This is a Solicitation/Contract/Order for Commercial Products and Commercial Services (Standard Form 1449) for an exterior building cleaning program for the Orlando VA Healthcare System (OVAHCS) facilities. The Department of Veterans Affairs, Network Contracting Office 8, is seeking a Service-Disabled Veteran-Owned Small Business (SDVOSB) to provide comprehensive exterior cleaning services across four VA facilities: Orlando VAMC at Lake Nona, Lake Baldwin VAMC, Lakemont Campus, and Viera VAHCC. The solicitation number is 36C24827Q0140 with an offer due date of December 16, 2026 at 11:00 AM EST and an anticipated effective date of January 1, 2027. The contract is a firm fixed-price award with a base performance period from January 1, 2027 through December 31, 2027, followed by four optional one-year extension periods through December 31, 2031, bringing the total potential contract duration to five years. The estimated total award amount is $16.5 million.

The contractor shall furnish all labor, transportation, supplies, equipment, and eco-friendly materials required to perform five main tasks: (1) exterior building and structure cleaning at two visits per 12-month period; (2) exterior and select interior window washing at two visits per 12-month period; (3) roof cleaning at two visits per 12-month period; (4) monthly light maintenance cleaning including de-webbing, minor pressure washing, and interior courtyard glass cleaning; and (5) hot pressure washing of parking garage levels, ramps, walls, columns, and stairwells at the Lake Nona facility at two visits per 12-month period. Work hours vary by facility, generally between 7:00 AM and 5:00 PM Monday through Friday, with extended hours for Lake Nona (7 days per week) and after-hours requirements for parking garage work. Contractor personnel must complete OSHA 10 training and high-rise training, obtain non-PIV card access, and undergo Special Agreement Check (SAC) background investigation. The contractor must submit a detailed safety plan at least five working days prior to service commencement and comply with all OSHA standards, occupational health and safety requirements, and VA facility security policies. Electronic invoicing is mandatory through the VA's Tungsten Network e-Invoice system, with payment processed by the VA Financial Services Center.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

36C24827Q0140

PAGE 1 OF

1. REQUISITION NO.

2. CONTRACT NO.

3. AWARD/EFFECTIVE DATE

4. ORDER NO.

5. SOLICITATION NUMBER

6. SOLICITATION ISSUE DATE

a. NAME

b. TELEPHONE NO. (No Collect Calls)

8. OFFER DUE DATE/LOCAL

TIME

9. ISSUED BY

CODE

10. THIS ACQUISITION IS

UNRESTRICTED OR

SET ASIDE:

% FOR:

SMALL BUSINESS

HUBZONE SMALL

BUSINESS

SERVICE-DISABLED

VETERAN-OWNED

SMALL BUSINESS

WOMEN-OWNED SMALL BUSINESS

(WOSB) ELIGIBLE UNDER THE WOMEN-OWNED

SMALL BUSINESS PROGRAM

EDWOSB

8(A)

NAICS:

SIZE STANDARD:

11. DELIVERY FOR FOB DESTINA-

TION UNLESS BLOCK IS

MARKED

SEE SCHEDULE

12. DISCOUNT TERMS

13a. THIS CONTRACT IS A

RATED ORDER UNDER

DPAS (15 CFR 700)

13b. RATING

14. METHOD OF SOLICITATION

RFQ

IFB

RFP

15. DELIVER TO

CODE

16. ADMINISTERED BY

CODE

17a. CONTRACTOR/OFFEROR

CODE

FACILITY CODE

18a. PAYMENT WILL BE MADE BY

CODE

TELEPHONE NO.

UEI:

EFT:

PHONE:

FAX:

17b. CHECK IF REMITTANCE IS DIFFERENT AND PUT SUCH ADDRESS IN OFFER 18b. SUBMIT INVOICES TO ADDRESS SHOWN IN BLOCK 18a UNLESS BLOCK BELOW IS CHECKED

SEE ADDENDUM

19.

20.

21.

22.

23.

24.

ITEM NO.

SCHEDULE OF SUPPLIES/SERVICES

QUANTITY

UNIT

UNIT PRICE

AMOUNT

(Use Reverse and/or Attach Additional Sheets as Necessary)

25. ACCOUNTING AND APPROPRIATION DATA

26. TOTAL AWARD AMOUNT (For Govt. Use Only) 27a. SOLICITATION INCORPORATES BY REFERENCE FAR 52.212-1, 52.212-4. FAR 52.212-3 AND 52.212-5 ARE ATTACHED. ADDENDA

ARE

ARE NOT ATTACHED.

27b. CONTRACT/PURCHASE ORDER INCORPORATES BY REFERENCE FAR 52.212-4. FAR 52.212-5 IS ATTACHED. ADDENDA

ARE

ARE NOT ATTACHED

28. CONTRACTOR IS REQUIRED TO SIGN THIS DOCUMENT AND RETURN _______________

29. AWARD OF CONTRACT: REF. ___________________________________ OFFER

COPIES TO ISSUING OFFICE. CONTRACTOR AGREES TO FURNISH AND

DATED ________________________________. YOUR OFFER ON SOLICITATION

DELIVER ALL ITEMS SET FORTH OR OTHERWISE IDENTIFIED ABOVE AND ON ANY

(BLOCK 5), INCLUDING ANY ADDITIONS OR CHANGES WHICH ARE

ADDITIONAL SHEETS SUBJECT TO THE TERMS AND CONDITIONS SPECIFIED

SET FORTH HEREIN IS ACCEPTED AS TO ITEMS:

30a. SIGNATURE OF OFFEROR/CONTRACTOR 31a. UNITED STATES OF AMERICA (SIGNATURE OF CONTRACTING OFFICER) 30b. NAME AND TITLE OF SIGNER (TYPE OR PRINT) 30c. DATE SIGNED 31b. NAME OF CONTRACTING OFFICER (TYPE OR PRINT) 31c. DATE SIGNED

AUTHORIZED FOR LOCAL REPRODUCTION

(REV. NOV 2021)

PREVIOUS EDITION IS NOT USABLE

Prescribed by GSA - FAR (48 CFR) 53.212

7. FOR SOLICITATION

INFORMATION CALL:

STANDARD FORM 1449

SOLICITATION/CONTRACT/ORDER FOR COMMERCIAL PRODUCTS AND COMMERCIAL SERVICES

OFFEROR TO COMPLETE BLOCKS 12, 17, 23, 24, & 30

xx 36C24827Q0140 11-24-2026

KURT KRAMER

407-840-9048 12-16-2026 11:00

EST

36C248 Department of Veterans Affairs Network Contracting Office 8 (NCO 8) 13800 Veterans Way Orlando

FL

32827 X X 561990 $16.5 Million N/A X Department of Veterans Affairs Orlando VA Healthcare System 13800 Veterans Way Orlando

FL

32827 36C248 Department of Veterans Affairs Network Contracting Office 8 (NCO 8) 13800 Veterans Way Orlando

FL

32827

Department of Veterans Affairs Financial Services Center P.O. Box 149971 Austin

TX

78714-9971

(877) 353-9791

(512) 460-5429 See CONTINUATION Page Exterior Building Cleaning Program for Orlando VA Healthcare System (OVAHCS) facilities.

