36C24924B0006.docx

DOCX document 49 KB Posted

Attached to
Z1DA--626-24-1-4209-0008 - 626A4-24-301 Replace Faucets in Buildings 11, 17 and 3
Solicitation number
36C24924B0006
Issued by

About this file

This document is a statement of work for a federal construction contract to replace faucets and valves in three buildings at a Department of Veterans Affairs medical center in Murfreesboro, Tennessee. The contract is set aside for service-disabled veteran-owned small businesses and has an estimated value between $500,000 and $1 million. The selected contractor will be responsible for removing existing fixtures in over 200 rooms across the three buildings, installing new faucets and valves according to the agency's standards, testing that finished installations meet temperature requirements, and providing additional spares. The work must be completed within 110 calendar days of notice to proceed. The solicitation is expected to be issued on December 15, 2023, with questions accepted until then.

View the file

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

SUBJECT*
626-24-1-4209-0008 - 626A4-24-301 Replace Faucets in Buildings 11, 17 and 3

GENERAL INFORMATION

CONTRACTING OFFICE’S ZIP CODE*
37129
SOLICITATION NUMBER*
36C24924B0006
RESPONSE DATE/TIME/ZONE
01-15-2024 2:00 PM CENTRAL TIME, CHICAGO, USA
ARCHIVE
99 DAYS AFTER THE RESPONSE DATE
SET-ASIDE
SBA
PRODUCT SERVICE CODE*
Z1DA
NAICS CODE*
238220
PLACE OF PERFORMANCE
Tennessee Valley Healthcare System

VA Medical Center

3400 Lebanon Road

Murfreesboro TN

POSTAL CODE
37129
COUNTRY
USA

CONTACT INFORMATION

CONTRACTING OFFICE ADDRESS
Department of Veterans Affairs

Network Contracting Office 9 (90C)

NCO 9

1639 Medical Center Parkway, Suite 400 Murfreesboro TN 37129

POINT OF CONTACT*

Contract Specialist Alan Raulerson alan.raulerson@va.gov 615-225-6878

ADDITIONAL INFORMATION

AGENCY’S URL

URL DESCRIPTION

AGENCY CONTACT’S EMAIL ADDRESS
alan.raulerson@va.gov

EMAIL DESCRIPTION

Presolicitation Notice

DESCRIPTION

*=Required Field
Presolicitation Notice

Presolicitation Notice

PRODUCT/SERVICE CODE: Z1DA – Maintenance of Hospitals and Infirmaries

This will be a 100% set-aside for Service-Disabled Veteran-Owned Small Business concerns under the authority of 38 U.S.C. section 8127 (d).

NAICS code 238220 – Plumbing, Heating, and Air- Conditioning Contractors, applies to this requirement. The small business size standard is $19M.

The estimated range of construction is Between $500,000 - $1,000,000.

This requirement will be procured per Federal Acquisition Regulation (FAR) Part 14.101 - Sealed Bidding.

The solicitation is expected to be posted on or around December 15, 2023.

This requirement is a 100% set-aside for Service-Disabled Veteran Owned Small Business (SDVOSB) concerns under the authority of 38 U.S.C §8127 (d).Only those SDVOSB’s listed and viewable in the SBA database located at https://veterans.certify.sba.gov/. The database will be checked at the time of offer submission as well as prior to award. All offers must also have an active listing in the System for Award Management (SAM) database. The awarded contractor must also submit evidence of enrollment with VETS4212.

In addition to the requirements as set forth in the solicitation notice (to be issued), the proposed contractor must also be determined responsible in accordance with FAR Part 9. The Contracting Officer will determine responsibility prior to any award being made.

Questions related to this requirement will only be addressed in writing by way of email to the Contract Specialist at alan.raulerson@va.gov. The Project number, Project Name and Solicitation Number must be included in the subject line of all questions related to this requirement.

No questions will be considered until the actual solicitation is released.

See attached document: 626A4-24-301 Replace Faucets in Buildings 11, 17, 3 Specs.

