14 - Exhibit M - RLP 36C248-27-R-0012 Deliverables Checklist.pdf
PDF 129 KB Posted
- Solicitation number
- 36C24827R0012
About this file
This is a Deliverables Checklist for a GSA Leased Property (RLP) Request for Lease Proposal 36C248-27-R-0012 for a VA Community Based Outpatient Clinic (CBOC) facility in Homestead, Florida.
The checklist establishes comprehensive submission requirements organized into two sections: Master Offer Deliverables (Section A) and Detailed Section 4.03 Evaluation-Factor Documentation (Section B). Section A requires 28 core deliverables including GSA Forms 1364 and 1217 for pricing and operating costs; proof of ownership, financing, zoning compliance, and local authorizations; sealed floor plans and test-fit layouts demonstrating accommodation of 17,350–17,400 assignable building area square feet; fire protection and life safety documentation; parking plans showing 150 government-exclusive spaces; architectural modernization plans if applicable; ENERGY STAR certification or efficiency documentation; and various environmental and compliance submissions. Section B requires nine standalone PDF evaluation factors addressing site appropriateness, neighborhood characteristics, amenities and transit accessibility within specified distances, access to highways and hospitals, flooding and environmental issues, architect-engineering design aligned with VA PACT CBOC standards, emergency response procedures, management and operations qualifications with personnel located within 50 miles, construction contractor experience with medical-facility projects, occupancy-date readiness with detailed scheduling, and pricing through completed GSA forms and unit-price exhibits. All submissions must include detailed written statements, maps, aerial photographs, and supporting documentation as specified for each factor.
View the file
Other files
Show all 14
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
RLP 36C248-27-R-0012 | Deliverables Checklist
RLP DELIVERABLES CHECKLIST
RLP No. 36C248-27-R-0012 | Homestead, Florida | Includes detailed Section 4.03 factor documentation
Offeror Property Reviewer Review Date Initial/FPR Overall Status
Use: Mark Included, N/A, or Deficient; verify the RLP reference, applicability, filename, signatures, and supporting content. Requirements below are transcribed and consolidated from the RLP. Conditional items must be evaluated against the offered property, offeror status, and final solicitation configuration.
A. Master Offer Deliverables
Status Deliverable RLP Reference Applicability Documentation / Completion Requirement Reviewer Notes
☐ Proposal to Lease Space, GSA Form 1364 3.03 B Required
Complete all sections. Include gross fully serviced rates per ABOA and RSF; shell, TI, BSAC, operating costs and parking breakdowns; non-firm shell rate; overtime HVAC; vacant-premises adjustment; rent concessions; broker compensation; and all requested deviations in Additional Remarks. Sign where required.
☐ Lessor’s Annual Cost Statement, GSA Form 1217 3.03 A Required Complete all sections. Operating-cost figures must support the Form 1364 pricing and annual cost per ABOA/RSF calculations. Sign where required.
☐ Authorization to Represent Ownership 3.01 C If offeror is not owner Written authorization from the ownership entity permitting the offeror/agent to submit the offer on ownership’s behalf.
☐ Conditional Commitment of Funds / Self-Financing Evidence 3.01 D Required
Financing commitment sufficient for Shell, TI and BSAC, signed by an authorized financing official, stating loan amount, term, APR and commitment period; or self-financing evidence such as financial statements, 3 months of bank statements, cash reserves, or financial-officer letter.
☐ Local Zoning Compliance 3.01 E Required Evidence property is properly zoned, including approved variances. If not compliant, provide plan and schedule to obtain approvals before construction.
☐ Ownership Evidence 3.01 F Required Deed or long-term lease showing ownership/control and encumbrances.
☐ Agreement to Acquire Interest in Property 3.01 G If no vested interest Fully executed acquisition/interest agreement plus current-owner statement that agreement is in force and conditions precedent have been satisfied, or other LCO-acceptable documentation. Keep current through award.
☐ Signing Authority Proof 3.01 H Required Corporation: articles, bylaws and authorizing resolution. Partnership: agreement/statement and authority evidence. LLC: articles, operating agreement and signer authority. Joint venture: JV agreement and signer authority.
☐ Conflict-of-Interest Documentation 3.01 I If applicable For one agent representing multiple owners, evidence of disclosure and authorization from each ownership entity.
☐ Active SAM Registration 3.01 J Required before award Active registration for All Awards, including required representations and certifications.
☐ Fire Protection and Life Safety Package 3.01 K Unless exempt
GSA Form 12000 Part A or B; previous-year fire alarm maintenance record if installed; previous-year sprinkler maintenance record if installed; valid Certificate of Occupancy, or qualifying fire-protection-engineer report, or new-construction code documentation and written commitment. Review stated exemptions.
☐ Legal Property Description and Tax Package 3.01 L Required Legal description, tax ID, prior-year tax notices and bills, tax-abatement documentation, and supporting property information such as photo, site plan, location map and tax parcel map when applicable.