See CONTINUATION Page X X X

KURT KRAMER

Contracting Officer Table of Contents

SECTION A1
A.1 SF 1449 SOLICITATION/CONTRACT/ORDER FOR COMMERCIAL PRODUCTS AND COMMERCIAL SERVICES1
SECTION B - CONTINUATION OF SF 1449 BLOCKS3
B.1 PRICE/COST SCHEDULE4
ITEM INFORMATION4
B.2 DELIVERY SCHEDULE25
Exterior Cleaning Program & Exterior Window Washing Services29
Performance Work Statement (PWS)29
SECTION C - CONTRACT CLAUSES45
C.1 52.217-8 OPTION TO EXTEND SERVICES (NOV 1999)45
C.2 52.217-9 OPTION TO EXTEND THE TERM OF THE CONTRACT (MAR 2000)45
C.3 52.222-40 NOTIFICATION OF EMPLOYEE RIGHTS UNDER THE NATIONAL LABOR RELATIONS ACT (NOV 2025) (DEVIATION)45
C.4 52.222-42 STATEMENT OF EQUIVALENT RATES FOR FEDERAL HIRES (MAY 2014)47
C.5 52.222-90 ADDRESSING DEI DISCRIMINATION BY FEDERAL CONTRACTORS (DEVIATION APR 2026)47
C.6 52.240-91 SECURITY PROHIBITIONS AND EXCLUSIONS (NOV 2025) (DEVIATION)48
C.7 52.252-2 CLAUSES INCORPORATED BY REFERENCE (FEB 1998)58
C.8 VAAR 852.219-73 VA NOTICE OF TOTAL SET-ASIDE FOR CERTIFIED SERVICE-DISABLED VETERAN-OWNED SMALL BUSINESSES (JAN 2023) (DEVIATION)59
C.9 VAAR 852.219-75 VA NOTICE OF LIMITATIONS ON SUBCONTRACTING—CERTIFICATE OF COMPLIANCE FOR SERVICES AND CONSTRUCTION (JAN 2023) (DEVIATION)62
C.10 SUPPLEMENTAL INSURANCE REQUIREMENTS63
SECTION D - CONTRACT DOCUMENTS, EXHIBITS, OR ATTACHMENTS65
SECTION E - SOLICITATION PROVISIONS66
E.1 52.209-7 INFORMATION REGARDING RESPONSIBILITY MATTERS (NOV 2025) (DEVIATION)69
E.2 52.216-1 TYPE OF CONTRACT (NOV 2025) (DEVIATION)71
E.3 52.233-2 SERVICE OF PROTEST (SEP 2006)71
E.4 52.240-90 SECURITY PROHIBITIONS AND EXCLUSIONS REPRESENTATIONS AND CERTIFICATIONS (NOV 2025) (DEVIATION)71
E.5 52.252-1 SOLICITATION PROVISIONS INCORPORATED BY REFERENCE (FEB 1998)75
E.6 VAAR 852.233-71 ALTERNATE PROTEST PROCEDURE (OCT 2018)76
E.7 52.212-2 EVALUATION—COMMERCIAL PRODUCTS AND COMMERCIAL SERVICES (OCT 2025) (DEVIATION)77

SECTION B - CONTINUATION OF SF 1449 BLOCKS

(continuation from Standard Form 1449, block 18A.)
1.Contract Administration: All contract administration matters will be handled by the following individuals:
a. CONTRACTOR:______________________(Company Name)
______________________(Address)
______________________(City-State-Zip)
POINT OF CONTACT: _____________________
PHONE NUMBER:_______________________
E-MAIL ADDRESS:_______________________
SAM UEI #:_______________________
GOVERNMENT:Kurt Kramer, Contracting Specialist (CO)
(E): Kurt.Kramer@va.gov

Network Contracting Office 8 (NCO 8)

2.CONTRACTOR REMITTANCE ADDRESS: All payments by the Government to the contractor will be made in accordance with:
[X]
52.232-33 Payment by Electronic Funds Transfer - System For Award Management (JUL 2013)

3. INVOICES/PAYMENT: Invoices shall be submitted electronically, in arrears:

a. After services have been rendered and accepted.

b. In order to comply with the Improper Payment Elimination and Recovery Act of 2010 (IPERA), the VA has mandated electronic invoice submission to the Veterans Affairs Financial Services Center (VAFSC). VAFSC has partnered with Tungsten Corporation e-Invoicing network, for submissions of all electronic invoices to VA. Tungsten Network electronic invoicing is free to all VA vendors. In order to submit electronic invoices, all VA vendors must register with Tungsten Network by submitting an email to Tungsten Network VA.Registration@tungsten-network.com or calling 1-877-752-0900 option 2 for Enrollment.

c. VA’s Electronic Invoice (e-Invoice) system uses a third-party contractor (Tungsten Network) for submission of electronic invoices. Go to this website to begin submitting electronic invoices, free of charge: http://www.tungsten-network.com/customer-campaigns/veteransaffairs-us/

For assistance setting up e-Invoice, the below information is provided:

· Tungsten Network e-Invoice Registration: VA.Registration@tungsten-network.com

· Tungsten Network Customer Service: (877) 489-6135

· VAFSC – for Invoice receipt or payment questions, call: (877)353-9791 or

· VAFSC Email: vafsccshd@va.gov

FACSIMILE, E-MAIL, AND SCANNED DOCUMENTS ARE NOT ACCEPTABLE FORMS OF

SUBMISSION FOR PAYMENT REQUESTS

CONTRACT ADMINISTRATION

The Contracting Officer is the only person authorized to approve changes or modify any of the requirements under this contract. The Contractor shall communicate with the Contracting Officer on all matters pertaining to contract administration. Only the Contracting Officer is authorized to make commitment or issue changes that will affect price, quantity or quality of performance of this contract. In the event the Contractor effects any such change at the direction of any person other than the Contracting Officer, the change shall be considered to have been made without authority and no adjustment will be made in the contract price to cover any increase in cost incurred thereof.

B.1 PRICE/COST SCHEDULE

ITEM INFORMATION

ITEM NUMBER
DESCRIPTION OF SUPPLIES/SERVICES
QUANTITY
UNIT
UNIT PRICE
AMOUNT
0.00
SV
__________________
__________________

Orlando VAMC at Lake Nona Contract Period: Base POP Begin: 01-01-2027 POP End: 12-31-2027 PRINCIPAL NAICS CODE: 561990 - All Other Support Services PRODUCT/SERVICE CODE: Z1DA - Maintenance of Hospitals and Infirmaries

0001AA

2.00
EA
__________________
__________________

Exterior Cleaning of all Buildings & Structures in accordance with the PWS

POP Begin: 01-01-2027 POP End: 12-31-2027

0001AB

2.00
EA
__________________
__________________

Exterior Cleaning of all Windows in accordance with the PWS Contract Period: Base POP Begin: 01-01-2027 POP End: 12-31-2027