*=Required Field
Presolicitation Notice

Page 1 of

Presolicitation Notice

Page 1 of

STATEMENT OF WORK

Department of Veterans Affairs TVHS, Nashville & Murfreesboro Campus Project Number 626A4-24-301 Replace Faucets in Buildings 11, 17, 3

A. GENERAL INFORMATION

1. Title of Project: Project 626A4-24-301 “Replace Faucets in Buildings 11,17,3”.

I. Project 626A4-21-301 “Replace Faucets in Buildings 11, 17, 3”, II. Project Location: Murfreesboro, TN.

III. Period of Performance 110 calendar days from receipt of Notice to Proceed

2. Scope of Work: Provide construction services for the installation of select faucets and mixing valves at the Tennessee Valley Healthcare System York Campus at 3400 Lebanon Pike, Murfreesboro, TN 37129. The contractor shall furnish all labor, material, equipment, and supervision necessary to complete all work described in SOW. Work included in Project 626A4-24-301 “Replace Faucets in Buildings 11, 17, and 3” includes, but is not limited to, plumbing and general construction.

3. Performance Period: The contractor shall complete the work required under this SOW is 110 calendar days from date of Notice to Proceed, which includes submittals and lead times, unless otherwise stated in any written modifications required under the resulting contract and signed by the Contracting Officer (CO).

B. GENERAL REQUIREMENTS

1. All written deliverables shall be phrased in lay person language.

2. Where a written milestone deliverable is required, the VA will complete their review of the draft deliverable within _4_ business days from the date of receipt. The contractor shall have 4 business days to deliver the final, revised deliverable from the date of receipt of the Government’s response.

3. The Department of Veterans Affairs intends to have the contractor fully survey, investigate, and document the existing faucets and connections to gain the knowledge and insight necessary to prepare quality, accurate documents, and perform the construction in a professional and competent manner.

4. The Information Technology Certification and Accreditation requirements do not apply, and a Security Accreditation Package is not required.

5. The contractor will coordinate all work through the VA COR.

6. The contractor superintendent will always be on-site during the performance of the work associated with this contract.

7. All labor, materials, equipment to perform the job; When “furnish”, “provide”, “install” or similar term is used, it shall mean a complete installation, ready for use.

8. The contractor shall identify all employees that will be working under the awarded contract. Contractor personnel shall include employees, sub-contractors, suppliers, and delivery personnel entering the medical center. Those employees shall bring photo ID and social security card or passport to obtain a VA Contractor identification badge. The badge shall always be worn above the belt while on medical center property. Contractor’s employees shall return all I.D. badges to designated personnel at the end of the period of performance of the contract. Lost badges compromise security and will result in action, including a surcharge.

9. The contractor’s safety manager is responsible for safety inspections of all contract operations. All VA and OSHA safety regulations shall be observed during the performance of work identified on this contract. Provide signage and barricades, as required, to maintain safety and protection around the project work site.

10. The Contractor will have a designated parking location (See General Requirements 01 00 00). Drivers should be particularly concerned with Pedestrian traffic; yield to pedestrians in crosswalks. Seat Belt use is mandatory on all VA grounds.

11. The Contractor shall always keep the work area, including any areas where materials and/or equipment is being stored, free from accumulations of waste materials. Before completing the work, the Contractor shall remove from the work and premises any rubbish, tools, scaffolding, equipment, and materials that are not the property of the Government.

12. When items, equipment, or materials are shown to be demolished, remove all appurtenances and patch back as necessary using materials consistent with adjacent construction. Do not leave any abandoned components or utility feeds. Remove utilities feeds back to the source or an active line, main, or main branch. Electronic faucets shall be disconnected with power remaining at wall with cover/cover-plate/receptacle.

13. Normal duty hours will be 7:00 am - 4:30 pm Monday through Friday. No work shall be performed on federal holidays unless approved by COR. This project may require work to be performed outside of normal duty hours to minimize the impact on patients and Medical Center operations but must be coordinated with and approved by COR a week in advance.

14. Prior to submitting a bid, contractor shall fully survey the site / locations / conditions in order to determine all work, labor and materials necessary to submit a fully developed bid for the successful completion of the project.

