This is a Statement of Work (SOW) for construction services at Bay Pines VA Medical Center (Project 516-23-604) in Bay Pines, Florida. The contractor shall install temporary shoring in crawl spaces at Building 1 to repair structural concrete damage in three predominant areas. The work must be completed within 90 calendar days from the Notice to Proceed (NTP), with commencement required within 10 days of receiving the NTP. Available work hours are 0700 to 1630, Monday through Friday, excluding Federal holidays; work outside these hours or on weekends requires a minimum 14-day advance request to the Contracting Officer's Representative (COR).
The contractor must furnish all labor, equipment, certification, supervision, tools, and materials necessary to perform work in strict accordance with project specifications, construction documents, and design schedules. A special inspector furnished by the General Contractor is required. The contractor shall submit all required material and shop drawing submittals to the Contracting Officer within 10 calendar days of award, with no materials installed prior to COR approval. All crawl space work is subject to confined space entry procedures, requiring OSHA-certified personnel and daily confined space permits from the FMS Safety Office; personnel must complete 8-hour OSHA confined space entry training before work commences. Contractor personnel must wear visible VA-issued badge identification at all times on premises, comply with VA facility regulations prohibiting smoking and weapons, and undergo searches of enclosed containers. The contractor shall coordinate bi-weekly progress meetings with the COR and Contracting Officer, provide construction meeting minutes, and be paid monthly upon submission of proper invoices. Final payment is withheld until all discrepancies are corrected and as-built drawings are approved by the government. The SOW includes extensive information security, privacy, and records management requirements applicable to federal contracts, including compliance with VA directives on data protection, encryption standards, security incident reporting, and records retention schedules.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| 36C24827R0028_1.docx | DOCX document | |
| S02_Drawings - Final Submission-Rev1.pdf | ||
| S02_Specifications - Final Submission-Rev1.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Statement of Work
Install Temp Shoring in Crawl Space at Building 1 516-23-604
Bay Pines VA Health Care System (516)
B.1 INTRODUCTION:
This requirement is for Construction Services for Project 516-23-604 “Install Temp Shoring in Crawl Space at Building 1” at Bay Pines VA Medical Center, in accordance with items specified herein. The contractor shall utilize the construction documents and specifications included as part of this project.
B.2 BACKGROUND / DESCRIPTION OF WORK:
A. This project will repair structural concrete damage in the crawlspaces of Building 1. There are three (3) predominant areas with damage to be repaired.
B. This project requires a special inspector furnished by the General Contractor.
B.3 CONSTRUCTION DOCUMENTS:
Contractor shall furnish all labor, equipment, certification, supervision, tools, and materials necessary to perform all operations in connection with this project. Contractor shall perform work in strict accordance with the Project Specifications, Statement of Work, Design, Schedule, and all other supporting documents for this contract.
B.4 SPECIFICATIONS:
The VA Master Construction Specifications contain work procedures and material requirements designed to meet regulatory compliance requirements.
A. In the case of any differences, the specifications will govern over the drawings. Any discrepancies should be brought to the immediate attention of the Contracting Officer and COR for clarification via RFI. Any errors or omissions in the contract drawings or specifications must be provided promptly by the Contractor to the COR, but in no case later than the start of related work.
B.5 UTILITY OUTAGES
A. All utility outages shall be requested in accordance with requirements listed in the project specifications.
B. All outage requests shall include a completed Method of Procedure worksheet; contractor shall request template from COR. Contractor shall also provide mitigation and contingency plans with outage requests. See specifications for additional utility outage/interruption requirements.
C. Work plans (including Method of Procedure worksheet) for any plumbing sterilization shall be submitted (if plumbing sterilization is required). The same requirements for utility outages apply to these plumbing sterilization work plans.
B.6 SPECIFIC REQUIREMENTS
A. Special Inspector – see specifications B. The contractor shall provide construction services in accordance with the attached specifications and construction documents.
C. This requirement will include but will not be limited to preparation and/or performance for submittals, field investigations, site visits, meetings and providing construction meeting minutes to the VA COR, phasing/scheduling, utility shutdowns, infection control measures, and other related information and services.
