Special Notice Special Notice

SUBJECT*
Portfolio Management and Patent Legal Services

GENERAL INFORMATION

CONTRACTING OFFICE’S ZIP CODE*
15212-5319
SOLICITATION NUMBER*
36C24E21R0024
ARCHIVE
30 DAYS AFTER THE RESPONSE DATE
RECOVERY ACT FUNDS
N
PRODUCT SERVICE CODE*
R498
NAICS CODE*
541199
CONTRACTING OFFICE ADDRESS
US Department of Veterans Affairs

Veterans Health Administration Regional Procurement Office (RPO) East 323 North Shore Drive, Suite 500 Pittsburgh PA 15212-5319

POINT OF CONTACT*

Mr. Robin A. Simmons, Contract Specialist robin.simmons@va.gov robin.simmons@va.gov

(412) 822-3483

ADDITIONAL INFORMATION

AGENCY’S URL

URL DESCRIPTION

AGENCY CONTACT’S EMAIL ADDRESS

EMAIL DESCRIPTION

DESCRIPTION

1. OVERVIEW

The Veterans Health Administration (VHA), Office of Research and Development (R&D), Regional Procurement Office (RPO) – East in Pittsburgh, PA intends to negotiate on a sole source basis with Ballard Spahr, LLP.

The requirement is for Ballard Spahr, LLP to provide the VA Technology Transfer Program (TTP), within the Office of Research and Development (ORD), with portfolio management and patent legal services. This action would be awarded as a follow-on contract. The result would be the Department of Veterans Affairs entering into a firm fixed price IDIQ contract with Ballard & Spahr LLP, an international law firm based in Atlanta, Georgia.

The requirement is for one (1) contractor to provide patent legal services including but not limited to patent drafting, filing, prosecution, docketing, and maintenance for 5 years (base period with 4 option periods). The law firm must possess the capabilities to handle the sheer volume of the VA’s patent portfolio. VA’s patent portfolio is unusually large and complex because it originates from research and development performed at over 100 VA Medical Centers (ORD), each one a Federal Laboratory with its own goals and interests. The current Contractor (Ballard Spahr, LLP) is responsible for 977 different patent matters, of which 635 are actively managed. This includes a mix of US (662), Patent Cooperation Treaty (PCT) (119), and foreign cases (196), the latter of which require careful coordination with foreign counsel.

This procurement is being conducted IAW FAR 6.302-1, Only one responsible source and no other services will satisfy agency requirements. This is because the Government asserts that awarding a follow-on contract to Ballard Spahr is critical to ensure the VA maintains continuity, thereby preventing a substantial duplication of cost and unacceptable delays to VA’s technology transfer efforts.

SCOPE OF WORK: VA requires that the contract awardee have the legal capability, training, and resources necessary to prosecute domestic, international, foreign regional and foreign national patent applications. The work under this contract will require patent preparation and patent prosecution in specific scientific and technical areas of interest to VA. Therefore, contractors must have scientific education or training in the scientific areas in which the contractor will be performing legal services for VA. Specifically, the contractor must have an attorney expert with Partner level experience to lead technical teams of PhD level scientific technical experts, junior attorneys and/or patent agents in, at least, the technical areas including, mechanical devices, computer software, computer engineering and electronics, medical devices, biological compounds/processes, chemical compounds/processes and medicinal chemistry, pharmaceuticals, and pharmacology.

Refer to Section 2, Contractor Requirements and Tasks. Interested contractors must be able to meet all Requirements and Tasks. It is the responsibility of the interested contractor to adequately demonstrate to the Government within their capability statement that they can perform all Requirements and Tasks.

This notice of intent is not a request for competitive proposals. However, any responsible source who believes it is capable of meeting the requirement may submit a capability statement and supporting documentation to the Contract Specialist no later than Friday, July 23, 2021, 4:00 PM, EST. Interest/capability statements may be sent by email to Mr. Robin Simmons at robin.simmons@va.gov. No telephone responses will be accepted. A determination not to compete the proposed requirement based upon the responses to this notice is solely within the discretion of the Government.

