This document is an amendment to a solicitation for the Building 2 Flooring and Lighting Replacement project at the Department of Veterans Affairs Veterans Health Administration Veterans Integrated Service Network 9 medical center. The amendment provides additional requests for information and responses related to project scope details. Questions address the need for scale drawings to determine patching and painting quantities, items to be removed and salvaged from walls, reuse of existing electrical components, and project phasing and duration. Responses clarify square footages for flooring replacement, assume quantities of items to be removed from walls, indicate existing conduit and conductors can be reused if compatible with new lights, and maintain that the project must be completed at night and on weekends within the original 120-day period of performance to minimize disruption to facility operations.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| 36C24924B0002 0004.docx | DOCX document | |
| Dimensions 2.pdf | ||
| Dimensions 147.pdf | ||
| Question 1 Answered_Redacted.pdf | ||
| Question 2 Answered_Redacted.pdf | ||
| 36C24924B0002 0002.docx | DOCX document | |
| 36C24924B0002 0001.docx | DOCX document | |
| Site Visit Sign In Sheet.pdf | ||
| 36C24924B0002.pdf | ||
| 626A4-24-502 Combined Specs.pdf | ||
| WD TN20230187 10132023 Rutherford.pdf | ||
| 626A4-24-502 Combined Drawings.pdf |
Show all 12
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
5. PROJECT NUMBER (if applicable)
CODE
7. ADMINISTERED BY
2.
AMENDMENT/MODIFICATION NUMBER
CODE
6. ISSUED BY
8. NAME AND ADDRESS OF CONTRACTOR
4. REQUISITION/PURCHASE REQ. NUMBER
3. EFFECTIVE DATE
9A. AMENDMENT OF SOLICITATION NUMBER
9B. DATED
PAGE OF PAGES
10A.
MODIFICATION OF CONTRACT/ORDER NUMBER
10B. DATED
BPA NO.
1. CONTRACT ID CODE
FACILITY CODE
CODE
Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods:
The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers
E. IMPORTANT:
is extended,
(a) By completing Items 8 and 15, and returning __________ copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted; or (c) By separate letter or electronic communication which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY is not extended.
12. ACCOUNTING AND APPROPRIATION DATA
(REV. 11/2016)
is required to sign this document and return ________ ___ copies to the issuing office.
is not, A. THIS CHANGE ORDER IS ISSUED PURSUANT TO:
Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT ORDER NO. IN ITEM 10A.
15C. DATE SIGNED
B. THE ABOVE NUMBERED CONTRACT/ORDE
R IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES
SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).
RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by letter or electronic communication, provided each letter or electronic communication makes reference to the solicitation and this amendment, and is rece ived prior to the opening hour and date specified.
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER
Contractor
16C. DATE SIGNED
14. DESCRIPTION OF AMENDMENT/MODIFICATION
16B. UNITED STATES OF
AMERICA
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15A. NAME AND TITLE OF SIGNER
16A. NAME AND TITLE OF
CONTRACTING OFFICER
15B. CONTRACTOR/OFFEROR
STANDARD FORM 30
PREVIOUS EDITION NOT USABLE
Prescribed by GSA - FAR (48 CFR) 53.243 (Type or print) (Type or print) (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
(Number, street, county, State and ZIP Code) (If other than Item 6) (Specify type of modification and authority) such as changes in paying office, appropriation date, etc.)
(If required)
(SEE ITEM 11)
(SEE ITEM 13)
(X)
CHECK
ONE
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS,
IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF
SOLICITATIONS
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
(Signature of person authorized to sign) (Signature of Contracting Officer) 626-24-1-4209-0002 626A4-24-502 Department of Veterans Affairs Network Contracting Office 9 (90C)
NCO 9
1639 Medical Center Parkway, Suite 204 Murfreesboro TN 37129 90C Network Contracting Office 9 Department of Veterans Affairs Network Contracting Office (90C) 1639 Medical Center Parkway Suite 204 Murfreesboro TN 37129 To all Offerors/Bidders
36C24924B0002 11-02-2023
X x
626-3640162-4209-854200-3223 23NRNR000
x The purpose of this amendment is to provide additional RFIs and responses.
Jeannette Morphew Contracting Officer
Additional RFIs and Answers 36C24924B0002 Bldg 2 Flooring and Lighting Replacement
1. We are to assume all flooring work in bldg. 2 totals 4400 sf and bldg. 147 totals 600 sf. However, without a scale for the drawing, we cannot determine quantities for patching and painting, and all other work associated with walls in bldg. 2. Please provide a scale or measurements for each room. Drawings provided.
1. RFI 12 Clarification: The responses says no scale will be provided and instead the qty’s provided by the Gov should be used. There is abatement qty provided for Bldg 2. Is it to be assumed this qty is to be used for all floor and ceiling demolition in Bldg2? See new drawings.
1. RFI 18 Clarification: The question is asking specifically what items will need to be removed from walls and/or salvaged and reinstalled. Please provide an approximate list of items and a count of each item. Assume 1 clock, and 4 pictures per room.
1. RFI 26 Clarification: The response to the question “Are all existing lighting conduit, conductors, and breakers to be reused?” said means and methods. This is not a matter of means and methods, this is specific information needed by the GOV to accurately estimate the project. Please provide clear direction. The conduit, conductors, and breakers can be reused if compatible with the lights. If not, then new conductors etc. will need to be provided.
1. RFI 32 Clarification: The response says that all areas are to remain in operation and all work is to be done after hours. Furthermore RFI 9 response states “Rooms will be given that can be completed during a shift. Rooms will be functional between 0600-1700 Monday thru Friday.” This approach can work in corridors where we can work in small sections, i.e. abate one night, replace ceilings one night, replace flooring one night, replace lighting and inspect one night, etc. However, this approach will not work for individual rooms in which GOV employees work. It is just not feasible. In order to have an office ready for an employee to work each morning the following activities are required each night; At 5pm the GOV to remove computers and equipment, the Contractor to move furniture out, the Contractor to setup ICRA, the Contractor to perform work, the Contractor to clean and remove ICRA, the Contractor to move furniture back in, the GOV to install computers and equipment by 6 am. This sequence of activities will allow maybe 4-5 hours of work to be performed each night. That is just not feasible for the GOV or the Contractor. This scenario will require 1-2 weeks per room. With approximately 26 rooms to complete, the total duration needed just to complete physical work would be about 26-52 weeks (or 182-364 calendar days). To meet the current contract duration of 120 calendar days provided in this solicitation the GOV would need to move GOV employees out of their office to allow the Contractor to work in at least 2-3 rooms concurrently. This has been typical for similar projects in the past. We respectfully request the GOV to allow the suggested phasing plan above so the Contractor can meet the period of performance on this solicitation. It is not only nights. The solicitation says nights and weekends. These jobs have been done in the past with 6 rooms or what the contractor can complete between 6pm on Friday and 6am on Monday morning. Hallways can be demolished over the weekend and then flooring laid through the following week at night.
1. If sequenced the way described in RFI 32 response, work cannot be completed in a single weeknight and will require a full weekend per room. In this scenario, we could only complete a full room in one weekend, and we estimate the work to take approximately 210 calendar days. Will the government consider extending the project to accommodate the additional duration? Not at this time.
1. RFI 17 Clarification: The response says signs will be outside of the project area, however the question was referring to existing room signs and wayfinding signs in the corridor. Will these items need to be removed and reinstalled after painting the corridors? Yes room and wayfinding signs will need to be removed and reinstalled when complete with that area.
See attached document: Dimensions 2.
See attached document: Dimensions 147.