36C24921Q0003 - 0002 36C24921Q0003 - 0002

5. PROJECT NUMBER (if applicable)

CODE

7.

ADMINISTERED BY

2. AMENDMENT/MODIFICATION NUMBER

CODE

6. ISSUED BY

8. NAME AND ADDRESS OF CONTRACTOR

4. REQUISITION/PURCHASE REQ. NUMBER

3. EFFECTIVE DATE

9A. AMENDMENT OF SOLICITATION NUMBER

9B. DATED

PAGE OF

PAGES

10A. MODIFICATION OF CONTRACT/ORDER NUMBER

10B. DATED

BPA NO.

1. CONTRACT ID CODE

FACILITY CODE

CODE

Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods:

The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers

E. IMPORTANT:

is extended,

(a) By completing Items 8 and 15, and returning __________ copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted; or (c) By separate letter or electronic communication which includes a reference to the solicitation and amendment numbers. FAILURE

OF YOUR

ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY is not extended.

12. ACCOUNTING AND APPROPRIATION DATA

(REV. 11/2016)

is required to sign this document and return ___________ copies to the issuing office.

is not, A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT ORDER NO. IN ITEM 10A.

15C. DATE SIGNED

B. THE ABOVE NUMBERE

D CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES

SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).

RESULT IN REJECTION OF YOUR

OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by letter or electronic communication, provided each letter or electronic communication makes reference to the solicitation and this amendmen t, and is received prior to the opening hour and date specified.

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER

Contractor

16C. DATE SIGNED

14. DESCRIPTION OF AMENDMENT/MODIFICATION

16B. UNITED

STATES OF AMERICA

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15A. NAME AND TITLE OF SIGNER

16A. NAME AND TITLE OF

CONTRACTING OFFICER

15B. CONTRACTOR/OFFEROR

STANDARD FORM 30

PREVIOUS EDITION NOT USABLE

Prescribed by GSA - FAR (48 CFR) 53.243 (Type or print) (Type or print) (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

(Number, street, county, State and ZIP Code) (If other than Item 6) (Specify type of modification and authority) (such as changes in paying office, appropriation date, etc.)

(If required)

(SEE ITEM 11)

(SEE ITEM 13)

(X)

CHECK

ONE

13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS,

IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF

SOLICITATIONS

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT

(Signature of person authorized to sign) (Signature of Contracting Officer) 09-03-2020 None 90C Department of Veterans Affairs Network Contracting Office 9 (90C)

NCO 9

1639 Medical Center Parkway, Suite 400 Murfreesboro TN 37129 90C Network Contracting Office 9 Department of Veterans Affairs Network Contracting Office (90C) 1639 Medical Center Parkway Suite 400 Murfreesboro TN 37129 To all Offerors/Bidders

36C24921Q0003 08-06-2020

X X X ** HOUR & DATE for Receipt of Offers is EXTENDED to:

See CONTINUATION Page X The purpose of this amendment is to provide answers to RFI's recieved and provide a correction to 1 (One) CLIN.

1. The quote due date remains September 17, 2020 @ 14:00 CST, no late quotes will be accepted.

2. Answers to 2nd set of rec eived Request for Information is attached. See: S05-RFI Answer to RFQ 36C24921Q0003

3. CLIN 1003 is hereby corrected to reflect POP Begin: 10-01-2021 - POP End: 09-30-2022. See Schedule.

---------------------------------------NO FURTHER RFI'S WILL BE ACCEPTED------------------------------------------------

---------------------------------------------END OF AMENDMENT 0002------------------------------------------------------ Shawn M. Hendricks Contracting Officer

NCO915L2-4043

CONTINUATION PAGE

A.1 PRICE/COST SCHEDULE

ITEM INFORMATION

ITEM NUMBER
DESCRIPTION OF SUPPLIES/SERVICES
QUANTITY
UNIT
UNIT PRICE
AMOUNT
12.00
MO
__________________
__________________

Maintenance, Testing, Decontamination of RO/DI system for the SPS service (Franklin R. Sousley Campus) Contract Period: Option 1 POP Begin: 10-01-2021 POP End: 09-30-2022

GRAND TOTAL
__________________

2ND RFI Answer to RFQ 36C24921Q0003

1. The 3 postfilters in the white housings are referred to as ultrafilters in Questions 2 and 14 responses. R2 states 5-micron rating, R14 states 0.5-micron rating. Ultrafilters would typically be < 0.1-micron rating and a common filter used for this application is 0.05 microns. There is significant price impact between 5 micron and 0.05 micron rated filters. What would the VA like proposed ? Clarification to previous answers for question 2 and 14. According to TIR 34 for Water quality, the ultrafilter size needs to be 0.001-0.05. I believe we are good to stay with the 0.05 micron rated filters.

1. Question 12 refers to the new Franklin campus. It lists a number of instruments to be fed. The response directed us back to spec section 1.2 and asks the water vendor to assume the consumable items for this new system. Not sure how to estimate these unless they are excluded and just the system checks, and decontamination is proposed. Clarification to previous answers for question 12. The consumables will not be excluded, per Section 1.6 “Services Performed Under Maintenance Plan” outlines the consumables, quantities and periods for servicing/replacement. Please base your quotes on this utilizing the same consumables in place as the SPS system. Section 1.2 provides the items that are in the current design of that system for situational awareness just in comparison to the one in SPS that also outlines the equipment.

END OF 2ND RFI ANSWERS