Contract Opportunity Combined Synopsis/Solicitation Notice
PRODUCT SERVICE CODE
SUBJECT
CONTRACTING OFFICE'S
ZIP-CODE
SOLICITATION NUMBER
RESPONSE DATE/TIME/ZONE
ARCHIVE
DAYS AFTER THE RESPONSE DATE
RECOVERY ACT FUNDS
SET-ASIDE
NAICS CODE
CONTRACTING OFFICE
ADDRESS
POINT OF CONTACT
(POC Information Automatically Filled from User Profile Unless Entered)
DESCRIPTION
See Attachment
AGENCY'S URL
URL DESCRIPTION
AGENCY CONTACT'S EMAIL
ADDRESS
EMAIL DESCRIPTION
ADDRESS
POSTAL CODE
COUNTRY
ADDITIONAL INFORMATION
GENERAL INFORMATION
PLACE OF PERFORMANCE
* = Required Field Contract Opportunity Combined Synopsis/Solicitation Notice J041 Refrigeration and A/C Unit Preventative Maintenance and Emergency Services Base plus four option years TVHS, NASHVILLE and MURFREESBORO CAMPUSES 37129 36C24920Q0276 07-09-2020
10:00AM
CENTRAL TIME, CHICAGO, USA
N 238220 Department of Veterans Affairs Network Contracting Office 9 (90C)
NCO 9
1639 Medical Center Parkway, Suite 400 Murfreesboro TN 37129 Christina Lawrence Christina Lawrence Christina.Lawrence2@va.gov 615-225-6463
PLEASE SEE PLACES OF PERFORMANCE LISTED IN THE
STATEMENT OF WORK (SOW)
Christina.Lawrence2@va.gov Description This is a combined synopsis/solicitation for commercial items prepared in accordance with the format in Federal Acquisition Regulation (FAR) subpart 12.6, “Streamlined Procedures for Evaluation and Solicitation for Commercial Items,” as supplemented with additional information included in this notice. This announcement constitutes the only solicitation; quotes are being requested, and a written solicitation document will not be issued.
This solicitation is issued as an RFQ. The solicitation document and incorporated provisions and clauses are those in effect through Federal Acquisition Circular 2020-06 Effective 06-05-2020.
This solicitation is unrestricted.
The associated North American Industrial Classification System (NAICS) code for this procurement is 238220, with a small business size standard of $16.5 million.
The FSC/PSC is J041.
The Nashville VA Medical Center and Alvin C. York VAMC is seeking to purchase refrigeration and A/C preventive maintenance services and emergency services.
All interested companies shall provide quotations for the following:
STATEMENT OF WORK (SOW)
Refrigeration and A/C Systems Services w/ Emergency service calls
GENERAL:
1. Introduction and Scope of Work:
Furnish all labor, materials, and equipment necessary to perform preventive maintenance and emergency maintenance, as specified for the current FY beginning August 1 through July 31, in accordance with the terms, conditions, and schedule of this agreement for the equipment on the attached list.
NOTE: Respondent must be registered in beta.SAM.gov.
Project requirements:
Base + 4 Years Contract Agreement
Base Year-2020-2021: Aug 1, 2020-July 31, 2021
Year 1-2021-2022: Aug 1, 2021-July 31, 2022
Year 2-2022-2023: Aug 1, 2022-July 31, 2023
Year 3-2023-2024: Aug 1, 2023-July 31, 2024
Year 4-2024-2025: Aug 1, 2024-July 31, 2025
2. Requirements:
a. Equipment is described on the attached list.
b. Scheduled Maintenance (Preventive Maintenance): During the PM visits, the contractor shall perform PM per OEM recommendations and to correct any equipment malfunctions to assure that the equipment meets manufacturer’s factory tolerance. Any calibration procedures or adjustments necessary to assure accurate and reliable equipment operation will be performed at this time. Any necessary cleaning of equipment, adjustment or replacements of belts will be the responsibility of the contractor. During the PM visit, the contractor will replace such parts as may be necessary for the satisfactory functioning of the equipment after following procedures outlined in paragraph 2c, PARTS.
(1) Quarterly PM inspections will be made during the months of December, March, June and September.
(2) All PM service shall be performed during normal VA working hours of 7:00a.m. to 3:30 p.m. PM is to be scheduled to minimize any inconvenience to the operation of the respective department.
