENT ELEMENTS REMOVED. STEEL ANGLE @ BASE SHALL
REMAIN
EXISTING ROOFING MATERIAL AND QUARRY TILE SUBSTRATE SHALL BE REMOVED IN THE
ENTIRETY OF THE ROOF FOOTPRINT. EXISTING QUARRY TILE MORTAR TO REMAIN AND BE
PREPPED AS REQ'D. TO RECEIVE NEW CONC. FLOOR TOPPING. IMPORTANT NOTE: FINISHED,
OCCUPIED SPACES EXIST ON THE 2ND FLOOR BELOW AND MUST BE PROTECTED THROUGHOUT
CONSTRUCTION FROM DAMAGE DUE TO CONSTRUCTION ACTIVITIES OR WATER PENETRATION.
GC SHALL COORD. ROOF REMOVAL SCOPE AND PROVIDE ALL TEMPORARY PROTECTION
MEASURES AS REQ'D.
EXISTING ROOF DRAIN TO BE REMOVED AND CAPPED AS REQ'D. SEE PLUMB. DWGS.
FOR REUSE OF EXISTING DRAIN LEADER
STEEL/MESH PANEL CAGED ROOF ENCLOSURE TO BE REMOVED IN ITS ENTIRETY, INCLUDING ALL
SUPPORTING STEEL MEMBERS, MESH PANELS, AND OVERHEAD STEEL BRACING MEMBERS
EXISTING NURSE CALL LIGHT TO BE REMOVED
PORTION OF EXISTING SEGMENTED LINEAR COVE LIGHT IN CORRIDOR TO BE REMOVED BACK
TO NEAREST FULL SEGMENT SEAM IN EXISTING CEILING AREA TO REMAIN. VERIFY FINAL
DEMO POINT IN FIELD WITH EXISTING FIXTURE
EXISTING SUSPENDED LIGHT FIXTURE TO BE REMOVED
EXISTING FLOORING AND BASE MATERIAL IN ENTIRE SPACE (U.N.O.) TO BE REMOVED
CONST. PARTITION NOTE: SOLID FILLED WALLS DEPICTED ON DEMOLITION PLAN INDICATE NEW
WALLS PER THE FINAL IMPROVEMENT PLAN THAT CAN BE BUILT DURING PRE-CONST. PHASE OF
WORK TO SERVE AS CONST. PARTITIONS. GC SHALL PROVIDE ALL TEMPORARY PROTECTIVE
MEASURES (E.G. ZIPWALLS) AROUND OPGS. DURING PARTITION CONST., AND SHALL INCLUDE
PATCHING, REPAIRING, AND FINISHES ON PARTITION INFILLS UPON COMPLETION OF CONST.
DOORS LOCATED WITHIN SUCH PARTITIONS SHALL NOT BE REUSED AND SHALL BE PROVIDED
WITH NEW PER PLAN
EXISTING MILLWORK TO BE REMOVED
EXISTING LIGHT FIXTURE TO BE REMOVED AND SAVED FOR REINSTALLATION IN NEW
IMPROVEMENTS. REFER TO REF. CEILING PLANS FOR LOCATIONS
EXISTING PLUMBING FIXTURE TO BE REMOVED. CAP EXISTING LINES AS REQ'D. TO PROPERLY
ABANDON
EXISTING WINDOW AND WOOD TRIM FRAMING TO BE REMOVED
EXISTING NURSE CALL PULL STATION TO BE REMOVED
HVAC DEMO/NEW WORK TO OCCUR ABOVE CEILINGS IN EXISTING PATIENT
BEDROOMS/BATHROOMS. GC SHALL COORDINATE ALL SCHEDULING AND SCREENING/INFECTION
CONTROL REQUIREMENTS WITH THE VA AHEAD OF CONSTRUCTION TO ENSURE THAT PROPER
PROTOCOLS ARE IN PLACE DURING THIS WORK. REFER TO HVAC DRAWINGS FOR SCOPE.
EXISTING WOOD CRASH RAIL TO BE REMOVED AND SALVAGED. EXISTING RAILS TO BE
CUT/MODIFIED AS REQUIRED TO REINSTALL UNDER NEW IMPROVEMENTS
EXISTING CORNER GUARD TO BE REMOVED. ALL REMOVED CORNER GUARDS SHALL BE
SALVAGED FOR REINSTALLATION IN NEW LOCATIONS WHERE POSSIBLE
EXISTING GYP. BD. SOFFIT TO BE DEMOLISHED
HEAVY DASHED LINE INDICATES WALLS ON WHICH EXISTING WALLCOVERING MATERIAL SHALL BE
REMOVED, FULL HEIGHT
EXISTING WALL TILE TO BE REMOVED IN ENTIRE ROOM. TEMPORARILY REMOVE EX. GRAB
BARS AND TOILET ACCESSORIES - REINSTALL UPON NEW TILE INSTALLATION, U.N.O. (SEE 27)
HOSPICE DEPT. FLOORING SPECIAL PROTECTION NOTE: GC SHALL FULLY PROTECT EXISTING
CORRIDOR CARPETING DURING CONSTRUCTION OF TEMP. PARTITIONS AND ALL WORK TO
AVOID DAMAGE. EXISTING CARPETING CANNOT BE REPLACED.
