36C24919B0010-001.pdf
PDF 5 MB Posted
- Solicitation number
- 36C24919B0010
About this file
36C24919B0010 S02-Solicitation-Offer-Award (SF1442) Prov Emer Pwr Telecomm 05292019.pdf
View the file
Other files
Show all 35
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
1. SOLICITATION NUMBER 2. TYPE OF SOLICITATION 3. DATE ISSUED PAGE OF PAGES
4. CONTRACT NUMBER 5. REQUISITION/PURCHASE REQUEST NUMBER 6. PROJECT NUMBER
7. ISSUED BY CODE 8. ADDRESS OFFER TO
a. NAME b. TELEPHONE NUMBER (Include area code) (NO COLLECT CALLS)
10. THE GOVERNMENT REQUIRES PERFORMANCE OF THE WORK DESCRIBED IN THESE DOCUMENTS (Title, identifying number, date)
12a. THE CONTRACTOR MUST FURNISH ANY REQUIRED PERFORMANCE AND PAYMENT BONDS?
(If "YES," indicate within how many calendar days after award in Item 12B.)
12b. CALENDAR DAYS
13. ADDITIONAL SOLICITATION REQUIREMENTS:
STANDARD FORM 1442 (REV. 8/2014) STANDARD FORM 1442
Prescribed by GSA-FAR (48 CFR) 52.236-1(d)
SOLICITATION, OFFER,
AND AWARD
(Construction, Alteration, or Repair)
SOLICITATION SOLICITATION
IMPORTANT - The "offer" section on the reverse must be fully completed by offeror.
9. FOR INFORMATION
CALL:
NOTE: In sealed bid solicitations "offer" and "offeror" mean "bid" and "bidder".
SEALED BID (IFB)
NEGOTIATED (RFP)
11. The Contractor shall begin performance within ____________ calendar days and complete it within ____________ calendar days after receiving award, notice to proceed. This performance period is mandatory negotiable. (See _____________________________).
YES NO
a. Sealed offers in original and ___________________copies to perform the work required are due at the place specified in Item 8 by _____________ (hour) local time _____________________ (date). If this is a sealed bid solicitation, offers must be publicly opened at that time. Sealed envelopes containing offers shall be marked to show the offeror's name and address, the solicitation number, the date and time offers are due.
b. An offer guarantee is, is not required.
c. All offers are subject to the (1) work requirements, and (2) other provisions and clauses incorporated in the solicitation in full text or by reference.
d. Offers providing less than _______________________ calendar days for Government acceptance after the date offers are due will not be considered and will be rejected.
36C24919B0010 X 05-30-2019
To Be Determined 603-19-2-2311-0022 603-18-601
90C
Department of Veterans Affairs Network Contracting Office 9 1639 Medical Center Parkway, Ste 400 c/o: Corey Malik, Contract Specialist Murfreesboro TN 37129
COREY MALIK 615-225-6957
Project 603-18-601, Provide Emergency Power to Telecommunication Rooms NAICS Code 236220 is applicable to this requirement. The small business size standard is $36.5M Bidder must have NAICS Code 236220 listed in both vetbiz.gov and at sam.gov at submission of bid and prior to award.
Contractor to provide all labor, material, equipment and expert supervision needed to complete the performance of project #603-18-601, in accordance with the Statement of Work, Project Specifications and Drawings as attached hereto.
To be eligible for award all interested parties must have an active registration in the System for Award Management.
This requirement is a 100% set-aside for Service Disabled Veteran Owned Small business concerns in accordance with 38 U.S.C. 8127(d). Verification of veteran status will be checked both following submission of bids, and prior to award
Estimated Range of Construction: between $1,000,000.00 and $2,000,000.00
For purposes of determining responsibility, in accordance with FAR Part 9.104-2, the successful Bidder must be able to demonstrate through way of Past Performance the capability and experience of performing the work associated with the subject project. The Contracting Officer will utilize a variety of means of verifying successful past performance of similar work.
This requirement is being procured in accordance with FAR Part 14 as a "Seal Bid" and FAR Part 36.2 " Special Aspects of Contracting for Construction"
An organized site visit will be held on Monday June 10, 2019 at 3:00 pm ET
The last day to submit questions relative to this procurement action is Monday June 24, 2019 at 2:00pmET. Questions shall be submitted in writing only, address to the Contract Specialist at corey.malik@va.gov. RFI/Questions submitted by way of email shall have the solicitation number, project title and project number in the subject line.
52.211-10
27010
10 Calendar Days
July 8, 20190 2:00pm ET
Department of Veterans Affairs Network Contracting Office (NCO) 9 1639 Medical Center Parkway, Ste 400 c/o: Corey Malik, Contract Specialist Murfreesboro, TN 37129
Bidders are hereby advised that in order to have a responsive bid, all pages of the solicitation must be returned as part of the bid submission.
Bidders are also responsible for acknowledging any amendments to this solicitation, as well as completing all sections of the solicitation that require a self-certification. To that end, bidders must be sure that their bid submission is inclusive of the completed certifications contained in section(s) 3.1,3.2,3.3 and 4.6 of this solicitation.
The official bid opening will occur at the medical center campus of the Robley Rex VA Medical Center, 800 Zorn Avenue, Louisville, Kentucky 40206. Building #4, Room 4211. The bid opening will take place at 2:00pm ET. Interested parties are encourage to arrive early as the doors will be locked once bid opening occurs.
14. NAME AND ADDRESS OF OFFEROR 15. TELEPHONE NUMBER
16. REMITTANCE ADDRESS
CODE FACILITY CODE
17. The offeror agrees to perform the work required at the prices specified below in strict accordance with the terms of the solicitation, if this offer is accepted by the Government in writing within __________ calendar days after the date offers are due.
AMOUNTS
18. The offeror agrees to furnish any required performance and payment bonds.
19. ACKNOWLEDGMENT OF AMENDMENTS
AMENDMENT
NUMBER
DATE.
20a. NAME AND TITLE OF PERSON AUTHORIZED TO SIGN OFFER 20b. SIGNATURE 20c. OFFER DATE
21. ITEMS ACCEPTED:
22. AMOUNT 23. ACCOUNTING AND APPROPRIATION DATA
24. SUBMIT INVOICES TO ADDRESS SHOWN IN ITEM 25. OTHER THAN FULL AND OPEN COMPETITION PURSUANT TO 10 U.S.C. 2304(c)( ) 41 U.S.C. 3304(a) ( )
26. ADMINISTERED BY 27. PAYMENT WILL BE MADE BY
PHONE: FAX:
28. NEGOTIATED AGREEMENT 29. AWARD Your Contractor agrees offer on this solicitation is hereby accepted as to the items listed. This to furnish and deliver all items or perform all work requirements identified award consummates the contract, which consists of (a) the Government on this form and any continuation sheets for the consideration stated in solicitation and your offer, and (b) this contract award. No further cont-this contract. The rights and obligations of the parties to this contract ractual document is necessary.
shall be governed by (a) this contract award, (b) the solicitation, and (c) the clauses, representations, certifications, and specifications incorporated by reference in or attached to this contract.
