This is a Statement of Work (SOW) for maintenance, testing, and repair services of an Eaton 9390 uninterruptible power supply (UPS) system and sealed VRLA batteries at the Tennessee Valley Healthcare System's Nashville Campus, located at 1310 24th Avenue South, Nashville, TN 37212. The contract requires qualified contractors to provide comprehensive support including parts, installation, troubleshooting, electrical work, low-voltage controls, and programming. The scope encompasses all personnel, equipment, supplies, tools, materials, and supervision necessary to meet or exceed performance standards critical to veteran care operations.
The specific deliverables include parts (model FL87NXDX-0160) and labor services consisting of eight-hour on-site emergency response capability, 24/7 after-hours support with parts and labor, a 30% spare parts kit with time-and-material discount, one pre-site survey per contract term, one UPS preventive maintenance visit per term, three sealed battery preventive maintenance visits per term, and one load-bank test for the UPS. The contractor must provide all necessary tools, labor, materials, equipment, and supervision to complete all required work as specified in the contract documents. This one-year anticipated scope aligns with the related pre-solicitation (36C249-27-AP-0670) issued by the Department of Veterans Affairs, Veterans Health Administration, Veterans Integrated Service Network 9.
View the file
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
STATEMENT OF WORK
Department of Veterans Affairs TVHS, Nashville Campus Requirements for Service, Maintenance and Testing of UPS system
1. Introduction/Background Information The UPS system is vital to the everyday operations of the Tennessee Valley Health System. The System must always be operational and maintained to the highest quality performance standards. This UPS system is critical to the care of our veterans and their families and friends. This Service shall provide all personnel, equipment, supplies, facilities, transportation, tools, materials, supervision, and other items necessary to perform maintenance, troubleshooting, inspections, and testing of the UPS as stated in this Statement of Work (SOW). The contractor shall perform as to meet or exceed Standards in this contract.
2. Place Of Performance
Tennessee Valley HealthCare System 1310 24th Ave S.
Nashville, TN 37212
3. Scope Of Work
a. This SOW describes the requirements for Qualified Contract Professionals – known as “Contractors” in this document, hereafter. Contractors who are contracted by Veteran Affairs (VA) Medical Center to perform maintenance troubleshooting, testing and repair of the UPS, and all its components shall meet all requirements stated in SOW.
b. Work includes parts, installation of parts, troubleshooting onsite, and travel as required, including, but not limited to electrical, low voltage controls, programming, and certain other items. The contractor shall provide all tools, labor, material, equipment, and supervision necessary to perform all work as required by the contract documents for the following Line Items below:
c. Product Description Serial Number
9390-100-120, VRLA Sealed, 40 EC511CAB09 & EC512CAB05
1) Parts and Materials:
a) FL87NXDX-0160
2) Labor/ Services:
a) 8 Hour Onsite Emergency Response Time
b) After Hours Support (24X7) w/ Parts and labor
b) 30% Spare Part kit and Time and Material Discount
c) 1x per term: Pre-Site Survey, After Hours (24X7) (0005NXXX-0160)
d) 1x per term: UPS Preventative Maintenance, Any time (0005NXXX-0160)
e) 3x per term: Sealed Battery Preventative Maintenance, any time (0005NSXX040)
f) 1x Load Bank for UPS <100KW/480v or 80KW/208 Anytime During PM, 24x7 Labor (LB05NXPM100)
4. Requirements/Tasks
a. A complete written report of the work performed shall be provided to the VA within 10 (ten) working days of contract work completion. Information shown in the report should meet the following:
1) Company’s name, addresses, telephone, & fax numbers.
2) Name and signature of contractors who perform the maintenance and testing.
3) VA Work Contract Number, name, and number of VA Contracting Officer.
4) Date and time of work.
5) Copies of contractors’ valid licenses, professional and training certificates, as applicable.
6) Descriptions and model number of specialized tools and equipment used such as multimeter.
7) Location, Type, Name, and nameplate information of electrical equipment maintained and tested.
8) Descriptions of work items.
9) Test data.
10) Reference materials such as equipment manufacturer’s specifications, coordination study, etc.
11) Remarks on conditions of electrical equipment. List all deficiencies, if any.
12) Recommended corrective actions, if any.
b. Submit 2 (two) hard copies of the complete written report, and 1 (one) electronic version of the report in Microsoft Word or PDF format to the Contracting Officers Representative (COR) within 10 (ten) calendar days of contracted work completion. All reference materials shall be included in the electronic version of the report, either through scanning or other means of electronic text import methods.