(3) The contractor shall call Engineering Service five (5) days in advance to confirm that the equipment can be serviced at the time that is agreeable to the VA and the contractor. Immediately following the PM or emergency service visit, the service technician will submit one written copy of the service report detailing the work performed to address below. The report must be signed by a responsible VA employee and must list parts replaced. Since the VA pays for parts in this contract, no parts should be replaced prior to getting approval from the Utility Systems Supervisor or his designee. Unless it is an emergency, a PO number must be provided to the vendor prior to the part being replaced.
c. PARTS: Contractor shall maintain enough stock of all parts meeting the original manufacturer’s design and specification needed for repair and maintenance of the equipment or be able to secure needed parts within one (1) working day or to be overnighted upon receipt. VA reserves the right to inspect the contractor’s facility to confirm the parts are locally available. Contractor will submit a list of parts to be replaced to the Supervisor of the Air Conditioning Plant or a designee thereof, prior to replacing said parts. Contract price will be equitably adjusted to include cost or replaced parts pursuant to changes clause.
d. COMPETENCY OF CONTRACT PERSONNEL: During PM inspections and emergency service calls, all work must be performed by a qualified technician. Technician must be EPA certified in use of refrigerants. Proof thereof may be requested to be submitted to the VA Medical Center. Said technicians are always accountable and under the supervision of the contractor. Technical competency is determined by correctly diagnosing and repairing equipment problems.
e. EXCLUDED SERVICES:
Contractor shall not be obligated to provide services under this agreement for (a) damage to or destruction of instrument(s) covered where such damage or destruction is (1) a result of or caused by fire or explosion of any origin, riot, civil commotion, aircraft, war, or any act of God including, but not limited to lightening, windstorm, hail, flood, earthquake, or (2) caused by the VAMC misuse or abuse of such instrument; (b) decontamination due to spillage; (c) interpretation of data; (d) installation of unauthorized field modifications; (e) accessories not listed nor included in agreement.
3. References: Standards of operation must always meet factory tolerance specifications.
4. Delivery:
a. Quarterly PM inspections will be made during the months of December, March, June and September.
b. All PM service shall be performed during normal VA working hours of 7:00 a.m. to 3:30 p.m. PM is to be scheduled to minimize any inconvenience to the operation of the respective department.
c. SERVICEMAN/REPAIRMAN: During PM inspections and emergency service calls, the service technician will be accompanied by the Utility Systems Operator Supervisor or designee thereof. The serviceman is to report to the Engineering Office of the respective campus for work to be performed.
d. There shall be a 2-hour response time for the Liebert cooling units that serve many important areas within the hospital such as, IRM computer rooms, MRI, Cardiac Cath, and CT rooms. There shall be a 2-hour response time for the Kitchen and Canteen Coolers that are important in serving patients, visitors and staff.
e. There shall be a 4-hour response time for the Walk-in cool boxes (Environmental Rooms) located in the Acre Bldg.
5. Progress and Compliance:
a. After each scheduled PM or emergency maintenance call is complete, the serviceman is to leave a signed service ticket with the Utility Systems Operator Supervisor or a designee thereof, during normal duty hours of 7:00am a.m. to 3:30 p.m., Monday through Friday.
b. After normal duty hours, the contractor will use the phone to call the Boiler Room Operator to leave the signed service ticket. The ticket must explain in detail, the arrival time, the problem, and what the repair was. If any part is needed a quote will be provided to the Utility Systems Supervisor at the start of the next workday.
c. Payment will be made quarterly in arrears upon receipt of signed service report.
6. Notes:
a. Any additional charges not included within this service agreement must have the PRIOR approval of the Contracting Officer before any costs are incurred.
b. Contractors are responsible for finding their own parking. Currently, contractors cannot park at the VAMC Nashville Campus. Contractors may park temporarily to drop off tools and supplies only.
c. Contractors required to obtain Temporary ID Badge from Engr Svc, Bldg. 18 Murfreesboro or Room D73 Nashville, while on VA property if not escorted during entire visit by an Engr Svc employee.