30a. NAME AND TITLE OF CONTRACTOR OR PERSON AUTHORIZED 31a. NAME OF CONTRACTING OFFICER
TO SIGN
30b. SIGNATURE 30c. DATE 31b. UNITED STATES OF AMERICA 31c. AWARD DATE
BY
OFFER
AWARD
STANDARD FORM 1442 (REV. 8/2014) BACK
(Include ZIP Code) (Include area code)
(Include only if different than Item 14.)
(Insert any number equal to or greater than the minimum requirement stated in Item 13d. Failure to insert any number means the offeror accepts the minimum in Item 13d.)
(The offeror acknowledges receipt of amendments to the solicitation -- give number and date of each)
(Type or print)
(4 copies unless otherwise specified)
(Type or print) (Type or print)
(Contractor is required to sign this document and return _______ copies to issuing office.)
(Contractor is not required to sign this document.)
(Must be fully completed by offeror)
(To be completed by Government)
CONTRACTING OFFICER WILL COMPLETE ITEM 28 OR 29 AS APPLICABLE
603-3690162-2311-854200-3220 23NRNR001
90C
Department of Veterans Affairs Network Contracting Office - 9 1639 Medical Center Parkway, Ste 400 c/o: Corey Malik, Contract Specialist Murfreesboro TN 37129
90C FSC e-Invoice Payment http://www.fsc.va.gov/fsc/einvoice.asp Invoice Setup Information 1-877-489-6135 Invoice must be submitted electronically
Setup 1-877-489-6135
Roxie Ann Keese Contracting Officer
Base Offer:____________________
Deduct Alt 1___________________ Deduct Alt 2___________________ Deduct Alt 3___________________ Deduct Alt 4___________________
Table of Contents
SOLICITATION/CONTRACT FORM
A.1 SF 1442 SOLICITATION, OFFER, AND AWARD (Construction, Alteration, or Repair) .. 1
A.2 SF 1442 SOLICITATION, OFFER, AND AWARD (CONSTRUCTION, ALTERATION,
OR REPAIR)
STATEMENT OF WORK
INFORMATION REGARDING BIDDING MATERIAL, BID GUARANTEE AND BONDS
1.1 52.228-1 BID GUARANTEE (SEP 1996)
1.2 52.228-5 INSURANCE-WORK ON A GOVERNMENT INSTALLMENT (JAN 1997)…
1.3 SUPPLEMENTAL INSURANCE REQUIREMENTS………………………….
INSTRUCTIONS, CONDITIONS AND OTHER STATEMENTS TO BIDDERS/OFFERORS
2.1 52.216-1 TYPE OF CONTRACT (APR 1984)
2.2 52.222-5 CONSTRUCTION WAGE RATE REQUIREMENTS—SECONDARY SITE OF
THE WORK (MAY 2014)
2.3 52.222-23 NOTICE OF REQUIREMENT FOR AFFIRMATIVE ACTION TO ENSURE
EQUAL EMPLOYMENT OPPORTUNITY FOR CONSTRUCTION (FEB 1999)
2.4 52.225-10 NOTICE OF BUY AMERICAN REQUIREMENT—CONSTRUCTION
MATERIALS (MAY 2014) ALTERNATE I (MAY 2014)
2.6 52.233-2 SERVICE OF PROTEST (SEP 2006)
2.7 52.236-27 SITE VISIT (CONSTRUCTION) (FEB 1995) ALTERNATE I (FEB 1995)
2.8 52.252-1 SOLICITATION PROVISIONS INCORPORATED BY REFERENCE (FEB
1998)
2.9 VAAR 852.211-72 TECHNICAL INDUSTRY STANDARDS (NOV 2018)
2.10 VAAR 852.228-72 ASSISTING SERVICE-DISABLED VETERAN-OWNED AND
VETERAN-OWNED SMALL BUSINESSES IN OBTAINING BONDS (DEC 2009)
2.11 VAAR 852.233-70 PROTEST CONTENT/ALTERNATIVE DISPUTE RESOLUTION
(OCT 2018)
2.12 VAAR 852.233-71 ALTERNATE PROTEST PROCEDURE (OCT 2018)
2.13 VAAR 852.270-1 REPRESENTATIVES OF CONTRACTING OFFICERS (JAN 2008)
REPRESENTATIONS AND CERTIFICATIONS
3.1 52.204-8 ANNUAL REPRESENTATIONS AND CERTIFICATIONS (OCT 2018)
3.2 52.209-7 INFORMATION REGARDING RESPONSIBILITY MATTERS (OCT 2018)
3.3 52.209-13 VIOLATION OF ARMS CONTROLS TREATIES OR AGREEMENTS—
CERTIFICATION (JUN 2018)
GENERAL CONDITIONS
4.1 52.204-19 INCORPORATION BY REFERENCE OF REPRESENTATIONS AND
CERTIFICATIONS (DEC 2014)
4.2 52.204-23 PROHIBITION ON CONTRACTING FOR HARDWARE, SOFTWARE, AND
SERVICES DEVELOPED OR PROVIDED BY KASPERSKY LAB AND OTHER COVERED
ENTITIES (JUL 2018)
4.3 52.209-9 UPDATES OF PUBLICLY AVAILABLE INFORMATION REGARDING
RESPONSIBILITY MATTERS (OCT 2018)
4.4 52.211-10 COMMENCEMENT, PROSECUTION, AND COMPLETION OF WORK
(APR 1984) ALTERNATE I (APR 1984)
4.5 52.211-12 LIQUIDATED DAMAGES—CONSTRUCTION (SEPT 2000)
4.6 52.219-28 POST-AWARD SMALL BUSINESS PROGRAM REREPRESENTATION (JUL
2013)
4.7 52.222-35 EQUAL OPPORTUNITY FOR VETERANS (OCT 2015)
4.8 52.222-40 NOTIFICATION OF EMPLOYEE RIGHTS UNDER THE NATIONAL LABOR
RELATIONS ACT (DEC 2010)
4.9 52.225-9 BUY AMERICAN—CONSTRUCTION MATERIALS (MAY 2014)
4.10 52.252-2 CLAUSES INCORPORATED BY REFERENCE (FEB 1998)
4.11 52.222-36 EQUAL OPPORTUNITY FOR WORKERS WITH DISABILITIES (JUL 2014)
4.12 VAAR 852.219-10 VA NOTICE OF TOTAL SERVICE-DISABLED VETERAN-
OWNED SMALL BUSINESS SET-ASIDE (JUL 2016)(DEVIATION)
4.13 VAAR 852.219-74 LIMITATIONS ON SUBCONTRACTING—MONITORING AND
COMPLIANCE (JUL 2018)
4.14 VAAR 852.228-70 BOND PREMIUM ADJUSTMENT (JAN 2008)
4.15 VAAR 852.232-72 ELECTRONIC SUBMISSION OF PAYMENT REQUESTS (NOV
2018)
4.16 VAAR 852.236-71 SPECIFICATIONS AND DRAWINGS FOR CONSTRUCTION (JUL
2002)
4.17 VAAR 852.236-74 INSPECTION OF CONSTRUCTION (JUL 2002)
4.18 VAAR 852.236-76 CORRESPONDENCE (APR 1984)
4.19 VAAR 852.236-77 REFERENCE TO "STANDARDS" (JUL 2002)
4.20 VAAR 852.236-78 GOVERNMENT SUPERVISION (APR 1984)
4.21 VAAR 852.236-79 DAILY REPORT OF WORKERS AND MATERIAL (APR 1984)
4.22 VAAR 852.236-80 SUBCONTRACTS AND WORK COORDINATION (APR 1984)
4.23 VAAR 852.236-84 SCHEDULE OF WORK PROGRESS (NOV 1984)
4.24 VAAR 852.236-85 SUPPLEMENTARY LABOR STANDARDS PROVISIONS (APR
1984)
4.25 VAAR 852.236-86 WORKER'S COMPENSATION (JAN 2008)
4.26 VAAR 852.236-87 ACCIDENT PREVENTION (SEP 1993)
4.27 VAAR 852.236-88 CONTRACT CHANGES--SUPPLEMENT (JUL 2002)
4.28 VAAR 852.236-89 BUY AMERICAN ACT (JAN 2008)
4.29 VAAR 852.236-91 SPECIAL NOTES (JUL 2002)
ATTACHMENTS
See attached document: Specs - Project 603-18-601.