0001AC

2.00
EA
__________________
__________________

Exterior Cleaning of all Rooftops

Contract Period: Base POP Begin: 01-01-2027 POP End: 12-31-2027

0001AD

2.00
EA
__________________
__________________

Parking Garage Levels & Stairwells

Contract Period: Base POP Begin: 01-01-2027 POP End: 12-31-2027

0.00
SV
__________________
__________________

Lake Baldwin VAMC

POP Begin: 01-01-2027 POP End: 12-31-2027

0002AA

2.00
EA
__________________
__________________

Exterior Cleaning of all Buildings & Structures in accordance with the PWS

POP Begin: 01-01-2027 POP End: 12-31-2027

0002AB

2.00
EA
__________________
__________________

Exterior Cleaning of all Windows

Contract Period: Base POP Begin: 01-01-2027 POP End: 12-31-2027

0002AC

2.00
EA
__________________
__________________

Exterior Cleaning of all Rooftops

Contract Period: Base POP Begin: 01-01-2027 POP End: 12-31-2027

0.00
SV
__________________
__________________

Lakemont Campus

POP Begin: 01-01-2027 POP End: 12-31-2027

0003AA

2.00
EA
__________________
__________________

Exterior Cleaning of all Buildings & Structures in accordance with the PWS

POP Begin: 01-01-2027 POP End: 12-31-2027

0003AB

2.00
EA
__________________
__________________

Exterior Cleaning of all Windows

Contract Period: Base POP Begin: 01-01-2027 POP End: 12-31-2027

0003AC

2.00
EA
__________________
__________________

Exterior Cleaning of all Rooftops

Contract Period: Base POP Begin: 01-01-2027 POP End: 12-31-2027

0.00
SV
__________________
__________________

Viera VAHCC

POP Begin: 01-01-2027 POP End: 12-31-2027

0004AA

2.00
EA
__________________
__________________

Exterior Cleaning of all Buildings & Structures in accordance with the PWS

POP Begin: 01-01-2027 POP End: 12-31-2027

0004AB

2.00
EA
__________________
__________________

Exterior Cleaning of all Windows

Contract Period: Base POP Begin: 01-01-2027 POP End: 12-31-2027

0004AC

2.00
EA
__________________
__________________

Exterior Cleaning of all Rooftops

Contract Period: Base POP Begin: 01-01-2027 POP End: 12-31-2027

0.00
SV
__________________
__________________

Orlando VAMC at Lake Nona Contract Period: Option 1 POP Begin: 01-01-2028 POP End: 12-31-2028

1001AA

2.00
EA
__________________
__________________

Exterior Cleaning of all Buildings & Structures in accordance with the PWS

POP Begin: 01-01-2028 POP End: 12-31-2028

1001AB

2.00
EA
__________________
__________________

Exterior Cleaning of all Windows

Contract Period: Option 1 POP Begin: 01-01-2028 POP End: 12-31-2028

1001AC

2.00
EA
__________________
__________________

Exterior Cleaning of all Rooftops

Contract Period: Option 1 POP Begin: 01-01-2028 POP End: 12-31-2028

1001AD

2.00
EA
__________________
__________________

Parking Garage Levels & Stairwells

Contract Period: Option 1 POP Begin: 01-01-2028 POP End: 12-31-2028

0.00
SV
__________________
__________________

Lake Baldwin VAMC

POP Begin: 01-01-2028 POP End: 12-31-2028

1002AA

2.00
EA
__________________
__________________

Exterior Cleaning of all Buildings & Structures in accordance with the PWS

POP Begin: 01-01-2028 POP End: 12-31-2028

1002AB

2.00
EA
__________________
__________________

Exterior Cleaning of all Windows

Contract Period: Option 1 POP Begin: 01-01-2028 POP End: 12-31-2028

1002AC

2.00
EA
__________________
__________________

Exterior Cleaning of all Rooftops

Contract Period: Option 1 POP Begin: 01-01-2028 POP End: 12-31-2028

0.00
SV
__________________
__________________

Lakemont Campus

POP Begin: 01-01-2028 POP End: 12-31-2028

1003AA

2.00
EA
__________________
__________________

Exterior Cleaning of all Buildings & Structures in accordance with the PWS

POP Begin: 01-01-2028 POP End: 12-31-2028

1003AB

2.00
EA
__________________
__________________

Exterior Cleaning of all Windows

Contract Period: Option 1 POP Begin: 01-01-2028 POP End: 12-31-2028

1003AC

2.00
EA
__________________
__________________

Exterior Cleaning of all Rooftops

Contract Period: Option 1 POP Begin: 01-01-2028 POP End: 12-31-2028

0.00
SV
__________________
__________________

Viera VAHCC

POP Begin: 01-01-2028 POP End: 12-31-2028

1004AA

2.00
EA
__________________
__________________

Exterior Cleaning of all Buildings & Structures in accordance with the PWS

POP Begin: 01-01-2028 POP End: 12-31-2028

1004AB

2.00
EA
__________________
__________________

Exterior Cleaning of all Windows

Contract Period: Option 1 POP Begin: 01-01-2028 POP End: 12-31-2028

1004AC

2.00
EA
__________________
__________________

Exterior Cleaning of all Rooftops

Contract Period: Option 1 POP Begin: 01-01-2028 POP End: 12-31-2028

0.00
SV
__________________
__________________

Orlando VAMC at Lake Nona Contract Period: Option 2 POP Begin: 01-01-2029 POP End: 12-31-2029

2001AA

2.00
EA
__________________
__________________

Exterior Cleaning of all Buildings & Structures in accordance with the PWS

POP Begin: 01-01-2029 POP End: 12-31-2029

2001AB

2.00
EA
__________________
__________________

Exterior Cleaning of all Windows

Contract Period: Option 2 POP Begin: 01-01-2029 POP End: 12-31-2029

2001AC

2.00
EA
__________________
__________________

Exterior Cleaning of all Rooftops

Contract Period: Option 2 POP Begin: 01-01-2029 POP End: 12-31-2029

2001AD

2.00
EA
__________________
__________________

Parking Garage Levels & Stairwells

Contract Period: Option 2 POP Begin: 01-01-2029 POP End: 12-31-2029

0.00
SV
__________________
__________________

Lake Baldwin VAMC

POP Begin: 01-01-2029 POP End: 12-31-2029

2002AA

2.00
EA
__________________
__________________

Exterior Cleaning of all Buildings & Structures in accordance with the PWS

POP Begin: 01-01-2029 POP End: 12-31-2029

2002AB

2.00
EA
__________________
__________________

Exterior Cleaning of all Windows

Contract Period: Option 2 POP Begin: 01-01-2029 POP End: 12-31-2029

2002AC

2.00
EA
__________________
__________________

Exterior Cleaning of all Rooftops

Contract Period: Option 2 POP Begin: 01-01-2029 POP End: 12-31-2029

0.00
SV
__________________
__________________

Lakemont Campus

POP Begin: 01-01-2029 POP End: 12-31-2029

2003AA

2.00
EA
__________________
__________________

Exterior Cleaning of all Buildings & Structures in accordance with the PWS

POP Begin: 01-01-2029 POP End: 12-31-2029

2003AB

2.00
EA
__________________
__________________

Exterior Cleaning of all Windows

Contract Period: Option 2 POP Begin: 01-01-2029 POP End: 12-31-2029

2003AC

2.00
EA
__________________
__________________

Exterior Cleaning of all Rooftops

Contract Period: Option 2 POP Begin: 01-01-2029 POP End: 12-31-2029

0.00
SV
__________________
__________________

Viera VAHCC

POP Begin: 01-01-2029 POP End: 12-31-2029

2004AA

2.00
EA
__________________
__________________

Exterior Cleaning of all Buildings & Structures in accordance with the PWS

POP Begin: 01-01-2029 POP End: 12-31-2029

2004AB

2.00
EA
__________________
__________________

Exterior Cleaning of all Windows

Contract Period: Option 2 POP Begin: 01-01-2029 POP End: 12-31-2029

2004AC

2.00
EA
__________________
__________________

Exterior Cleaning of all Rooftops

Contract Period: Option 2 POP Begin: 01-01-2029 POP End: 12-31-2029

0.00
SV
__________________
__________________

Orlando VAMC at Lake Nona Contract Period: Option 3 POP Begin: 01-01-2030 POP End: 12-31-2030