15. Contractor shall not allow smoking in any building or vehicle (located on VA property) and shall ensure employees do not smoke on VA property. This is a smoke free facility.

16. Upon completing a segment of work (related to a location/task), the Contractor shall demonstrate a complete working replacement/installation and leave the work area in a clean, neat, and orderly condition satisfactory to the Contracting Officer or the Contracting Officer's Representative (COR).

B. SPECIFIC MANDATORY TASKS AND ASSOCIATED DELIVERABLES

Description of Tasks and Associated Deliverables: The contractor shall provide the specific deliverables described below within the time specified in the approved schedule that will be provided by the contractor.

Deliverable One: Construction in accordance with VA specifications including all closeout documentation, certifications, test reports, training, warranties, manuals, etc. specified in contract documents. Work includes but is not limited to:

1. The contractor shall thoroughly investigate each identified room (see attachment) and select/order the appropriate faucet for each application. See specification for description and facility standards. If there is an apparent leak, the contractor shall notify COR / M&O before proceeding with work. Other elements that shall be verified before proceeding with work should include the following items: stops work properly (test hot and cold), drain works properly, sink or surfaces around the fixture are free of damage (damage to be document).

2. Remove identified faucets completely including all actuating devices (handles, foot pedals, etc.). Thoroughly clean all surfaces exposed by fixture removal. If further rough work is required, coordinate with COR.

3. Clean the mounting area, removing all gasket material and water stains.

4. Faucet Replacement with Added Mixing Valve:

a. Remove and dispose of faucet and accessories, including any electronic automatic sensor faucets connections, foot controls, etc. Electrical power to remain at wall with cover/cover-plate.

b. Fill any screw penetrations with silicone. Match or complement wall color. Sealant and color selection shall be equal to Dow Corning 795 Silicone and 14 color selection charts.

c. Install appropriate mixing valve and faucet combination with supply lines in rooms identified. Refer to attachment and section C for the Basis of Design for selection guidance.

d. Provide and install stainless steel sink hole cover with bolt and wing nut where necessary.

e. Submit materials, accessories, sealant, and chart/samples to COR. Field verify each installation /lavatory prior to bid. Submittal shall indicate faucet and mixing valve combination suitable for each location.

5. Immediately after installation, fixtures shall be thermostatically tested with a calibrated thermometer. Provide calibration documentation to COR upon each installation, before moving on to the next site. Record location/room number, date and final temperature. Adjust the mixing valve and re-test as required to achieve the VA temperature target of 102 to105 degrees Fahrenheit.

6. Shower valve replacement. Coordinate work with COR. Work includes valve and all components listed in basis of design below.

a. All exposed components in Buildings 11 and 17 shall be completely anti-ligature, completely tamperproof, sealed, and assembled with tamper proof fasteners.

b. The shower valve and trim set should be installed to be tamper proof/ resistant and anti/ ligature or ligature resistant. Product should meet or exceed Acorn SV16 series with ADA compliant tri-lever ligature resistant handle. Basis of design is the Acorn SV16 shower valve series.

c. The contractor will solder or braze all necessary fittings to install the new valves and trim kits. Piping may need to be reworked at each location to accommodate the new valves. Any repairs to existing piping will be made at each location to provide a finished product. Currently there are “NO” known problems to existing piping.

d. Contractor shall replace/repair wall openings cut to accommodate shower valve install.

e. Showers shall be thermostatically tested and set to 105 degrees F.

7. The contractor shall be prepared to provide and install 50 stop valves as a contingency if leaking valves are encountered. Any contingency stop valves not used after the project is complete must be turned over to the VA plumbing shop.

8. Provide an additional 10 (ea.) faucets and mixing valves for shelf stock.

9. In the case that a faucet/ valve has been replaced or is no longer needed, contractor will submit the material to the VA.

10. Provide and maintain infection control devices as required per VA specification. Contractor shall close room doors and maintain an air scrubber during work. Work area will be cleaned by the contractor before moving to next location.

11. All work must be scheduled and coordinated through the Contracting Officers Representative (COR). Each week, survey and coordinate future work with COR, providing a 2-week look-ahead review.