See attached document: Drawings - M1.
See attached document: Drawings - E9.
See attached document: Drawings - M10.
See attached document: Drawings - M2.
See attached document: Drawings - M3.
See attached document: Drawings - M4.
See attached document: Drawings - M5.
See attached document: Drawings - M6.
See attached document: Drawings - M7.
See attached document: Drawings - M8.
See attached document: Drawings - M9.
See attached document: Drawings - A1.
See attached document: Drawings - A2.
See attached document: Drawings - A3.
See attached document: Drawings - A4.
See attached document: Drawings - E1.
See attached document: Drawings - E2.
See attached document: Drawings - E3.
See attached document: Drawings - E4.
See attached document: Drawings - E5.
See attached document: Drawings - E6.
See attached document: Drawings - E7.
See attached document: Drawings - E8.
See attached document: P07 General Wage Decision-KY190093 02012019 KY93.
PROJECT#: 603‐18‐601
PROJECT TITLE:
Provide Emergency Power to Telecommunication Rooms
Index
DESIGN ELEMENTS:
Summary
Architectural Construction Elements
Fire Protection Construction Elements
Plumbing Construction Elements
Mechanical Construction Elements
Electrical Construction Elements
APPENDICES:
Appendix A.................................................................................................................Cut Sheets
Summary
This project will provide construction services for the upgrading of the electrical service to the closets from 120V normal power to 208V emergency power to accommodate the Cisco Systems Catalyst 4500 Series Switches operating at their maximum power configuration. The affected closets are:
1. Building 1, Room D-002b
2. Building 1, Room B-016a.
3. Building 1, Room D-102
4. Building 1, Room C-132c
5. Building 1, Room B-237
6. Building 1, Room C-219
7. Building 1, Room B-328
8. Building 1 Room C-306e (Deduct Alternate #3)
9. Building 1, Room B-435a (Deduct Alternate #1)
10. Building 1, Room A-933
11. Building 3/4, Room 3201 (Deduct Alternate #2)
12. Building 5, Room 5104
13. Building 6, Room 6101
14. Building 8, Room 8101 (Boiler Room)
15. Building 12, Room 12002
Most of the closets are interior rooms without an adjacent exterior building wall. The size of the cooling units will take into consideration the heat loads of the new Cisco Systems Catalyst 4500 Series Switches.
Architectural Construction Elements Statement of Work
We will be adding a ceiling to Building 1, Room B-435a.
We will be adding walls to deck in Building 3/4, Room 3201.
Fire Protection Construction Elements
No work anticipated. The existing Fire Protection devices will remain.
Plumbing Construction Elements
Install insulated condensate drains from the new units to the existing sanitary drains.
Mechanical Construction Elements
Construction Parameters & Reference Data
1. HVAC Manual for New, Replacement, Addition, and Renovation of Existing VA Facilities
2. ASHRAE 62.1-2016, Ventilation for Acceptable Indoor Air Quality
3. ASHRAE 90.1 IP-2016, Energy Efficient of New Low-Rise Residential Buildings
4. ASHRAE Standard 170 -2017 (Ventilation for Health Care Facilities)
5. ASHRAE Handbooks, 2017 Fundamentals, 2015 HVAC Applications, 2016 HVAC
Systems and Equipment
6. ASME B31.9-2017, Building Services Piping
7. NFPA 90A-2018, Standard for the Installation of Air Conditioning and Ventilating
Systems
8. SMACNA HVAC Duct Construction Standards, Metal and Flexible-2009
9. SMACNA, HVAC Air Duct Leakage Test Manual-2012
10. International Mechanical Code 2018
11. International Building Code 2018
Some of the existing IT closets do not have an existing cooling coil unit. A split system with a wall mounted indoor unit and a dedicated outdoor unit is anticipated for each IT room. The split system is comprised of individual wall-mounted fan coil units with DX coils and fans located in each IT Closet. Refrigerant piping connects indoor units to an Outdoor Condensing unit. Wall or ceiling mounted indoor fan coil unit will be located in the closet where space allows. Some IT closets are too small or crowded for a cooling unit inside the room and may need an indoor unit installed outside the room. Each IT closet will have its own indoor unit and thermostat.
The outdoor condensing unit will be located on the nearest roof or on grade where space is available and in proximity to the indoor unit. Manufacturer’s proprietary controls are used between the indoor fan coils and outdoor condensing unit with BACnet connection to monitor the system through the existing hospital controls system.
Building 1, Room A-933 indoor VRF fan coil unit will be connected to the existing refrigerant riser installed in the 603-16-701 Louisville Replace TIP Units Project.
Electrical Construction Elements
Construction Parameters & Reference Data
1. National Electrical Code (NEC), 2017 Edition
2. International Building Code, 2018 Edition
3. International Fire Code, 2018 Edition
4. NFPA 99, 2018 Edition
5. NFPA 101, Life Safety Code 2018 Edition
6. NFPA 72, National Fire Code, 2016 Edition
7. Department of Veterans Affairs—Electrical Design Manual
The scope includes upgrade of the electrical service from 120V normal power to 208V emergency power for the new Cisco Systems Catalyst 4500 Series switches operating at maximum power configuration. Cooling systems for the affected closets will also be revised, and electrical circuits for the revised cooling system will be included.
The proposed scenario for serving the TIP units and closets is to circuit power from existing panels which were added in prior construction and add additional panels if those are needed.