EXISTING RECESSED TOILET PAPER DISPENSER TO BE REMOVED. PATCH WALL TO BE FLUSH
W/ADJACENT CONDITIONS
E X
C
E I L I N
G
A B
O V
E
T
O
R E
M A
I N
BRICK DEMO INTENT IS
FOR THE LINE OF
DEMOLITION TO ALIGN
W/CENTERLINE OF EX.
CONC. COLUMN, BOTH
SIDES - VERIFY LOC. IN
FIELD
2A
ENTIRE
LENGTH
DASHED LINES
INDICATE EXTERIOR
WALL BELOW COPING
TO REMAIN
ENTIRE
LENGTH
DASHED LINES
INDICATE EXTERIOR
WALL BELOW COPING
TO REMAIN
ENTIRE
EXISTING
ROOF
FOOTPRINT
EXISTING
ROOF-MOUNTED
INSULATED
DUCTWORK TO
REMAIN THROUGHOUT
PROJECT. PROTECT
AS REQ'D.
DEMO EX. WALL TO
HEIGHT ALIGNING
W/ADJACENT
SOFFIT
E X
C
E I L I N
G
F
L O
O R
I N
G
B A
S
R
E M
A I N
EXISTING MECHANICAL
PENTHOUSE
14 14
2A 2A 2A 2A
EX. GYP. BD.
SOFFIT ABOVE
TO REMAIN
15 15
10 13
ENTIRE
ROOM
INCLUDING
CORRIDOR
10 13
ENTIRE
ROOM
10 13
ENTIRE
ROOM
10 13
ENTIRE
ROOM &
CORRIDOR
10 13
ENTIRE
ROOM
10 13
ENTIRE
ROOM
16 17
E X
C
E I L I N
G
A B
O V
E
T
O
R E
M A
I N
ENTIRE
ROOM
START OPG. @
SILL HEIGHT OF
+ 3'-3 1/2" AFF
START OPG.
@ SILL
HEIGHT OF +
3'-3 1/2" AFF
E X
C
E I L I N
G
A B
O V
E
T
O
R E
M A
I N
GC SHALL COORDINATE
WITH VA FOR
RELOCATION/STORAGE OF
EXISTING FURNITURE IN
THIS AREA
HEAD &
CONTROLS
3B-123
3B-123A
PHASE II
PHASE II
PHASE I
PHASE I
PHASE I
THREE (3) AREAS OF CONSTRUCTION WITHIN
THESE BOUNDARIES SHALL BE INCLUDED IN
PHASE I BASE BID. DEDUCT ALTERNATE #2
SHALL FULLY REMOVE CONSTRUCTION
SCOPE FROM PROJECT
PHASE I SCOPE OF WORK:
EX. CLG.
ABOVE TO
REMAIN
ALIGN
WALLS
FLUSH
ALIGN
WALLS
FLUSH
ALIGN
WALLS
FLUSH
3B001
3B118A
3B120A
3B120
3B118
3B100E
3B116
3B100O
3B116A
3B114
3B112
3B124
3B109
3B108A
3B108
3B124A
3B124
3B126A
3B114
3B112
3B109
3B108A
3B116A
3B100O
3B123A
3B129
3B147
3B156A
3B158A
3B164
A
AS-3.1
1/4"=1'-0"
DEMOLITION SCOPE
EXISTING BLDG. - NORTH ELEVATION
A
AS.3.1
12 89
REMOVE THREE (3) EXISTING
LIGHTS AND ALL
BUILDING-MOUNTED CONDUIT
EXISTING STONE COPING TO REMAIN
AND BE TEMPORARILY SHORED UNTIL
NEW ROOF STRUCTURE IS INSTALLED
EXISTING STONE COPING TO
REMAIN, EXISTING METAL COPING
ON TOP TO BE REMOVED
NOT SHOWN FOR CLARITY:
EXISTING STEEL CAGE STRUCTURE
(WHICH SHALL BE REMOVED IN ITS
ENTIRETY)
EX. BRICK TO
REMAIN
S A
W C
U T
S A
W C
U T
EX. BRICK
TO REMAIN
EX. BRICK FACING TO BE REMOVED IN ITS ENTIRETY, FULL HEIGHT
EXISTING STONE COPING TO REMAIN,
EXISTING METAL COPING ON TOP TO BE
REMOVED
EXISTING DOOR &
FRAME TO BE
REMOVED
EXISTING ROOF CURB &
FLASHING TO BE REMOVED -
ENTIRE WALL LENGTH
LINES OF EX.
C.I.P. CONC.
COLS. & BEAMS
BEYOND TO
REMAIN, TYP.
LINES OF EX.
C.I.P. CONC.
COLS. & BEAMS
BEYOND TO
REMAIN, TYP.
EXISTING MASONRY BACK-UP
WALL BEHIND BRICK TO BE
REMOVED IN ITS ENTIRETY
EXISTING ELEC. CONDUIT CONTINUES ACROSS
ROOF TO SOUTH METAL PANEL WALL ON
PENTHOUSE. THIS CONDUIT AND THE CONDUIT
ON THE PENTHOUSE SHALL ALSO BE REMOVED
PATIENT BEDROOM
PATIENT
BEDROOM
PATIENT
BEDROOM
PATIENT
BEDROOM
PATIENT
BEDROOM
EXISTING
CORRIDOR
ELEC.
ELEC./COMM.
LINEN ROOM
PATIENT
BEDROOM
PATIENT BEDROOM
ELEC.
