S02-SOLICITATION CHILLER PREVENTATIVE MAINT 36C24827Q0126.pdf
PDF 553 KB Posted
- Attached to
- Chiller Preventative Maintenance Services
- Solicitation number
- 36C24827Q0126
About this file
This is a Request for Quotation (RFQ) for chiller maintenance services issued by the Department of Veterans Affairs (VA), Network Contracting Office 8, for James A. Haley Veterans Hospital in Tampa, Florida.
The solicitation is set aside for Service-Disabled Veteran-Owned Small Businesses (SDVOSBs) and requires preventative maintenance on nine water-cooled centrifugal chillers (six Carrier units in Building 39 and three York units in Building 100). The contractor must provide all labor, parts, travel, and equipment for one annual preventative maintenance procedure, four quarterly running inspections, two eddy current tests per year on specified chillers, two oil analyses annually per chiller, and two 10-year tear down maintenance procedures on Carriers chillers 5 and 6 in Building 39 during the base year. Additional work includes modernizing chiller controls on six Building 39 Carrier chillers from legacy PIC II to Carrier PIC 6 systems and replacing worn shaft seals on York chillers 1 and 3 in Building 100. The contractor must provide eight four-hour emergency service calls annually with one-hour phone response and two-hour on-site arrival requirements. The contract period is base year 12-15-2026 to 12-14-2027 with four one-year options. Quotations are due by December 3, 2026, at 5:00 PM EST via email to jvonne.wilson@va.gov, with a site visit encouraged on November 20, 2026. Evaluation criteria include technical acceptability (factory certifications for Carrier, Daikin, Trane, and York chillers; electrical component experience; electronic invoice submission capability; one-week maintenance report submission), past performance (minimum three commercial references), and price. The estimated contract value is $19 million. Award will be made to the responsible SDVOSB offeror whose conforming offer provides the best value considering technical, past performance, and price factors. Invoices shall be submitted in arrears upon completion to the Austin Financial Services Center via electronic submission.
View the file
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
PAGE 1 OF 1. REQUISITION NO.
2. CONTRACT NO. 3. AWARD/EFFECTIVE DATE 4. ORDER NO. 5. SOLICITATION NUMBER 6. SOLICITATION ISSUE DATE
a. NAME b. TELEPHONE NO. (No Collect Calls) 8. OFFER DUE DATE/LOCAL
TIME
9. ISSUED BY CODE 10. THIS ACQUISITION IS UNRESTRICTED OR SET ASIDE: % FOR:
SMALL BUSINESS
HUBZONE SMALL
BUSINESS
SERVICE-DISABLED
VETERAN-OWNED
SMALL BUSINESS
WOMEN-OWNED SMALL BUSINESS
(WOSB) ELIGIBLE UNDER THE WOMEN-OWNED
SMALL BUSINESS PROGRAM
EDWOSB
8(A)
NAICS:
SIZE STANDARD:
11. DELIVERY FOR FOB DESTINA-
TION UNLESS BLOCK IS
MARKED
SEE SCHEDULE
12. DISCOUNT TERMS
13a. THIS CONTRACT IS A
RATED ORDER UNDER
DPAS (15 CFR 700)
13b. RATING
14. METHOD OF SOLICITATION
RFQ IFB RFP
15. DELIVER TO CODE 16. ADMINISTERED BY CODE
17a. CONTRACTOR/OFFEROR CODE FACILITY CODE 18a. PAYMENT WILL BE MADE BY CODE
TELEPHONE NO. UEI: EFT:
PHONE: FAX:
17b. CHECK IF REMITTANCE IS DIFFERENT AND PUT SUCH ADDRESS IN OFFER
18b. SUBMIT INVOICES TO ADDRESS SHOWN IN BLOCK 18a UNLESS BLOCK BELOW IS CHECKED
SEE ADDENDUM
19. 20. 21. 22. 23. 24.
ITEM NO. SCHEDULE OF SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT
(Use Reverse and/or Attach Additional Sheets as Necessary)
25. ACCOUNTING AND APPROPRIATION DATA 26. TOTAL AWARD AMOUNT (For Govt. Use Only)
27a. SOLICITATION INCORPORATES BY REFERENCE FAR 52.212-1, 52.212-4. FAR 52.212-3 AND 52.212-5 ARE ATTACHED. ADDENDA ARE ARE NOT ATTACHED.
