36C24918R0089-002.docx

DOCX document 13 KB Posted

Attached to
Project # 596A4-18-102 AE Upgrade Public Elevators P1, P2, & P3 (VA-18-930821)
Solicitation number
36C24918R0089
Issued by

About this file

36C24918R0089 36C24918R0089_1.docx

View the file

Other files

File Type Posted
36C24918C0065-000.docx DOCX document
36C24918R0089-000.docx DOCX document
36C24918R0089-001.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

FedBizOpps Modification to a Previous Notice

CLASSIFICATION CODE

SUBJECT

CONTRACTING OFFICE'S

ZIP-CODE

SOLICITATION NUMBER

BASE NOTICE TYPE

RESPONSE DATE (MM-DD-YYYY)

ARCHIVE

DAYS AFTER THE RESPONSE DATE

RECOVERY ACT FUNDS

SET-ASIDE

NAICS CODE

CONTRACTING OFFICE

ADDRESS

POINT OF CONTACT

(POC Information Automatically Filled from User Profile Unless Entered)

DESCRIPTION

See Attachment

AGENCY'S URL

URL DESCRIPTION

AGENCY CONTACT'S EMAIL

ADDRESS

EMAIL DESCRIPTION

ADDRESS

POSTAL CODE

COUNTRY

ADDITIONAL INFORMATION

GENERAL INFORMATION

PLACE OF PERFORMANCE

* = Required Field FedBizOpps Modification to a Previous Notice Rev. March 2010 C A/E Service to Upgrade Public Elevators P1, P2, & P3 at the Lexington, VAMC, Cooper Division, Project # 596A4-18-102 **This modification serves to remove Part 5. Mileage Restriction, see page 2.** 40511 36C24918R0089 12-05-2017 N 541330 Department of Veterans Affairs Network Contracting Office 9 2250 Leestown Road Lexington, KY 40511 Matthew R. Whisman, Contracting Officer Matthew.Whisman@va.gov Lexington, VAMC Cooper Division 1101 Veterans Drive Lexington, KY 40502 40502 U.S.

www.va.gov Veterans Affairs Matthew.Whisman@va.gov VHA NCO-09 Contracting Officer The purpose of this modification is to remove Part 5. “Mileage Restriction” from the Pre-Sol Notice and implement a new Part 5. “Response Time” requirement instead. The below paragraph 5 replaces the original paragraph 5 in its entirety;

5. RESPONSE TIME

The successful A-E shall abide by a four (4) hour response time for Lexington VAMC, Cooper Division, during the design phase and the construction period services (CPS) phase, as appropriate. The VA has no preference on the method utilized by contractors on achieving the four (4) hour response time. The response time will be determined from the moment the request to the A-E to be on site is submitted. The individual or individuals responding can be either the prime contractor or a subcontractor that’s part of the design team.

All other terms and conditions of Pre-Sol Notice remain unchanged.

END OF PRE-SOL MODIFICATION

File details come from the government source that posted it.