D. The crawlspaces of Building 1 are considered confined spaces. The contractor shall obtain a daily confined space permit from the FMS Safety office. Refer to the attached blank confined space permit document for instructions. Specific requirements are as follows:
a. All Contract personnel are required to complete OSHA-confined space entry training (8 hrs) before working on this project. Please see below a summary of the confined space daily entry procedures.
b. Conduct pre-entry briefing;
c. Assemble, check, and or calibrate equipment;
d. Establish acceptable entry conditions;
e. Initiate hot work permit (if applicable);
f. Conduct initial air sampling;
g. Execute and complete entry permit;
h. Contact Seminole Fire Department (727) 588-4761 to notify them of the confined space entry;
i. Station entry attendant;
j. Establish monitoring of the atmosphere;
k. Establish communication;
l. Post confined space entry permit;
m. Enter space;
n. Post-entry debrief if problems were encountered; and
o. Cancel the permit and return a copy to the Safety Office.
B.7 HOURS OF COVERAGE:
All work shall be completed within 90 calendar days from NTP. Available hours of work are 0700 to 1630, Monday through Friday, excluding Federal holidays. If the contractor needs to work outside these hours or on weekends, make a request to the COR at least 14 calendar days in advance of the proposed date of work. Approval to work outside these hours is not guaranteed.
A. Before commencement of work, the Contractor shall confer with the COR and Contracting Officer to agree on a sequence of procedures; means of access to premises and building.
All work performed, including delivery of materials and equipment, shall be made with minimal interference to VA operations and personnel.
B.8 IDENTIFICATION, PARKING, NO SMOKING, & VA REGULATIONS:
A. All contractor personnel shall wear visible badge identification issued by the VA at all times while on the premises of VAHCS. It is the responsibility of the Contractor to park in the appropriate designated parking areas. Information on parking is available from the VA Police Section. VAHCS shall not invalidate or make reimbursement for parking violations of the Contractor under any conditions. Smoking is strictly prohibited anywhere in the Veterans Affairs Health Care Facility buildings or anywhere on the facility premises. Possession of weapons is prohibited. Enclosed containers, including tool kits, shall be subject to search.
Violations of VA regulations may result in citation answerable in the United States (Federal) District Court, not a local district, state, or municipal court.
B.9 INFORMATION SECURITY:
See below.
B.10 POINTS OF CONTACT AND PHYSICAL LOCATION:
Access to the worksite shall be coordinated through the COR.
C.W. Bill Young VAMC Bay Pines VAHCS 10000 Bay Pines Blvd Bldg. 24, 3rd Floor Bay Pines, FL 33744 COR will be appointed at the time of award via COR Delegation Memo.
B.11 PERIOD OF PERFORMANCE:
Commencement of work shall begin within 10 days of receipt of written Notice to Proceed (NTP) and should last no longer than 90 calendar days after the date NTP is issued.
B.12 SUBMITTALS:
A. Contractor shall submit all required material/shop drawing submittals to the Contracting
Officer within 10 calendar days of award, or as agreed by the Contracting Officer for approval. No materials shall be installed prior to approval via submittal exchange or other electronic transfer method.
Approval by the COR is required.
B. All material submittals and shop drawings shall have the Project Title, Project Number, and Contract number clearly indicated.
C. Material submittals and shop drawings shall be checked and signed by the contractor prior to submission to the Government.
D. Submittals shall be legible and shall include all technical data needed to verify that the item meets requirements of listed specifications and applicable codes.
E. Contractors shall utilize Material Approval Submittal (or similar template) for use as cover sheet when submitting to Government for approval. Forms shall be provided to the Contractor at the post-award pre-construction conference.
B.13 COMMENCEMENT, COMPLETION, AND PAYMENT FOR WORK:
The Contractor shall be required to commence work required at the time specified on the Notice to Proceed (NTP), execute the work, and complete the entire work not later than the completion time specified on the NTP. The time stated for completion shall include final cleanup of the premises. At the government’s option, it may choose to specify a two-stage performance period. For example, separating material lead-time from construction days can considerably decrease the length of time occupied buildings are inconvenienced by construction.
A. Before commencement of work, the Contractor shall confer with the VA COR and Contracting Office to agree on a sequence of procedures; means of access to premises and building; space for storage of materials and equipment; delivery of materials and use of approaches; use of corridors, stairways, elevators, and similar means of communications; location of partitions, eating spaces, and restrooms for the Contractor employees; and the like. Delivery of materials and equipment shall be made with minimal interference to Government operations and personnel.