27b. CONTRACT/PURCHASE ORDER INCORPORATES BY REFERENCE FAR 52.212-4. FAR 52.212-5 IS ATTACHED. ADDENDA ARE ARE NOT ATTACHED
28. CONTRACTOR IS REQUIRED TO SIGN THIS DOCUMENT AND RETURN _______________ 29. AWARD OF CONTRACT: REF. ___________________________________ OFFER COPIES TO ISSUING OFFICE. CONTRACTOR AGREES TO FURNISH AND DATED ________________________________. YOUR OFFER ON SOLICITATION DELIVER ALL ITEMS SET FORTH OR OTHERWISE IDENTIFIED ABOVE AND ON ANY (BLOCK 5), INCLUDING ANY ADDITIONS OR CHANGES WHICH ARE ADDITIONAL SHEETS SUBJECT TO THE TERMS AND CONDITIONS SPECIFIED SET FORTH HEREIN IS ACCEPTED AS TO ITEMS:
30a. SIGNATURE OF OFFEROR/CONTRACTOR 31a. UNITED STATES OF AMERICA (SIGNATURE OF CONTRACTING OFFICER)
30b. NAME AND TITLE OF SIGNER (TYPE OR PRINT) 30c. DATE SIGNED 31b. NAME OF CONTRACTING OFFICER (TYPE OR PRINT) 31c. DATE SIGNED
AUTHORIZED FOR LOCAL REPRODUCTION (REV. NOV 2021)
PREVIOUS EDITION IS NOT USABLE Prescribed by GSA - FAR (48 CFR) 53.212
7. FOR SOLICITATION
INFORMATION CALL:
STANDARD FORM 1449
SOLICITATION/CONTRACT/ORDER FOR COMMERCIAL PRODUCTS AND COMMERCIAL SERVICES
OFFEROR TO COMPLETE BLOCKS 12, 17, 23, 24, & 30
36C24827Q0126
J'Vonne Wilson 813-816-4620 12-03-2026
05:00 PM EST
36C248 Department of Veterans Affairs Network Contracting Office 8 (NCO 8)
8875 Hidden River Pkwy Ste 160A Tampa FL 33637
X 100
X
238220
$19 Million
Net 30
N/A
X
Department of Veterans Affairs James A. Haley Veterans Hospital (90C) 13000 Bruce B. Downs Blvd
Tampa FL 33612
36C248
Department of Veterans Affairs Network Contracting Office 8 (NCO 8)
8875 Hidden River Pkwy
Department of Veterans Affairs Financial Services Center
P.O. Box 149971 Austin TX 78714-9971
See CONTINUATION Page
Quotations must be received by email no later than December 03, 2026 at 5:00pm EST. Quotations received after that time will be handled according the applicable provisions.
Highly encouraged site visit will be conducted prior to quote submission. The site visit will be conducted on November 20, 2026, at 9:00am EST. Meeting location will be in building 39 Central Energy Plant.
All Vendors must send site visit request via e-mail to jvonne.wilson@va.gov. A confirmation e-mail will follow.
See CONTINUATION Page
X X
X 1
J'Vonne Wilson Contracting Officer
Table of Contents
SECTION A
A.1 SF 1449 SOLICITATION/CONTRACT/ORDER FOR COMMERCIAL PRODUCTS
AND COMMERCIAL SERVICES
SECTION B - CONTINUATION OF SF 1449 BLOCKS
B.1 CONTRACT ADMINISTRATION DATA
B.2 PRICE/COST SCHEDULE
ITEM INFORMATION
SECTION C - CONTRACT CLAUSES
