This is a General Condition Breakdown document for a construction project that details the anticipated costs and requirements across multiple categories of work. The document outlines three primary cost categories: Project Management, Bonds and Insurance, and Site Conditions.
The Project Management section includes personnel requirements such as superintendent(s), safety manager, CPM scheduler, quality assurance/quality control staff, project manager(s), project executive, field office engineer, field office support staff, project expeditor, and assistant superintendent(s). The Bonds and Insurance section specifies builder's risk insurance, general liability insurance, and security, payment, and performance bonds required for the general contractor (excluding subcontractor bonds and insurance). The Site Conditions section is extensive and encompasses temporary infrastructure and services including power consumption for offices and general site use, water and sewer consumption and distribution, electrical and telephone hookups, temporary fire protection, heating and cooling, fencing, covered walkways, stormwater pollution prevention plan (SWPPP) measures, traffic control, temporary barricades and signage, temporary roads and walkways, lighting, partitions, sanitary facilities, laydown areas, security systems, documentation (pre-construction and progress photos), and protection measures for existing work and adjacent structures. This breakdown serves as a component of the larger construction solicitation for critical environment upgrades at a Department of Veterans Affairs facility, specifically a 100% Service-Disabled Veteran-Owned Small Business (SDVOSB) set-aside under NAICS code 236220 with a small business size standard of $45 million.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Attachment 5 Contractor EMR Certification Form.docx | DOCX document | |
| Attachment 3 Price Breakout Schedule.xlsx | XLSX spreadsheet | |
| 36C24927B0004.docx | DOCX document | |
| Attachment 1 SPECIFCIATIONS - FINAL - 03-02-2026.pdf | ||
| Attachment 7 Request For Information Form.docx | DOCX document | |
| Attachment 9 SF33 36C24927B0004.pdf | ||
| Attachment 4 Calc. of Self Performed Work.xlsx | XLSX spreadsheet | |
| Attachment 8 Wage Determination - TN20260178 - Modification 1 - 05-18-2026.pdf | ||
| Attachment 2 DRAWINGS - FINAL - 03-02-2026.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Project Management:
Superintendent(s)
Safety Manager
CPM Scheduler
Quality Assurance/Quality Control
Project Manager (s)
Project Executive
Field Office Engineer
Field Office Support Staff
Project Expeditor
Assistant Superintendent (s)
Project Manager Subtotal
Bonds and Insurance (excluding any for Subcontractors):
Builder’s Risk Insurance
General Liability Insurance
Security, Payment & Performance Bonds
Bonds and Insurance Subtotal:
Site Conditions:
Temporary Power Consumption (Offices)
Temporary Power Consumption (General Site Use)
Temporary Water and Sewer Consumption
Temporary Water Hookup, Distribution & Meters
Temporary Electrical Hookup, Distribution & Meters
Temporary Telephone & Network System Installation
Temporary Telephone & Internet Consumption Fees
Temporary Fire Protection
Temporary Heating & Cooling
Temporary Fencing
Temporary Covered Walkways
SWPPP Measures
Temporary Entries and Truck Washes
Street Cleaning (by G.C.)
Traffic Control Measures
Temporary Barricades & Signage
Temporary Roads & Walkways (install & maintenance)
Temporary Lighting
Temporary Partitions & Covered Floor Openings
Temporary Toilets/Sanitary Measures
Temporary Laydown (prep and restoration)
Security System/Watchman
Pre-construction Photo Documentation
Progress Photos
Temporary Protection (in place work/adjacent structures)