3001AA

2.00
EA
__________________
__________________

Exterior Cleaning of all Buildings & Structures in accordance with the PWS

POP Begin: 01-01-2030 POP End: 12-31-2030

3001AB

2.00
EA
__________________
__________________

Exterior Cleaning of all Windows

Contract Period: Option 3 POP Begin: 01-01-2030 POP End: 12-31-2030

3001AC

2.00
EA
__________________
__________________

Exterior Cleaning of all Rooftops

Contract Period: Option 3 POP Begin: 01-01-2030 POP End: 12-31-2030

3001AD

2.00
EA
__________________
__________________

Parking Garage Levels & Stairwells

Contract Period: Option 3 POP Begin: 01-01-2030 POP End: 12-31-2030

0.00
SV
__________________
__________________

Lake Baldwin VAMC

POP Begin: 01-01-2030 POP End: 12-31-2030

3002AA

2.00
EA
__________________
__________________

Exterior Cleaning of all Buildings & Structures in accordance with the PWS

POP Begin: 01-01-2030 POP End: 12-31-2030

3002AB

2.00
EA
__________________
__________________

Exterior Cleaning of all Windows

Contract Period: Option 3 POP Begin: 01-01-2030 POP End: 12-31-2030

3002AC

2.00
EA
__________________
__________________

Exterior Cleaning of all Rooftops

Contract Period: Option 3 POP Begin: 01-01-2030 POP End: 12-31-2030

0.00
SV
__________________
__________________

Lakemont Campus

POP Begin: 01-01-2030 POP End: 12-31-2030

3003AA

2.00
EA
__________________
__________________

Exterior Cleaning of all Buildings & Structures in accordance with the PWS

POP Begin: 01-01-2030 POP End: 12-31-2030

3003AB

2.00
EA
__________________
__________________

Exterior Cleaning of all Windows

Contract Period: Option 3 POP Begin: 01-01-2030 POP End: 12-31-2030

3003AC

2.00
EA
__________________
__________________

Exterior Cleaning of all Rooftops

Contract Period: Option 3 POP Begin: 01-01-2030 POP End: 12-31-2030

0.00
SV
__________________
__________________

Viera VAHCC

POP Begin: 01-01-2030 POP End: 12-31-2030

3004AA

2.00
EA
__________________
__________________

Exterior Cleaning of all Buildings & Structures in accordance with the PWS

POP Begin: 01-01-2030 POP End: 12-31-2030

3004AB

2.00
EA
__________________
__________________

Exterior Cleaning of all Windows

Contract Period: Option 3 POP Begin: 01-01-2030 POP End: 12-31-2030

3004AC

2.00
EA
__________________
__________________

Exterior Cleaning of all Rooftops

Contract Period: Option 3 POP Begin: 01-01-2030 POP End: 12-31-2030

0.00
SV
__________________
__________________

Orlando VAMC at Lake Nona Contract Period: Option 4 POP Begin: 01-01-2031 POP End: 12-31-2031

4001AA

2.00
EA
__________________
__________________

Exterior Cleaning of all Buildings & Structures in accordance with the PWS

POP Begin: 01-01-2031 POP End: 12-31-2031

4001AB

2.00
EA
__________________
__________________

Exterior Cleaning of all Windows

Contract Period: Option 4 POP Begin: 01-01-2031 POP End: 12-31-2031

4001AC

2.00
EA
__________________
__________________

Exterior Cleaning of all Rooftops

Contract Period: Option 4 POP Begin: 01-01-2031 POP End: 12-31-2031

4001AD

2.00
EA
__________________
__________________

Parking Garage Levels & Stairwells

Contract Period: Option 4 POP Begin: 01-01-2031 POP End: 12-31-2031

0.00
SV
__________________
__________________

Lake Baldwin VAMC

POP Begin: 01-01-2031 POP End: 12-31-2031

4002AA

2.00
EA
__________________
__________________

Exterior Cleaning of all Buildings & Structures in accordance with the PWS

POP Begin: 01-01-2031 POP End: 12-31-2031

4002AB

2.00
EA
__________________
__________________

Exterior Cleaning of all Windows

Contract Period: Option 4 POP Begin: 01-01-2031 POP End: 12-31-2031

4002AC

2.00
EA
__________________
__________________

Exterior Cleaning of all Rooftops

Contract Period: Option 4 POP Begin: 01-01-2031 POP End: 12-31-2031

0.00
SV
__________________
__________________

Lakemont Campus

POP Begin: 01-01-2031 POP End: 12-31-2031

4003AA

2.00
EA
__________________
__________________

Exterior Cleaning of all Buildings & Structures in accordance with the PWS

POP Begin: 01-01-2031 POP End: 12-31-2031

4003AB

2.00
EA
__________________
__________________

Exterior Cleaning of all Windows

Contract Period: Option 4 POP Begin: 01-01-2031 POP End: 12-31-2031

4003AC

2.00
EA
__________________
__________________

Exterior Cleaning of all Rooftops

Contract Period: Option 4 POP Begin: 01-01-2031 POP End: 12-31-2031

0.00
SV
__________________
__________________

Viera VAHCC

POP Begin: 01-01-2031 POP End: 12-31-2031

4004AA

2.00
EA
__________________
__________________

Exterior Cleaning of all Buildings & Structures in accordance with the PWS

POP Begin: 01-01-2031 POP End: 12-31-2031

4004AB

2.00
EA
__________________
__________________

Exterior Cleaning of all Windows

Contract Period: Option 4 POP Begin: 01-01-2031 POP End: 12-31-2031

4004AC

2.00
EA
__________________
__________________

Exterior Cleaning of all Rooftops

Contract Period: Option 4 POP Begin: 01-01-2031 POP End: 12-31-2031

GRAND TOTAL
__________________

B.2 DELIVERY SCHEDULE

ITEM NUMBER
SHIPPING INFORMATION
QUANTITY
DELIVERY DATE

0.00

0001AA

2.00

0001AB

2.00

0001AC

2.00

0001AD

2.00

0.00

0002AA

2.00

0002AB

2.00

0002AC

2.00

0.00

0003AA

2.00

0003AB

2.00

0003AC

2.00

0.00

0004AA

2.00

0004AB

2.00

0004AC

2.00

0.00

1001AA

2.00

1001AB

2.00

1001AC

2.00

1001AD

2.00

0.00

1002AA

2.00

1002AB

2.00

1002AC

2.00

0.00

1003AA

2.00

1003AB

2.00

1003AC

2.00

0.00

1004AA

2.00

1004AB

2.00

1004AC

2.00

0.00

2001AA

2.00

2001AB

2.00

2001AC

2.00

2001AD

2.00

0.00

2002AA

2.00

2002AB

2.00

2002AC

2.00

0.00

2003AA

2.00

2003AB

2.00

2003AC

2.00

0.00

2004AA

2.00

2004AB

2.00

2004AC

2.00

0.00

3001AA

2.00

3001AB

2.00

3001AC

2.00

3001AD

2.00

0.00

3002AA

2.00

3002AB

2.00

3002AC

2.00

0.00

3003AA

2.00

3003AB

2.00

3003AC

2.00

0.00

3004AA

2.00

3004AB

2.00

3004AC

2.00

0.00

4001AA

2.00

4001AB

2.00

4001AC

2.00

4001AD

2.00

0.00

4002AA

2.00

4002AB

2.00

4002AC

2.00

0.00

4003AA

2.00

4003AB

2.00

4003AC

2.00

0.00

4004AA

2.00

4004AB

2.00

4004AC

2.00

36C24827Q0140

Page 1 of Page 1 of Exterior Cleaning Program & Exterior Window Washing Services Performance Work Statement (PWS)