Equipment listing
REFRIGERATION AND A/C SYSTEMS
TVHS, NASHVILLE and MURFREESBORO CAMPUSES
NASHVILLE
| Equipment | Serial # | PM or EE # | Location | |
| Bally Walk-in Unit L27331 | 4110-5334 | F603 |
Commercial Refrigerator
Liebert Challenger System 355492002 4310-3188 D-03 Model No. FE219WUAAG IRM Basement Computer Room AHU 14
Liebert Challenger System 355492001 4310-3187 D-03 Model No. FE199A7AAG IRM Basement Computer Room AHU 15
Forma Freezer 812324 4110-5348 B46 Model No. 8096
Liebert Challenger Sys. 697619-001 D-27F Model No. DE245aae1
MRI AHU 34
Liebert Challenger Sys. 323192001 4310-3144 D-57 Model No. FH086WAAM
CT AHU 46
Forma Scientific Walk-in Coolers, Model 74739:
| 4310-2046 | F-305 | ||
| 4310-2047 | F-312 | ||
| 4310-2048 | F-405 | ||
| 4310-2049 | F-412 | ||
| 4310-2050 | F-505 | ||
| 4310-2051 | F-516 |
Walk-in Freezer, Maneurop Compressor Model CLTW504
| SN 9410705 | 4310-3125 | 1st Floor – Kitchen | ||
| SN 9410706 4310-3126 | 1st Floor – Kitchen | |||
| Morgue Box – Basement Morgue, Mopec | EE 91718 | Room A03 |
Canteen walking Boxes –
| Kolpack | SN 9205802220P | Model 18610-S | E-109 | |
| Kolpack | SN 9205B0220PF | Model 18903S | E-109 | |
| Kolpak | SN 963650760P | Model 18500-S | D-101 | |
| Kolpak | SN 96365710P | Model 18602-S | D-101 |
Cardiac Cath Unit #11 Mistubishi Model PUYA36NHA4 S/N 18003974D Loc: Fan Room 4
Cardiac Cath Unit #12 Mistubishi Model PUYA36NHA4 S/N 18004036D Loc: Fan Room 4
Cardiac Cath Unit #12 Mistubishi Model PUBA36NHA4 S/N 25U047288A Loc: Fan Room 4
IRM AHU 10 Compu Air Model CAA-1534C S/N 82735Y0910-5429 Loc: D03
IRM AHU 15 Compu Air Model CAA-1534C S/N 82735Y0910-5439 Loc: D03
Environmental cold room F412 Heatcraft Model: BST21M6C S/N T12C16085
Environmental cold room F512 Heatcraft Model: LST020M6CS S/N T12C16085
MURFREESBORO
| Equipment | Serial # | PM or EE # | Location | ||
| Morgue Cooler | E967035-011 | Bldg 1, G23a | |||
| M# IPE-H15M4-2 |
| Morgue Condensing unit | 5007E02191 | Bldg 1, Roof | |
| M#25HBR348A520 |
| Liebert A/C Unit | 0809C09028 | Bldg 5, IRM |
| Model DCSF083-P | Outside on Right | Rm 115, Murfreesboro |
| Liebert A/C Unit | 0809C09026 | Bldg 5, IRM |
| Model DCSF083-P | Outside on Left | Rm 115, Murfreesboro |
| Liebert A/C Unit | NO8B740196 | Bldg 5, IRM | |
| Model BF067A-CAE15261 | #1 | Rm 115, Murfreesboro |
| Liebert A/C Unit | NO8B740195 | Bldg 5, IRM | ||
| Model BF067A-CAE15261 | #2 | Rm 115 |
Liebert A/C Unit D16845 EE 60878 Bldg 1, Rm G36A Model DMC037APLL
Liebert A/C Unit PS048A-AB2 EE 60765 Bldg 1, Rm G36A
| Lennox M A/C Unit | 5808E22515 | EE 92443 | Telephone Switch Room | |
| Model 13ACD-060-230-04 | Bldg. 1 |
American Standard M34322L2H EE 71908 Bldg. 146 Model #YCC024F1LOBE
American Standard K395S0E2H EE 52915 Bldg. 147 Model YCC048F1HOBC
American Standard L4023C02H EE 71907 Bldg. 147 Model YCC048F1HOBD
| Mistubishi | 31900433A | Bldg. 7 | |
| Model MUZ09UN | Psychiatry |
| Fujitsu | CWN000953 | EE | Bldg 7 | |||
| Model AOU36RLX | Elevator Machine Room | |||||
| Fujitsu Mini Split | M# AOU48RLXFZ | EE-112380 | ||||
| Directors Offices | S# 651 |
(3 Cassetts)
| Fujitsu Mini Split | M# AOU24RRXFZ | EE-113774 |
| Chief of Staff | S# LUN007819 |
(2 Cassetts)