B. The Contractor shall be paid monthly upon submission of proper invoices for work completed. If the performance period exceeds 30 days and a progress schedule (approved by the Government) has been submitted, partial payment(s) may be authorized. Final payment shall be withheld until all discrepancies are corrected and as-built drawings are approved by the Government.
C. The contractor shall coordinate no less than bi-weekly progress meetings with the COR and/or Contracting Officer to discuss at a minimum; progression of work, projected progress versus actual progress, action items due from the contractor, submittals, invoicing, payroll submission and associated 1413’s, change order requests, RFIs, safety action items due from the government, and any other significant issues that require attention. The contractor also shall document the meeting minutes and forward a signed copy to the COR for concurrence of the documentation. Copies of all minutes shall be forwarded to the Contracting Officer and COR. In the event of any discrepancies, the Contracting Officer or COR shall be notified immediately for clarification. Contractor shall use the Meeting Minutes form (or similar template) provided for use at the post-award, pre-construction conference.
GENERAL REQUIREMENTS FOR PRIVACY INFORMATION:
a. Contractor will be required to comply with physical security guidelines by either checking in with the VA Police each time they come on-site to perform contracted services or by obtaining a VA Contractor ID badge from the VA Police.
b. Contractor may not have access to any VA sensitive information or to the VA network under this contract. Contractor must be escorted at all times while performing work in sensitive areas with patient information.
c. Each Contractor employee must be escorted at all times by a VA employee (or)Contractor employee working on-site must complete training course “VA Privacy and Information Security Awareness and Rules of Behavior”
RECORD MANAGEMENT OBLIGATIONS LANGUAGE
A. Applicability
This clause applies to all Contractors whose employees create, work with, or otherwise handle Federal records, as defined in Section B, regardless of the medium in which the record exists.
B. Definitions
“Federal record” as defined in 44 U.S.C. § 3301, includes all recorded information, regardless of form or characteristics, made or received by a Federal agency under Federal law or in connection with the transaction of public business and preserved or appropriate for preservation by that agency or its legitimate successor as evidence of the organization, functions, policies, decisions, procedures, operations, or other activities of the United States Government or because of the informational value of data in them.
The term Federal record:
1. includes Bay Pines VA Healthcare System records.
2. does not include personal materials.
3. applies to records created, received, or maintained by Contractors pursuant to their Bay Pines VA Healthcare System contract.
4. may include deliverables and documentation associated with deliverables.
C. Requirements
1. Contractor shall comply with all applicable records management laws and regulations, as well as National Archives and Records Administration (NARA) records policies, including but not limited to the Federal Records Act (44 U.S.C. chs. 21, 29, 31, 33), NARA regulations at 36 CFR Chapter XII Subchapter B, and those policies associated with the safeguarding of records covered by the Privacy Act of 1974 (5 U.S.C. 552a). These policies include the preservation of all records, regardless of form or characteristics, mode of transmission, or state of completion.
2. In accordance with 36 CFR 1222.32, all data created for Government use and delivered to, or falling under the legal control of, the Government are Federal records subject to the provisions of 44 U.S.C. chapters 21, 29, 31, and 33, the Freedom of Information Act (FOIA) (5 U.S.C.
552), as amended, and the Privacy Act of 1974 (5 U.S.C. 552a), as amended and must be managed and scheduled for disposition only as permitted by statute or regulation.
3. In accordance with 36 CFR 1222.32, Contractor shall maintain all records created for Government use or created in the course of performing the contract and/or delivered to, or under the legal control of the Government and must be managed in accordance with Federal law. Electronic records and associated metadata must be accompanied by sufficient technical documentation to permit understanding and use of the records and data.
4. Bay Pines VA Healthcare System and its contractors are responsible for preventing the alienation or unauthorized destruction of records, including all forms of mutilation. Records may not be removed from the legal custody of Bay Pines VA Healthcare System or destroyed except for in accordance with the provisions of the agency records schedules and with the written concurrence of the Head of the Contracting Activity. Willful and unlawful destruction, damage or alienation of Federal records is subject to the fines and penalties imposed by 18 U.S.C. 2701. In the event of any unlawful or accidental removal, defacing, alteration, or destruction of records, Contractor must report to Bay Pines VA Healthcare System. The agency must report promptly to NARA in accordance with 36 CFR 1230.