ELEC./COMM.
ANTEROOM
ELEC.
21 21 21
ENTIRE
WALL
LENGTH
COUNTER,
BASE/UPPER
CABS
COUNTER,
BASE/UPPER
CABS
COUNTER,
BASE/UPPER
CABS
COUNTER,
BASE/UPPER
CABS
WALL BASE
ONLY,
FLOORING TO
REMAIN
EX. WALLCOVERING TO REMAIN
WORKPOINT TO ALIGN WITH EAST EDGE
OF EX. DOOR FRAME, AS SHOWN. GC
SHALL CAREFULLY CUT EX.
WALLCOVERING TO LEAVE CLEAN LINE
*WALL BASE ONLY
ENTIRE DASHED
WALL, FLOORING
TO REMAIN
21 24
*WALL
BASE
ONLY,
FLOORING
TO
REMAIN
EX. WALL BASE TO REMAIN
13 13
VA TO
REMOVE/RELOCATE
EXISTING TV
ENTIRE
ROOM
65% CD'S SUBMISSION 2.9.18
B
AS-4.1
REFER TO 4TH FLOOR PLAN FOR
METAL PANEL TEMPORARY
REMOVAL SCOPE
8 9 10
11A
V
T
VA SHALL
REMOVE ALL
LOCKERS
PRIOR TO
CONSTRUCTION
3B105A
3B115
3B121A
3B121
R316
3B127
3B125
3B111
3B115A
3B115B
3B110
3B100F
3B105A
3B127
3B111
3B110
3B125
3B100N
3B115
ENTIRE
CORRIDOR
ENTIRE
CORRIDOR
8 9 10 12
11A
L
K
J
Q
100% CD'S SUBMISSION 4.4.18
17. ALL NOISE-GENERATING OPERATIONS SHALL BE SCHEDULED SO AS NOT TO IMPEDE
OWNER'S OPERATIONS AS DETERMINED BY THE COR. ALL WORK IN PUBLIC CORRIDORS
SHALL BE PERFORMED "OFF HOURS" UNLESS OTHERWISE APPROVED BY THE COR.
V
E R
I F
Y
E
L D
14'-2" +/- 5'-6"
1'-8"
5'-0" 5'-6"
1'-6"
15'-5"
1'-8"
EQ.
12'-0"
EQ.
1'-0" +/- 8'-0" CLR.
7'-0" 6'-2"
9'-9"
EQ. EQ.
3'-3"3'-3"
1'-0"
OIT Telecom/ Data Closet
L1
EQ. 1'-8"
5'-0" 1'-8"
EQ.
8'-0" 8'-0"
6'-10 1/2" 4'-0"
14'-5" +/-
1'-0"
1'-7"
4.4.18 CJK DAK
1-AS-3.2
THIRD FLOOR IMPROVEMENT
PLANS - PHASES I & II
Revisions: Date
Drawing Title
Approved: Project Director
Project Title
Date
Location
Checked
Building Number
Project Number
Drawing Number
Drawn
CONSULTANTS: ARCHITECT:
Office of
Construction and Facilities
Management
N
N
S
T
R
U
C
T
I
O
N
VETERANS AFFAIRS MEDICAL CENTER
PALLIATIVE CARE - TCU EXPANSION
THIRD FLOOR
10701 EAST BLVD. CLEVELAND, OHIO
541-18-503
MECHANICAL/ELECTRICAL/PLUMBING ENGINEERING:
SCHEESER BUCKLEY MAYFIELD, LLC
1540 CORPORATE WOODS PKWY. UNIONTOWN, OH 44685
P. 330.526.2700
COST ESTIMATING:
MCGUINESS UNLIMITED, INC.
15724 STILLWOOD AVE. CLEVELAND, OH 44111
P. 440.667.5120
FULLY SPRINKLERED
STRUCTURAL ENGINEERING:
THORSON BAKER + ASSOCIATES
3030 WEST STREESTBORO RD. RICHFIELD, OH 44286
P. 330.659.6688
HAZARDOUS MATERIALS ABATEMENT:
STEPHEN J. SEBESTA & ASSOCIATES, INC.
30628 DETROIT RD., NO. 258 WESTLAKE, OH 44145
P. 216.781.0060
DD SUBMISSION 12.1.17
3/16" = 1'-0"
IMPROVEMENT PLAN
THIRD FLOOR - PHASE I
3/16" = 1'-0"
IMPROVEMENT PLAN
THIRD FLOOR - PHASE II
CONSTRUCTION NOTES:
SOLID GRAY AREA INDICATES NEW 1" +/- SELF-LEVELING LIGHTWEIGHT
CONCRETE FLOOR TOPPING TO BE PROVIDED ON TOP OF EXISTING
ROOF AREA TO BRING THE AREA FLUSH WITH THE EXISTING 3RD FLOOR
FINISHED ELEVATION. VERIFY FINAL CONCRETE TOPPING THICKNESS IN
FIELD WITH EXISTING FLOOR ELEVATION. FLOOR TOPPING SHALL BE IN
COMPLIANCE WITH FINISHING FLOORING MANUFACTURER'S
REQUIREMENTS FOR MAXIMIUM MOISTURE LEVEL AND pH
REQUIREMENTS. FLOOR TOPPING SHALL MEET OR EXCEED A MINIMUM
OF 3,000 PSI UPON FINAL CURING.