Emergency power is to be provided via a 30A 208V twist lock receptacle intended for a UPS in each TIP room, as well as Normal power distributed via two (2) 208V 20A twist lock receptacles for the normal power feed to the new switches. The normal feeder power will be distributed from an existing normal panelboard located in the basement electrical room of Building 1.
Where TIP rooms are located in buildings other than Building 1, power will be served from adjacent panels which exist in the buildings being served.
One UPS will be provided and turned over to the VA OIT, for each TIP room, with the following characteristics: NEMA L6-30P input; 8 NEMA 5-15/20R, 2 L6-20R & 1 L6-30R outlets, Rack mounted, 5kVA / 5000VA line interactive UPS; Sine wave output, 208 & 120V output during brownouts to 167 and over voltages to 260V, 3750W. The delivery of the UPS will be coordinated with the COR and the
OIT.
Appendix A Cut Sheets
Submittal Data Sheet
12 Ton, 230V VRV IV HP
FEATURES
Larger capacity single modules ranging up to 14 tons and systems up to 34 tons allow for a more flexible system design
Variable Refrigerant Temperature (VRT) control allows the VRV IV to deliver up to 28% of improvement in seasonal cooling efficiency compared to previous Daikin VRV heat pump systems
Modular and lightweight enables flexibility in system layout and installation with larger capacity single modules reducing electrical, piping connections
System wide auto-climate adjustment technology to increase the energy efficiency
Improved efficiency with IEER values now up to 28
The rated seasonal cooling efficiency has been improved by an average of 11%
All inverter compressors to increase the efficiency and avoid starting current inrush
Same product structure for 230V and 460V simplifies ordering
New configurator software designed to simplify the commissioning and maintenance of the system
Factory standard coil guards
Assembled in the US to increase flexibility and reduce lead times
Standard Limited Warranty: 10-year limited parts warranty
BENEFITS
Can operate up to 25 indoor units on a single piping network
Modular and lightweight - enables flexibility in system layout and installation
Refrigerant cooled inverted technology to avoid influence from ambient temperatures
Integrated inverter technology deliver maximum efficiency during part load conditions and provide precise individual zone control
Heat exchanger coil wraps around on all 4 sides of the unit to increase the surface area and efficiency
3 row 7mm heat exchanger coil improves efficiency
Corrosion resistance 1000hr salt spray tested Daikin PE blue fin heat exchanger
Design flexibility with long piping lengths up to 3,280 ft. total and 100 ft.
vertical separation between indoor units
Designed with reduced MOP to optimize installation cost
Digital display on the unit for improved and faster configuration, commissioning, and trouble shooting
PERFORMANCE
Outdoor Unit Model No.
RXYQ144TATJU
Outdoor Unit Name:
Type:
Heat Pump
Unit Combination:
Rated Cooling Conditions:
Indoor (°F DB/WB): 80 / 67
Ambient (°F DB/WB): 95 / 75
Rated Heating Conditions:
Indoor (°F DB/WB): 70 / 60
Ambient (°F DB/WB): 40 / 43
Rated Piping Length(ft):
Rated Height Difference (ft):
Rated Cooling Capacity (Btu/hr):
138,000
Rated Heating Capacity (Btu/hr):
154,000
Nom Cooling Capacity (Btu/hr):
144,000
Nom Heating Capacity (Btu/hr):
162,000
Cooling Input Power (kW):
11.80
Heating Input Power (kW):
11.10
EER (Non-Ducted/Ducted):
12.30 / 11.50
Heating COP (Non-Ducted/Ducted):
3.7 / 3.3
IEER (Non-Ducted/Ducted):
24.80 / 22.60
Heating COP 17F (Non-Ducted/Ducted):
2.3 / 2.2
OUTDOOR UNIT DETAILS
Power Supply (V/Hz/Ph):
208-230 / 60 / 3
Compressor Stage:
Inverter
Power Supply Connections:
L1, L2, L3 Ground
Capacity Control Range (%):
11 - 100
Min. Circuit Amps MCA (A):
55.1
Capacity Index Limit:
72.0 - 187.0
Max Overcurrent Protection (MOP) (A):
Airflow Rate (H) (CFM):
Max Starting Current MSC(A):
Gas Pipe Connection (inch):
1-1/8
Rated Load Amps RLA(A):
16.7+16.7
Liquid Pipe Connection (inch):
1/2
Dimensions (Height) (in):
66-11/16
H/L Pressure Connection (inch)
Dimensions (Width) (in):
48-7/8
H/L Equalizing Connection (inch)
Dimensions (Depth) (in):
30-3/16
Sound Pressure (H) (dBA):
Net Weight (lb):
Sound Power Level (dBA):
Max. No. of Indoor Units:
SYSTEM DETAILS
Refrigerant Type:
R-410A
Cooling Operation Range (°F DB):
23 - 122
Holding Refrigerant Charge (lbs):
18.1
Heating Operation Range (°F WB):
-4 - 60
Additional Charge (lb/ft):
Max. Pipe Length (Vertical) (ft):
Pre-charge Piping (Length) (ft):
Cooling Range w/Baffle (°F DB):
Max. Pipe Length (Total) (ft):
Heating Range w/Baffle (°F WB):
Max Height Separation (Ind to Ind ft):
DIMENSIONAL DRAWING
Project 17-275 Louisville TIP2
1-AC-B435
1-AC-C132
1 AC C306
VISTA™
FFQ-Q
Single-Zone Systems
Designer Comfort
VISTA is a remarkable blend of iconic design and engineering excellence with an elegant white or a silver and white finish.
Fitting within the ceiling grid and discreetly mounted to the ceiling itself, VISTA is stylish, low profile, and compact. High efficiency and comfort is delivered through the combined use of floor and presence sensors (optional). It is also possible to close individual louvers via the wired remote control for personalized comfort.
Features ›› Seamless integration in standard architectural ceiling tiles, leaving only 5/16”.
›› High efficiencies with up to 20.9 SEER and up to 11.7 HSPF.
›› Reduced energy consumption thanks to specially developed small tube heat exchanger, DC fan motor, and two optional intelligent sensors.
›› Remarkable blend of iconic design and engineering excellence with an elegant finish in white, or a combination of silver and white.
›› No optional adapter needed for DIII-connection, link your unit into the wider building management system.
›› Fresh air integration possible.
›› 12-Year Parts Limited Warranty*
* Complete warranty details available from your local dealer or at www.daikincomfort.com. To receive the 12-Year Parts Limited Warranty, online registration must be completed within 60 days of installation.