12. Request the final inspection in writing to the CO and COR.

13. All work shall be warranted for a 1 year.

C. BASIS OF DESIGN

TVHS has selected faucets, shower, and mixing valves as facility standards. These standards are enforced and are selected to meet the high-water temp requirements of system flushing for the prevention of Legionella. Any deviation must be approved in writing from the VA Project Manager.

1. T & S Bronze and Brass Works – Model B-1141-2VL15CR4

2. T & S Bronze and Brass Works – Model B-0890-CR-LF05 add outlet B-0199-08-LF15

3. T & S Bronze and Brass Works –Model B-2866-05CR-L15
4. T & S Bronze and Brass Works – Model B-2990 – BWH4CR add outlet B-0199-08-LF15
5. T & S Bronze and Brass Works – Model B-0231-CR4-L22
6. T & S Bronze and Brass Works – B-1122-XS-V22CR
7. T & S Bronze and Brass Works – Model BP-0300-CR-VF15
8. Acorn Controls Shower Valve – Model SV16 – include all the following components:
Showerhead CSH25; Handheld Shower – HHC23 with HHSH hose and GR 24 mounting rail.
9. Chicago Faucets Mixing Valve – Model 131-CFMABRCF with flush mode. Required

D. STATEMENT OF BID ITEMS:

1. A. BID ITEM NO. I: Provide all work, materials, infection control, management and documentation per SOW.

B. BID ITEM NO. 2: Same as BID ITEM 1 except, remove all work associated with Building 3B.

C. BID ITEM NO. 3: Same as BID ITEM 2 except, remove all work associated with Building 3A.

D. BID ITEM NO. 4: Same as BID ITEM 3 except, remove all work associated with Building 3G.

E. BID ITEM NO. 5: Same as BID ITEM 4 except, remove all work associated with Building 11.

E. CHANGES TO THE STATEMENT OF WORK

Any changes to this SOW shall be authorized and approved only through written modifications to the contract by the CO. Costs incurred by the contractor through the actions of parties other than the CO shall be borne by the contractor.

E. REPORTING REQUIREMENTS

1. Prior to work commencing the contractor shall provide the COR with a performance schedule and a schedule of values. The performance schedule shall be updated and resubmitted with each pay application. The schedule of values (SOV) shall be a true representation of the work required. For this project, payment will be based on the number of faucet/mixing valve and shower valve units installed, therefore the (SOV) should reflect this.

2. The contractor shall provide a Daily Work Report (DWR). The report must contain forces by trade, equipment, locations and work performed, testing documentation and any issues encountered. Each DWR is due the following business day. DWR’s shall be submitted electronically in a format agreed upon by the contractor and COR.

F. CONTRACTOR EXPERIENCE REQUIREMENTS

1. The contractor must inform the COR and the CO when personnel are removed from the contract for any reason.

2. Master Plumber (licensed) is required for Plumbing installations.

3. If a key person becomes unavailable to complete the contract, the proposed substitutions of key personnel shall be made by the contractor to the COR and CO.

4. The COR may request contractor or contractor personnel to be removed from the site for violating VA Medical Center rules and regulations. The Contractor will provide a corrective action write-up on personnel removed that shall be approved by CO. Corrective action may include permanent removal of personnel from the premises.

4. If a key person becomes unavailable to complete the contract, the proposed substitutions of key personnel shall be made by the contractor to the COR and CO.

5. The COR may request contractor or contractor personnel to be removed from the site for violating VA Medical Center rules and regulations. The Contractor will provide a corrective action write-up on personnel removed that shall be approved by CO. Corrective action may include permanent removal of personnel from the premises.

G. CONFIDENTIALITY AND NONDISCLOSURE

1. The preliminary and final deliverables, and all associated working papers, application source code, and other material deemed relevant by VA which have been generated by the contractor in the performance of this contract, are the exclusive property of the U.S. Government and shall be submitted to the CO at the conclusion of the contract.

2. The CO will be the sole authorized official to release any data, draft deliverables, final deliverables, or any other written or printed materials pertaining to this contract. No information shall be released by the contractor. Any request for information relating to this contract, presented to the contractor, shall be submitted to the CO for a response.