☐ Parking Plan and Narrative 3.01 M Required Plan and short narrative showing compliance with the parking requirements, including 150 Government-exclusive spaces.
Status Deliverable RLP Reference Applicability Documentation / Completion Requirement Reviewer Notes
☐ Architectural Modernization Plans 3.01 N If building is not modern Plans showing proposed modernization of the offered building.
☐ Asbestos Management Plan and Reinspection Report 2.05 D If ACM is present Current asbestos management or O&M plan and reinspection report performed within the past 5 years, listing ACM and condition.
☐ Scaled Floor Plans / CAD Files 3.01 O Required Computer-generated plans, preferably 1/8 inch = 1 foot, including offered floors, exit-discharge floors, stairs, elevators, offered space, interrupted stairs, corridor pattern and architectural features. Provide AutoCAD-compatible DWG, polyline layer, and written layer matrix. Show planned alterations.
☐ Test Fit Layout 2.01 Required Layout demonstrating that the requirement can be accommodated efficiently within the offered ABOA SF.
☐ Pre-Award DIDs and Finish Options 3.05 / 3.06 Required by selected turnkey approach Level 1 DID package: cover sheet, demolition plan if applicable, construction/partition plan, power/communications plan, furniture plan and finish plan. Base fixed TI pricing on DIDs.
☐ Security Unit Price List 3.03 C Required by selected turnkey approach Itemized countermeasure cost breakdown by shell, TI or BSAC; no charge for items already existing.
☐ TI Unit Price List 3.03 D Required by selected turnkey approach Completed TI unit-price list consistent with the selected pricing method.
Hazardous Conditions / Environmental Releases Disclosure
2.09 If known / required Written disclosure of known hazardous conditions or environmental releases involving the offered space, building, or property.
☐ Vending Facilities Statement 3.01 P Required State whether existing vending facilities have exclusive rights in the building.
☐ Amenities Evidence 3.01 Q Required Evidence amenities exist or will exist by occupancy, such as signed leases, construction contracts, or other LCO-acceptable documentation.
☐ ENERGY STAR / Efficiency Documentation 3.01 R; 2.08 Required Evidence of current ENERGY STAR label, or exception and proposed cost-effective improvements; if none, Online
Tools analysis; if requesting additional time, substantiation of eligibility and ability to earn the label.
☐ Seismic Compliance Evidence 2.03 / 2.04 If seismic paragraph retained
Applicable Seismic Form A, B, C or D and required supporting checklists, calculations, evaluations, retrofit documents, schedule, drawings/specifications and geotechnical report as applicable.
☐ Environmental Due Diligence / NEPA Documentation 2.10 At LCO direction / if applicable Current ASTM E1527-21 Phase I ESA focused on Government as user; REC response, Phase II and cleanup documentation/schedule as necessary; recent studies and requested NEPA information.
☐ NHPA Documentation 2.11 If applicable Requested historic-property documentation and studies; preservation architect qualifications/design documentation when Government determines historic property may be affected.
☐ Hydrology Statement 3.01 S If more than 5,000 SF of land disturbed Statement acknowledging and committing to comply with Lease hydrology maintenance/restoration requirements.
☐ Telecommunications Representation 3.01 T As applicable FAR 52.240-90 representation, contingent on the SAM online response.
☐ Foreign Ownership/Financing Representation 3.01 U Required GSAR 552.270-33 completed representation.
☐ Construction Schedule 3.01 V
When complex buildout and occupancy date applies
Schedule showing permitting, design and construction phases and principal work categories aligned with required occupancy and Lease milestones.
Status Deliverable RLP Reference Applicability Documentation / Completion Requirement Reviewer Notes
☐ Small Business Subcontracting Plan 1.13 / SAM
If other-than-small and aggregate rent over $900,000
Completed subcontracting plan meeting the stated threshold condition.
☐ Hourly Overtime HVAC Rates Lease paragraph If applicable State hourly overtime HVAC rate consistently with Form 1364 and Lease requirements.
☐ Periodic Lease Above-Standard Services Rates
Lease paragraph If applicable Rates for periodic above-standard services other than HVAC.
☐ Broker Project Exhibit Submittals Applicable exhibit If broker project Submittals required by the Broker Project Exhibit, including brokerage commission agreement when applicable.
☐ Net Utilities Exhibit Submittals Applicable exhibit If net utilities applies Submittals identified in the Net Utilities Exhibit.
☐ New Construction Exhibit Submittals
Applicable exhibit If new construction Submittals identified in the New Construction Exhibit and any additional technical items required.
☐ Operating-Lease Scorekeeping Support 3.04 Upon LCO request Supporting documentation needed for determination that the lease scores as an operating lease under OMB
Circular A-11, Appendix B.
☐ Offeror Submission / Deliverables Checklist
4.03 final text / listed exhibit
Required by final RLP wording
Complete and execute the checklist; identify each required document by corresponding filename and page number, if applicable.