1. General. This is a non-personal service contract that will be in support of the Orlando VA Healthcare System (OVAHCS) facilities. The Contractor is responsible for providing an annual exterior cleaning program to include but not limited to the exterior of all buildings & structures, walls, rooftops, sidewalks, patios, crosswalks, parking garages, and exterior windows and designated interior windows as outlined in the PWS.

The Government shall not exercise any supervision or control over the contract service providers performing the services herein. Such contract service providers shall be accountable solely to the Contractor who, in turn is responsible to the government. The Contractor shall perform to the requirements set forth in this document that are designed to provide acceptable service levels of performance standards.

2. Scope. The contractor shall plan, develop, and implement an exterior cleaning program for all OVAHCS buildings, structures, walkways, and exterior windows as outlined in this Performance Work Schedule (PWS). The designated areas are to be cleaned in their entirety (NOT spot cleaned). Best commercial practices shall be applied in the performance of work. All work shall be completed per approved and accepted industry standards throughout the duration of the contract. The Contractor shall furnish all labor, transportation, supplies, and equipment.

2.1. Period of Performance (POP). The total POP shall consist of one base year, and four 12-month options to extend the term of the contract:

Base Year: January 01, 2027, through December 31, 2027
Option Year 1: January 01, 2028 through December 31, 2028
Option Year 2: January 01, 2029 through December 31, 2029
Option Year 3: January 01, 2030 through December 31, 2030
Option Year 4: January 01, 2031 through December 31, 2031

2.2. Place of Performance. Services to be performed at:

2.2.1. Orlando VA Medical Center (VAMC) at Lake Nona, 13800 Veterans Way, Orlando, FL 32827

2.2.2. Lake Baldwin VAMC*, 5201 Raymond St., Orlando, FL 32803

2.2.3. Lakemont Campus, 2500 S. Lakemont Ave., Orlando, FL 32814

2.2.4. Viera OPC, 2900 Veterans Way, Viera, FL 32940

2.3. Work Hours. The COR shall determine the actual date and time of service and will notify the Contractor no less than 30 days prior to the date on which service is required.

2.3.1. Orlando VAMC at Lake Nona. The Contractor may provide most services between the hours of 7:00 am and 5:00 pm, Monday through Sunday (7-days per week), except in an event of a facility operation schedule change identified in this PWS.

2.3.1.1. Some services will need to be conducted on weekends due to clinical operations of the radiology department.

2.3.1.2. The cleaning of the parking garages and stairwells will need to be performed after 6:00 pm to minimize impact to patients, employees, and patient care.

2.3.2. Lake Baldwin VAMC. The Contractor may provide services between the hours of 7:00 am and 5:00 pm, Monday through Friday, except in an event of a facility operation schedule change identified in this PWS.

2.3.3. Lakemont Campus. The Contractor may provide services between the hours of 7:00 am and 5:00 pm, Monday through Friday, except in an event of a facility operation schedule change identified in this PWS.

2.3.4. Viera VAHCC. The Contractor may provide services between the hours of 7:00 am and 5:00 pm, Monday through Friday, except in an event of a facility operation schedule change identified in this PWS.

2.4. The following approved holiday are shown in Table 1. Under normal circumstance, contractor is not required to perform services during Federal Holidays. When a holiday falls on Sunday, the following Monday will be observed as a legal holiday. When a holiday falls on a Saturday, the preceding Friday is observed by the U.S. Government agencies.

Holiday

Date
Month
New Year’s Day
1st
January
Martin Luther King Jr.’s Birthday
3rd Monday
January
President’s Day
3rd Monday
February
Memorial Day
Last Monday
May
Juneteenth
19th
June
Independence Day
4th
July
Labor Day
1st Monday
September
Columbus Day
2nd Monday
October
Veterans Day
11th
November
Thanksgiving Day
4th Thursday
November
Christmas Day
25th
December

Table 1

2.5. Type of Contract. The Government anticipates award of a Firm Fixed-Price contract.

2.6. Quality Assurance (QA). The Government Quality Assurance Surveillance Plan (QASP) shall be used as the objective basis for determining the Contractor's performance during any established reporting period. This plan primarily focuses on the Government's measures to ensure that the Contractor has performed IAW performance standards. The QASP is a living document that the Government may review and revise on a regular basis. The intent of the QASP is to ensure performance IAW the metrics set forth in the contract documents to guarantee the Government receives the quality of services specified and only pays for the acceptable level of services it receives. The QASP defines how the performance standards will be applied, the frequency of surveillance, and the minimum acceptable defect rate(s).

2.7. Contractor Personnel Security & Suitability. The services provided under this contract are considered low-risk or non-sensitive contractor positions. Contractor and all associated Subcontractor employees shall comply with applicable facility and local security policies and procedures. The Contractor shall also provide information required for background checks to meet VA access requirements, if applicable. The Contractor workforce must comply with all personal identity verification requirements as directed by VA and/or local policy.

2.7.1. Non-PIV Cards. The Contractor’s Work-Lead and Supervisor will be issued non-PIV cards for access into designated areas (e.g. rooftops) in the performance of services included in this contract.

2.7.1.1. The level of background investigation commensurate with the level of access needed is: Special Agreement Check (SAC) (This requirement is applicable to all subcontractor personnel requiring the same access.)

2.8. Contracting Officer's Representative (COR). The COR will be designated by a formal letter to the Contractor. The COR monitors all technical aspects of the contract and assists in contract administration. The COR is authorized to perform the following functions identified in the appointment letter: assure that the Contractor performs the technical requirements of the contract; perform inspections necessary in connection with contract performance; maintain written and oral communications with the Contractor concerning technical aspects of the contract; issue written interpretations of technical requirements including Government drawings, designs, and specifications; monitor the Contractor's performance and notify both the CO and Contractor of any deficiencies; coordinate availability of Government furnished property; and provide worksite entry for Contractor personnel. The COR's formal designation letter states the responsibilities and limitations of the COR, especially regarding changes in cost or price, estimates, or changes in delivery dates. The COR is not authorized to change any of the terms and conditions of the contract.

2.9. Post Award Meeting. The Contractor shall attend any post award conference convened by the contracting activity in accordance with Federal Acquisition Regulation (FAR) Subpart 42.5. The post-award orientation shall be held within 30 calendar days of award.

The purpose of the post-award orientation is to: discuss any unique characteristics of the requirement(s); identify stakeholders' roles and responsibilities; and establish a common understanding of schedule and performance expectations.