2. CONTRACTOR REQUIREMENTS AND TASKS

Potential contracting firms responding to this Solicitation must demonstrate a thorough understanding and have significant experience in the practice of U.S. patent law. All firm attorneys or agents assigned to handle matters under this contract must be in good standing to practice before the United States Patent and Trademark Office (USPTO) and, if a firm practitioner is an attorney, be an active member in good standing with his or her respective state bar licensing organization. Contracting firms will be responsible for identifying competent attorneys in foreign jurisdictions for foreign national and foreign regional patent filings. Contractors shall be responsible for directing foreign associates subject to VA guidance and approval. The Contractor shall file, or ensure foreign associates file, patent applications which include all parts necessary to meet statutory requirements for obtaining a priority date as of the date of filing, or an earlier date, if earlier filed applications are claimed as priority documents. The following list of tasks is provided as a minimum, non-exhaustive, description of the kinds of US, international and foreign patent prosecution tasks that will be required of Contractors. The Contractor in submitting its capability statement must ensure it clearly communicates its ability to meet all Requirements and Tasks, as well as the volume of patents mentioned in Section 1.

Selection as a VA contracted law firm under this Solicitation will entail the transfer of all or a substantial fraction of VA’s currently existing legal docket of matters to the contracting firm.

The Contractor shall, as directed by TTP Contracting Officer, perform all necessary and appropriate services in connection with the filing and prosecution of U.S. national, international (PCT), foreign regional (e.g. European Patent Office) and foreign national patents. Domestic patent matters shall be handled in compliance with Title 35, US Code, and with Volume 37, Code of Federal Regulation and other applicable laws, regulations and current case law. The preparation and filing of provisional, utility, plant, or design patent applications shall be based on invention disclosures in light of known prior art and any contemplated prosecution strategy. All foreign patent matters shall be handled by the Contractor or foreign associates under the direction of the Contractor, in accordance with the applicable statues, regulations, and case law of the particular foreign jurisdiction. All required responses to U.S. and foreign patent office actions should be filed within foreign filing deadlines or shortened U.S. statutory periods such that extension of time or patent revival fees are avoided unless specifically authorized by TTP. For all applications claiming a priority date to an application filed prior to March 16, 2013, the law firm will provide notice to TTP when it believes new matter is being added to the claims of a new or existing application in a patent family.

VA reserves the right to specify staffing requirements and limit the amount of time for partner/senior attorney review in a specific task order.

2.1TASK 1 – Filing Patent Applications.
Contractor shall:
2.1.1Prepare and Submit Patentability Assessment or Prior Art Search. Contractor shall provide the following services, only when and as specifically requested by TTP, after providing a written cost estimate:

· Search patent and/or non-patent literature databases, including ,where requested chemical structure databases, for disclosures relevant to subject matter identified by TTP.

· Provide freedom to operate searches of issued and pending patent claims. When requested, provide written summary and analysis of the search results.

· Provide prior art searches of patent and/or non-patent literature databases, including, where requested chemical structure databases to assist in patent application filing and prosecution decisions.

· Provide infringement/non-infringement and patent validity opinions.

2.1.2 File U.S. Design Patent Application and Corresponding International Design Registrations.

· When and as directed by TTP, draft design patent applications by reviewing invention disclosure materials, discuss with TTP Technology Transfer Specialist responsible for VA ID number, and speak with VA investigators as appropriate.

· File the U.S. design patent application with the USPTO prior to any known public disclosure dates;

· When specifically instructed by TTP, the Contractor shall direct foreign associate(s) to file corresponding international design registration applications per the requirements of the Hague Convention or the law of the foreign jurisdiction, as appropriate.

· Contractor will provide copies of all foreign associate and foreign Patent Office correspondence and reminders of prosecution deadlines per the schedule specified in Section 3.

2.1.3 File U.S. Provisional Application.

· When and as directed by TTP, prepare draft provisional patent applications including a specification, draft claim(s) and applicable drawings, based upon invention disclosure, manuscripts, drawing(s), discussions with TTP Technology Transfer Specialist responsible for VA ID number and conduct inventor interview(s) as necessary.