B. Detailed Section 4.03 Evaluation-Factor Documentation For each row below, verify the standalone PDF naming convention and every listed component. These requirements are in addition to the general offer deliverables above.
Status Factor / Subfactor Required Filename Format Detailed Documentation Requirement Reviewer Notes
☐ 1.1 Appropriate Land Use Appropriate land use Standalone
Written statement; zoning information; maps and aerial photos showing appropriate zoning for a VA Community Based Outpatient Clinic; relationship to compatible land uses; measured distances demonstrating office-residential, commercial general, institutional, or mixed-use land is no more than 1 mile away.
☐ 1.2 Neighborhood Neighborhood Standalone
Written statement; maps and aerial photos showing the proposed site relative to neighboring businesses and tenants and supporting the asserted neighborhood compatibility/stability.
☐ 1.3 Amenities Amenities Standalone
Written statement; maps and aerial photos identifying at least 7 amenity instances within a safely accessible, walkable 2,640 feet of the primary functional entrance, including 2 inexpensive/moderately priced restaurants and 5 other instances across at least 2 diverse-use categories; show walking and driving distances and paths.
☐ 1.4 Transit Accessibility Transit Accessibility Standalone
Written statement; maps and aerial photos depicting qualifying bus stop(s); show safely accessible walking distance, no more than 2,640 feet from the principal functional entrance; show pedestrian path.
☐ 1.5 Access Access Standalone
Written statement; maps and aerial photos demonstrating the proposed site is within 5 miles of a major highway;
show driving distance and access route to and from the highway.
☐ 1.6 Parking Parking Standalone
Written statement and architectural/site plans showing at least 150 onsite spaces for VA exclusive use, including the RLP-stated accessibility requirement; show parking area no more than 250 feet from clinic main entry, walking distance and pedestrian path.
☐ 1.7 Visibility and Direct Access Visibility and Direct Access Standalone
Written statement; maps and photographs showing access roads, visibility from the street/access road, any obstructions, and route/turn information supporting the offered condition.
Status Factor / Subfactor Required Filename Format Detailed Documentation Requirement Reviewer Notes
☐ 1.8 Proximity to Hospital with ER
Proximity to Hospitals with
ER
Standalone
Written statement; maps and aerial photos demonstrating the proposed site is within 5 miles of an existing hospital with an Emergency Room; show driving distance and access route to and from the hospital.
☐ 1.9 Flooding and Environmental Issues
Flooding and Environmental Issues
Standalone
Written statement; floodplain maps and aerial photos demonstrating site is outside the 100-year floodplain and addressing major environmental constraints, bodies of water, known prior contamination, construction-delay obstacles and veteran-access impacts; include mitigation plan for minor environmental issues, if applicable.
☐ 2 Architect- Engineering Design A-E Design Standalone
PDF file(s)
Written statement and architectural plans in accordance with RLP 3.06. Include the Level 1 DID elements required by
3.06 and demonstrate alignment with the VA standard for PACT CBOC design and applicable VA Technical Information Library requirements.
☐ 3 Emergency Response Time Emergency Response Standalone
Written plan explaining response to EMS/custodial emergencies and other-than-routine issues, including the proposed response-time commitments and escalation/coverage approach.
4.1 Management and
Operations Qualifications
M-O Qualifications Standalone
Property Management and Operations Plan; profiles of participating companies, team leads and individuals; roles in buildout and lease operations; planned response times; work-order request/tracking process; evidence of mechanical, electrical and civil expertise and current or prior medical-facility experience.
☐ 4.2 Management and Operations Proximity M-O Proximity Standalone
Written statement and map identifying Property Management and Operations/Maintenance personnel locations and measured distance to the proposed site, demonstrating location within 50 miles.
☐ 5 Construction Contractor Team Construction Contractor Standalone
Profiles of construction companies and key individuals; evidence of medical-facility experience and at least two substantially similar construction projects related to VA PACT design models.
☐ 6 Occupancy Date Readiness Occupancy Readiness Standalone
Detailed construction schedule, such as Critical Path Method, demonstrating delivery/occupancy by the final required date and stating time after award.
☐ 7 Available Space Available Space Standalone
Architectural plans of existing space before TI remodeling/buildout; demonstrate 17,350–17,400 ABOA SF and location within the building.
☐ 8 Past Performance Past Performance Standalone
Three references for past lease experience with names, telephone numbers and relevant information; completed Exhibit J Past Performance Questionnaires from cited references.
☐ 9 Price Original Exhibit names Separate completed PDFs
Completed and signed Exhibits D and E (GSA Forms 1364 and 1217), Exhibit K (TI cost table), and Exhibit L (Security Unit Price List) as required by 4.03; preserve original exhibit filenames.
| A. Master Offer Deliverables |
| B. Detailed Section 4.03 Evaluation-Factor Documentation |
File details come from the government source that posted it. Updated .