| Fujitsu Mini Split | M# AOU48RLXFZ | EE-113775 |
| Conference Room | S# KNN001409 |
(3 Cassetts)
| Fujitsu Mini Split | M# AOU48RLXFZ | EE-137398 |
| B-1 1st floor Right | S# 1443 |
(2 Cassetts)
| Fujitsu Mini Split | M# AOU48RLXFZ | EE-137399 |
| B-1 1st floor Left | S# 2989 |
(4 Cassetts)
| Fujitsu Mini Split | M# ASU12RLS2 | EE-?????? |
| B-1 Ground G37I | S# JAR 038950 |
(Wall Cassett)
| Mistubishi | 82U00321B | EE | Bldg 1 | |
| Model PUMY-P36NHMU | Dirs Conference Rm 149 |
BARD 190P092671559-02 EE Bldg. 120 MRI Model WA701HC9X-G
BARD 190PO92671559 EE Bldg. 120 MRI Model WA701HC9X-G
CARRIER 2059X91173 EE Bldg. 120 MRI Model 38QRR036-3
MITSUBISHI 8YU00224A EE Bldg. 120 MRI Model PUZ-A30NHA2
Tennessee Fisher House: Carrier CU-1 Model # 38AUDA12AOA5AOAOAO Serial # 1813C93672
AHU #1 Carrier Model #4OR6AA12A2A6AOAOAO Serial # 3912644868
Tennessee Fisher House: Carrier CU-2 Model # 38AUDA12AOA5AOAOAO Serial # 1813C93676
AHU-2 Carrier Model # 40RHAA12A2A6AOAOAO Serial # 2612628100
Tennessee Fisher House: Carrier CU-3 Model # 24ABB36OA520 1613E07268
AHU-3 Carrier Model # FX4DNF061 Serial # 5012A84197
Tennessee Fisher House; Boiler LAARS Model # MT2H Serial # C13249013
Pharmacy Building 3 Roof top Unit
AAON EE-113809 Model # RN-025-3-0-EB09-000 Serial # 202007-BNCR02827
Pharmacy Refrigerators and Freezers: Building #3 Gem- EE-112557 Model #GAR2-G Serial # 1.1215E+11
Forma Scientific-EE-28822 Model # 3660 Serial # 85532776
So-Low EE-113800 Model # DHN4-80GD-0 Serial # 11110156
Gem- EE-92795 Model # Serial # 0808-0552
Revco Thermo dynamics EE-86029 Model # ULT3030A Serial # P165-128054PS
Lab Coolers and Freezers Building 117 room 139
Norlake Freezer EE-76487 M#NSPF482WWW/0 S#5090848
Norlake Refrigerator EE-79848 M#NSPR522WWG/O S#5050054
Norlake Freezer EE-88454 M#NSPF522WWW/0 S#7071302
Norlake Refrigerator EE-83642 M#NSPR803WWG/8 S#609412
Norlake Refrigerator EE-83641 M#NSPR803WWG/8 S#609331
Helmer Refrigerator EE-15842 M#HBR256-GX S#2073338
Thermo Blood EE-73226 M#3866 S#502340-223
Helmer Blood Freezer EE-114042 M#IPF105 S#2000498
Kelvanator Refrigerator EE-59599 M#BTSORG-4.1 S#C4177135
Helmer Refrigerator EE-125128 M#IPR256 S#2008305
Helmer Refrigerator EE-125129 M#IPR256 S#2008306
Norlake Refrigerator EE-86603 M#NSPR522WWG/o S#7040673
Helmer Refrigerator EE-108537 M#ILR120 S#997188
Helmer Refrigerator EE-132954 M#HPR256 S#2015027
Norlake Ultra-Low EE-121827 M#NSSUF241WWW/4 S#1305232
Kitchen Equipment: Building #2 Main Kitchen
| WC-01 | Thermo-Kool Walk In Cooler EE-72413 | |
| Model # TK4278-WFR-L | ||
| Serial # 40162 | ||
| Condenser-Air Cooled (Heat Craft) | ||
| Model #M0S040M6BCF | ||
| Serial # TO2K00945 |
| WC-02 | Bally Walk In Cooler EE-96475 | |
| Model # 3677.5-4-6 | ||
| Serial # DX9807724-02 | ||
| Cond. Unit Air Cooled | ||
| Model # BEHA010H2-HT3BB | ||
| Serial # 82403960 |
| WC-03 | Bally Walk In Cooler | |
| Model # 367735-4-P | ||
| Serial # DX9807724-01 | ||
| Cond. Unit Air Cooled | ||
| Model # BEHA025E6-HT38-F |
| WF-1/108J | Bally Walk in Freezer | |
| Evap. Heat Craft EE-109163 | ||
| Model # LET160BEWMC6K | ||
| Serial # T10E14377 | ||
| Evap. Heat Craft EE-109164 | ||
| Model # LET160BEWMC6K | ||
| Serial # T10E14376 | ||
| Cond. Unit Air Cooled Heat Craft EE-109162 | ||