· File U.S. provisional applications with the USPTO by TTP’s requested deadline and/or prior to any known public disclosure dates.

2.1.3.1 Provide Notice of U.S. Provisional Application Conversion and Other Filing Deadlines to the TTP.

· Contractor will notify TTP of U.S. provisional application expiration and conversion deadline per the schedule specified in Section 3.

2.1.4 File U.S. Non-Provisional Utility Patent Application.

· When and as directed by TTP, prepare draft non-provisional patent applications, for TTP review, prior to filing applications.

· Review pending provisional application(s), invention disclosure materials, known and disclosed prior art, and manuscripts. Consult with TTP Technology Transfer Specialist responsible for application and, if approved by TTP in advance, interview VA inventors when preparing non-provisional application.

· File the U.S. non-provisional application with the USPTO, as directed by TTP, so the application is filed prior to:

· the one (1) year anniversary of a provisional application to which the non-provisional application will claim priority;

· any known investigator or third party public disclosures dates; and/or

· the one (1) year anniversary of any known public disclosures.

· Request expedited prosecution (such as Prioritized Examination, Accelerated Examination) as directed by TTP.

2.1.5 File International Applications under the Patent Cooperation Treaty (PCT).

· When and as directed by TTP, draft international applications in compliance with the Patent Cooperation Treaty.

· Utilize the invention disclosure materials, known and disclosed prior art, filed parent patent applications, such as provisional applications or non-provisional application, design registrations and applications, and information provided by inventors.

· File PCT applications in a PCT designated receiving office. Unless otherwise directed by TTP, filings shall be during the pendency of any earlier filed application to which the PCT application may claim priority under foreign, domestic or international law.

2.1.5.1 Provide TTP Notice of PCT Request, Response, and National Stage Conversion Filing Deadlines.

· Contractor will notify TTP of PCT Requests, Written Opinion Response, and national stage conversion filing deadlines per the schedule specified in Section 3.

2.1.6 File U.S. National Stage Application under PCT.

· When and as directed by TTP, prepare for TTP review a U.S. national stage patent application based on a prior filed PCT application.

· File, as directed by TTP, the U.S. national stage application within U.S. and international filing deadline requirements in order to maintain the earliest claimed priority date for the subject matter disclosed in the parent application(s).

· File supplemental information necessary to perfect the national stage filing.

2.1.7 Provide Notice to TTP of Paris Convention Application Filing Deadlines.

· Contractor will notify TTP of Paris Convention application filing deadlines per the schedule specified in Section 3

2.1.7.1 File Patent Application under Paris Convention.

· When and as directed by TTP, prepare for TTP review English-language patent applications including proposed claim sets, meeting the legal requirements of the Paris Convention.

· Utilize invention disclosure materials, known and disclosed prior art, prior filed parent applications and information provided by investigators to prepare the Paris Convention application.

· As requested by TTP, provide translation cost estimates for each country in which the Paris Convention application may be filed. As requested by TTP, secure translation services to have the Paris Convention applications translated in the countries designated by TTP.

· File as directed by TTP, the Paris Convention application in specified foreign or regional Patent Offices.

2.1.9 File Foreign Regional or Foreign National Stage Application based on PCT filing.

· When and as directed by TTP, prepare for TTP review English-language patent applications including the proposed claims meeting the legal requirements for each foreign regional or foreign national jurisdiction.

· Utilize invention disclosure materials, known and disclosed prior art, prior filed parent applications and information provided by inventors to prepare the foreign regional or foreign national stage application(s).

· As requested by TTP, provide translation cost estimates for each country or region in which the foreign regional or foreign national patent application may be filed. Have translated the patent applications into languages requested by TTP.

· File foreign regional or national application(s) so as to maintain the benefit of the earliest claimed priority dates in parent application(s).

2.1.10 Instructions to Foreign Associate to file and prosecute National and/or Regional Applications.

· When specifically instructed by TTP, the Contractor shall direct foreign associate(s) to file foreign regional or foreign national applications.