C.1 52.212-4 CONTRACT TERMS AND CONDITIONS—COMMERCIAL PRODUCTS
AND COMMERCIAL SERVICES (OCT 2025) (DEVIATION)
C.2 52.217-9 OPTION TO EXTEND THE TERM OF THE CONTRACT (MAR 2000) ...28
C.3 52.222-40 NOTIFICATION OF EMPLOYEE RIGHTS UNDER THE NATIONAL
LABOR RELATIONS ACT (NOV 2025) (DEVIATION)
C.4 52.222-90 ADDRESSING DEI DISCRIMINATION BY FEDERAL CONTRACTORS
(DEVIATION APR 2026)
C.5 52.223-23 SUSTAINABLE PRODUCTS (NOV 2025) (DEVIATION)
C.6 SUPPLEMENTAL INSURANCE REQUIREMENTS
C.7 52.240-91 SECURITY PROHIBITIONS AND EXCLUSIONS (NOV 2025)
(DEVIATION)
C.8 VAAR 852.204-72 PERSONNEL VETTING AND CREDENTIALING (DEVIATION)
(MAR 2026)
C.9 VAAR 852.219-73 VA NOTICE OF TOTAL SET-ASIDE FOR CERTIFIED
SERVICE-DISABLED VETERAN-OWNED SMALL BUSINESSES (JAN 2023)
(DEVIATION)
C.10 VAAR 852.219-75 VA NOTICE OF LIMITATIONS ON SUBCONTRACTING—
CERTIFICATE OF COMPLIANCE FOR SERVICES AND CONSTRUCTION (JAN 2023)
(DEVIATION)
C.11 52.252-2 CLAUSES INCORPORATED BY REFERENCE (FEB 1998)
SECTION D - CONTRACT DOCUMENTS, EXHIBITS, OR ATTACHMENTS
SECTION E - SOLICITATION PROVISIONS
E.1 52.212-1 INSTRUCTIONS TO OFFERORS—COMMERCIAL PRODUCTS AND
COMMERCIAL SERVICES (OCT 2025) (DEVIATION)
E.2 52.209-7 INFORMATION REGARDING RESPONSIBILITY MATTERS (NOV 2025)
(DEVIATION)
E.3 52.216-1 TYPE OF CONTRACT (NOV 2025) (DEVIATION)
E.4 52.233-2 SERVICE OF PROTEST (SEP 2006)
E.5 52.240-90 SECURITY PROHIBITIONS AND EXCLUSIONS REPRESENTATIONS
AND CERTIFICATIONS (NOV 2025) (DEVIATION)
E.6 VAAR 852.233-71 ALTERNATE PROTEST PROCEDURE (OCT 2018)
E.7 52.252-1 SOLICITATION PROVISIONS INCORPORATED BY REFERENCE (FEB
1998)
E.8 52.212-2 EVALUATION—COMMERCIAL PRODUCTS AND COMMERCIAL
SERVICES (OCT 2025) (DEVIATION)
SECTION B - CONTINUATION OF SF 1449 BLOCKS
B.1 CONTRACT ADMINISTRATION DATA
1. Contract Administration: All contract administration matters will be handled by the following individuals:
a. CONTRACTOR:
b. GOVERNMENT: Contracting Officer 36C248
Department of Veterans Affairs
Network Contracting Office 8 (NCO 8)
8875 Hidden River Pkwy Ste 160A
2. CONTRACTOR REMITTANCE ADDRESS: All payments by the Government to the contractor will be made in accordance with:
[X] 52.232-33, Payment by Electronic Funds Transfer—System For Award Management, or
[] 52.232-36, Payment by Third Party
3. INVOICES: Invoices shall be submitted in arrears:
a. Quarterly []
b. Semi-Annually []
c. Other [X] Upon completion.
4. GOVERNMENT INVOICE ADDRESS: All Invoices from the contractor shall be submitted electronically in accordance with VAAR Clause 852.232-72 Electronic Submission of Payment Requests.