The CO, COR, and other Government personnel, as appropriate, may meet periodically with the Contractor to review the Contractor’s performance. At these meetings, the CO or COR will apprise the Contractor of how the Government views the Contractors performance and the Contractor will apprise the Government of problems, if any, being experienced. Appropriate action shall be taken to resolve outstanding issues. These meetings shall be at no additional cost to the Government.

2.10. Contractor Personnel.

2.10.1. Responsibilities. The Contractor shall assume responsibility for all functions outlined in this PWS upon contract award date.

2.10.2. Contractor shall comply with the occupational health and safety standards as forth in OSHA 29 CFR 1910 and ANSI /ICWA 1 14, the Window Cleaning Safety Standard, for exterior building maintenance operations.

2.10.2.1. Contractor personnel performing work shall have completed Occupational Safety and Health Administration (OSHA) 10 training and high-rise training by a competent authority in conformance with industry standards.

2.10.3. Contractor shall provide any and all types of shielding, barricades, warning signs and any other protection necessary to protect the personnel, equipment and the area in which the Contractor's will be working, from injury, damage, and/or contamination during the duration of the work.

2.10.4. Contractor shall notify the COR immediately in the event of any damage to VA property caused by the Contractor's personnel, equipment, or materials. Special care shall be taken with automatic doors, ID card readers, and all electronic fixtures when using water. The Contractor shall notify the COR in the event damage is discovered prior to the beginning of or during the work performed as part of these specifications.

2.10.5. Contractor shall promptly repair, or source to have repaired all damage caused by the Contractor's personnel equipment, including the procedures used and/or the materials used by them in the performance of the work pursuant to these specifications. The repairs shall be done to the complete satisfaction of the government.

3. Miscellaneous.

3.1. Other Workplace Safety Requirements.

3.1.1. Safety Plan. The Contractor shall provide the COR a written work and safety plan for review at least five working days prior to the start of any work.

3.1.1.1. The plan shall address potential risks in pursuing the work and steps taken to mitigate those risks including but not limited to methods of anchoring working surfaces and personnel to ensure fall protection, and procedures used in case of an emergency.

Additionally, the work plan shall include the proposed work schedule and shall identify by timeline when certifications of wire ropes, working platforms, and other associated equipment are required during the project. A procedural description of daily inspections to ensure personnel safety and equipment readiness must also be provided. Proof of certification, where certifications is required, shall be provided to the COR before equipment systems and their components may be used on the jobsite and should be provided in the work plan. In addition, the work plan should provide documentation related to employee training and experience.

3.1.1.2. VA personnel, Contractor's personnel, the building, and property shall always be protected when overhead work is in progress.

3.2. Work Site Clean Up.

3.2.1. The Contractor shall thoroughly clean all walls, floors, roofs, staging, storage areas, sidewalks, canopies, roadways, etc. affected by the work.

3.2.2. All areas shall be left in a neat and clean condition in compliance with VA standards of cleanliness and must meet the approval of the COR.

3.3. Safety Data Sheets (SDS) Requirements.

3.3.1. Contractor shall provide the COR a copy of Safety Data Sheets (SDS) for all materials used in the performance of this contract where such a sheet is required.

3.3.2. Contractor shall always keep a copy of the above referenced SDS at its work site for products in use requiring such a sheet.

3.3.3. All products (i.e. cleaners) used must be eco-friendly.

4. Definitions.

4.1. Contractors. A supplier or vendor awarded a contract to provide specific supplies or service to the Government. The term used in this contract refers to the prime.

4.2. Contracting Officer (CO). A person with authority to enter, administer, and or terminate contracts, and make related determinations and findings on behalf of the Government. Note: The only individual who can legally bind the Government.

4.3. Contracting Officer's Representative (COR). An employee of the U.S. Government appointed by the CO to administer the contract. Such appointment shall be in writing and shall state the scope of authority and limitations. This individual has authority to provide technical direction to the Contractor if that direction is within the scope of the contract, does not constitute a change, and has no funding implications. This individual does NOT have authority to change the terms and conditions of the contract.

4.4. Defective Service. A service output that does not meet the standard of performance associated with the PWS and may require re-performance until the standard is met.

4.5. Deliverables. Anything that can be physically delivered but may include non manufactured things such as meeting minutes or reports.

4.6. Exterior Cleaning. Process of making sure the exterior of a building is clear of any dirt, grime, stains, and pollutants.

4.7. Landscape. Boulders, statutes, outdoor dedications and memorials shall be included in cleaning services.

4.8. Physical Security. Actions that prevent the loss or damage of Government property.

4.9. Quality Assurance. The Government procedures to verify that services being performed by the Contractor are performed according to acceptable standards.

4.10. Quality Assurance Surveillance Plan (QASP). An organized written document specifying the surveillance methodology to be used for surveillance of Contractor performance.

4.11. Quality Control. All necessary measures taken by the Contractor to assure that the quality of a product or service shall meet contract requirements.

4.12. Safety Data Sheet (SDS). A written document that outlines information and procedures for handling and working with chemicals. Also, may be referred to as a Material Data Safety Data Sheet (MSDS).

4.13. Structures. Includes entire building envelope for all buildings, all exterior building aesthetics (i.e. super-structure), over-hangs, roofs of structures with no walls, enclosed (screened) outdoor patios, atriums, covered walk-ways, gazebos, parking garages (exterior), loading dock areas, water towers, surrounding walls/perimeter walls & columns, entryways, ambulance parking area(s). All shall be included in cleaning services.

4.14. Sub-Contractor. A person that enters a contract with a prime Contractor. The Government does not have privity of contract with the Sub-contractor.

4.15. Walkway. Any area designated for foot traffic includes but not limited to sidewalks, crosswalks, & walking paths. Typically, made from concrete, asphalt, pavers, or tile.

4.16. Workday. The number of hours per day the Contractor provides services in accordance with the contract.

4.17. Work Week. Monday through Friday unless specified otherwise.

5. Government Furnished Property, Equipment and/or Services.

5.1. Services: The Government will move furniture or other objects, as needed. The Contractor shall make requests to the COR .

5.2. Facilities: All services outlined in this PWS will take place at VA facilities; however, no permanent workspace will be provided to the contractor.

5.3. Utilities: The Government will provide all utilities at facilities for the Contractors use in performance of tasks outlined in this PWS. The Contractor shall instruct its employees in utilities conservation practices. The Contractor shall be responsible for operating under conditions that preclude the waste of utilities, which include turning off the water faucets or valves after using the required amount to accomplish their task.

6. Contractor Furnished Items and Responsibilities.

6.1. The Contractor shall provide all personnel, services, supplies, equipment, and transportation required to perform work under this contract. The contractor shall ensure all personnel have the required relevant experience and training to handle their tasks successfully. The Contractor shall have qualified technicians at the start of the contract period.

6.2. Equipment: Personal Protective Equipment (PPE). The Contractor will provide PPE to contractor/subcontractor employees. PPE will include disposable gloves, masks and other items that may be required or deemed necessary for personnel working in the facility.