| Model # BTD0600LBC | ||
| Serial # T10F05206 |
| TC1/108R | Bally Walk in Cooler (Thaw) | |
| Evap. Heat Craft EE-109166 | ||
| Model # ADT130AEWMC6K | ||
| Serial # T10E12659 | ||
| Evap. Heat Craft EE-109167 | ||
| Model # ADT130AEWMC6K | ||
| Serial # T10E14373 | ||
| Cond. Unit Air Cooled Heat Craft EE-109165 | ||
| Model # M0H015X63C | ||
| Serial # T10F05195 |
| WC-04/108J | Bally Walk in Cooler | |
| Evap. Heat Craft EE-109158 | ||
| Model # ADT130AEWMC6K | ||
| Serial # T10E14375 | ||
| Evap. Heat Craft EE-109168 | ||
| Model # ADT130AEWMC6K | ||
| Serial # T10E14374 | ||
| Cond. Unit Air Cooled Heat Craft EE-109157 | ||
| Model # MOH030X63C | ||
| Serial # T10F05219 |
WC-05/108LBally Walk in Cooler
| Evap. Heat Craft EE-109159 |
| Model # ADT156AEWMC6K |
| Serial # T10E14371 |
| Evap. Heat Craft EE-109160 |
| Model # ADT156AEWMC6K |
| Serial # T10E14372 |
| Cond. Unit Air Cooled Heat Craft EE-109161 |
| Model # M0Z035M36C |
| Serial # T10F05221 |
| SC-01 | Blast Freezer Traulsen EE-96488 |
| Model # RBC200 | |
| Serial # T95302108 | |
| Cond. Unit Air Cooled Copland | |
| Model # VJHA40HTHC020 | |
| Serial # UKN |
| SC-02 | Blast Freezer Traulsen EE-96489 |
| Model # RBC200 | |
| Serial # T95302109 | |
| Cond. Unit Air Cooled Copland | |
| Model # VJHA40HTHC020 |
| C/F 01 | Cooler/Freezer Traulsen | EE-96477 | |
| Model # RDX132WUTHHS | |||
| Serial # T95080108 |
| C-01 | Cooler Traulsen | EE-96464 |
| Model # RHT132WUTFHS | ||
| SERIAL # T00259K08 |
| C-02 | Cooler 2 door Cart Traulsen | EE-96467 |
| Model # RR1232HUTFHS | ||
| Serial # T94578108 |
| C-03 | Cooler 2 door Cart Traulsen | EE-96466 |
| Model # RR1232HUTFHS | ||
| Serial # T9460518 |
| C-04 | Cooler Aladdin | EE-????? |
| Model # ADL-26 | ||
| Serial # ????? |
| C-05 | Cooler Aladdin | EE-92122 |
| Model # ADL-26 | ||
| Serial # 8217161 |
| C-06 | Cooler Aladdin | EE-????? |
| Model # ADL-26 | ||
| Serial # ????? |
| C-07 | Cooler Aladdin | EE-92123 |
| Model # ADL-26 | ||
| Serial # 8217162 |
| C-08 | Cooler Traulsen | EE-96463 |
| Model # RHT132WUTFSH | ||
| Serial # T00151K08 |
| C-09 | Cooler Traulsen | EE-96479 |
| Model # RR1232HUTFSH | ||
| Serial # T97560J08 |
| C-10 | Cooler Traulsen | EE-96465 |
| Model # RR1232HUTFSH | ||
| Serial # T94607I08 |
| C-11 | Cooler Traulsen | EE-96480 |
| Model # RR1232HUTFSH | ||
| Serial # T00119K08 |
| C-12 | Cooler Traulsen | EE-92121 |
| Model # ADL-26 | ||
| Serial # 8218182 |
| C-13 | Cooler Traulsen | EE-96462 |
| Model # RR1232WUTFSH | ||
| Serial # T00072K08 |
| F-01 | Freezer Traulsen | EE-96470 | |
| Model # RLT132WUTFSH | |||
| Serial | # T00077K08 |
| F-02 | Freezer Traulsen | EE-96468 | |
| Model # RLT232WUTFSH | |||
| Serial | # T00267K08 |
| F-03 | Freezer Traulsen | EE-96469 | |
| Model # RLT232W1NUTFSH | |||
| Serial | # T00159K08 |
| Tray Line | Kitchen Avtec | |
| Comp. Cold Top Total of 4 | ||
| Model # LX120A035W0 | ||
| Serial # TTB2779206A |
| Chill Plate Table | Dinningroom EE-93197 | |
| Duke Model # DCTF60PGM |
Building 106 Women’s Clinic
Rheem Split System (AHU-1) M#RA1642AC1NB S#W261536303
Rheem Split System (AHU-2) M#RA1348AJ1NB S#W261536288
Rheem Split System (AHU-3) M#RA1624AJ1HA S#W271508251
Rheem Split System (AHU-4) M#RA1336AC1NB S#281501192