Department of Veterans Affairs, Financial Services Center https://www.fsc.va.gov/Payments.asp
ACKNOWLEDGMENT OF AMENDMENTS: The offeror acknowledges receipt of amendments to the Solicitation numbered and dated as follows:
AMENDMENT NO DATE
Chiller Maintenance SOW
B.3 STATEMENT OF WORK
I. INTRODUCTION:
The James A. Haley Veterans Hospital (JAHVH) has a requirement to ensure/maintain on site chillers for occupied mission critical facilities. The Contractor shall furnish all labor, parts, travel, and equipment to provide preventative maintenance services on/of 9 identified water-cooled centrifugal chiller systems at the below locations covered in this Statement of Work (SOW):
Building 39
• Carrier Centrifugal Chiller one model number 19XR-385CQH68 serial number 3498J58356
• Carrier Centrifugal Chiller two model number 19XR-565EJS68 serial number 339J58357
• Carrier Centrifugal Chiller three model number 19XR-565EJS68 serial number 3498J58358
• Carrier Centrifugal Chiller four model number 19XR-565EJ568 serial number 3498J58359
• Carrier Centrifugal Chiller five model number 19XR-555EKS68 serial number 2305Q71464
• Carrier Centrifugal Chiller six model number 19XR-8686574EHH685 serial number 2807Q74389
Building 100
• York Centrifugal Chiller one model number YKHCFXP8-ESG Serial Number SBHM-487370
York Variable Speed Drive model number LVD0503GXN01KC30806LZ-46A
SN11552A01384246
• York Centrifugal Chiller one model number YKHCFXP8-ESG Serial Number SBHM-487840
York Variable Speed Drive model number LVD0503GXN01KC30806LZ-46A
SN11552A01979967
• York Centrifugal Chiller one model number YKHCFXP8-ESG Serial Number SBHM-487600
York Variable Speed Drive model number LVD0503GXN01KC30806LZ-46A
SN11552A01384245
Contractor shall supply all labor, test equipment, tools, materials, replacement parts, oil, lubricants, supplies, software, transportation, supervision, and any other items and services necessary to accomplish one (1) annual preventative maintenance procedure, four (4) quarterly running inspections, perform two EDDY CURRENTS per year on 3 chillers for a total of six (6) eddy currents per year, alternating between even and odd numbered chillers every other year on both evaporator and condenser, there shall be two (2) oil analysis preformed on each chiller annually, and there will be two 10-year tear down maintenance procedures. The 10-year tear downs are required on chiller 5 & 6 Building 39 this maintenance cycle, one per year to be performed from January 1st to March 31st., Chiller #5 10-year teardown to be performed in year one, chiller #6 teardown to be performed in year 2. Contractor shall modernize the chiller controls on chillers 1-6 in building 39, this will upgrade the chillers from the legacy PIC II control system to the current generation Carrier PIC 6 control platform during base year, new control systems must be BACnet capable and communicate with the facility’s current JCI Metasys BAS system. Contractor also to replace worn shaft seals on York Chillers 1 & 3 in building 100 during base year. Any required repairs discovered during routine inspections or emergencies, outside of the PM schedule will be quoted to the CO/COR at the time of discovery.
Upon completion of preventive maintenance (PM) inspection the Contractor shall leave a copy of the service report with the using service and submit to the same location as designated above a service report annotating what service, calibration, etc., were performed and whether preventive maintenance was done. Each service report shall include the name of the contractor, name of Field Service Engineer (FSE), date, time (starting and ending), equipment downtime, hours of labor including costs (when emergency service is authorized outside of normal working hours), the parts utilized including costs, the nature of the problem, the nomenclature of the item replaced (serial number & VA inventory number), and the room number where equipment is located. The service designee and the FSE attesting that the equipment is in satisfactory working order and is functioning at an acceptable level of performance shall sign this report. The contractor shall sign out at the designated location before leaving. NOTE: Failure to furnish a service report or obtain a signed copy of the service report could result in delay of payment or non- payment. The COR or alternate COR in the using service has the authority to approve/request a service call from the contractor.
Preventive maintenance (PM):
A. Provide 4 (quarterly) running inspections of the 9 existing chillers
B. Provide once-a-year factory Cooling Season Start-up Preparation and Inspection under Chiller Service, on the 9 existing chillers during the November–February timeframe.
C. Performance Standard: Contractor shall ensure that the equipment functions in conformance with the latest published edition of OSHA, NFPA, EPA, NEC, CDRH and the original equipment manufacturer (OEM) specifications.
D. The contractor shall furnish/replace all parts, equipment, and materials to meet identified Original Equipment Manufacturer (OEM) PM specifications. All materials shall be provided as part of this contract at the vendor’s cost. The contractor shall have ready access to all replacement parts; The contractor shall maintain enough stock of all parts needed for maintenance of the equipment or be able to secure needed parts within three (3) calendar days(contractor must identify, source, and have order placed to obtain required component(s).
When OEM components have a documented manufacturer lead time to exceed 3 calendar days, contractor to notify COR immediately, and make all efforts in securing the component(s) in the timeliest manner. The contract does not cover operating supplies that are consumed during normal operation of the equipment covered. The contractor shall use new parts only. If and when requested, the contractor shall provide JAHVH with a letter from the manufacturer of the equipment specifying that all parts for the equipment will be sold to the contractor. All replacement parts provided under this contract shall be warranted for a period of one (1) year for replacement of same including all applicable costs, e.g., travel, labor, etc. If published or issued by the equipment manufacturer, field service software updates/upgrades will be provided at no additional cost (to include parts and labor) during the contract period.