5. The Contractor shall immediately notify the appropriate Contracting Officer upon discovery of any inadvertent or unauthorized disclosures of information, data, documentary materials, records or equipment. Disclosure of non-public information is limited to authorized personnel with a need-to-know as described in the contract. The Contractor shall ensure that the appropriate personnel, administrative, technical, and physical safeguards are established to ensure the security and confidentiality of this information, data, documentary material, records and/or equipment is properly protected. The Contractor shall not remove material from
Government facilities or systems, or facilities or systems operated or maintained on the Government’s behalf, without the express written permission of the Head of the Contracting Activity. When information, data, documentary material, records and/or equipment is no longer required, it shall be returned to Bay Pines VA Healthcare System control or the Contractor must hold it until otherwise directed. Items returned to the Government shall be hand carried, mailed, emailed, or securely electronically transmitted to the Contracting Officer or address prescribed in the contract. Destruction of records is EXPRESSLY PROHIBITED unless in accordance with Paragraph (4).
6. The Contractor is required to obtain the Contracting Officer's approval prior to engaging in any contractual relationship (sub-contractor) in support of this contract requiring the disclosure of information, documentary material and/or records generated under, or relating to, contracts.
The Contractor (and any sub-contractor) is required to abide by Government and Bay Pines VA Healthcare System guidance for protecting sensitive, proprietary information, classified, and controlled unclassified information.
7. The Contractor shall only use Government IT equipment for purposes specifically tied to or authorized by the contract and in accordance with Bay Pines VA Healthcare System policy.
8. The Contractor shall not create or maintain any records containing any non-public Bay Pines VA Healthcare System information that are not specifically tied to or authorized by the contract.
9. The Contractor shall not retain, use, sell, or disseminate copies of any deliverable that contains information covered by the Privacy Act of 1974 or that which is generally protected from public disclosure by an exemption to the Freedom of Information Act.
10. The Bay Pines VA Healthcare System owns the rights to all data and records produced as part of this contract. All deliverables under the contract are the property of the U.S.
Government for which Bay Pines VA Healthcare System shall have unlimited rights to use, dispose of, or disclose such data contained therein as it determines to be in the public interest.
Any Contractor rights in the data or deliverables must be identified as required by FAR 52.227- 11 through FAR 52.227-20.
11. Training. All Contractor employees assigned to this contract who create, work with, or otherwise handle records are required to take VA-provided records management training. The Contractor is responsible for confirming training has been completed according to agency policies, including initial training and any annual or refresher training.
[Note: To the extent an agency requires contractors to complete records management training, the agency must provide the training to the contractor.]
D. Flowdown of requirements to subcontractors
1. The Contractor shall incorporate the substance of this clause, its terms and requirements including this paragraph, in all subcontracts under this [contract vehicle], and require written subcontractor acknowledgment of same.
2. Violation by a subcontractor of any provision set forth in this clause will be attributed to the Contractor.
VA INFORMATION CUSTODIAL LANGUAGE
1. VA INFORMATION CUSTODIAL LANGUAGE. This entire section applies to all acquisitions requiring any Information Security and Privacy language.
a. The Government shall receive unlimited rights to data/intellectual property first produced and delivered in the performance of this contract or order (hereinafter “contract”) unless expressly stated otherwise in this contract. This includes all rights to source code and all documentation created in support thereof. The primary clause used to define Government and Contractor data rights is FAR 52.227-14 Rights in Data – General. The primary clause used to define computer software license (not data/intellectual property first produced under this contractor or order) is FAR 52.227- 19, Commercial Computer Software License.
b. Information made available to the contractor by VA for the performance or administration of this contract will be used only for the purposes specified in the service agreement, SOW, PWS, PD, and/or contract. The contractor shall not use VA information in any other manner without prior written approval from a VA Contracting Officer (CO). The primary clause used to define Government and Contractor data rights is FAR 52.227-14 Rights in Data – General.
c. VA information will not be co-mingled with any other data on the contractor’s information systems or media storage systems. The contractor shall ensure compliance with Federal and VA requirements related to data protection, data encryption, physical data segregation, logical data segregation, classification requirements and media sanitization.