EXISTING MECHANICAL PENTHOUSE STRUCTURAL COLUMN TO RECEIVE NEW 2-HR RATED
FIREPROOF SPRAY ASSEMBLY PER UL DES X772. PREP EXISTING STEEL SURFACE AS REQ'D.
TO RECEIVE FIREPROOF SPRAY
DASHED LINES INDICATE NEW STEEL BEAMS TO ATTACH TO EXISTING COLUMNS. BEAMS
SHALL RECEIVE 2-HR RATED FIREPROOF SPRAY ASSEMBLY PER UL DES X772. REFER TO
STRUCTURAL DRAWINGS FOR SCOPE OF EXISTING, FABRICATED STEEL TO BE INSTALLED AS
A PART OF THIS PROJECT AND FOR EXISTING STEEL SURFACE PREPARATION
REQUIREMENTS NECESSARY TO RECEIVE FIREPROOF SPRAY
EXISTING PELLA ARCHITECT SERIES WINDOW TO BE INSTALLED IN NEW EXTERIOR WALL.
NOTE: EXISTING WINDOWS ARE CURRENTLY STORED AT THE VA BRECKSVILLE CAMPUS. GC
SHALL PICK UP AND DELIVER WINDOWS TO THE JOB SITE. REFER TO ELEVATIONS FOR
GLASS REPAIR REQUIREMENT IN ONE WINDOW UNIT. VERIFY ALL ROUGH OPENING SIZES
WITH EXISTING WINDOWS PRIOR TO EXTERIOR WALL FRAMING
QUARTZ COUNTERTOP ATOP LOW WALL ASSEMBLY OR MILLWORK CABINET WITH
RECESSED TV BELOW - SEE INT. ELEVATIONS & MILLWORK DETAILS
WALL-MOUNTED FLAT PANEL TV, FURNISHED AND INSTALLED BY OWNER. GC SHALL
PROVIDE FRTW PLYWD. BLOCKING IN STUD WALL AND POWER/DATA/CABLE. SEE INT.
ELEVATIONS FOR MOUNTING HEIGHT
QUARTZ COUNTERTOP @ 2'-10" AFF WITH BASE CABINETS BELOW AND WALL CABINETS
ABOVE. SEE INT. ELEVATION
BASE BID: NEW NOURISHMENT STATION: QUARTZ COUNTERTOP @ 2'-10" AFF WITH BASE
CABINETS BELOW AND WALL CABINETS ABOVE. SEE INT. ELEVATION FOR ADDITIONAL
EQUIPMENT INFORMATION AND DETAILS.
DEDUCT ALTERNATE #2: NOURISHMENT STATION TO BE REMOVED FROM SCOPE.
BASE BID: EXISTING ADJACENT CORRIDOR FLOOR, WALL, AND BASE FINISHES SHALL BE
EXTENDED INTO NEW ALCOVE. SEE FINISH PLAN AND SCHEDULE
DEDUCT ALTERNATE #2: ALCOVE CONSTRUCTION WORK TO BE REMOVED FROM SCOPE.
CONTINUOUS QUARTZ SILL ASSEMBLY ATOP EXISTING STONE COPING - SEE SECTION
& DETAILS
" TEMP. SAFETY GLASS STAINED WOOD WINDOW ASSEMBLY WITH STAINED WOOD
PERIMETER TRIM ON BOTH SIDES - SEE INT. ELEVATIONS & DETAILS
FULL HT. REFRIGERATOR TO BE FURNISHED & INSTALLED BY VA. GC TO INSTALL POWER &
PLUMBING, SEE MEP DWGS.
COUNTERTOP-SEATED WATER/ICE MACHINE TO BE FURNISHED & INSTALLED BY VA. GC TO
INSTALL POWER & PLUMBING, SEE MEP DWGS.
15 HI-LO QUARTZ COUNTER STAFF WORKSTATION. SEE INTERIOR ELEVATIONS AND DETAILS
UNDERCOUNTER-MOUNT STAINLESS STEEL DOUBLE BOWL SINK, SEE MECH. DWGS. VERIFY
COUNTERTOP CUTOUT SIZE WITH SINK MANUF. PRIOR TO CUTTING OPENING
COUNTERTOP-SEATED COFFEE MACHINE TO BE FURNISHED & INSTALLED BY VA. GC TO
INSTALL POWER & PLUMBING, SEE MEP DWGS.
MICROWAVE AND TOASTER OVEN (ABOVE) TO BE FURNISHED & INSTALLED BY VA. GC TO
INSTALL POWER, SEE ELEC. DWGS.
SYSTEMS FURNITURE TO BE FURNISHED & INSTALLED BY VA. GC TO INSTALL POWER/DATA,
SEE ELEC. DWGS.
20 ADA PUSH PAD LOCATION FOR ENTRY DOOR, SEE ELEC. DWGS.
NOT USED.
QUARTZ COUNTERTOP ATOP RESIDENTIAL-STYLE MILLWORK BASE CABINETS - SEE INT.
ELEVATIONS & MILLWORK DETAILS
5. WHERE NEW UTILITIES ARE INSTALLED IN EXISTING PARTITIONS, ALL SUB-CONTRACTORS
SHALL REMOVE EXISTING DRYWALL AS REQUIRED FOR INSTALLATION OF SAME, AND PATCH
AND REPAIR WITH NEW TO MATCH EXISTING CONDITIONS.