5. Qualifications of Contractors
a. Contractors shall be experienced Technician Contractors, having properly trained and licensed permanent staff required to perform the proposed work. Electrical/Controls Contracting shall be the primary interest/specialty of the Contractor’s business.
b. Contractors shall be certified by the National Institute for Certification in Engineering Technologies (NICET 1) or equivalent International Electrical Testing Association (NETA 2) certifying organization as Certified Technicians with each having completed the appropriate Occupational Safety & Health Administration (OSHA) approved construction safety training.
c. Contractors shall have technical training and demonstrable track records of working experience in maintenance, inspection, and testing of the Automatic Transfer Switch Systems and related components in healthcare, industrial, educational, and commercial facilities for a minimum of 3 (three) continuous years.
d. Contractors shall have safety trainings – either on-the-job or class-room type - in electrical safety outlined in the OSHA Standard 29 Code of Federal Regulations (CFR) 1910 Subpart S – Electrical, and the NFPA 70E – Standard for Electrical Safety in the Workplace. Training certification shall be provided indicating each technician is a Qualified Person as defined by NFPA 70E. Training certifications shall be submitted to the VA Contracting Officer prior to work. If no training certifications are available, the contractor’s Employer shall certify that he/she has met this requirement in writing and submit it to the VA Contracting Officer prior to work.
e. Contractors shall have ready access to the latest versions of the following references:
1) NFPA 70, National Electrical Code.
2) NFPA 70B, Recommended Practice for Electrical Equipment Maintenance.
3) NFPA 70E, Standard for Electrical Safety for the Workplace.
4) NFPA 110, Standard for Emergency and Standby Power System.
5) OSHA Standard 29 CFR 1910, Subparts I & S.
6) International Electrical Testing Association, Inc. (NETA) – Maintenance and Testing Specifications.
7) Operating /Maintenance manuals and specifications of the electrical equipment to be maintained and tested. These documents may be obtained from the VHA Medical Center, or the equipment manufacturers.
8) VHA Directive [Current], Electrical Power Distribution System
f. Contractors shall have and provide all necessary tools, equipment, and Personal Protective Equipment (PPE) to perform the work safely, effectively, and timely. Tools, equipment, and PPE shall comply with the requirements of OSHA Standard 29 CFR 1910, Subpart I, and NFPA 70E. Prior to initiating work, Contractor Shall do a walk through to verify all different manufacturers of equipment and shall provide documentation that all instruments, test equipment, tools and personal protective equipment (PPE) have current calibration and are manufacturer compliant. Dated calibration labels shall be visible on all instruments, test equipment, tools and PPE as appropriate.
6. Summary of Work
a. Due to the power outages required for maintenance and testing, and the power requirements for the medical center, all outages and testing are to be coordinated and scheduled with the Contracting officer representative, Electrician Supervisor, and the Maintenance and Operations Supervisor, any requirements for adjusting the schedule (e.g. to minimize disruption to the Veterans Affairs Medical Center (VAMC)) shall be incorporated by the Contractor. VA shall indicate approval or disapproval of plan within 5 (five) calendar days. Outages shall be scheduled only after the facilities normal working hours of 7 am - 4 pm and on weekends unless otherwise indicated by the COR.
b. Contractors shall report deficiencies that are deemed critical or catastrophic immediately to the Contracting Officers Representative and or the Electric Shop Supervisor or the Maintenance and Operations Supervisor for immediate actions.
c. Work items, definitions, and references shall comply with the latest edition of the NETA – Maintenance Testing Specifications (MTS) and with the VHA Directive (1028), Electrical Power Distribution System.
1) Emergency Systems, Automatic Transfer Switches.
a) All maintenance, testing and functional tests of the transfer switches are to be performed by a manufactured factory trained and authorized service technicians.
7. Hours of Operation and Scheduling
a. Work in the Main Hospital Generator/ATS Room may be accomplished as scheduled in advance.
b. Schedule all normal work Monday through Friday, 7AM to 4PM with COR, Stephen Browne 615-938-2182 or Matt Hickerson 615-456-2501.
c. Federal Government Holidays:
| New Year’s Day | January 1 | |||
| Martin Luther King’s Birthday | 3rd Monday in January President’s Day | 3rd Monday in February Memorial Day | Last Monday in May | |
| Juneteenth | June 19th | |||
| Independence Day | July 4th | |||
| Labor Day | 1st Monday in September Columbus Day | 2nd Monday in October | ||
| Veteran’s Day | November 11 | |||
| Thanksgiving Day | Last Thursday in November | |||
| Christmas Day | December 25 |
(And any other day the President determines a Federal Holiday)
8. Confirmation Of Work
a. All work is to be confirmed and subject to Quality Control Methods before being approved by COR, Stephen Browne, or Matt Hickerson.