d. VA reserves the right to conduct scheduled or unscheduled audits, assessments, or investigations of contractor Information Technology (IT) resources to ensure information security is compliant with Federal and VA requirements. The contractor shall provide all necessary access to records (including electronic and documentary materials related to the contracts and subcontracts) and support (including access to contractor and subcontractor staff associated with the contract) to VA, VA's Office Inspector General (OIG), C‐8 and/or Government Accountability Office (GAO) staff during periodic control assessments, audits, or investigations.
e. The contractor may only use VA information within the terms of the contract and applicable Federal law, regulations, and VA policies. If new Federal information security laws, regulations or VA policies become applicable after execution of the contract, the parties agree to negotiate contract modification and adjustment necessary to implement the new laws, regulations, and/or policies.
f. The contractor shall not make copies of VA information except as specifically authorized and necessary to perform the terms of the contract. If copies are made for restoration purposes, after the restoration is complete, the copies shall be destroyed in accordance with VA Directive 6500, VA Cybersecurity Program and VA Information Security Knowledge Service.
g. If a Veterans Health Administration (VHA) contract is terminated for default or cause with a business associate, the related local Business Associate Agreement (BAA) shall also be terminated and actions taken in accordance with VHA Directive 1605.05, Business Associate Agreements. If there is an executed national BAA associated with the contract, VA will determine what actions are appropriate and notify the contactor.
h. The contractor shall store and transmit VA sensitive information in an encrypted form, using VA-approved encryption tools which are, at a minimum, Federal Information Processing Standards (FIPS) 140-2, Security Requirements for Cryptographic Modules (or its successor) validated and in conformance with VA Information Security Knowledge Service requirements. The contractor shall transmit VA sensitive information using VA approved Transport Layer Security (TLS) configured with FIPS based cipher suites in conformance with National Institute of Standards and Technology (NIST) 800-52, Guidelines for the Selection, Configuration and Use of Transport Layer Security (TLS) Implementations.
i. The contractor’s firewall and web services security controls, as applicable, shall meet or exceed VA’s minimum requirements.
j. Except for uses and disclosures of VA information authorized by this contract for performance of the contract, the contractor may use and disclose VA information only in two situations: (i) in response to a qualifying order of a court of competent jurisdiction after notification to VA CO (ii) with written approval from the VA CO. The contractor shall refer all requests for, demands for production of or inquiries about, VA information and information systems to the VA CO for response.
k. Notwithstanding the provision above, the contractor shall not release VA records protected by Title 38 U.S.C. § 5705, Confidentiality of medical quality-assurance records and/or Title 38 U.S.C. § 7332, Confidentiality of certain
C‐9 medical records pertaining to drug addiction, sickle cell anemia, alcoholism or alcohol abuse or infection with Human Immunodeficiency Virus (HIV). If the contractor is in receipt of a court order or other requests for the above‐mentioned information, the contractor shall immediately refer such court order or other requests to the VA CO for response.
l. Information made available to the contractor by VA for the performance or administration of this contract or information developed by the contractor in performance or administration of the contract will be protected and secured in accordance with VA Directive 6500 and Identity and Access Management (IAM) Security processes specified in the VA Information Security Knowledge Service.
m. Any data destruction done on behalf of VA by a contractor shall be done in accordance with National Archives and Records Administration (NARA) requirements as outlined in VA Directive 6300, Records and Information Management, VA Handbook 6300.1, Records Management Procedures, and applicable VA Records Control Schedules.
n. The contractor shall provide its plan for destruction of all VA data in its possession according to VA Directive 6500 and NIST 800-88, Guidelines for Media Sanitization prior to termination or completion of this contract. If directed by the COR/CO, the contractor shall return all Federal Records to VA for disposition.
o. Any media, such as paper, magnetic tape, magnetic disks, solid state devices or optical discs that is used to store, process, or access VA information that cannot be destroyed shall be returned to VA.The contractor shall hold the appropriate material until otherwise directed by the Contracting Officer’s Representative (COR) or CO. Items shall be returned securely via VA-approved methods. VA sensitive information must be transmitted utilizing VA-approved encryption tools which are validated under FIPS 140- 2 (or its successor) and NIST 800-52. If mailed, the contractor shall send via a trackable method (USPS, UPS, FedEx, etc.) and immediately provide the COR/CO with the tracking information. Self-certification by the contractor that the data destruction requirements above have been met shall be sent to the COR/CO within 30 business days of termination of the contract.
p. All electronic storage media (hard drives, optical disks, CDs, back-up tapes, etc.) used to store, process or access VA information will not be returned to the contractor at the end of lease, loan, or trade-in. Exceptions to this paragraph will only be granted with the written approval of the VA CO.