GENERAL NOTES:
EXISTING WALLS TO REMAIN
INDICATES NEW DOOR
INDICATES EXISTING DOORS
NEW WALLS
1. CONSIDER ALL AREAS OWNER-OCCUPIED, UNLESS OTHERWISE NOTED.
2. ALL WALLS ARE DRAWN AND DIMENSIONED TO A 5" NOMINAL WIDTH TYPICAL UNLESS
OTHERWISE NOTED. ALL DIMENSIONS ARE CLEAR DIMENSIONS FROM FACE OF GYPSUM
BOARD TO FACE OF GYPSUM BOARD
3. ALL SUB-CONTRACTORS (I.E. FIRE PROTECTION, HVAC FIRE ALARM, ELECTRICAL, ETC.) TO
DESIGN AND INSTALL SYSTEM PER OWNER REQUIREMENTS AND IN STRICT ACCORDANCE
WITH THE REQUIREMENTS OF ALL APPLICABLE CODES.
4. PATCH AND REPAIR ALL EXISTING AREAS TO REMAIN AS REQUIRED TO MATCH EXISTING
CONDITIONS.
6. ALL DAMAGE TO EXISTING AREAS OCCURING AS A RESULT OF CONSTRUCTION SHALL BE
REPAIRED AS REQUIRED BY TRADE CAUSING IT. CONTRACTOR SHALL PROTECT ALL
EXISTING WALL, CEILING, AND FLOOR FINISHES IN EACH AREA. ANY SURFACES DAMAGED
BY CONTRACTOR SHALL BE REPLACED BY THE CONTRACTOR AT NO ADDITIONAL COST TO
OWNER.
7. ALL NEW PENETRATIONS IN FIRE RATED ASSEMBLIES TO MAINTAIN FIRE RATING OF
ASSEMBLY AS REQUIRED.
15. ALL FLOOR, WALL, CEILING, AND MISC. FIRE RESISTIVE ASSEMBLIES AND CONSTRUCTION
SHALL BE OF THE FIRE RATING CALLED FOR ON THE DRAWINGS AND / OR AS REQUIRED BY
CODE. ALL EXISTING FIRE RESISTIVE ASSEMBLIES SHALL BE MAINTAINED AND THE RATING
NOT COMPROMISED. FIRE RATED ASSEMBLIES AND CONSTRUCTION INCLUDING ALL FIRE
STOPPING, FIRE RATED DOORS AND MISC. FIRE RESISTIVE REQUIREMENTS SHALL BE LEFT
UNCONCEALED AS REQUIRED FOR INSPECTION BY THE BUILDING OFFICIAL.
8. FURNITURE SHOWN FOR REFERENCE ONLY, BY OWNER. THE OWNER SHALL REMOVED,
PRIOR TO CONSTRUCTION, ALL ITEMS THAT THE OWNER DESIRES TO SALVAGE. ALL
REMAINING ITEMS INDICATED TO BE DEMOLISHED SHALL BE REMOVED BY THE
CONTRACTOR AND LEGALLY DISPOSED OF IN ACCORDANCE WITH THE PROJECT
SPECIFICATIONS. ALL ITEMS TO REMAIN IN SPACE SHALL BE PROTECTED BY THE
CONTRACTOR THROUGHOUT CONSTRUCTION.
WALLS TO BE REMOVED FULL HEIGHT U.N.O.
DASHED LINES INDICATE ITEMS TO BE DEMOLISHED
9. CONTRACTOR SHALL PROVIDE DUST REMOVING WALK-OFF MATS (TACKY MAT) AT
ALL CONSTRUCTION ENTRY POINTS
10. CONTRACTOR SHALL PROVIDE HEPA FILTERED NEGATIVE AIR MACHINE(S) TO MAINTAIN
NEGATIVE PRESSURE IN WORK AREA ENSURING NO DUST OR FUMES WILL BE
TRANSFERRED TO OCCUPIED AREAS. PROVIDE VISUAL PRESSURE MONITORING DEVICE AT
DUST PROOF BARRICADE TO CONFIRM PRESSURE. DUST MONITORING SHALL BE BY
OWNER. SEE SPECIFICATION 01 00 00 "GENERAL REQUIREMENTS" ATTACHMENT AND 01 35
26 "SAFETY REQUIREMENTS" FOR ADDITIONAL REQUIREMENTS.
11. ALL DEMOLITION WORK BEING DONE OUTSIDE TEMPORARY PARTITIONS IS TO BE
APPROPRIATELY SEALED OFF TO PREVENT THE TRANSMISSION OF DUST AND DEBRIS.
WORK SHALL BE DONE TO MINIMIZE DISRUPTION TO VISITORS, PATIENTS, AND STAFF.
COORDINATE LOCATION OF BARRIERS WITH OWNER.
12. THE HOSPITAL'S SMOKE AND FIRE SUPPRESSION SYSTEM SHALL REMAIN IN OPERATION
WITHIN THE PROJECT AREA DURING THE ENTIRE CONSTRUCTION PHASE.
13. FIELD VERIFY LOCATION OF ALL EXISTING CONDITIONS. NOTIFY COR OF ANY
DISCREPANCIES.