9. Compliance
a. The contractor shall be fully responsible for compliance with all VA, local, state, and Federal occupational safety laws, rules, and regulations.
b. The contractor shall follow life and safety codes and take necessary actions to avoid conditions that may be hazardous to the health and safety of hospital personnel and patients.
c. The contractor is responsible for meeting all applicable OSHA and VA guidelines for safe working procedures.
d. All work for the duration of the contract shall be performed by certified trained technicians.
10. Contractor Employees
a. Contractor personnel shall present a neat appearance and be easily recognized as contract employees. Example: wearing steel toe boots and safety glasses, Identification (ID) badges and or name tags.
11. Contractor Employee Identification
a. All contractor employees must be clearly identified as contractors (not VA employees) when performing services under this contract. This includes visual (appearance), verbal (phone), and electronic (email). The contractor must provide all employees with a contractor identification (ID) badge at the contractor’s expense prior to performing work under this contract. Contractor employees are always required to display this badge when performing services under this contract.
b. Employees released from service by the contractor must have their badge collected by the contractor. All badges must contain an expiration date and photograph of the employee.
c. All contractor employees must also be required to wear VA issued badges and must always display these badges while in the performance of this contract and/or as instructed by the COR.
d. The contractor supervisor must ensure that all contractor employees display their VA issued badges.
e. The contractor supervisor must be responsible for managing all VA issued badges provided to contractor employees and immediately collect these badges from employees no longer working on the contract.
12. Contractor Employee Conduct
a. The contractor is completely responsible for all actions and conduct of their employees. Contractor employees must be well-groomed and neat in appearance.
b. Contract employees must be professional in attire and must not wear any offensive clothing.
c. Contractor employees must conduct themselves in a socially acceptable manner appropriate for an office work environment; Loudness, vulgarity, rudeness, smoking, or other similar offensive conduct by a contractor employee may be grounds for denying the employee further access to VA premises.
d. Contractor employees must not consume alcohol or illegal drugs during working hours or at any other time the employees are performing work under this contract.
13. Contractor Responsibility
a. The contractor shall obtain all necessary licenses and/or permits as required to perform this work.
b. He/she shall take all reasonable precautions necessary to protect people and property from injury or damage during the performance of this contract.
c. Further, it is agreed that any negligence of the Government, its officers, agents, servants and employees, shall not be the responsibility of the contractor here under regarding any claims, loss, damage, injury, and liability resulting from there.
14. CONTRACT AWARD MEETING
a. The contractor shall not commence performance on the tasks in this SOW until the Contracting Officer (CO) has conducted a Kickoff Meeting or advised the contractor that a kickoff meeting is waived.
15. Changes to The Statement of Work
a. Any changes to this SOW shall be authorized and approved only through written correspondence from the CO. A copy of each change shall be kept in a project folder with all other products of the project. Costs incurred by the contractor through the actions of parties other than CO shall be borne by the contractor.
16. Performance Requirements
a. Contractors shall provide the necessary personnel and equipment to meet or exceed required service. Contractor shall have the following responsibilities:
1) Provide all supervision, labor, and materials to complete all requirements described in this SOW.
2) Contractor shall obtain all necessary licenses and permits required to perform the work required by this SOW.
3) Contractor shall take all precautions necessary to protect people and property from injury and/or damage during performance of this contract.
4) Contractor shall be responsible for any injury to their employees as well as for any damages to personnel or Government property that occurs during the performance of this contract that is caused by the Contractor’s fault or negligence.
5) Contractor should ensure that all areas where equipment is serviced under this contract are left in a clean, neat and orderly condition.
6) Contractors shall possess and utilize all necessary tools, equipment, and Personal Protective Equipment (PPE) to perform all work safely, effectively, and in a timely manner. Tools, equipment, and PPE shall comply with OSHA Standard 29 CFR 1910, (Subpart I), and NFPA 70E. Prior to initiating work, the Contractor shall provide documentation demonstrating that all instruments, test equipment, tools, and PPE possess current calibration and safety inspections. Dated calibration and safety inspection labels shall be visible on all equipment as applicable
1) Arrange and pay for all proper disposal of waste and debris.
2) Maintain project schedule agreed upon in the final contract documents.
3) Provide all OSHA site safety for each employee during work.
4) Contractor employees shall have complete background checks.
17. Deliverables
a. The Contractor shall perform the services necessary to complete the tasks in accordance with the procedures described in a timely and professional manner, consistent with industry standards, at the location, place and time that the VA has set aside, and all in accordance with the SOW.
b. Contactor shall provide a copy of the inspection document used (field report) on the day of each inspection performed at the COR.
18. Technical Expert/ Point of Contact
Electric Supervisor / Stephen Browne / Stephen.Browne@va.gov / 615-938-2182 M&O Supervisor / Matt Hickerson / Alan.Hickerson@va.gov / 615-456-2501 Healthcare Engineer / Marques Santiago / Marques.Santiago@va.gov / 615-598-1487