3. Press releases, marketing material, or any other printed or electronic documentation related to this project, shall not be publicized without the written approval of the CO.

ATTACHMENT A – PROJECT 626A4-24-301 MURFREESBORO

#
BLDG
ROOM
DESCRIPTION
FIXTURE TYPE
NOTES
FINAL TEMP & DATE
1
17
103
Exam Room
B-2742-A22
2
17
104
SINK
B-2742-A22
3
17
105
SINK
B-2742-A22
4
17
106
SINK
B-2703-LF15
5
17
109
SINK
B-2703-LF15
6
17
109
SINK
B-2703-LF15
7
17
110
SHOWER
8
17
110
SINK
B-2703-LF15
9
17
113
SHOWER
10
17
113
SINK
B-2703-LF15
11
17
115
SHOWER
12
17
115
SINK
B-2703-LF15
13
17
117
SHOWER
14
17
117
SINK
B-2703-LF15
15
17
120
SHOWER
16
17
120
SINK
B-2703-LF15
17
17
123
SHOWER
18
17
123
SINK
B-2703-LF15
19
17
124
SHOWER
20
17
124
SINK
B-2703-LF15
21
17
131
SHOWER
22
17
131
SINK 1
B-2742-A22
23
17
136
SINK 2
B-2866-05CR-L15
24
17
136
SINK
B-2703-LF15
25
17
137
SHOWER
26
17
137
SINK
B-2703-LF15
27
17
138
SHOWER
28
17
138
SINK
B-2703-LF15
29
17
142
SHOWER
30
17
142
SINK
B-2703-LF15
#
BLDG
ROOM
DESCRIPTION
FIXTURE TYPE
NOTES
FINAL TEMP & DATE
31
3G
G04F
SINK
B-0874-122x-CR
32
3G
G04G
SINK
B-0874-122x-CR
33
3G
GO4H
SINK
B-0874-122x-CR
34
3G
G04J
SINK
B-0874-122x-CR
35
3G
G04K
SINK
B-0874-122x-CR
36
3G
G04L
SINK
B-0874-122x-CR
37
3G
G04M
SINK
B-0874-122x-CR
38
3G
G04Q
SINK
B-0874-122x-CR
39
3G
G04P
SINK
B-0874-122x-CR
40
3G
G05
SINK
B-0874-122x-CR
41
3G
G06
SINK
B-0874-122x-CR
42
3G
G16
SINK
B-0874-122x-CR
43
3G
G18A
SINK
B-0874-122x-CR
44
3G
G18E
SINK
B-0874-122x-CR
45
3G
G18F
SINK
B-0874-122x-CR
46
3G
G18G
SINK
B-0874-122x-CR
48
3G
G18H
SINK
B-0874-122x-CR
49
3G
G18I
SINK
B-0874-122x-CR
50
3G
G18J
SINK
B-0874-122x-CR
51
3G
G18K
SINK
B-0874-122x-CR
52
3G
G18N
SINK
B-0874-122x-CR
53
3G
G18O
SINK
B-0874-122x-CR
54
3G
G18P
SINK
B-0874-122x-CR
55
3G
G21C
SINK
B-0874-122x-CR
56
3G
G21D
SINK
B-0874-122x-CR
57
3G
G21E
SINK
B-0874-122x-CR
58
3G
G21F
SINK
B-0874-122x-CR
59
3G
G21H
SINK
B-0874-122x-CR
60
3G
G21J
SINK
B-0874-122x-CR
61
3G
G21K
SINK
B-0874-122x-CR
62
3G
G21O
SINK
B-0874-122x-CR
63
3G
G04F
SINK
B-0874-122x-CR
64
3G
G04G
SINK
B-0874-122x-CR
65
3G
GO4H
SINK
B-0874-122x-CR
66
3G
G04J
SINK
B-0874-122x-CR
#
BLDG
ROOM
DESCRIPTION
FIXTURE TYPE
NOTES
FINAL TEMP & DATE
67
3A
103
SINK
B-2703-LF15
68
3A
102
SINK
B-2703-LF15
69
3A
105
SINK
B-0874-122x-CR
70