2. ACCESS TO VA INFORMATION AND VA INFORMATION SYSTEMS. This section applies when any person requires access to information made available to the contractor by VA for the performance or administration of this contract or information developed by the contractor in performance or administration of the contract.
a. A contractor/subcontractor shall request logical (technical) or physical access to VA information and VA information systems for their employees and subcontractors only to the extent necessary to perform the services specified in the solicitation or contract.
This includes indirect entities, both affiliate of contractor/subcontractor and agent of contractor/subcontractor.
b. Contractors and subcontractors shall sign the VA Information Security Rule of Behavior (ROB) before access is provided to VA information and information systems (see Section 4, Training, below). The ROB contains the minimum user compliance requirements and does not supersede any policies of VA facilities or other agency components which provide higher levels of protection to VA’s information or information systems. Users who require privileged access shall complete the VA elevated privilege access request processes before privileged access is granted.
c. All contractors and subcontractors working with VA information are subject to the same security investigative and clearance requirements as those of VA appointees or employees who have access to the same types of information. The level and process of background security investigations for contractors shall be in accordance with VA Directive and Handbook 0710, Personnel Suitability and Security Program. The Office of Human Resources and Administration/Operations, Security and Preparedness (HRA/OSP) is responsible for these policies and procedures. Contract personnel who require access to classified information or information systems shall have an appropriate security clearance. Verification of a Security Clearance shall be processed through the Special Security Officer located in HRA/OSP. Contractors shall conform to all requirements stated in the National Industrial Security Program Operating Manual
(NISPOM).
d. All contractors and subcontractors shall comply with conditions specified in VAAR 852.204-71(d); Contractor operations required to be in United States. All contractors and subcontractors working with VA information must be permanently located within a jurisdiction subject to the law of the United States or its Territories to the maximum extent feasible. If services are proposed to be performed abroad the contractor must state where all non-U.S. services are provided. The contractor shall deliver to VA a detailed plan specifically addressing communications, personnel control, data protection and potential legal issues. The plan shall be approved by the COR/CO in writing prior to access being granted.
e. The contractor shall notify the COR/CO in writing immediately (no later than 24 hours) after personnel separation or occurrence of other causes. Causes may include the following:
(1) Contractor/subcontractor personnel no longer has a need for access to VA information or VA information systems. Contractor/subcontractor personnel are terminated, suspended, or otherwise has their work on a VA project discontinued for any reason.
(2) Contractor believes their own personnel or subcontractor personnel may pose a threat to their company’s working environment or to any company-owned property. This includes contractor-owned assets, buildings, confidential data, customers, employees, networks, systems, trade secrets and/or VA data.
(3) Any previously undisclosed changes to contractor/subcontractor background history are brought to light, including but not limited to changes to background investigation or employee record.
(4) Contractor/subcontractor personnel have their authorization to work in the United States revoked.
(5) Agreement by which contractor provides products and services to VA has either been fulfilled or terminated, such that VA can cut off electronic and/or physical access for contractor personnel.
f. In such cases of contract fulfillment, termination, or other causes; the contractor shall take the necessary measures to immediately revoke access to VA network, property, information, and information systems (logical and physical) by contractor/subcontractor personnel. These measures include (but are not limited to):
removing and then securing Personal Identity Verification (PIV) badges and PIV – Interoperable (PIV-I) access badges, VA-issued photo badges, credentials for VA facilities and devices, VA-issued laptops, and authentication tokens. Contractors shall notify the appropriate VA COR/CO immediately to initiate access removal.
g. Contractors/subcontractors who no longer require VA accesses will return VA-issued property to VA. This property includes (but is not limited to): documents, electronic equipment, keys, and parking passes. PIV and PIV-I access badges shall be returned to the nearest VA PIV Badge Issuance Office. Once they have had access to VA information, information systems, networks and VA property in their possessions removed, contractors shall notify the appropriate VA COR/CO.