Chiller Service
A maximum of one chiller at a time will be removed from service for maintenance/repairs. All work on the chillers shall be completed and accepted before work on the next chiller is started.
All work shall be coordinated with Contracting Officer Representatives
1. Chiller Service: The contractor shall perform preventative maintenance (PM) service to ensure the equipment listed above is in accordance with the (OEM) equipment’s performance standards, as per equipment manuals, with paper and/or electronic copies on site that can be provided to the COR. The contractor shall provide and utilize procedures and checklists with worksheet originals indicating work performed and actual values obtained. They will provide these to the Contracting Officers Representative (COR) at the completion of the inspections, emergency repairs and PM. PM services will include but not limited to:
Preventative Maintenance:
a) Each unit to be serviced four times each year, once each quarter. Chillers 5 & 6- building 39 need to be scheduled for their 10-year inspections, chiller #5 in year one, chiller #6 in year 2.
b) No more than one unit to be serviced at one time unless weather permits. Additional units can be serviced, subject to approval by the COR/Alt COR.
c) Service to include for each unit, leak check with a leak detector, review and evaluation of log readings, sample and analysis of refrigerant and oil.
d) Provide the following preventive maintenance procedures as a part of this contract.
Check of general machine operation, controls, safety devices, gauges, indicators, piping and wiring.
Replace batteries in control panels on all chillers.
Log chill water and condensing water in and out temperatures, flow and pump delta-p, cooler (refrigerant temperatures, pressure, leaving temperature differences), condenser (water in and out temperatures, water flow and delta-p, approach temperature, refrigerant and sub cooler temperatures, and leaving temperature differences), oil (level, pump current, sump pressure and temperature, bearing temperature and supply pressure), refrigerant dry cycle indicator status.
Calibrate cooler transducer, condenser transducer, oil pressure transducer, condenser high pressure cut out, oil low pressure cut out, operating controls, flow switches, motor amperage and voltage, and KW meter. Contractor must provide test sheets with all calibrated points listed including system operational set points tolerances and safety devices set point tolerances per unit.
Perform oil analysis twice annually on each chiller.
Compressor oil changes shall be performed on an as needed basis, as determined through the Spectro-analysis results or per chiller manufacturer timeframe. Replace oil reclaim filters and airside filters on all units once a year. Remove all waste oil from the facility.
Annual visual inspection of condenser tubes including removal of heads, annual brush cleaning of condenser tubes. Perform Eddy Current testing on water-cooled chillers during evaporator cleaning.
The evaporator tubes shall be cleaned every other year starting with even numbered chillers in year one.
Disposal of all used refrigerant they remove from equipment.
Required to submit written reports on all repairs and preventive maintenance completed and refrigerant recovered or disposed of within 30 days of completion of service.
Required to conduct refrigerant leak checks during each PM visit on all chillers and submit a loss report within 30 days when there has been any leak repair.
The annual inspection will also consist of leak testing, Meg the compressor motor and oil pump motor, clean the oil strainer, replace the filter and gaskets where required, test vent piping of all relief valves, tighten oil heater leads, check the operation of vane positioners, change compressor oil as indicated by analysis, check condition of chiller starter contacts, and inspect overloads, mechanical trips, and verify settings on electronics, replace batteries in control panel on all chillers. Remove condenser tube sheet cover, clean and brush condenser tubes yearly on all chillers. Remove evaporator tube sheet cover, clean and brush evaporator tubes every two years (alternating years, three chillers per year) starting with the even number chillers in year one of the contract.
There will be four scheduled maintenances performed during operation consisting of inspecting operating and safety controls, check the operation control circuit, log temperatures, voltage and amperage, check entire lube oil system, checking motor and starter operation, check refrigerant and oil levels, check shift logs and discuss the operation of the equipment with the supervisor.