7. VHA Supplemental Contract Requirements for Ensuring Adequate COVID-19 Safety Protocols for Federal Contractors

7.1. Contractor employees who work in or travel to VHA locations must comply with the following:

7.1.1. Documentation requirements:

7.1.1.1. If fully vaccinated, shall show proof of vaccination.

7.1.1.1.1. NOTE: Acceptable proof of vaccination includes a signed record of immunization from a health care provider or pharmacy, a copy of the COVID-19 Vaccination Record Card (CDC Form MLS-319813_r, published on September 3, 2020), or a copy of medical records documenting the vaccination.

7.1.1.2. If unvaccinated and granted a medical or religious exception, shall show negative COVID-19 test results dated within three calendar days prior to desired entry date. Test must be approved by the Food and Drug Administration (FDA) for emergency use or full approval. This includes tests available by a doctor’s order or an FDA approved over-the-counter test.

7.1.1.3. Documentation cited in this section shall be digitally or physically maintained on each contractor employee while in a VA facility and is subject to inspection prior to entry to VA facilities and after entry for spot inspections by Contracting Officer Representatives (CORs) or other hospital personnel.

7.1.1.4. Documentation will not be collected by the VA; contractors shall, at all times, adhere to and ensure compliance with federal laws designed to protect contractor employee health information and personally identifiable information.

7.1.2. Contractor employees are subject to daily screening for COVID-19 and may be denied entry to VA facilities if they fail to pass screening protocols. As part of the screening process contractors may be asked screening questions found on the COVID-19 Screening Tool. Check regularly for updates.

7.1.2.1. Contractor employees who work away from VA locations, but who will have direct contact with VA patients shall self-screen utilizing the COVID-19 Screening Tool, in advance, each day that they will have direct patient contact and in accordance with their person or persons who coordinate COVID-19 workplace safety efforts at covered contractor workplaces. Contractors shall, at all times, adhere to and ensure compliance with federal laws designed to protect contractor employee health information and personally identifiable information.

7.1.3. Contractor must immediately notify their COR or Contracting Officer if contract performance is jeopardized due to contractor employees being denied entry into VA Facilities.

8. Tasks. The Contractor shall provide the management staff, material and financial resources, documentation, and technical expertise to perform all the tasks. The Contractor shall manage the total work effort associated with all services required herein to assure full and timely completion of these services. Included in this function are a full range of duties including, but not limited to, planning, scheduling, quality assurance, cost accounting.

8.1. Task 1 – Exterior Building Cleaning. The Contractor shall provide exterior cleaning to all buildings, structures, and walkways at each OVAHCS facility. Services shall be conducted using industry-approved techniques that will clean the materials without damage.

8.1.1. Frequency – 2 visits per 12-month period.

8.2. Task 2 – Window Cleaning. The exterior (& select interior) windows shall be washed using industry-approved techniques, producing a finished product free from streaks or other removable blemishes or foreign matter. During the cleaning process, if any defects or deficiencies are noticed, Contractor personnel shall report the issue and location to the COR.

8.2.1. Frequency – 2 visits per 12-month period.

8.3. Task 3 – Roof Cleaning. The Contractor shall provide services to clean the entire roof area of all buildings. Services shall be conducted using industry-approved techniques that will clean the materials without damage.

8.3.1. Frequency – 2 visits per 12-month period.

8.4. Task 4 – Monthly Cleaning. To maintain acceptable appearance standards between scheduled cleanings, the Contractor shall provide light maintenance cleaning (e.g. de-web main entrances to the facility at Lake Nona, Lake Baldwin, Lakemont, and Viera to include the CLC and Dom, and parking garage stair wells; interior glass in and around courtyards; main entry glass doors to the facility and minor pressure washing).

8.5. Task 5 – Parking Garage Levels. At the Orlando VAMC at Lake Nona, the Contractor shall hot pressure wash all levels (floors) and ramp, inside walls, columns, including stairwell areas. Services shall be conducted using industry-approved techniques that will clean the materials without damage. Pretreatment using biodegradable cleaner will be required for any stains larger than 2” x 2”. There are (2) parking garages (East Garage & West Garage). Each parking garage has (8) levels and (2) stairwells; totally (16) levels and (4) stairwells.

8.5.1. Frequency – 2 visits per 12-month period.

9. Deliverables.

9.1. Base Year Deliverables

LINE ITEM
Task
Qty
VA Facility
Attend Post-Award Conference
1 ea.
Orlando VAMC at Lake Nona
Safety Plan
1 ea.
Addressing all locations
Task 1 – Exterior Building Cleaning
2 ea.
Orlando VAMC at Lake Nona
Task 2 – Exterior Window Cleaning
2 ea.
Orlando VAMC at Lake Nona
Task 3 – Roof Cleaning
2 ea.
Orlando VAMC at Lake Nona
Task 4 – Monthly Cleaning
12 ea
Orlando VAMC at Lake Nona
Task 5 – Parking Garages
2 ea.
Orlando VAMC at Lake Nona
LINE ITEM
Task
Qty
VA Facility
Task 1 – Exterior Building Cleaning
2 ea.
Lake Baldwin VAMC
Task 2 – Exterior Window Cleaning
2 ea.
Lake Baldwin VAMC
Task 3 – Roof Cleaning
2 ea.
Lake Baldwin VAMC
Task 4 – Monthly Cleaning
12 ea
Lake Baldwin VAMC
LINE ITEM
Task
Qty
VA Facility
Task 1 – Exterior Building Cleaning
2 ea.
Lakemont Campus
Task 2 – Exterior Window Cleaning
2 ea.
Lakemont Campus
Task 3 – Roof Cleaning
2 ea.
Lakemont Campus
Task 4 – Monthly Cleaning
12 ea
Lakemont Campus
LINE ITEM
Task
Qty
VA Facility
Task 1 – Exterior Building Cleaning
2 ea.
Viera VAHCC
Task 2 – Exterior Window Cleaning
2 ea.
Viera VAHCC
Task 3 – Roof Cleaning
2 ea.
Viera VAHCC
Task 4 – Monthly Cleaning
12 ea
Viera VAHCC

9.2. Option Year 1 Deliverables

LINE ITEM
Task
Qty
VA Facility
Task 1 – Exterior Building Cleaning
2 ea.
Orlando VAMC at Lake Nona
Task 2 – Exterior Window Cleaning
2 ea.
Orlando VAMC at Lake Nona
Task 3 – Roof Cleaning
2 ea.
Orlando VAMC at Lake Nona
Task 4 – Monthly Cleaning
12 ea
Orlando VAMC at Lake Nona
Task 5 – Parking Garages
2 ea.
Orlando VAMC at Lake Nona
LINE ITEM
Task
Qty
VA Facility
Task 1 – Exterior Building Cleaning
2 ea.
Lake Baldwin VAMC
Task 2 – Exterior Window Cleaning
2 ea.
Lake Baldwin VAMC
Task 3 – Roof Cleaning
2 ea.
Lake Baldwin VAMC
Task 4 – Monthly Cleaning
12 ea
Lake Baldwin VAMC
LINE ITEM
Task
Qty
VA Facility
Task 1 – Exterior Building Cleaning
2 ea.
Lakemont Campus
Task 2 – Exterior Window Cleaning
2 ea.
Lakemont Campus
Task 3 – Roof Cleaning
2 ea.
Lakemont Campus
Task 4 – Monthly Cleaning
12 ea
Lakemont Campus
LINE ITEM
Task
Qty
VA Facility
Task 1 – Exterior Building Cleaning
2 ea.
Viera VAHCC
Task 2 – Exterior Window Cleaning
2 ea.
Viera VAHCC
Task 3 – Roof Cleaning
2 ea.
Viera VAHCC
Task 4 – Monthly Cleaning
12 ea
Viera VAHCC