Rheem Split System (AHU-5) M#RA1624I1NA S#W261536347
Rheem Split System (AHU-6) M#RA1348AC1NB S#W261536347
Samsung Mini Split w-2 wall cassettes M#AJ036JCJ5CH/AA S#B48ZP3CG400296T
Building 107 Canteen
Cooler Combination Walk in EE-111068 Evap. HTP Model # HTA28-134B-AS Serial # E11E55291105003
Cond. Roof Top Air Cooled EE-111059 Model # HLH151M44-E Serial # E11E55191309002
| Ice Machine Hoshizaki | EE-84780 | ||
| Model # KM280MWH | Serial # N10676K |
Building 17 RRTP
Lochinvar Boiler B-17 EE-154602 Model KBN400 Serial 170210445663
Lochinvar Boiler B-17 EE-154601 Model KBN400 Serial 170210445664
Trane South Condensing Unit EE-154601 Model TTA18H300AA Serial 17022KU7TA
Trane North Condensing Unit EE-154601 Model TTA18H300AA Serial 16334M07TA
Anticipated period of performance: 08/01/2020 thru 07/31/2025.
Place of Performance/Place of Delivery
| Address: |
| Tennessee Valley Healthcare Systems |
1310 24th Avenue South Nashville, TN
| Postal Code: |
| 37212 |
Place of Performance/Place of Delivery
| Address: |
| Alvin C. York VA Medical Center |
3400 Lebanon Pike Murfreesboro, TN
| Postal Code: |
| 37212 |
The full text of FAR provisions or clauses may be accessed electronically at http://acquisition.gov/comp/far/index.html.
The following solicitation provisions apply to this acquisition:
1. FAR 52.212-1, “Instructions to Offerors–Commercial Items” March 2020
2. FAR 52.212-3, “Offerors Representations and Certifications–Commercial Items” Offerors must complete annual representations and certifications electronically via the System for Award Management (SAM) website located at https://www.sam.gov/portal in accordance with FAR 52.212-3, “Offerors Representations and Certifications–Commercial Items.” If paragraph (j) of the provision is applicable, a written submission is required.
The following contract clauses apply to this acquisition:
· FAR 52.212-4, “Contract Terms and Conditions–Commercial Items” OCT 2018
· FAR 52.212-5, “Contract Terms and Conditions Required to Implement Statutes or Executive Orders” MAR 2020
| FAR Number |
| Title |
| Date |
| 52.203-16 |
| PREVENTING PERSONAL CONFLICTS OF INTEREST |
| DEC 2011 |
| 52.203-17 |
| CONTRACTOR EMPLOYEE WHISTLEBLOWER RIGHTS AND REQUIREMENT TO INFORM EMPLOYEES OF WHISTLEBLOWER RIGHTS |
| APR 2014 |
| 52.204-4 |
| PRINTED OR COPIED DOUBLE-SIDED ON POSTCONSUMER FIBER CONTENT PAPER |
| MAY 2011 |
| 52.204-13 |
| SYSTEM FOR AWARD MANAGEMENT MAINTENANCE |
| OCT 2018 |
| 52.232-18 |
| AVAILABILITY OF FUNDS |
| APR 1984 |
| 52.232-19 |
| AVAILABILITY OF FUNDS FOR THE NEXT FISCAL YEAR |
| APR 1984 |
| 52.232-40 |
| PROVIDING ACCELERATED PAYMENTS TO SMALL BUSINESS SUBCONTRACTORS |
| DEC 2013 |
(End of Clause)
52.217-8 OPTION TO EXTEND SERVICES (NOV 1999)
The Government may require continued performance of any services within the limits and at the rates specified in the contract. These rates may be adjusted only as a result of revisions to prevailing labor rates provided by the Secretary of Labor. The option provision may be exercised more than once, but the total extension of performance hereunder shall not exceed 6 months. The Contracting Officer may exercise the option by written notice to the Contractor within 30.