10 Year Teardown Inspection: The compressor refurbishment includes disassembly of the compressor, inspection of all rotating parts, and replacement of the complete high speed thrust assembly, transmission bearings, labyrinth seals and motor bearings.
a) Lock out and tag electrical circuits.
b) Leak test entire unit.
c) Recover refrigerant following EPA guidelines.
d) Remove compressor oil and filter.
e) Perform meg ohm test on motor terminals.
f) Perform compressor slide back.
g) Remove impeller and high-speed thrust assembly.
h) Remove compressor motor transmission.
i) Disassemble transmission, inspect gears, replace and pull pinion gear bearings
j) Reassemble transmission.
k) Replace demister.
l) Re-install motor.
m) Re-install transmission assembly.
n) Replace motor shaft bearing.
o) Provide and install factory new high speed thrust assembly and labyrinth seal.
p) Re-install impeller.
q) Re-install compressor to vane assembly flange replacing all disturbed gasket and O- rings.
r) Remove oil pump, disassembly, and check for wearing.
s) Re-assemble oil pump assembly, re-install oil pump.
t) Replace refrigerant, oil, and oil return filters.
u) Perform system leak test.
v) Install new compressor oil.
w) Perform dehydration vacuum and standing vacuum test.
x) Charge with existing refrigerant.
y) Perform system start up.
z) Provide one (1) year material and workmanship warranty.
aa) Additional refrigerant, if required for trim charge, is not included.
bb) Any additional repairs or components that need replacing, other than those identified above, are not included.
cc) All work shall be performed as per manufacturer guidelines
Remove refrigerant to a reclaim cylinder. Get a weight on the refrigerant removed, prepare, and file a loss report if needed re-certify and return refrigerant to the machine if it meets specs.
Perform a complete teardown to the maximum extent possible, of the chiller compressor including diffuser, high speed assembly, and transmission; inspect all interior and exterior components for wear and report all indications of possible failures, any replacement parts not covered by the tear down list to the CEP/HVAC supervisor for replacement; replace all seals, gaskets, O-rings, bearings and other normal wear items. Check chiller stator motor for damage, including motor windings and bearings; re-assemble chiller compressor assembly; perform all additional maintenance requirements as listed by Carrier recommendations; charge chiller with refrigerant.
a) Electrical safety inspections will be completed at the time of the PM and results will be documented and provided to the COR. Assemblies such as batteries which will be replaced as needed during inspection/test and analysis which would indicate that useful life has been exceeded
b) The Contractor shall notify the COR in writing (report form) any uncorrected deficiencies.
Contractor shall provide a quote for all deficiencies not covered by PM. Written notification shall include the type of deficiency noted, dated, and initialed. Contractor shall immediately notify the COR of any deficiencies, which are a hazard. It shall be the responsibility of James A Haley VA to take the necessary actions to initiate any Interim Life Safety Measures (ILSM).
Control System Modernization:
Chillers 1-6 in building 39 shall undergo a control system upgrade to ensure continued reliability of the plant. The 6 Carrier 19XR chillers shall be upgraded from the legacy PIC II control system to the current generation Carrier PIC 6 control system.
Building 100 Chillers 1 & 3 Shaft Seal Replacements:
Furnish and install one new compressor shaft seal on the #1 & #3 York YK chiller located in Building 100. This new seal will replace the existing seal that is leaking refrigerant. Evacuate and reclaim refrigerant from the chiller and weigh charge. Charge the chiller with nitrogen.
Remove components to access the shaft seal. Furnish and install one new oil/refrigerant double shaft seal. Recheck hub alignment, reinstall coupling, reinstall high speed cover. Leak check the machine and evacuate all non-condensable contamination. Recharge the chiller with reclaimed refrigerant. Check and monitor for proper operation. Return the chiller back to normal operation and provide a customer service report. This is limited to the identified shaft-seal replacement procedure and associated seal replacement, alignment verification, startup, and operational testing. Any additional deficiencies discovered after disassembly, including shaft, coupling, bearing, compressor, oil, refrigerant or other component damage not specifically included in the identified shaft-seal replacement will be documented and separately quoted to the COR prior to corrective work.
Unscheduled Emergency Service:
c) All PM will be performed during the normal VA business hours (7:00 - 16:30) Monday through Friday, except Federal holidays, unless otherwise specified. Contractor may work outside normal business hours by arrangement with the COR if such services are provided without additional charge to the Government. Any overtime charges must be approved by the CO/COR or designee prior to the initiation of overtime work.