Online registration is not required in California or Quebec.
http://www.daikincomfort.com.to/
Model
Indoor Unit FFQ09Q2VJU FFQ12Q2VJU FFQ15Q2VJ U
FFQ18Q2VJU
Outdoor Unit
RX09RMVJU RX12RMVJU RX15RMVJ
U
RX18RMVJU
Cooling Heating Cooling Heating Cooling Heat ng Cooling Heating
Capacity Rated (Min. ~ Max.) Btu/h 9,100
(4,600 ~ 11,000)
10,000
(4,600 ~ 14,000)
10,800
(4,600 ~ 13,300)
13,500
(4,600 ~ 16,800)
14,400
(5,100 ~ 16,200)
16,2
(5,200 ~
6,300)
17,400
(5,100 ~ 18,800)
21,600
(5,400 ~ 21,800)
Moisture Removal gal/h N/A – N/A – N/A – N/A –
COP Rated 4.58 4.02 3.86 3.36
EER Rated 13.0 12.5 12.5 12.5
SEER 20.9 20.2 20.7 19.3
HSPF 11.7 11.2 11.0 10.1
Piping Connections Liquid
in. (mm)
Ø 1/4 (Ø 6.4)
Gas Ø 3/8 (Ø 9.5) Ø 1/2 (Ø 12.7)
Drain Ø1-1/32 (Ø 26.0)
Max. Interunit Piping Length
ft. (m)
65-5/8 (20) 98-7/16 (30)
Max. Interunit Height Difference 49-1/4 (15) 65-5/8 (20)
Chargeless 32-13/16 (10)
Amount of Additional Charge of Refrigerant oz/ft (g/m) 0.21 (20)
Operating Range - Cooling
°F DB
50 ° - 115 °F
Operating Range - Low-Ambient Cooling* 14 ° - 115 °F
Operating Range - Cooling with Optional Air Adjustment Grille*
-4 ° - 115 °F
Operating Range - Heating °F WB 5 ° - 65 °
Indoor Unit FFQ09Q2VJU FFQ12Q2VJU FFQ15Q2VJ U
FFQ18Q2VJU
Airflow Rate
H cfm (m³/min)
378 (10.7) 399 (11.3) 406 (11.5) 427 (12.1) 420 (11.9) 441 ( 2.5) 448 (12.7) 498 (14.1)
M 339 (9.6) 357 (10.1) 353 (10.0) 371 (10.5) 367 (10.4) 385 ( 0.9) 378 (10.7) 420 (11.9)
L 268 (7.6) 282 (8.0) 268 (7.6) 282 (8.0) 293 (8.3) 307 ( .7) 275 (7.8) 307 (8.7)
SL – – – – – – – –
Fan Speed Steps Turbo Fan, 3 Steps, Quiet, Auto
Air Direction Control Right, Left, Horizontal, Downward
Air Filter Removable, Washable, Mildew Proof
Dimensions (H × W × D) in. (mm) 10-1/4 × 22-5/8 × 22-5/8 (260 × 575 × 575)
Weight lbs. (kg) 36 (16) 39 (17.5)
Sound Pressure Level (H / M / L / SL) dB(A) 38 / 35 / 29 39 / 36 / 30 40 / 37 / 31 44 / 40 / 32
Outdoor Unit RX09RMVJU RX12RMVJU RX15RMVJ U
RX18RMVJU
Compressor Motor Output W 790 1,100 1,100
Refrigerant Type R-410A
Charge lbs. (kg) 2.09 (0.95) 2.49 (1.13)
Airflow Rate H cfm
(m³/min)
985 (27.9) 1,105 (31.3) 2,313 (65.53) 2,108 59.3) 2,461 (69.7) 2,553 (72.3)
Dimensions (H × W × D) in. (mm) 21-5/8 × 26-9/16 × 11-3/16 (550 × 675 × 284) 28-15/16 × 34 1/4 × 12-5/8 (735 × 870 × 320)
Weight lbs. (kg) 60 (27) 97 (44)
Sound Pressure Level H dB(A) 46 50 49 51 50 5 54 55
ENERGY STAR® Certified** YES YES YES YES
*Cutting a jumper or a dipswitch setting is required. Refer to installation manual.
Standard Features:
Draft Prevention
This system directs warm air to the floor in winter and cool air across the room in summer for optimal efficiency and comfort. The large flap governs airflow direction while the small flap (or diffuser) swings, producing fine air currents that help circulate the air around the room.
Individual Louver Control
The new louver changes the delivery angle to horizontal for cooling and vertical for heating operation, to keep cold or warm air from blowing directly onto your body.
Included in the optional sensor kit:
Presence and Floor Sensor
Optional part #BRYQ60A2(W/S)
The presence and floor sensors are infrared sensors with the ability to sense movement in the room. When you are in the room, the system operates normally. If you leave the room for more than 20 minutes the system automatically changes to an energy-saving operation.
Using the intelligent eye, savings of up to 20% in cooling and up to 30% in heating can be achieved. The floor sensor detects the average floor temperature and ensures even temperature distribution between ceiling and floor.
ADDITIONAL INFORMATION
Before purchasing this appliance, read important information about its estimated annual energy consumption, yearly operating cost, or energy efficiency rating that is available from your retailer.
Visit www.daikincomfort.com
Proper sizing and installation of equipment is critical to achieve optimal performance. Split system air conditioners and heat pumps must be matched with appropriate coil components to meet ENERGY STAR® criteria. Ask your contractor for details or visit www.energystar.gov
Daikin and its design are trademarks owned by Daikin.
PF-VISTASZ 4-18
http://www.daikincomfort.com/ http://www.energystar.gov/
1.5-Ton Wall Mounted Unit
FEATURES
Auto-swing mechanism ensures efficient air distribution via louvers that automatically close when the unit is turned off
Easy to clean front panel with a flat smooth surface that can be removed for additional cleaning
Five different airflow distribution angles programmable by the optional controller
Condensate drain pipe can be installed on either the left or right side of the unit
Wide air discharge outlet distributes a comfortable airflow throughout the entire space
Standard Limited Warranty: 10-year warranty on compressor and all parts
PERFORMANCE
Indoor Unit Model No.
FXAQ18PVJU
Indoor Unit Name: 1.5-Ton Wall Mounted Unit
Type:
Wall Mounted
Rated Cooling Conditions: Indoor (°F DB/WB): 80 / 67 Ambient (°F DB/WB): 95 / 75
Rated Cooling Capacity (Btu/hr):
18,000
Rated Heating Conditions: Indoor (°F DB/WB): 70 / 70 Ambient (°F DB/WB): 47 / 43
Sensible Capacity (Btu/hr):
13,700
Rated Piping Length(ft):
Cooling Input Power (kW):
0.030
Rated Height Separation (ft):
Rated Heating Capacity (Btu/hr):
20,000
Heating Input Power (kW):
0.04
INDOOR UNIT DETAILS
Power Supply (V/Hz/Ph):
208-230 / 60 / 1
Airflow Rate (H/L) (CFM):
500/400
Power Supply Connections:
L1, L2, Ground
Moisture Removal (Gal/hr):
Min. Circuit Amps MCA (A):
0.50
Gas Pipe Connection (inch):
1/2
Max Overcurrent Protection (MOP) (A):
Liquid Pipe Connection (inch):
1/4
Dimensions (HxWxD) (in):
11-3/8 x 41-3/8 x 9-1/4
Condensate Connection (inch):
11/16
Panel (HxWxD) (in):
Sound Pressure (H/L) (dBA):
43/37
Net Weight (lb):
Sound Power Level (dBA):
Panel Weight (lb):
Ext. Static Pressure (Rated/Max) (inWg):
0.00 / 0.00
DIMENSIONAL DRAWING
The Liebert® MCR is a self-contained rack enclosure system that includes a load-sized, computer-grade air conditioner located at the bottom of the enclosure, with the option of a top mount design, supplying cool air to sensitive equipment on all levels. A back-up cooling system ensures environmental security. Power can be supplied and protected through an optional Liebert GXT on-line UPS or Liebert PSI line-interactive UPS.