· Contractor will provide copies of all foreign associate and foreign Patent Office correspondence and reminders of prosecution deadlines per the schedule specified in Section 3.

· When and as specifically instructed by TTP, the Contractor shall provide instructions to foreign associate(s) on national or regional patent prosecution matters being handled by the foreign associate.

2.1 TASK 2 – Formal Patent Documents and Application Parts

2.2.1 Prepare and File Power of Attorney/Revocation of Power of Attorney Forms.

· Contractor will use USPTO Power of Attorney forms.

· For foreign prosecution, Contractor will ensure that foreign associates provide and file jurisdictionally valid Powers of Attorney.

· Contractor will correspond with appropriate parties and TTP and acquire all necessary authorizing signatures on Power of Attorney documents. All Power of Attorney documents shall include the VA ID number, the Contractor’s docket number, and the patent application serial number, if available.

2.2.2 Evaluate Inventorship, Ownership and Prepare Inventor Declaration or Supplemental Statement.

· Contractor will investigate and determine inventorship based on proposed patent claims and TTP input and, as directed by TTP, inventor interviews or statements.

· Prepare the inventor declarations or, as necessary, a supplemental statement, and have appropriate parties sign all documents. All inventor declarations or supplemental statements shall include the VA ID number, the Contractor’s docket number, and the patent application serial number, if available.

2.2.3 File Inventor Declaration, Correct Inventorship during Prosecution, or File Supplemental Statement.

· Where all inventors are named on the USPTO Application Data Sheet (ADS), Contractor may file inventor declarations prior to a Notice of Allowance or in response to a Notice of Allowability.

· Where inventors are not named in the USPTO ADS, Contractor will file executed inventor declaration or corrected ADS forms with the USPTO as early in prosecution of the application as possible, within statutorily required periods and prior to publication of the application.

· Where inventorship changes during the course of prosecution, Contractor will obtain necessary signatures and file all required documentation in order to reflect the change of inventorship. Inventorship should be confirmed and corrections should be completed prior to payment of the Issue Fee.

2.2.4Prepare and File Application Data Sheets (ADS).
•Contractor will utilize the USPTO Application Data Sheet (ADS) form. The ADS must correctly claim priority to all parent patent applications, identify all inventors, name VA as applicant where appropriate and otherwise comply with USPTO ADS requirements.
2.2.5File Revised Application Data Sheet.

· When necessary and directed by TTP, Contractor will file corrected or revised ADS.

2.2.6 Prepare and File Amino Acid and/or Nucleic Acid Sequence Listings.

· Where necessitated by the subject matter of an application, Contractor will prepare and file amino acid and/or nucleic acid sequence listings compliant with USPTO or foreign Patent Office requirements.

2.2.7 Prepare and File Drawings.

· Where necessitated by the subject matter of an application, Contractor will prepare and file accurate drawings compliant with USPTO or foreign Patent Office requirements.

2.2.8Review and Report Patent Application Filing Receipt.
•Contractor will use the USPTO Electronic Filing System (EFS) system for filing U.S. applications unless a filing deadline must be met and the EFS system is not operational.

· Contractor will review application Filing Receipts for accuracy and file for corrections as necessary and as directed by TTP.

2.2.9 File Request for Corrected Filing Receipt.

· When necessary and directed by TTP, Contractor will file a Request for Corrected Filing Receipt.

2.2.10 Prepare and Record Domestic and Foreign Assignments.

· Contractor will prepare legally valid domestic assignment documents and obtain assignment document signatures of all requisite parties. Assignment document(s) requiring VA signatories should be directed to the Technology Transfer Specialist responsible for the application and must include the VA ID number, Contractor docket number, patent application serial number and inventor name(s).

· Contractor will file for recordation executed assignment document(s) with the USPTO, preferably at the time of patent application filing, but in any event within 60 days of receipt of the executed assignment document(s).