9.3. Option Year 2 Deliverables

LINE ITEM
Task
Qty
VA Facility
Task 1 – Exterior Building Cleaning
2 ea.
Orlando VAMC at Lake Nona
Task 2 – Exterior Window Cleaning
2 ea.
Orlando VAMC at Lake Nona
Task 3 – Roof Cleaning
2 ea.
Orlando VAMC at Lake Nona
Task 4 – Monthly Cleaning
12 ea
Orlando VAMC at Lake Nona
Task 5 – Parking Garages
2 ea.
Orlando VAMC at Lake Nona
LINE ITEM
Task
Qty
VA Facility
Task 1 – Exterior Building Cleaning
2 ea.
Lake Baldwin VAMC
Task 2 – Exterior Window Cleaning
2 ea.
Lake Baldwin VAMC
Task 3 – Roof Cleaning
2 ea.
Lake Baldwin VAMC
Task 4 – Monthly Cleaning
12 ea
Lake Baldwin VAMC
LINE ITEM
Task
Qty
VA Facility
Task 1 – Exterior Building Cleaning
2 ea.
Lakemont Campus
Task 2 – Exterior Window Cleaning
2 ea.
Lakemont Campus
Task 3 – Roof Cleaning
2 ea.
Lakemont Campus
Task 4 – Monthly Cleaning
12 ea
Lakemont Campus
LINE ITEM
Task
Qty
VA Facility
Task 1 – Exterior Building Cleaning
2 ea.
Viera VAHCC
Task 2 – Exterior Window Cleaning
2 ea.
Viera VAHCC
Task 3 – Roof Cleaning
2 ea.
Viera VAHCC
Task 4 – Monthly Cleaning
12 ea
Viera VAHCC

9.4. Option Year 3 Deliverables

LINE ITEM
Task
Qty
VA Facility
Task 1 – Exterior Building Cleaning
2 ea.
Orlando VAMC at Lake Nona
Task 2 – Exterior Window Cleaning
2 ea.
Orlando VAMC at Lake Nona
Task 3 – Roof Cleaning
2 ea.
Orlando VAMC at Lake Nona
Task 4 – Monthly Cleaning
12 ea
Orlando VAMC at Lake Nona
Task 5 – Parking Garages
2 ea.
Orlando VAMC at Lake Nona
LINE ITEM
Task
Qty
VA Facility
Task 1 – Exterior Building Cleaning
2 ea.
Lake Baldwin VAMC
Task 2 – Exterior Window Cleaning
2 ea.
Lake Baldwin VAMC
Task 3 – Roof Cleaning
2 ea.
Lake Baldwin VAMC
Task 4 – Monthly Cleaning
12 ea
Lake Baldwin VAMC
LINE ITEM
Task
Qty
VA Facility
Task 1 – Exterior Building Cleaning
2 ea.
Lakemont Campus
Task 2 – Exterior Window Cleaning
2 ea.
Lakemont Campus
Task 3 – Roof Cleaning
2 ea.
Lakemont Campus
Task 4 – Monthly Cleaning
12 ea
Lakemont Campus
LINE ITEM
Task
Qty
VA Facility
Task 1 – Exterior Building Cleaning
2 ea.
Viera VAHCC
Task 2 – Exterior Window Cleaning
2 ea.
Viera VAHCC
Task 3 – Roof Cleaning
2 ea.
Viera VAHCC
Task 4 – Monthly Cleaning
12 ea
Viera VAHCC

9.5. Option Year 4 Deliverables

LINE ITEM
Task
Qty
VA Facility
Task 1 – Exterior Building Cleaning
2 ea.
Orlando VAMC at Lake Nona
Task 2 – Exterior Window Cleaning
2 ea.
Orlando VAMC at Lake Nona
Task 3 – Roof Cleaning
2 ea.
Orlando VAMC at Lake Nona
Task 4 – Monthly Cleaning
12 ea
Orlando VAMC at Lake Nona
Task 5 – Parking Garages
2 ea.
Orlando VAMC at Lake Nona
LINE ITEM
Task
Qty
VA Facility
Task 1 – Exterior Building Cleaning
2 ea.
Lake Baldwin VAMC
Task 2 – Exterior Window Cleaning
2 ea.
Lake Baldwin VAMC
Task 3 – Roof Cleaning
2 ea.
Lake Baldwin VAMC
Task 4 – Monthly Cleaning
12 ea
Lake Baldwin VAMC
LINE ITEM
Task
Qty
VA Facility
Task 1 – Exterior Building Cleaning
2 ea.
Lakemont Campus
Task 2 – Exterior Window Cleaning
2 ea.
Lakemont Campus
Task 3 – Roof Cleaning
2 ea.
Lakemont Campus
Task 4 – Monthly Cleaning
12 ea
Lakemont Campus
LINE ITEM
Task
Qty
VA Facility
Task 1 – Exterior Building Cleaning
2 ea.
Viera VAHCC
Task 2 – Exterior Window Cleaning
2 ea.
Viera VAHCC
Task 3 – Roof Cleaning
2 ea.
Viera VAHCC
Task 4 – Monthly Cleaning
12 ea
Viera VAHCC

10. RECORDS MANAGEMENT OBLIGATIONS

A. Applicability This clause applies to all Contractors whose employees create, work with, or otherwise handle Federal records, as defined in Section B, regardless of the medium in which the record exists.

B. Definitions “Federal record” as defined in 44 U.S.C. § 3301, includes all recorded information, regardless of form or characteristics, made or received by a Federal agency under Federal law or in connection with the transaction of public business and preserved or appropriate for preservation by that agency or its legitimate successor as evidence of the organization, functions, policies, decisions, procedures, operations, or other activities of the United States Government or because of the informational value of data in them.

The term Federal record:

1. includes VHA records.

2. does not include personal materials.

3. applies to records created, received, or maintained by Contractors pursuant to their VHA contract.

4. may include deliverables and documentation associated with deliverables.

C. Requirements

1. Contractor shall comply with all applicable records management laws and regulations, as well as National Archives and Records Administration (NARA) records policies, including but not limited to the Federal Records Act (44 U.S.C. chs. 21, 29, 31, 33), NARA regulations at 36 CFR Chapter XII Subchapter B, and those policies associated with the safeguarding of records covered by the Privacy Act of 1974 (5 U.S.C. 552a). These policies include the preservation of all records, regardless of form or characteristics, mode of transmission, or state of completion.

2. In accordance with 36 CFR 1222.32, all data created for Government use and delivered to, or falling under the legal control of, the Government are Federal records subject to the provisions of 44 U.S.C. chapters 21, 29, 31, and 33, the Freedom of Information Act (FOIA) (5 U.S.C. 552), as amended, and the Privacy Act of 1974 (5 U.S.C. 552a), as amended and must be managed and scheduled for disposition only as permitted by statute or regulation.

3. In accordance with 36 CFR 1222.32, the Contractor shall maintain all records created for Government use or created in the course of performing the contract and/or delivered to, or under the legal control of the Government and must be managed in accordance…

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it. Updated .