3A
106
SINK
B-0874-122x-CR
71
3A
108
SINK
B-2703-LF15
72
3A
111
SINK
B-0874-122x-CR
73
3A
112
SINK
B-0874-122x-CR
74
3A
114
SINK
B-0874-122x-CR
75
3A
115
SINK
B-0874-122x-CR
76
3A
116A
SINK1
B-2703-LF15
77
3A
116A
SINK2
B-2703-LF15
78
3A
120B
SINK
B-0874-122x-CR
79
3A
120D
SINK
B-0874-122x-CR
80
3A
120E
SINK
B-0874-122x-CR
81
3A
120F
SINK
B-0874-122x-CR
82
3A
120K
SINK
B-0874-122x-CR
83
3A
124
SINK
B-2703-LF15
84
3A
120L
SINK
B-0874-122x-CR
85
3A
123
SINK
B-2703-LF15
86
3A
125B
SINK
B-0874-122x-CR
87
3A
126A
SINK
B-0874-122x-CR
88
3A
126B
SINK
B-0874-122x-CR
89
3A
126C
SINK
B-0874-122x-CR
90
3A
126D
SINK
B-0874-122x-CR
91
3A
127C
SINK
B-0874-122x-CR
92
3A
127D
SINK
B-0874-122x-CR
93
3A
127E
SINK
B-0874-122x-CR
94
3A
130
SINK
B-2703-LF15
95
3A
135
SINK
B-2703-LF15
96
3A
135A
SINK
B-0874-122x-CR
97
3A
135C
SINK
B-2703-LF15
98
3A
135E
SINK
B-2703-LF15
99
3A
135F
SINK
B-2703-LF15
100
3A
135G
SINK
B-0874-122x-CR
101
3A
142
SINK
B-2703-LF15
102
3A
149
SINK
B-2703-LF15
103
3A
150
SINK
B-2703-LF15
104
3B
204A
SINK
B-2703-LF15
105
3B
208
SINK
B-0874-122x-CR
106
3B
210
SINK
B-0874-122x-CR
107
3B
213
SINK
B-0874-122x-CR
108
3B
214
SINK
B-0874-122x-CR
109
3B
215
SINK
B-0874-122x-CR
110
3B
215A
SINK
B-0874-122x-CR
#
BLDG
ROOM
DESCRIPTION
FIXTURE TYPE
NOTES
FINAL TEMP & DATE
111
3B
219
SINK
B-0874-122x-CR
112
3B
219A
SINK
B-0874-122x-CR
113
3B
220
SINK
B-0874-122x-CR
114
3B
233
SINK
B-2703-LF15
115
3B
238
SINK
B-0874-122x-CR
116
3B
238A
SINK
B-0874-122x-CR
117
3B
240
SINK
B-0874-122x-CR
118
3B
241
SINK
B-0874-122x-CR
119
3B
242
SINK
B-0874-122x-CR
120
3B
242
SINK
B-0874-122x-CR
121
3B
245A
SINK
B-0874-122x-CR
122
3B
245B
SINK
B-0874-122x-CR
123
3B
247
SINK
B-2703-LF15
124
3B
248
SINK
B-0874-122x-CR
125
3B
248A
SINK
B-0874-122x-CR
126
3B
252
SINK
B-2703-LF15
127
3B
253
SINK
B-2703-LF15
#
BLDG
ROOM
DESCRIPTION
FIXTURE TYPE
NOTES
FINAL TEMP & DATE
128
11G
G07
SINK
B-0874-122x-CR
129
11A
109
SINK
B-2703-LF15
130
11A
109
SINK
B-2703-LF15
131
11A
109
SINK
B-2703-LF15
132
11A
109
SHOWER
133
11A
114A
SINK
B-2703-LF15
134
11A
114B
SINK
B-0874-122x-CR
135
11B
209
SINK
B-0874-122x-CR
137
11B
209
SINK
B-0874-122x-CR
138
11B
209
SHOWER
139
11B
209
SHOWER
140
11B
215
SINK
B-0874-122x-CR
141
11B
215
SINK
B-0874-122x-CR
142
11B
215
SHOWER
#
BLDG
ROOM
DESCRIPTION
FIXTURE TYPE