· Correspond and consult with foreign associates regarding foreign assignment requirements. Ensure jurisdictionally valid and correct foreign assignment documents are filed within required national periods. Assignment document(s) requiring VA signatories should be directed to the Technology Transfer Specialist responsible for the application must include the VA ID number, Contractor docket number, patent application serial number and inventor name(s).

2.2.11 Record Corrected Assignments.

· When necessary and directed by TTP, Contractor will prepare and file corrected assignment document(s), for domestic and foreign applications. All corrected assignment document(s) will be subject to the same requirements set forth in Section 2.2.10 above.

2.2.12 Report Notice to File Missing Parts/Missing Requirements and Prepare and File Responses to Notice to File Missing Parts/Missing Requirements.

· Contractor will notify TTP of the receipt of a Notice to File Missing Parts per the schedule specified in Section 3.

•Contractor will file fully responsive responses to Notices of Missing Parts or Missing Requirements.
•Contractor will file within shortened statutory periods unless otherwise directed by TTP.
2.2.13Review and Report Notice of Acceptance of Application Under U.S.C. 371 and 37 CFR 1.495.
•The Contractor shall review and report to TTP the Notice of Acceptance of Application Under U.S.C. 371 and 37 CFR 1.495, when applicable.
2.2.14Report New or Revised Publication Date.
•The Contractor shall review and report to TTP the Notice of a New or Revised Publication Date.
2.2.15Report Publication of Application.
•The Contractor shall report to TTP the Notice of Publication of all domestic and foreign filed patent application(s).
2.2.16Payment of Patent Filing Fees.
•The Contractor shall pay all patent filing fees in accordance with the USPTO Fee Schedule effective on the date of payment. The Contractor shall be responsible for timely handling and filing of submissions to the USPTO and other foreign regional or foreign national Patent Offices in order to minimize additional costs or late fees. In the event that it is determined by the CO that additional claimed costs are due to a delay, lack of action or inappropriate action by the Contractor, the Contractor agrees that it, and not TTP, shall be liable for all fees and expenses related to professional services and other costs necessary to revive or otherwise extend the time period for response.
2.3Task 3 – Substantive Patent Prosecution
•For responses to Office Actions, responses to formality requirements and other responses required by the USPTO or other foreign regional or foreign national Patent Office, Contractor will file within shortened statutory response periods, unless otherwise directed by TTP. Response Extension of Time fees imposed by the USPTO or other Patent Offices will presumptively be paid out-of-pocket by the Contractor, unless Contractor demonstrates that the late filing was due to VA action or inaction. Similarly, all costs for the revival of unintentionally abandoned applications will be borne by the Contractor, unless the Contractor can clearly and convincingly show the application was abandoned as a result of VA action or inaction.
2.3.1File Information Disclosure Statement.
•The Contractor shall file Information Disclosure Statement(s), as needed per the USPTO requirements. Prior art known to the Contractor, TTP, and inventor(s) shall be identified and discussed in the background section of the patent application. The Contractor will take all reasonable steps to ensure that Information Disclosure Statement(s) containing the known relevant prior art is filed prior to a First Office Action on the Merits. The Contractor will have an ongoing obligation to file new art as it becomes aware of the art, including art cited in corresponding international or foreign prosecution proceedings. The inventor(s) shall be notified in writing of the duty of disclosure during the prosecution of the patent application.
2.3.2File Preliminary Amendment.

· The Contractor shall file a Preliminary Amendment in an application, when necessary or instructed to do so by TTP, at the time a 35 USC 371 U.S. Patent application is filed or prior to issuance of the first Office Action.

2.3.3 Report Office Actions (Domestic and Foreign).

· Report to TTP all Office Actions no later than five (5) days after the Contractor receives it from the office of the patent examining authority per the schedule specified in Section 3 at 3.3.3.

· Send reminders to TTP of upcoming Office Action response due dates per the schedule specified in Section 3 at 3.3.3.

2.3.4 Prepare and File Office Action Response for Domestic and Foreign Prosecution.

· When specifically directed by TTP, review Office Action and prepare draft response.

