36C24918B0354-008.pdf

PDF 70 KB Posted

Attached to
Project 603-17-401 Renovate Building 3 for PRRC
Solicitation number
36C24918B0354
Issued by

About this file

36C24918B0354 TS02 - CALCULATION OF SELF PERFORMED WORK.pdf

View the file

Other files

File Type Posted
36C24918C0173-000.docx DOCX document
36C24918B0354-0004000.docx DOCX document
36C24918B0354-0003000.docx DOCX document
36C24918B0354-0003001.pdf PDF
36C24918B0354-0002000.docx DOCX document
36C24918B0354-0002001.pdf PDF
36C24918B0354-A0001000.docx DOCX document
36C24918B0354-007.pdf PDF
36C24918B0354-005.pdf PDF
36C24918B0354-003.pdf PDF
36C24918B0354-004.pdf PDF
36C24918B0354-006.pdf PDF
36C24918B0354-002.docx DOCX document
36C24918B0354-001.docx DOCX document
36C24918B0354-000.docx DOCX document
Show all 15

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

CALCULATION OF SELF-PERFORMED/SUBCONTRACTED WORK (xxx-xx-xxx)

Offerors for General Construction (NAICS code 236220) must provide at least 15 percent (25% for specialty trade NAICS codes with 237 and 238 prefix) of the cost of the contract performance incurred for personnel must be performed by the Service Disabled Veteran Owned Small Business (SDVOSB) awardee or those of a verified SDVOSB subcontractor. Provide a breakdown of material and personnel costs, by specification division listed for the project. Home Office overhead, profit/fee and bond costs shall be added after a subtotal of personnel and material/Equipment costs has been calculated. Clearly identify the personnel costs you will be performing, and the personnel costs of other eligible service disabled veteran-owned small business concerns. Below is a suggested format.

Specification Division SDVOB Vendor (Y or N) Personnel Cost Material/Equipment Costs

Division 01 $ $ Division 02 $ $ Division 03 $ $ (Add additional lines as necessary for each Division applicable to this project)

Sub Total (Personnel Costs, Material/Equipment Costs)

Profit $ Home Office Overhead $ Bond $ Grand Total $

Calculation of self-performed personnel costs:

1. Total personnel costs * both prime and all subcontractors: $

2. Subtract all subcontractor personnel costs* that are not SDVOSB companies that will perform work on this contract: $

3. Remainder is ‘Total amount of work to be self-performed under the Contract’: $

4. Self-performed work = Line 3/Line 1 x 100 = %

*personnel costs include labors, mechanics, other tradesmen, and office personnel directly charged to the project (includes project manager, job superintendent, administrative, estimators, etc.)