NOTES
FINAL TEMP & DATE
143
117
G04
SINK
B-2703-LF15
144
117
G06
SINK
B-2703-LF15
145
117
G07
SINK
B-2703-LF15
146
117
G07A
SINK
B-2703-LF15
147
117
G08
SINK
B-2703-LF15
148
117
G09
SINK
B-2703-LF15
149
117
G11
SINK
B-0874-122x-CR
150
117
G12
SINK
B-0874-122x-CR
151
117
G13
SINK
B-0874-122x-CR
152
117
G14
SINK
B-0874-122x-CR
153
117
G15
SINK
B-0874-122x-CR
154
117
G16
SINK
B-0874-122x-CR
155
117
G20
SINK
B-0874-122x-CR
156
117
G21
SINK
B-0874-122x-CR
157
117
G22
SINK
B-0874-122x-CR
158
117
G23
SINK
B-0874-122x-CR
159
117
G25
SINK
B-0874-122x-CR
160
117
G26
SINK
B-0874-122x-CR
161
117
G27
SINK
B-0874-122x-CR
162
117
G28
SINK
B-0874-122x-CR
163
117
G29
SINK
B-0874-122x-CR
164
117
G31
SINK
B-0874-122x-CR
165
117
G32
SINK
B-0874-122x-CR
166
117
G33
SINK
B-2703-LF15
167
117
G34
SINK
B-2703-LF15
168
117
G35
SINK
B-2703-LF15
169
117
G36
SINK
B-2703-LF15
170
117
G37B
SINK
B-2703-LF15
171
117
G37C
SINK
B-2703-LF15
172
117
G37D
SINK
B-2703-LF15
#
BLDG
ROOM
DESCRIPTION
FIXTURE TYPE
NOTES
FINAL TEMP & DATE
173
117
G37E
SINK
B-0874-122x-CR
174
117
G37F
SINK
B-0874-122x-CR
175
117
G37G
SINK
B-0874-122x-CR
176
117
G37H
SINK
B-0874-122x-CR
177
117
G37I
SINK
B-0874-122x-CR
178
117
G37K
SINK
B-0874-122x-CR
179
117
G37L
SINK
B-0874-122x-CR
180
117
G37M
SINK
B-0874-122x-CR
181
117
G37N
SINK
B-0874-122x-CR
182
117
G37Q
SINK
B-0874-122x-CR
183
117
G37R
SINK
B-0874-122x-CR
184
117
G37S
SINK
B-0874-122x-CR
185
117
G42
SINK 1
B-0874-122x-CR
186
117
G42
SINK 2
B-0874-122x-CR
187
117
G44
SINK 1
B-0874-122x-CR
188
117
G44
SINK 2
B-0874-122x-CR
189
117
G45C
SINK
B-0874-122x-CR
190
117
G45E
SINK
B-0874-122x-CR
191
117
G45J
SINK
B-0874-122x-CR
192
117
G45K
SINK
B-0874-122x-CR
193
117
G45L
SINK
B-0874-122x-CR
194
117
G45M
SINK
B-0874-122x-CR
195
117
G45N
SINK
B-0874-122x-CR
196
117
G45P
SINK
B-0874-122x-CR
197
117
G45Q
SINK
B-0874-122x-CR
198
117
G45T
SINK
B-0874-122x-CR
199
117
G45U
SINK
B-0874-122x-CR
200
117
G45V
SINK
B-0874-122x-CR
201
117
G45W
SINK
B-0874-122x-CR
202
117
G45X
SINK
B-0874-122x-CR
203
117
G45Y
SINK
B-0874-122x-CR
204
117
G49
SINK
B-0874-122x-CR
205
117
G54
SINK
B-2703-LF15
206
117
G56
SINK
B-2703-LF15
207
117
G57
SINK
B-2703-LF15
208
117
G59
SINK
B-2703-LF15
209
117
G60
SINK
B-2703-LF15

PROJECT #626A4-24-301 Replace Faucets in Buildings 11, 17, 3