LIEBERT® MCR MINI COMPUTER
ROOM ENCLOSURE
An optional top mounted ECM allows for maximum use of internal rack space and can be used to double capacity with internal/rack mount ECM.
Secure Door lockable door provides an extra measure of security by limiting access to critical equipment.
BCM
(Back-up Cooling Module)
Sealed Door specially designed rubber gasket provides NEMA12 sealing protection.
Liebert GXT on-line UPS
ECM
(Environmental Control Module)
Exclusive Uninterruptible Environmental Support
Internal ECM
The integrated ECM enclosure design promotes the best air circulation to prevent hot spots within the enclosure. Inside and outside air are isolated for maximum cleanliness.
Air Distribution
Exclusive ECM conditioned air distribution duct ensures uniform air flow for multiple enclosures.
LIEBERT® MCR MINI COMPUTER ROOM ENCLOSURE
Back-Up Cooling
During high internal temperature or power outage conditions, the BCM (Back-Up Cooling Module) — powered by the enclosure’s UPS — is automatically activated, drawing in filtered outside air to ensure continuous air flow to protected equipment.
External ECM
The top mounted ECM allows maximum use of internal rack space or can be used with the internal/rack mount ECM to double cooling capacity.
Flexibility: Lowest Total Cost Of Ownership:
Designed as a plug-and-play system ready to install.
Optional top mounted air conditioning allows maximum use of internal rack space or can be used to double cooling capacity with the internal air conditioning unit.
Lockable door protects against unauthorized access. Specially designed door gasket and sealed cable entrance ensure stable cooling environment. Back-up cooling assures continued cooling in the event of a power loss.
Server closets or small rooms.
Liebert® MCR 22U Model
Improved cable access and management improves airflow to reduce overheating of protected IT equipment.
Network closets.
Ideally Suited For: Cools IT equipment to eliminate downtime from overheating.
Optional energy saver control saves money by allowing back-up cooling to operate as primary enclosure cooler. Integrated air conditioning reduces potential downtime costs by assuring proper system operation. Higher Availability:
Competitively priced as an integrated system, compared to purchasing separate components.
Simplified plug-and-play installation reduces overall implementation time, Wheel-mounted cabinet for easy relocation. Adjustable racks and rack rails support a wide variety of equipment.
Specifications
ENCLOSURE DIMENSIONS
Model Overall Frame Dimensions Rack Adjustable Rack Depth Internal Rack Height* Width Depth*** Width Available Width B****
In. (mm) In. (mm) In. (mm) Max In. (mm) Min In.
(mm)
RACK U In. (mm)
HD_780 77 (1956) 23.5 (597) 30 (762) 19 (483) 17.8 (450) 22.5 (571.5) 18.5 (470) 42 73.5 (1867)
HD_788 77 (1956) 23.5 (597) 38 (965) 19 (483) 17.8 (450) 30.5 (775) 26.5 (673) 42 73.5 (1867)
* Casters add 1.5” to overall height of frame = 2000mm.
*** BCM option adds an additional 3.00” to overall depth of frame.
**** Max dimension is for ex-factory configuration. Rails can be inverted to provide an additional 4.00” of adjustment.
ECM (ENVIRONMENTAL COOLING MODULE) PERFORMANCE DATA
Rated Capacit y
Supported Load
Height Width Depth Total Heat Rej.
Input Power
(1PH)
Sound
Model Number BTUH
(Watts)
BTUH
(Watts)
Max Ambient
In (mm)-U In (mm) In (mm) BTUH
(Watts)
Volts Hz FLA WSA OPD Plug Lpa(1.5m)
ECM2000L*-C60 6897 5621 105°F/41°C 12.25 (311)-
17.43 (443)
29 (737) 10935 120 60 9.8 11.7 15 73.5 52
(2021) (1647) (3204) (1867)
“* T (top mount) and R (rack mount). Top mount weight does not include interface plenum. The interface plenum for a 19”” rack x 30 “” deep cabinet is 38 lbs.” Sound data based on sound pressure A- weighted scale for free field spherical radiation at 1.5 meters from cabinet.
Sound data reflects only rack mount design. Consult factory for top mount data.
BCM (BACK-UP COOLING MODULE) PERFORMANCE DATA
Rated Capacit y
Supported Load
Height Width Depth Weight Total Heat Rej.
Input Power (1PH) Sound
Model Number BTUH
(Watts)
BTUH Max
(Watts) Ambient
In (mm) In (mm) In (mm) lbs (kg) BTUH
(Watts)
Volts Hz FLA WSA OPD Lpa
(1.5m)
BCM2000L-60 N/A 2811 (824) 105°F/41°C 35.0 (889) 15.5 3.75 47 10935 120 60 2.0 2.5 15 59
(393.7) (95.2) (21.3) (3204)
Above BCM weight includes rear door weight of 17 Lbs.
Sound data based on sound pressure A- weighted scale for free field spherical radiation at 1.5 meters from cabinet.
22U PACKAGED ENCLOSURE
Model Overall Frame Dimensions in. (mm) Rack in. (mm) Adjustable Rack Depth in. (mm) Internal Rack Height Weight Rack Cooling supported load
HD448D000KD9
(rack and cooling module)
59.1 (1501) 23.5 (597) 38 (965) 19 (483) 17.8 (450) 30.5 (775) 26.5 (673) 22 38.5 (978) 367 1647 Watt
22U Model dimensions include top-mount module and casters.
VertivCo.com | Vertiv Headquarters, 1050 Dearborn Drive, Columbus, OH, 43085, USA
© 2017 Vertiv Co. All rights reserved. Vertiv and the Vertiv logo are trademarks or registered trademarks of Vertiv Co. All other names and logos referred to are trade names, trademarks or registered trademarks of their respective owners. While every precaution has been taken to ensure accuracy and completeness herein, Vertiv Co. assumes no responsibility, and disclaims all liability, for damages resulting from use of this information or for any errors or omissions. Specifications are subject to change without notice.
SL-15602 (R11/17) 4
In. (mm) Rack U Available Maximum Width
Height
38.5 (978) 441 22 19 (483) 17.8 (450) 30.5 (775)
LIEBERT® MCR MINI COMPUTER ROOM ENCLOSURE
U.S. Patent No. 7,866,093
Location:
® CXP
RUBBER SUPPORT SERIES
Specification:
Dimensions - see chart
Material
Base - 100% recycled rubber, UV resistant
Maximum Load CXP - 500 lbs.