14. WHERE NEW DOORS ARE INDICATED IN EXISTING WALL ASSEMBLIES, CUT OPENINGS IN
EXISTING WALL. REFER TO DOOR SCHEDULE FOR DIMENSIONS. PREPARE OPENINGS FOR
NEW DOOR, INCLUSIVE OF THE ADDITION OF JAMB AND HEAD STUD REINFORCEMENT (I.E.
DOUBLE STUDS, HEADERS) AND PATCH ADJACENT WALLS TO MATCH EXISTING.
16. DEBRIS REMOVAL SHALL NOT INTERFERE WITH OWNER'S OPERATIONS AND SHALL OCCUR
DURING OFF HOURS AS DETERMINED BY THE COR. SEE ALSO SPECIFICATION SECTION 01
35 26 "SAFETY REQUIREMENTS" FOR ADDITIONAL REQUIREMENTS REGARDING THE HAULING
OF DEBRIS FROM THE PROJECT AREA.
17. ALL NOISE-GENERATING OPERATIONS SHALL BE SCHEDULED SO AS NOT TO IMPEDE
OWNER'S OPERATIONS AS DETERMINED BY THE COR. ALL WORK IN PUBLIC CORRIDORS
SHALL BE PERFORMED "OFF HOURS" UNLESS OTHERWISE APPROVED BY THE COR.
SYMBOL LEGEND:
18. EXISTING FLOOR SLABS ARE 2 HR FIRE RATED. FOR ALL NEW CORE DRILLS/UTILITY
PENETRATIONS, GC SHALL UTILIZE GROUND PENETRATING RADAR TO X-RAY EXISTING
FLOOR SLAB AT PROPOSED, NEW PENETRATION LOCATION TO ENSURE THAT FLOOR SLAB
REBAR STRUCTURE WILL NOT BE COMPROMISED, AND SHALL NOTIFY COR AND A/E TEAM OF
ANY ISSUES DISCOVERED IN FIELD. GC SHALL PROVIDE NEW 2 HR RATED THRU-SLAB
FIRESTOP ASSEMBLIES AT ALL PENETRATIONS. FOR EXISTING THRU-SLAB UTILITIES THAT
ARE REMOVED AS A PART OF DEMOLITION SCOPE, GC SHALL PATCH CONC. SLAB FULLY
WITH NEW CONCRETE TO MATCH EXISTING.
HATCHED AREA OUTSIDE OF PROJECT SCOPE.
ACCESS INTO CEILING SPACES MAY OCCUR, REFER
TO MEP DWGS.
TEMPORARY PARTITION WALL W/3'-0" X 7'-0" SCWD
DOOR FOR CONTRACTOR ACCESS ONLY. WALL AND
DOOR TO BE REMOVED UPON COMPLETION OF WORK
U.N.O. PATCH REPAIR EXISTING CONDITIONS AS
REQUIRED UPON REMOVAL OF ALL TEMPORARY
CONSTRUCTION. REFER TO TYPICAL TEMPORARY
PARTITION DETAIL ON SHEET 1-AS-7.0. SCHEDULE
NOTE: CONSTRUCTION OF TEMPORARY BARRIERS
SHALL BE PERFORMED AFTER NORMAL BUSINESS
HOURS UNLESS OTHERWISE APPROVED BY THE COR.
PHASING DURATION:
PHASING DURATION DURING THE CONSTRUCTION PERIOD
SHOULD BE AS FOLLOWS:
PRECONSTRUCTION - 30 DAYS
PHASE I - 90 DAYS
ACTIVATION OF PHASE I - 30 DAYS
PHASE II - 90 DAYS
TOTAL PROJECT TIMEFRAME - 240 DAYS
TEMPORARY ZIP WALL PROTECTION TO BE PROVIDED
AROUND CONSTRUCTION AREA PER VA SAFETY
STANDARDS
AS-5.1
A
A
AS-5.0
B
AS-5.0
A S
B
H
AS-6.0
3B-
3B-
122A
3B-
121A
3B-
111B
3B-
3B-
3B-
105A
F
AS-6.0
G
AS-6.0
J
AS-6.0
K
AS-6.0
SOLID GRAY
AREA
F L U
S H
F L U
S H
F L U
S H
F L U
S H
2 23
2 2
LINE OF EXISTING
STONE COPING TO
REMAIN - SEE SECTION
E X
I S
T I N
G
M E
C H
A N
I C
A L
P E
N T
H O
U S
E
E X
I S
T I N
G
M E
C H
A N
I C
A L
P E
N T
H O
U S
E
1-AS-6.1
M
N
O
L
ALIGN WALLS
FLUSH
ALIGN
WALLS
FLUSH
1-AS-5.2
1-AS-5.2
1B
1A
1A
1A
1A
1A
1A
1A
3B-
100F
1C
1C
3B-111A
LIVING ROOM
RESIDENT
3B-111
DINING ROOM
RESIDENT
3B-111B
ROOM
STORAGE
3B-110
LOUNGE
FAMILY
3B-105A
STORAGE
TCU MED.
3B-100F
CORRIDOR
EXISTING
3B-127
WORK AREA
DICTATION
TCU
3B-121A
RESTROOM
STAFF
3B-121
OFFICE
NURSE MGR.