· Review Office Action, the specification, prior art, and, with prior notification to TTP, speak with the VA investigators when preparing the response.

· Office Action responses must address all rejections or objections raised by the Patent Office in the Office Action and must be drafted in view of applicable statutes, regulations and current case law.

· Timely file the response to the Office Action with the USPTO or foreign Patent Office; extensions of time may be taken only when authorized by TTP.

2.3.5Report International Search Report (ISR) under the PCT.
•Provide copy of the International Search Report (ISR) and when requested by TTP, review ISR, prepare informal comments for TTP review.
2.3.6File PCT Article 19 Amendment.
•The Contractor shall file an Article 19 Amendment only when expressly authorized by TTP.
2.3.7File Demand for International Preliminary Examination Report (IPER).
•The Contractor will prepare and file demands for International Preliminary Examination when, and as directed by, TTP.
2.3.8Report International Preliminary Examination Report (IPER).
•The Contractor will report the International Preliminary Examination Report (IPER) to TTP after receipt from the international examining authority.
2.3.9File PCT Article 34 Amendment.
•The Contractor shall file an Article 34 Amendment only when expressly authorized by TTP.
2.3.10File Inventors’ Declarations/Affidavits.
•When necessitated by prosecution and directed by TTP, the Contractor shall consult and confer with the inventor(s) to draft declarations appropriate to the prosecution strategy formulated with TTP.
2.3.11File Request for Continued Examination.
•The Contractor shall file a Request for Continued Examination (RCE) only when expressly authorized by TTP.
2.3.12Represent VA Before the Patent Trial and Appeals Board (PTAB).
•The Contractor will represent VA, in person as necessary, before the Patent Trial and Appeals Board (PTAB) in all matters assigned by task order to the Contractor, including without limitation, derivation and interference proceedings.
2.3.13File Notice of Appeal.
•The Contractor shall only file a Notice of Appeal when expressly authorized by TTP.
2.3.14Prepare and File Appeal Brief.
•The Contractor shall only file an appeal brief when expressly authorized by TTP.
2.3.15File Petition.
•The Contractor shall only file a petition when expressly authorized by TTP.
2.3.16Report Notice of Interference and Derivation Proceedings.

· The Contractor shall provide TTP with a copy of any Notices of Interference of Derivation Proceedings per the schedule set forth in Section 3.

2.3.18 File Continuation and Divisional Patent Applications.

· The Contractor will prepare and file continuation and divisional applications when and as directed by TTP; the Contractor will ensure that any divisional or continuation applications are filed prior to the payment of issue fee in the parent application unless expressly instructed to do otherwise by TTP.

2.3.19File Express Abandonment – (Foreign and Domestic).
•No patent application may be voluntarily abandoned without written authorization from TTP and written confirmation from the CO or COR. Written confirmation may be made through email communication.
2.3.20Report Notices of Abandonment and Revival (Foreign and Domestic)

· The Contractor will be presumptively responsible for any unavoidably or unintentionally abandoned patent applications and will solely bear the costs of revival.

2.4Task 4 – Issuance and Post Issuance
2.4.1Review and Report Notice of Allowance/Issue Fee Due.
•The Contractor shall review and report to TTP the Notice of Allowance/Issue Fee within a week from when the Contractor receives the Notice per the schedule set forth in Section 3.

· Prior to paying any issue fee, the Contractor shall:

· Review and confirm that inventorship is accurate;

· Confirm that priority is accurately claimed;

· To the best of Contractor’s ability, ensure that all relevant art has been cited in an IDS initialed by the examiner;

· Review examiner’s amendments (if any) and communicate amendments to TTP; and

· Prepare and file necessary corrections to the application.