CXP-2 - 800 lbs.
Environmentally Friendly made from
100% recycled tires
Function: The CXP Series supports provide an economic alternative. They are ideal for supporting conduit or pipe. Strut and clamps by others.
Pipe strap clamps for CXP
CXP-2
CXP
CXP illustrated. Pipe clamp by others.
MODEL NO. HEIGHT (H) WIDTH (W) LENGTH (L) WEIGHT LIST PRICE CRATE
QUANTITY
CXP 4” (102) 6” (152) 9.6” (244) 4.56 lbs. $18.50 340
CXP-2
4” (102) 6” (152) 22” (559) 10.84 lbs. $44.00 170
Job Name:
Section No:
Schedule No:
Page No:
Contractor:
Purchase Order No:
MIFAB® reserves the right to make changes in material and design without formal notice and obligation.
Page CP2
USA: 1-800-465-2736 www.mifab.com CAN: 1-800-387-3880
10-14-2016
CALIFORNIA PROPOSITION 65 WARNING. This product contains chemicals known to the State of California to cause cancer and birth defects or other reproductive harm.
http://www.mifab.com/
INFORMATION REGARDING BIDDING MATERIAL, BID GUARANTEE
AND BONDS
1.1 52.228-1 BID GUARANTEE (SEP 1996)
(a) Failure to furnish a bid guarantee in the proper form and amount, by the time set for opening of bids, may be cause for rejection of the bid.
(b) The bidder shall furnish a bid guarantee in the form of a firm commitment, e.g., bid bond supported by good and sufficient surety or sureties acceptable to the Government, postal money order, certified check, cashier's check, irrevocable letter of credit, or, under Treasury Department regulations, certain bonds or notes of the United States. The Contracting Officer will return bid guarantees, other than bid bonds—
(1) To unsuccessful bidders as soon as practicable after the opening of bids; and
(2) To the successful bidder upon execution of contractual documents and bonds (including any necessary coinsurance or reinsurance agreements), as required by the bid as accepted.
(c) The amount of the bid guarantee shall be Twenty (20%) percent of the bid price or $3,000,000.00, whichever is less.
(d) If the successful bidder, upon acceptance of its bid by the Government within the period specified for acceptance, fails to execute all contractual documents or furnish executed bond(s) within 10 days after receipt of the forms by the bidder, the Contracting Officer may terminate the contract for default.
(e) In the event the contract is terminated for default, the bidder is liable for any cost of acquiring the work that exceeds the amount of its bid, and the bid guarantee is available to offset the difference.
(End of Provision)
1.2 52.228-5 INSURANCE—WORK ON A GOVERNMENT INSTALLATION
(JAN 1997)
(a) The Contractor shall, at its own expense, provide and maintain during the entire performance of this contract, at least the kinds and minimum amounts of insurance required in the Schedule or elsewhere in the contract.
(b) Before commencing work under this contract, the Contractor shall notify the Contracting Officer in writing that the required insurance has been obtained. The policies evidencing required insurance shall contain an endorsement to the effect that any cancellation or any material change adversely affecting the Government's interest shall not be effective—
(1) For such period as the laws of the State in which this contract is to be performed prescribe; or
(2) Until 30 days after the insurer or the Contractor gives written notice to the Contracting Officer, whichever period is longer.
(c) The Contractor shall insert the substance of this clause, including this paragraph (c), in subcontracts under this contract that require work on a Government installation and shall require subcontractors to provide and maintain the insurance required in the Schedule or elsewhere in the contract. The Contractor shall maintain a copy of all subcontractors' proofs of required insurance and shall make copies available to the Contracting Officer upon request.
(End of Clause)
1.3 SUPPLEMENTAL INSURANCE REQUIREMENTS
In accordance with FAR 28.307-2 and FAR 52.228-5, the following minimum coverage shall apply to this contract:
(a) Workers' compensation and employer’s liability: Contractors are required to comply with applicable Federal and State workers' compensation and occupational disease statutes. If occupational diseases are not compensable under those statutes, they shall be covered under the employer's liability section of the insurance policy, except when contract operations are so commingled with a Contractor's commercial operations that it would not be practical to require this coverage. Employer's liability coverage of at least $100,000 is required, except in States with exclusive or monopolistic funds that do not permit workers' compensation to be written by private carriers.
(b) General Liability: $500,000.00 per occurrences.
(c) Automobile liability: $200,000.00 per person; $500,000.00 per occurrence and $20,000.00 property damage.
(d) The successful bidder must present to the Contracting Officer, prior to award, evidence of general liability insurance without any exclusionary clauses for asbestos that would void the general liability coverage.
(End of Clause)
INSTRUCTIONS, CONDITIONS AND OTHER STATEMENTS TO
BIDDERS/OFFERORS
2.1 52.216-1 TYPE OF CONTRACT (APR 1984)
The Government contemplates award of a Firm-Fixed-Price contract resulting from this solicitation.
(End of Provision)
2.2 52.222-5 CONSTRUCTION WAGE RATE REQUIREMENTS—
SECONDARY SITE OF THE WORK (MAY 2014)
(a)(1) The offeror shall notify the Government if the offeror intends to perform work at any secondary site of the work, as defined in paragraph (a)(1)(ii) of the FAR clause at 52.222-6, Construction Wage Rate Requirements, of this solicitation.
(2) If the offeror is unsure if a planned work site satisfies the criteria for a secondary site of the work, the offeror shall request a determination from the Contracting Officer.
(b)(1) If the wage determination provided by the Government for work at the primary site of the work is not applicable to the secondary site of the work, the offeror shall request a wage determination from the Contracting Officer.
(2) The due date for receipt of offers will not be extended as a result of an offeror's request for a wage determination for a secondary site of the work.
(End of Provision)
2.3 52.222-23 NOTICE OF REQUIREMENT FOR AFFIRMATIVE ACTION TO
ENSURE EQUAL EMPLOYMENT OPPORTUNITY FOR CONSTRUCTION
(FEB 1999)
(a) The offeror's attention is called to the Equal Opportunity clause and the Affirmative Action Compliance Requirements for Construction clause of this solicitation.
(b) The goals for minority and female participation, expressed in percentage terms for the Contractor's aggregate workforce in each trade on all construction work in the covered area, are as follows:
Goals for minority participation for each trade Goals for female participation for each trade
11.2 % 6.9 %
These goals are applicable to all the Contractor's construction work performed in the covered area. If the Contractor performs construction work in a geographical area located outside of the covered area, the Contractor shall apply the goals established for the geographical area where the work is actually performed. Goals are published periodically in the Federal Register in notice form, and these notices may be obtained from any Office of Federal Contract Compliance Programs office.