3B-122
OFFICE
DICTATION
STAFF
3B-122B
DINING ROOM
TCU PATIENT
3B-122A
LIVING ROOM
TCU PATIENT
3B-115
ALCOVE
OPEN
1-AS-5.2
1-AS-5.2
E
AS-6.0
3B-
PHASE II
PHASE II
1A
1A
1A
1B
ALIGN WALLS FLUSH
1A
PHASE I
PHASE I
PHASE I
ALIGN
WALLS
FLUSH
ALIGN
WALLS
FLUSH
1A
NOTE: TEMPORARY
CONTRACTOR DOOR SHALL BE
PROVIDED IN THIS OPENING
UNTIL FINAL, FINISHED DOOR
IS INSTALLED
SET FACE OF DESK
STUD WALL 1" BACK
FROM FACE OF PIER
1-AS-6.0
B
A
THREE (3) AREAS OF CONSTRUCTION WITHIN
THESE BOUNDARIES SHALL BE INCLUDED IN
PHASE I BASE BID. DEDUCT ALTERNATE #2
SHALL FULLY REMOVE CONSTRUCTION
SCOPE FROM PROJECT
PHASE I SCOPE OF WORK:
3B-100N
STATION
NOURISHMENT
ALIGN
WALLS
FLUSH
ALIGN WALLS
FLUSH
716 1817
3B-100C
CORRIDOR
EXISTING
3B-100C
CORRIDOR
EXISTING
3B-100D
CORRIDOR
EXISTING
3B-100E
CORRIDOR
EXISTING
3B-123
3B-123A
3B001
3B118A
3B120A
3B120
3B118
3B100E
3B116
3B100O
3B116A
3B114
3B112
3B124
3B109
3B108A
3B108
PATIENT BEDROOM
PATIENT
BEDROOM
PATIENT
BEDROOM
PATIENT
BEDROOM
PATIENT
BEDROOM
EXISTING
CORRIDOR
ELEC.
ELEC./COMM.
LINEN ROOM
PATIENT
BEDROOM
3B124A
3B124
3B126A
3B114
3B112
3B109
3B108A
3B116A
3B100O
3B123A
3B129
3B147
3B156A
3B158A
PATIENT BEDROOM
ELEC.
ELEC./COMM.
ANTEROOM
ELEC.
1C
1C
1C
1-AS-6.0
C D
P
AS-6.1
65% CD'S SUBMISSION 2.9.18
1-AS-5.2
1-AS-5.2
8 9 10 11A 12
V
T
1A/1B
1-AS-6.1
1A/1B
1-AS-6.1
3B115
3B100N
3B100F 3B105A
8 9 10 12
11A
L
K
J
Q
100% CD'S SUBMISSION 4.4.18
F
1-AS-7.0
S
S
S
S
14'-0" 3'-5" +/-15'-6 1/2" 4'-6 1/4"3'-3"
EQ. EQ.
EQ. EQ.
EQ. EQ.
EQ. EQ.
EQ.
EQ.
E Q
E
Q
EQ. EQ.
E Q
E
Q
EQ. EQ.
9'-9"
1'-0"
5"
EQ. EQ.
SD
OIT Telecom/ Data Closet
L1
S
S
EQ. EQ.
E Q
E
Q
2'-0"
19'-7 1/2"
2'-0"
13'-0" +/-
EQ. EQ.
E
Q
E Q
8'-0"
1'-3" 2'-3" 2'-3"
4.4.18 CJK DAK
1-AS-3.3
THIRD FLOOR REF. CEILING
PLANS - PHASES I & II
Revisions: Date
Drawing Title
Approved: Project Director
Project Title
Date
Location
Checked
Building Number
Project Number
Drawing Number
Drawn
CONSULTANTS: ARCHITECT:
Office of
Construction and Facilities
Management
N
N
S
T
R
U
C
T
I
O
N
VETERANS AFFAIRS MEDICAL CENTER
PALLIATIVE CARE - TCU EXPANSION
THIRD FLOOR
10701 EAST BLVD. CLEVELAND, OHIO
541-18-503
MECHANICAL/ELECTRICAL/PLUMBING ENGINEERING:
SCHEESER BUCKLEY MAYFIELD, LLC
1540 CORPORATE WOODS PKWY. UNIONTOWN, OH 44685
P. 330.526.2700
COST ESTIMATING:
MCGUINESS UNLIMITED, INC.
15724 STILLWOOD AVE. CLEVELAND, OH 44111
P. 440.667.5120
FULLY SPRINKLERED
STRUCTURAL ENGINEERING:
THORSON BAKER + ASSOCIATES
3030 WEST STREESTBORO RD. RICHFIELD, OH 44286
P. 330.659.6688
HAZARDOUS MATERIALS ABATEMENT:
STEPHEN J. SEBESTA & ASSOCIATES, INC.
30628 DETROIT RD., NO. 258 WESTLAKE, OH 44145
P. 216.781.0060
DD SUBMISSION 12.1.17
3/16" = 1'-0"
REFLECTED CEILING PLAN
THIRD FLOOR - PHASE I
3/16" = 1'-0"
REFLECTED CEILING PLAN
THIRD FLOOR - PHASE II
5. WHERE NEW UTILITIES ARE INSTALLED IN EXISTING PARTITIONS, ALL SUB-CONTRACTORS
SHALL REMOVE EXISTING DRYWALL AS REQUIRED FOR INSTALLATION OF SAME, AND PATCH
AND REPAIR WITH NEW TO MATCH EXISTING CONDITIONS.
