Vendor Questions Sitewalk -MHOP Bubble Wall rev2.pdf
PDF 105 KB Posted
- Attached to
- Tropical Bubble Wall
- Solicitation number
- 36C24W24Q0233
About this file
This document contains questions and answers from a site visit with a prospective vendor for the Tropical Bubble Wall federal contract opportunity. The key details are:
The contract is for a custom-designed, self-sustained water panel bubble wall system for the VA Long Beach Healthcare System's new Mental Health Outpatient Lobby. The solicitation number is 36C24W24Q0233. Questions covered topics such as water drainage, the stainless-steel kickboard, the wall finish, lettering, and panel heights. Responses indicated the water would be distilled with minimal drainage, the kickboard would remain, the finish is black acrylic trim, lettering details would be determined after contract award, and the panel heights are staggered per the elevation drawing. The electrical system will require a dedicated circuit, and the vendor requested a remote-controlled on/off switch. Any further questions should be directed to the contracting specialist.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
MHOP BUBBLE WALL – SITE VISIT WITH PERSPECTIVE VENDOR
DATE: 9/10/2024
QUESTIONS
Vendor/Rep/Attendee:
Kieran Jackson
Crew Industrial LLC
9000 W. Sunset Blvd, Ste. 1100
West Hollywood, CA 90069
Question 1:
How will the water drain from the bubble wall?
Answer 1:
Water drainage from the wall will be determined by the manufacturer. It will be distilled water.
(Water drainage will be from the unit to the outside using a standard hose. There should not be any/much drainage. No interior floor drains on site).
Question 2:
There is a stainless-steel kickboard (cove base, bottom of wall). Is It needed after installation?
Answer 2:
The base board at the bottom of the wall will remain in place and should not need to be disturbed as this item will not be attached to the wall or up against the wall.
Question 3:
The specs state that there’s a black steel finish. Can this be confirmed?
Answer 3:
- No black steel finish. There’s a black acrylic trim.
- The circles inside of the image is structural. It is to create the bubble pattern.
Question 4:
Will the lettering be scaled?
Answer 4:
Once the contract is awarded, the Activations team with have a kickoff meeting to detail the lettering feature that appears on this bubble feature with the awardee.
Question 5:
There are different heights for each wall section/panel. Where should they be placed…9’ to the Left and 10’ to the Right?
Answer 5:
The Left is the tallest structure. An elevation drawing is in the contract and shows where each panel goes.
Panels do not go side-by-side, they are staggered.
Other:
Marc Cruz: The electricity will require a dedicated circuit.
Vendor: On/Off switch should be remote controlled.
Vickie Orloff: If there are any further questions, our contracting specialist, Mika Gant should be contacted.