This document is a contract amendment to Solicitation 36C24W25R0010 for IT Server Racks. The amendment provides answers to 7 vendor questions related to the installation of the server racks at the Tulsa VA Medical Center. Key details include:
The contractor will be required to supply and install server racks, cable management, and patch panels in accordance with the statement of work. Drawings for the exact rack locations and configurations will be coordinated with the contractor prior to installation. No temporary storage will be provided on-site, so the contractor must coordinate delivery with room availability. There is no software or server installation required as part of this effort. Access to a loading dock is possible but still under construction. The contractor will need to coordinate dumpster/trash removal through the construction contractor, Crossland Construction.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| S06 36C24W25R0010 0001 Amendment IT Server Racks.pdf | ||
| 36C24W25R0010 0001 Amendment IT Server Racks.pdf | ||
| Past Performance Survey.pdf | ||
| Past Performance Survey.pdf | ||
| S02 36C24W25R0010_1.pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
36C24W25R0010_ 1 0002 - IT SERVER RACKS
5. PROJECT NUMBER (if applicable)
CODE 7. ADMINISTERED BY
2. AMENDMENT/MODIFICATION NUMBER
CODE
6. ISSUED BY
8. NAME AND ADDRESS OF CONTRACTOR
4. REQUISITION/PURCHASE REQ. NUMBER 3. EFFECTIVE DATE
9A. AMENDMENT OF SOLICITATION NUMBER
9B. DATED
PAGE OF PAGES
10A. MODIFICATION OF CONTRACT/ORDER NUMBER
10B. DATED
BPA NO. 1. CONTRACT ID CODE
FACILITY CODE CODE
Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods:
The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers
E. IMPORTANT:
is extended,
(a) By completing Items 8 and 15, and returning __________ copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted; or (c) By separate letter or electronic communication which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY is not extended.
12. ACCOUNTING AND APPROPRIATION DATA
(REV. 11/2016)
is required to sign this document and return ___________ copies to the issuing office. is not, A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT ORDER NO. IN ITEM 10A.
15C. DATE SIGNED
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).
RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by letter or electronic communication, provided each letter or electronic communication makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER
Contractor
16C. DATE SIGNED
14. DESCRIPTION OF AMENDMENT/MODIFICATION
16B. UNITED STATES OF AMERICA
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15A. NAME AND TITLE OF SIGNER 16A. NAME AND TITLE OF CONTRACTING OFFICER
15B. CONTRACTOR/OFFEROR
STANDARD FORM 30 PREVIOUS EDITION NOT USABLE
Prescribed by GSA - FAR (48 CFR) 53.243
(Type or print) (Type or print)
(Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
(Number, street, county, State and ZIP Code)
(If other than Item 6)
(Specify type of modification and authority)
(such as changes in paying office, appropriation date, etc.)
(If required)
(SEE ITEM 11)
(SEE ITEM 13)
(X)
CHECK
ONE
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS,
IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
(Signature of person authorized to sign) (Signature of Contracting Officer)
36C24W
1 3
None
36C24W
Regional Procurement Office West (RPOW)
3237 Peacekeeper Way Building 200 Suite 204 McClellan Park CA 95652
36C24W
Regional Procurement Office West (RPOW) 3237 Peacekeeper Way Building 200 Suite 204
McClellan Park CA 95652
To all Offerors/Bidders
36C24W25R0010
10-09-2024
X
X
See CONTINUATION Page
X 1
The purpose of this amendment is to answer vendor questions. See page 3.
The purpose of this amendment 0002 is to answer vendor questions as follows:
Question 1: Will drawings be provided identifying the exact locations for the racks to be installed or will this need to be coordinated for each room prior to installation?
Answer 1: This will be coordinated for each room prior to installation.
Question 2: Will drawings be provided identifying each racks accessory configuration or will this need to be coordinated for each rack during installation?
Answer 2: This will be coordinated for each rack prior to installation.
Question 3: Will temporary storage space be provided inside the building for storing the racks and accessories, or will the contractor be required to provide temporary dry and secure storage on the construction site to store uninstalled racks and accessories? If temporary exterior storage is required to be provided, will there be space on site for up to two 40ft storage containers?
Answer 3: Storage will not be provided. Racks are required to be delivered and installed as rooms become available.
Question 4: Is software required to be installed as part of this effort?
Answer 4: No
Question 5: Are servers required to be installed and tested as part of this effort?
Answer 5: No
Question 6: Is a loading dock available to unload shipments from delivery trucks?
Answer 6: Possibly, but it’s still under construction and subject to approval & coordination from VHIT/Crossland Construction through the COR.
Question 7: Will there be dumpsters on site to dispose of boxes and packaging material or will the contractor be responsible for coordinating dumpster rentals delivery and removal?
Answer 7: The VA will not have any dumpsters or trash removal services on site during installation. You may either coordinate use of dumpsters that the construction contractor, Crossland Construction, has on site or coordinate the placement of a dumpster that you coordinate and pay for. Either way you’ll need Crossland Construction’s concurrence obtained through the COR at initial kick-off meetings.