GENERAL NOTES:
EXISTING WALLS TO REMAIN
INDICATES NEW DOOR
INDICATES EXISTING DOORS
NEW WALLS
1. CONSIDER ALL AREAS OWNER-OCCUPIED, UNLESS OTHERWISE NOTED.
2. ALL WALLS ARE DRAWN AND DIMENSIONED TO A 5" NOMINAL WIDTH TYPICAL UNLESS
OTHERWISE NOTED. ALL DIMENSIONS ARE CLEAR DIMENSIONS FROM FACE OF GYPSUM
BOARD TO FACE OF GYPSUM BOARD
3. ALL SUB-CONTRACTORS (I.E. FIRE PROTECTION, HVAC FIRE ALARM, ELECTRICAL, ETC.) TO
DESIGN AND INSTALL SYSTEM PER OWNER REQUIREMENTS AND IN STRICT ACCORDANCE
WITH THE REQUIREMENTS OF ALL APPLICABLE CODES.
4. PATCH AND REPAIR ALL EXISTING AREAS TO REMAIN AS REQUIRED TO MATCH EXISTING
CONDITIONS.
6. ALL DAMAGE TO EXISTING AREAS OCCURING AS A RESULT OF CONSTRUCTION SHALL BE
REPAIRED AS REQUIRED BY TRADE CAUSING IT. CONTRACTOR SHALL PROTECT ALL
EXISTING WALL, CEILING, AND FLOOR FINISHES IN EACH AREA. ANY SURFACES DAMAGED
BY CONTRACTOR SHALL BE REPLACED BY THE CONTRACTOR AT NO ADDITIONAL COST TO
OWNER.
7. ALL NEW PENETRATIONS IN FIRE RATED ASSEMBLIES TO MAINTAIN FIRE RATING OF
ASSEMBLY AS REQUIRED.
15. ALL FLOOR, WALL, CEILING, AND MISC. FIRE RESISTIVE ASSEMBLIES AND CONSTRUCTION
SHALL BE OF THE FIRE RATING CALLED FOR ON THE DRAWINGS AND / OR AS REQUIRED BY
CODE. ALL EXISTING FIRE RESISTIVE ASSEMBLIES SHALL BE MAINTAINED AND THE RATING
NOT COMPROMISED. FIRE RATED ASSEMBLIES AND CONSTRUCTION INCLUDING ALL FIRE
STOPPING, FIRE RATED DOORS AND MISC. FIRE RESISTIVE REQUIREMENTS SHALL BE LEFT
UNCONCEALED AS REQUIRED FOR INSPECTION BY THE BUILDING OFFICIAL.
8. FURNITURE SHOWN FOR REFERENCE ONLY, BY OWNER. THE OWNER SHALL REMOVED,
PRIOR TO CONSTRUCTION, ALL ITEMS THAT THE OWNER DESIRES TO SALVAGE. ALL
REMAINING ITEMS INDICATED TO BE DEMOLISHED SHALL BE REMOVED BY THE
CONTRACTOR AND LEGALLY DISPOSED OF IN ACCORDANCE WITH THE PROJECT
SPECIFICATIONS. ALL ITEMS TO REMAIN IN SPACE SHALL BE PROTECTED BY THE
CONTRACTOR THROUGHOUT CONSTRUCTION.
WALLS TO BE REMOVED FULL HEIGHT U.N.O.
DASHED LINES INDICATE ITEMS TO BE DEMOLISHED
9. CONTRACTOR SHALL PROVIDE DUST REMOVING WALK-OFF MATS (TACKY MAT) AT
ALL CONSTRUCTION ENTRY POINTS
10. CONTRACTOR SHALL PROVIDE HEPA FILTERED NEGATIVE AIR MACHINE(S) TO MAINTAIN
NEGATIVE PRESSURE IN WORK AREA ENSURING NO DUST OR FUMES WILL BE
TRANSFERRED TO OCCUPIED AREAS. PROVIDE VISUAL PRESSURE MONITORING DEVICE AT
DUST PROOF BARRICADE TO CONFIRM PRESSURE. DUST MONITORING SHALL BE BY
OWNER. SEE SPECIFICATION 01 00 00 "GENERAL REQUIREMENTS" ATTACHMENT AND 01 35
26 "SAFETY REQUIREMENTS" FOR ADDITIONAL REQUIREMENTS.
11. ALL DEMOLITION WORK BEING DONE OUTSIDE TEMPORARY PARTITIONS IS TO BE
APPROPRIATELY SEALED OFF TO PREVENT THE TRANSMISSION OF DUST AND DEBRIS.
WORK SHALL BE DONE TO MINIMIZE DISRUPTION TO VISITORS, PATIENTS, AND STAFF.
COORDINATE LOCATION OF BARRIERS WITH OWNER.
12. THE HOSPITAL'S SMOKE AND FIRE SUPPRESSION SYSTEM SHALL REMAIN IN OPERATION
WITHIN THE PROJECT AREA DURING THE ENTIRE CONSTRUCTION PHASE.
13. FIELD VERIFY LOCATION OF ALL EXISTING CONDITIONS. NOTIFY COR OF ANY
DISCREPANCIES.
14. WHERE NEW DOORS ARE INDICATED IN EXISTING WALL ASSEMBLIES, CUT OPENINGS IN
EXISTING WALL. REFER TO DOOR SCHEDULE FOR DIMENSIONS. PREPARE OPENINGS FOR
NEW DOOR, INCLUSIVE OF THE ADDITION OF JAMB AND HEAD…