Contractor to provide eight (8) four-hour emergency service troubleshooting calls per year, this is to include initial troubleshooting and diagnosis, as well as corrective repair (within the allotted emergency service call time) as long as parts/supplies are available in house. If repair cannot be performed within the timeline or parts are not available in house, contractor will notify the COR for authorization to continue troubleshooting/corrective action or provide required parts/supplies. A technical maintenance representative shall respond by telephone to the VA within one (1) hour of the original service call. The contractor shall arrive on-site for maintenance within two business hours from the original service call. The equipment and all sub-systems shall be restored to fully operational status within twenty-four (24) business hours (three days) of the original call. 24 business hour restoration is contingent upon the availability of required OEM replacement parts and materials, authorization from the government to proceed with the repairs, availability of required government personnel and equipment access, as well as conditions reasonably within the contractor’s control. When OEM components have a documented manufacturer lead time to exceed 3 calendar days, contractor to notify COR immediately, and make all efforts in securing the component(s) in the timeliest manner All on-site visits will be authorized by the COR only.
PERFORMANCE REQUIREMENTS:
1. Contractor shall provide the necessary personnel and equipment to meet or exceed required service, contractor shall have parts readily accessible for all chillers, particularly the aging 19xr Carrier chillers in the main chiller plant of building 39. Contractor shall have the following responsibilities:
a) Provide licensed and trained personnel to perform the project in the State of Florida.
b) Provide all supervision, labor, and materials to complete all requirements described in this
PWS.
c) Contractor shall obtain all necessary licenses and permits required to perform this work required by this PWS, with each having completed the Occupational Safety & Health
Administration (OSHA) approved 10-hour Construction Outreach Training or General Industry Outreach Training.
d) Contractor shall insure that all areas where equipment is serviced under this contract are left in a clean, neat and orderly condition.
e) Contractors shall have technical training and evident track records of working experience in Maintenance and Testing of manufacture specified chillers (York, Carrier, Daikin) all identified in the PWS and related components in healthcare, industrial, educational, or commercial facilities for a minimum of five (5) years.
f) Contractors shall possess and utilize all necessary tools, equipment, and Personal Protective Equipment (PPE) to perform all work safely, effectively, and timely (i.e. vendor uniform, face mask, steel toe boots and safety glasses). Tools, equipment, and PPE shall comply with OSHA Standard 29 CFR 1910, (Subpart I), and NFPA 70E. Prior to initiating work, the Contractor shall provide documentation demonstrating that all instruments, test equipment, tools, and PPE possess current calibration and safety inspections. Dated calibration and safety inspection labels shall be visible on all equipment as applicable
g) Contractors shall maintain project schedule agreed upon in the purchase order documents.
h) Contractors shall ensure employees have background checks completed.
2. Contractor’s Minimum Requirement
a) The contractor shall provide a dedicated Account Manager to supervise all delivery of services per scope.
b) The contractor shall always be escorted by a VA employee when conducting maintenance at all facilities.
DELIVERABLES
The Contractor shall perform the services necessary to complete the tasks in accordance with the procedures described in a timely and professional manner, consistent with industry standards, at the location, place and time that the VA has set aside, and all in accordance with the PWS.
Contactor shall provide a copy of the inspection document used (field report) on the day of each inspection performed.
RECORDS MANAGEMENT OBLIGATIONS
A. Applicability
This clause applies to all Contractors whose employees create, work with, or otherwise handle Federal records, as defined in Section B, regardless of the medium in which the record exists.
B. Definitions
“Federal record” as defined in 44 U.S.C. § 3301, includes all recorded information, regardless of form or characteristics, made or received by a Federal agency under Federal law or in connection with the transaction of public business and preserved or appropriate for preservation by that agency or its legitimate successor as evidence of the organization, functions, policies, decisions, procedures, operations, or other activities of the United States Government or because of the informational value of data in them.
The term Federal record:
1. includes [Agency] records.
2. does not include personal materials.
3. applies to records created, received, or maintained by Contractors pursuant to their [Agency] contract.
4. may include deliverables and documentation associated with deliverables.
C. Requirements
1. Contractor shall comply with all applicable records management laws and regulations, as well as National Archives and Records Administration (NARA) records policies, including but not limited to the Federal Records Act (44 U.S.C. chs. 21, 29, 31, 33), NARA regulations at 36 CFR Chapter XII Subchapter B, and those policies associated with the safeguarding of records covered by the Privacy Act of 1974 (5 U.S.C. 552a).
These policies include the preservation of all records, regardless of form or characteristics, mode of transmission, or state of completion.