(End of Clause)
52.217-9 OPTION TO EXTEND THE TERM OF THE CONTRACT (MAR 2000)
(a) The Government may extend the term of this contract by written notice to the Contractor within 30; provided that the Government gives the Contractor a preliminary written notice of its intent to extend at least 60 days before the contract expires. The preliminary notice does not commit the Government to an extension.
(b) If the Government exercises this option, the extended contract shall be considered to include this option clause.
(c) The total duration of this contract, including the exercise of any options under this clause, shall not exceed 66 months.
(End of Clause)
VAAR 852.203-70 COMMERCIAL ADVERTISING (MAY 2018)
The Contractor shall not make reference in its commercial advertising to Department of Veterans Affairs contracts in a manner that states or implies the Department of Veterans Affairs approves or endorses the Contractor’s products or services or considers the Contractor’s products or services superior to other products or services.
(End of Clause)
VAAR 852.232-72 ELECTRONIC SUBMISSION OF PAYMENT REQUESTS (NOV 2018)
(a) Definitions. As used in this clause—
(1) Contract financing payment has the meaning given in FAR 32.001;
(2) Designated agency office means the office designated by the purchase order, agreement, or contract to first receive and review invoices. This office can be contractually designated as the receiving entity. This office may be different from the office issuing the payment;
(3) Electronic form means an automated system transmitting information electronically according to the accepted electronic data transmission methods and formats identified in paragraph (c) of this clause. Facsimile, email, and scanned documents are not acceptable electronic forms for submission of payment requests;
(4) Invoice payment has the meaning given in FAR 32.001; and
(5) Payment request means any request for contract financing payment or invoice payment submitted by the contractor under this contract.
(b) Electronic payment requests. Except as provided in paragraph (e) of this clause, the contractor shall submit payment requests in electronic form. Purchases paid with a Government-wide commercial purchase card are considered to be an electronic transaction for purposes of this rule, and therefore no additional electronic invoice submission is required.
(c) Data transmission. A contractor must ensure that the data transmission method and format are through one of the following:
(1) VA’s Electronic Invoice Presentment and Payment System at the current website address provided in the contract.
(2) Any system that conforms to the X12 electronic data interchange (EDI) formats established by the Accredited Standards Center (ASC) and chartered by the American National Standards Institute (ANSI).
(d) Invoice requirements. Invoices shall comply with FAR 32.905.
(e) Exceptions. If, based on one of the circumstances in this paragraph (e), the Contracting Officer directs that payment requests be made by mail, the Contractor shall submit payment requests by mail through the United States Postal Service to the designated agency office. Submission of payment requests by mail may be required for—
(1) Awards made to foreign vendors for work performed outside the United States;
(2) Classified contracts or purchases when electronic submission and processing of payment requests could compromise the safeguarding of classified or privacy information;
(3) Contracts awarded by contracting officers in the conduct of emergency operations, such as responses to national emergencies;
(4) Solicitations or contracts in which the designated agency office is a VA entity other than the VA Financial Services Center in Austin, Texas; or
(5) Solicitations or contracts in which the VA designated agency office does not have electronic invoicing capability as described above.
(End of Clause)
VAAR 852.270-1 REPRESENTATIVES OF CONTRACTING OFFICERS (JAN 2008)
The contracting officer reserves the right to designate representatives to act for him/her in furnishing technical guidance and advice or generally monitor the work to be performed under this contract. Such designation will be in writing and will define the scope and limitation of the designee's authority. A copy of the designation shall be furnished to the contractor.
(End of Clause)
The following subparagraphs of FAR 52.212-5 are applicable:
(a) The Contractor shall comply with the following Federal Acquisition Regulation (FAR) clauses, which are incorporated in this contract by reference, to implement provisions of law or Executive orders applicable to acquisitions of commercial items:
(1) 52.203-19, Prohibition on Requiring Certain Internal Confidentiality Agreements or Statements (JAN 2017) (section 743 of Division E, Title VII, of the Consolidated and Further Continuing Appropriations Act, 2015 (Pub. L. 113-235) and its successor provisions in subsequent appropriations acts (and as extended in continuing resolutions)).
(2) 52.204–23, Prohibition on Contracting for Hardware, Software, and Services Developed or Provided by Kaspersky Lab and Other Covered Entities (Jul 2018) (Section 1634 of Pub. L. 115–91).
(3) 52.204–25, Prohibition on Contracting for Certain Telecommunications and Video Surveillance Services or Equipment. (AUG 2019) (Section 889(a)(1)(A) of Pub. L. 115–232).
(4) 52.209-10, Prohibition on Contracting with Inverted Domestic Corporations (NOV 2015).