3. TRAINING. This entire section applies to all acquisitions which include section 3.
a. All contractors and subcontractors requiring access to VA information and VA information systems shall successfully complete the following before being granted access to VA information and its systems:
(1) VA Privacy and Information Security Awareness and Rules of Behavior course (Talent Management System (TMS) #10176) initially and annually thereafter.
(2) Sign and acknowledge (electronically through TMS #10176) understanding of and responsibilities for compliance with the Organizational Rules of Behavior, relating to access to VA information and information systems initially and annually thereafter; and
(3) Successfully complete any additional cyber security or privacy training, as required for VA personnel with equivalent information system or information access [to be defined by the VA program official and provided to the VA CO for inclusion in the solicitation document – i.e., any role-based information security training].
b. The contractor shall provide to the COR/CO a copy of the training certificates and certification of signing the Organizational Rules of Behavior for each applicable employee within five days of the initiation of the contract and annually thereafter, as required.
c. Failure to complete the mandatory annual training is grounds for suspension or termination of all physical or electronic access privileges and removal from work on the contract until such time as the required training is complete.
4. SECURITY INCIDENT INVESTIGATION. This entire section applies to all acquisitions requiring any Information Security and Privacy language.
a. The contractor, subcontractor, their employees, or business associates shall immediately (within one hour) report suspected security / privacy incidents to the VA OIT’s Enterprise Service Desk (ESD) by calling (855) 673-4357 (TTY: 711). The ESD is OIT’s 24/7/365 single point of contact for IT-related issues. After reporting to the ESD, the contractor, subcontractor, their employees, or business associates shall, within one hour, provide the COR/CO the incident number received from the ESD.
b. To the extent known by the contractor/subcontractor, the contractor/ subcontractor's notice to VA shall identify the information involved and the circumstances surrounding the incident, including the following:
(1) The date and time (or approximation of) the Security Incident occurred.
(2) The names of individuals involved (when applicable).
(3) The physical and logical (if applicable) location of the incident.
(4) Why the Security Incident took place (i.e., catalyst for the failure).
(5) The amount of data belonging to VA believed to have been compromised.
(6) The remediation measures the contractor is taking to ensure no future incidents of a similar nature.
c. After the contractor has provided the initial detailed incident summary to VA, they will continue to provide written updates on any new and relevant circumstances or facts they discover. The contractor, subcontractor, and their employes shall fully cooperate with VA or third-party entity performing an independent risk analysis on behalf of VA. Failure to cooperate may be deemed a material breach and grounds for contract termination.
d. VA IT contractors shall follow VA Handbook 6500, Risk Management Framework for VA Information Systems VA Information Security Program, and VA Information Security Knowledge Service guidance for implementing an Incident Response Plan or integrating with an existing VA implementation.
e. In instances of theft or break-in or other criminal activity, the contractor/subcontractor must concurrently report the incident to the appropriate law enforcement entity (or entities) of jurisdiction, including the VA OIG, and the VA Office of Security and Law Enforcement. The contractor, its employees, and its subcontractors and their employees shall cooperate with VA and any law enforcement authority responsible for the investigation and prosecution of any possible criminal law violation(s) associated with any incident. The contractor/subcontractor shall cooperate with VA in any civil litigation to recover VA information, obtain monetary or other compensation from a third party for damages arising from any incident, or obtain injunctive relief against any third party arising from, or related to, the incident.
f. The contractor shall comply with VA Handbook 6500.2, Management of Breaches Involving Sensitive Personal Information, which establishes the breach management policies and assigns responsibilities for the oversight, management and reporting procedures associated with managing of breaches.
g. With respect to unsecured Protected Health Information (PHI), the contractor is deemed to have discovered a data breach when the contractor knew or should have known of breach of such information. When a business associate is part of VHA contract, notification to the covered entity (VHA) shall be made in accordance with the executed BAA.
h. If the contractor or any of its agents fails to protect VA sensitive personal information or otherwise engages in conduct which results in a data breach involving any VA sensitive personal information the contractor/subcontractor processes or maintains under the contract; the contractor shall pay liquidated damages to the VA as set forth in clause 852.211-76, Liquidated Damages— Reimbursement for Data Breach Costs.
(END OF SOW)