(c) The Contractor's compliance with Executive Order 11246, as amended, and the regulations in 41 CFR 60-4 shall be based on (1) its implementation of the Equal Opportunity clause, (2) specific affirmative action obligations required by the clause entitled "Affirmative Action Compliance Requirements for Construction," and (3) its efforts to meet the goals. The hours of minority and female employment and training must be substantially uniform throughout the length of the contract, and in each trade. The Contractor shall make a good faith effort to employ minorities and women evenly on each of its projects. The transfer of minority or female employees or trainees from Contractor to Contractor, or from project to project, for the sole purpose of meeting the Contractor's goals shall be a violation of the contract, Executive Order 11246, as amended, and the regulations in 41 CFR 60-4. Compliance with the goals will be measured against the total work hours performed.
(d) The Contractor shall provide written notification to the Deputy Assistant Secretary for Federal Contract Compliance, U.S. Department of Labor, within 10 working days following award of any construction subcontract in excess of $10,000 at any tier for construction work under the contract resulting from this solicitation. The notification shall list the—
(1) Name, address, and telephone number of the subcontractor;
(2) Employer's identification number of the subcontractor;
(3) Estimated dollar amount of the subcontract;
(4) Estimated starting and completion dates of the subcontract; and
(5) Geographical area in which the subcontract is to be performed.
(e) As used in this Notice, and in any contract resulting from this solicitation, the "covered area" is
2.4 52.225-10 NOTICE OF BUY AMERICAN REQUIREMENT—
CONSTRUCTION MATERIALS (MAY 2014) ALTERNATE I (MAY 2014)
(a) Definitions. "Commercially available off-the-shelf (COTS) item," "construction material," "domestic construction material," and "foreign construction material," as used in this provision, are defined in the clause of this solicitation entitled "Buy American—Construction Materials" (Federal Acquisition Regulation (FAR) clause 52.225-9).
(b) Requests for determinations of inapplicability. An offeror requesting a determination regarding the inapplicability of the Buy American statute shall submit the request with its offer, including the information and applicable supporting data required by paragraphs (c) and (d) of the clause at FAR 52.225-9.
(c) Evaluation of offers.
(1) The Government will evaluate an offer requesting exception to the requirements of the Buy American statute, based on claimed unreasonable cost of domestic construction material, by adding to the offered price the appropriate percentage of the cost of such foreign construction material, as specified in paragraph (b)(3)(i) of the clause at FAR 52.225-9.
(2) If evaluation results in a tie between an offeror that requested the substitution of foreign construction material based on unreasonable cost and an offeror that did not request an exception, the Contracting Officer will award to the offeror that did not request an exception based on unreasonable cost.
(d) Alternate offers.
(1) When an offer includes foreign construction material not listed by the Government in this solicitation in paragraph (b)(2) of the clause at FAR 52.225-9, the offeror also may submit an alternate offer based on use of equivalent domestic construction material.
(2) If an alternate offer is submitted, the offeror shall submit a separate Standard Form 1442 for the alternate offer, and a separate price comparison table prepared in accordance with paragraphs (c) and (d) of the clause at FAR 52.225-9 for the offer that is based on the use of any foreign construction material for which the Government has not yet determined an exception applies.
(3) If the Government determines that a particular exception requested in accordance with paragraph
(c) of the clause at FAR 52.225-9 does not apply, the Government will evaluate only those offers based on use of the equivalent domestic construction material, and the offeror shall be required to furnish such domestic construction material. An offer based on use of the foreign construction material for which an exception was requested—
(i) Will be rejected as nonresponsive if this acquisition is conducted by sealed bidding; or
(ii) May be accepted if revised during negotiations.
2.5 52.233-2 SERVICE OF PROTEST (SEP 2006)
Protests, as defined in section 33.101 of the Federal Acquisition Regulation, that are filed directly with an agency, and copies of any protests that are filed with the Government Accountability Office (GAO), shall be served on the Contracting Officer (addressed as follows) by obtaining written and dated acknowledgment of receipt from:
Roxie Ann Keese
Contracting Officer Hand-Carried Address:
Department of Veterans Affairs
Network Contracting Office (NCO) 9 800 Zorn Avenue roxie.keese@va.gov (email) Louisville KY 40206 Mailing Address:
Department of Veterans Affairs
VISN 9 ASC (90C)
1639 Medical Center Parkway, Suite 400
TN 37129
(b) The copy of any protest shall be received in the office designated above within one day of filing a protest with the GAO.
(End of Provision)
2.6 52.236-27 SITE VISIT (CONSTRUCTION) (FEB 1995) ALTERNATE I (FEB
1995)
(a) The clauses at 52.236-2, Differing Site Conditions, and 52.236-3, Site Investigations and Conditions Affecting the Work, will be included in any contract awarded as a result of this solicitation. Accordingly, offerors or bidders are urged and expected to inspect the site where the work will be performed.
(b) An organized site visit has been scheduled for—
Monday June 10, 2019 at 3:00pm ET
(c) Participants will meet at—
Engineering Conference Room #4211, Bldg 4
2.7 52.252-1 SOLICITATION PROVISIONS INCORPORATED BY
REFERENCE (FEB 1998)
This solicitation incorporates one or more solicitation provisions by reference, with the same force and effect as if they were given in full text. Upon request, the Contracting Officer will make their full text available. The offeror is cautioned that the listed provisions may include blocks that must be completed by the offeror and submitted with its quotation or offer. In lieu of submitting the full text of those provisions, the offeror may identify the provision by paragraph identifier and provide the appropriate information with its quotation or offer. Also, the full text of a solicitation provision may be accessed electronically at this/these address(es):
http://www.acquisition.gov/far/index.html http://www.va.gov/oal/library/vaar/ https://www.wdol.gov/dba.aspx
(End of Provision)
FAR
Number
Title Date
52.204-7 SYSTEM FOR AWARD MANAGEMENT OCT 2018
52.204-16 COMMERCIAL AND GOVERNMENT ENTITY CODE
REPORTING
JUL 2016
52.204-22 ALTERNATIVE LINE ITEM PROPOSAL JAN 2017
52.214-3 AMENDMENTS TO INVITATIONS FOR BIDS DEC 2016
52.214-4 FALSE STATEMENTS IN BIDS APR 1984
52.214-5 SUBMISSION OF BIDS DEC 2016
52.214-6 EXPLANATION TO PROSPECTIVE BIDDERS APR 1984
52.214-7 LATE SUBMISSIONS, MODIFICATIONS, AND
WITHDRAWALS OF BIDS
NOV 1999
52.214-18 PREPARATION OF BIDS—CONSTRUCTION APR 1984
52.214-19 CONTRACT AWARD—SEALED BIDDING—
CONSTRUCTION
AUG 1996
52.214-34 SUBMISSION OF OFFERS IN THE ENGLISH LANGUAGE APR 1991
52.214-35 SUBMISSION OF OFFERS IN U.S. CURRENCY APR 1991
2.8 VAAR 852.211-72 TECHNICAL INDUSTRY…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it.