(5) 52.233-3, Protest After Award (Aug 1996) (31 U.S.C. 3553).
(6) 52.233-4, Applicable Law for Breach of Contract Claim (Oct 2004) (Public Laws 108-77 and 108-78 (19 U.S.C. 3805 note)).
(b) The Contractor shall comply with the FAR clauses in this paragraph (b) that the Contracting Officer has indicated as being incorporated in this contract by reference to implement provisions of law or Executive orders applicable to acquisitions of commercial items:
[X] (1) 52.203-6, Restrictions on Subcontractor Sales to the Government (Sept 2006), with Alternate I (Oct 1995) (41 U.S.C. 4704 and 10 U.S.C. 2402).
[X] (4) 52.204–10, Reporting Executive Compensation and First-Tier Subcontract Awards (Oct 2018) (Pub. L. 109–282) (31 U.S.C. 6101 note).
[X] (8) 52.209-6, Protecting the Government's Interest When Subcontracting with Contractors Debarred, Suspended, or Proposed for Debarment. (OCT 2015) (31 U.S.C. 6101 note).
[X] (19) 52.219-14, Limitations on Subcontracting (MAR 2020) (15 U.S.C. 637(a)(14)).
[X] (ii) Alternate I (MAR 2020) of 52.219-28.
[X] (27) 52.222-3, Convict Labor (June 2003) (E.O. 11755).
[X] (29) 52.222-21, Prohibition of Segregated Facilities (APR 2015).
[X] (30)(i) 52.222–26, Equal Opportunity (SEP 2016) (E.O. 11246).
[X] (ii) Alternate I (JULY 2014) of 52.222-35.
[X] (32)(i) 52.222-36, Equal Opportunity for Workers with Disabilities (JUL 2014) (29 U.S.C. 793).
[X] (33) 52.222-37, Employment Reports on Veterans (FEB 2016) (38 U.S.C. 4212).
[X] (34) 52.222-40, Notification of Employee Rights Under the National Labor Relations Act (DEC 2010) (E.O. 13496).
[X] (ii) Alternate I (MAR 2015) of 52.222-50 (22 U.S.C. chapter 78 and E.O. 13627).
[X] (44) 52.223-18, Encouraging Contractor Policies to Ban Text Messaging While Driving (AUG 2011) [X] (51) 52.225-13, Restrictions on Certain Foreign Purchases (JUN 2008) (E.O.'s, proclamations, and statutes administered by the Office of Foreign Assets Control of the Department of the Treasury).
[X] (57) 52.232-33, Payment by Electronic Funds Transfer—System for Award Management (Oct 2018) (31 U.S.C. 3332).
[X] (2) 52.222-41, Service Contract Labor Standards (AUG 2018) (41 U.S.C. chapter 67).
[X] (3) 52.222-42, Statement of Equivalent Rates for Federal Hires (MAY 2014) (29 U.S.C. 206 and 41 U.S.C. chapter 67).
[X] (4) 52.222-43, Fair Labor Standards Act and Service Contract Labor Standards—Price Adjustment (Multiple Year and Option Contracts) (AUG 2018) (29 U.S.C. 206 and 41 U.S.C. chapter 67).
[X] (8) 52.222-55, Minimum Wages Under Executive Order 13658 (DEC 2015).
[X] (9) 52.222-62, Paid Sick Leave Under Executive Order 13706 (JAN 2017) (E.O. 13706).
All quotes shall be sent to Thomas Nicholls Thomas.Nicholls@va.gov The following are the decision factors:
IAW FAR 15.102-2, Award will be made in the basis of the lowest priced offer.
To facilitate the award process, all quotes must include a statement regarding the terms and conditions herein as follows:
"The terms and conditions in the solicitation are acceptable to be included in the award document without modification, deletion, or addition."
OR
"The terms and conditions in the solicitation are acceptable to be included in the award document with the exception, deletion, or addition of the following:"
Quoters shall list exception(s) and rationale for the exception(s), if any.
Any questions or concerns regarding this solicitation should be forwarded in writing via e-mail to the Point of Contact listed below.
Point of Contact Any questions or concerns regarding this solicitation should be forwarded in writing via email addressed to Christina Lawrence at Christina.Lawrence2@va.gov, subject line: Refrigeration and A/C Systems Services.
Questions shall be submitted NO LATER THAN July 7, 2020 @ 1000 CST.
Quotations shall be received not later than 10:00am CST July 09, 2020. Quotes must be submitted via email to Christina.Lawrence2@va.gov. Late submissions shall be treated in accordance with the solicitation provision at FAR 52.212-1(f).