2.4.2Pay Issue Fee.
•The Contractor shall timely pay the Issue Fee when directed by the TTP COR.
2.4.3Review and Report Issue Notification.
•The Contractor shall review and report the notification that the patent will issue within a week from when the Contractor receives the Notice per the schedule set forth in Section 3.
2.4.4Review and Report Letters Patent.
•The Contractor shall review and report the receipt of the Letters Patent and provide patent ribbon copies to VA.
2.4.5Report Maintenance and Annuity Fee Deadlines.
•The Contractor shall report all Maintenance and Annuity Fee due dates and deadlines, and send TTP reminders of upcoming Maintenance and Annuity Fee due dates per the schedule set forth in Section 3.
2.4.6Pay Maintenance and Annuity Fee(s).
•The Contractor shall timely pay the Maintenance and Annuity Fees unless TTP expressly indicates in writing and the COR confirms in writing that Contractor should not pay Maintenance or Annuity Fees.
2.4.7File Petition to Correct Issued Patent.
•The Contractor will prepare and file post-issuance corrections as necessary and after consultation with TTP.
2.4.8Foreign Opposition Proceedings.

· The Contractor will promptly communicate the notice of opposition proceedings to TTP according to the schedule set forth in Section 3.

· The Contractor will coordinate meetings with TTP and the foreign associate(s) in order to formulate a strategy for responding to the opposition.

· The Contractor will arrange and manage representation before foreign opposition boards.

2.4.9Supplemental Examination Requests.
•When and as directed by TTP, the Contractor shall request Supplemental Examination.
2.4.10Request for Reexamination.
•When and as directed by TTP, the Contractor shall request reexamination of an issued U.S. Patent.
2.4.11Report Notice of Ex Parte Reexamination.
•The Contractor will report the receipt of demands for Ex Parte Reexamination represent TTP and assist in the prosecution of Ex Parte Reexaminations.
2.4.12Post Grant and Inter Parties Review.
•When and as directed by TTP, file for Post Grant Review or Inter-Parties Review.
2.5Task 5 – Miscellaneous
2.5.1Prepare and Submit Pre-issuance Submissions (35 USC 112(e)). Where requested by TTP, consult with TTP and prepare pre-issuance submissions (third party submission) to the USPTO.
2.5.2Advise and Consult on Intellectual Property (IP) Matters. When specifically instructed by TTP, the Contractor shall advise and consult with TTP (and other VA Offices as directed by TTP):

· On IP related issues dealing with possible patent litigation. Patent litigation matters are handled by Department of Justice in coordination with VA’s Office of General Counsel.

· On U.S. patent prosecution strategy and portfolio management.

· On patent valuation and licensing strategy.

· On enforcement of VA’s Intellectual Property licenses and agreements including joint Intellectual Property.

· On international and foreign patent prosecution strategy and portfolio management.

· Filing and registration of other VA-owned intellectual property, including but not limited to trademark applications and copyright registrations.

· On other IP issues not directly related to pending patent applications or issued patents.

2.5.3Respond to Information Requests Concerning Outstanding Patent Prosecution , Other Legal or Administrative Matters.
•Acknowledge and respond, if possible, to informational requests from Technology Transfer Office addressing thoroughly all points raised within one business day of TTP query.
2.5.4Prepare Docket Reports.
•When specifically instructed by TTP, prepare a docket report of the pending applications and a status of each application, including information regarding outstanding Office Actions and other USPTO requirements.

• Maintain and update electronic database containing information on all VA matters, including VA reference numbers, patent and patent application numbers, attorney docket numbers, filing documents, action deadlines, total and monthly fees and costs per matter. Database must be accessible by TTP staff and matters can be filtered by responsible TTP case manager. Contractor database must allow for streamlined review of invoices submitted on a monthly basis by responsible TTP case manager and must have data integration with separate 3rd-party-hosted TTP database so that patent expenditures and pdf invoices are updated on applicable patent and patent application records in TTP database on a regular, monthly basis with no manual data input or other effort required on the part of TTP staff.

2.5.5Matter Close-Out and/or Transfer.
•Task orders for a particular matter may be terminated for cause or convenience. Where a matter is transferred following termination or expiration of a task order, Contractor agrees to ensure all attorney work product, files and information concerning the matter are transferred as instructed by TTP. Where requested by TTP, Contractor will accept transfer of legacy matters from prior contracted VA law firms.