2. In accordance with 36 CFR 1222.32, all data created for Government use and delivered to, or falling under the legal control of, the Government are Federal records subject to the provisions of 44 U.S.C. chapters 21, 29, 31, and 33, the Freedom of Information Act (FOIA) (5 U.S.C. 552), as amended, and the Privacy Act of 1974 (5 U.S.C. 552a), as amended and must be managed and scheduled for disposition only as permitted by statute or regulation.
3. In accordance with 36 CFR 1222.32, Contractor shall maintain all records created for Government use or created in the course of performing the contract and/or delivered to, or under the legal control of the Government and must be managed in accordance with Federal law. Electronic records and associated metadata must be accompanied by sufficient technical documentation to permit understanding and use of the records and data.
4. James A. Haley Veterans’ Hospital and Clinics and its contractors are responsible for preventing the alienation or unauthorized destruction of records, including all forms of mutilation. Records may not be removed from the legal custody of James A. Haley Veterans’ Hospital and Clinics or destroyed except for in accordance with the provisions of the agency records schedules and with the written concurrence of the Head of the Contracting Activity. Willful and unlawful destruction, damage or alienation of Federal records is subject to the fines and penalties imposed by 18 U.S.C. 2701. In the event of any unlawful or accidental removal, defacing, alteration, or destruction of records, Contractor must report to James A. Haley Veterans’ Hospital and Clinics. The agency must report promptly to NARA in accordance with 36 CFR 1230.
5. The Contractor shall immediately notify the appropriate Contracting Officer upon discovery of any inadvertent or unauthorized disclosures of information, data, documentary materials, records or equipment. Disclosure of non-public information is limited to authorized personnel with a need-to-know as described in the [contract vehicle]. The Contractor shall ensure that the appropriate personnel, administrative, technical, and physical safeguards are established to ensure the security and confidentiality of this information, data, documentary material, records and/or equipment is properly protected. The Contractor shall not remove material from Government facilities or systems, or facilities or systems operated or maintained on the Government’s behalf, without the express written permission of the Head of the Contracting Activity.
When information, data, documentary material, records and/or equipment is no longer required, it shall be returned to James A. Haley Veterans’ Hospital and Clinics control, or the Contractor must hold it until otherwise directed. Items returned to the Government shall be hand carried, mailed, emailed, or securely electronically transmitted to the Contracting Officer or address prescribed in the [contract vehicle]. Destruction of records is EXPRESSLY PROHIBITED unless in accordance with Paragraph (4).
6. The Contractor is required to obtain the Contracting Officer's approval prior to engaging in any contractual relationship (sub-contractor) in support of this contract requiring the disclosure of information, documentary material and/or records generated under, or relating to, contracts. The Contractor (and any sub-contractor) is required to abide by Government and James A. Haley Veterans’ Hospital and Clinics guidance for protecting sensitive, proprietary information, classified, and controlled unclassified information.
7. The Contractor shall only use Government IT equipment for purposes specifically tied to or authorized by the contract and in accordance with James A. Haley Veterans’ Hospital and Clinics policy.
8. The Contractor shall not create or maintain any records containing any non-public James A. Haley Veterans’ Hospital and Clinics information that are not specifically tied to or authorized by the contract.
9. The Contractor shall not retain, use, sell, or disseminate copies of any deliverable that contains information covered by the Privacy Act of 1974 or that which is generally protected from public disclosure by an exemption to the Freedom of Information Act.
10. James A. Haley Veterans’ Hospital and Clinics owns the rights to all data and records produced as part of this contract. All deliverables under the contract are the property of the U.S. Government for which James A. Haley Veterans’ Hospital and Clinics shall have unlimited rights to use, dispose of, or disclose such data contained therein as it determines to be in the public interest. Any Contractor rights in the data or deliverables must be identified as required by FAR 52.227-11 through FAR 52.227-20.
11. Training. All Contractor employees assigned to this contract who create, work with, or otherwise handle records are required to take James A. Haley Veterans’ Hospital and Clinics-provided records management training. The Contractor is responsible for confirming training has been completed according to agency policies, including initial training and any annual or refresher training.
[Note: To the extent an agency requires contractors to complete records management training, the agency must provide the training to the contractor.]
D. Flowdown of requirements to subcontractors
1. The Contractor shall incorporate the substance of this clause, its terms and requirements including this paragraph, in all subcontracts under this [contract vehicle], and require written subcontractor acknowledgment of same.
2. Violation by a subcontractor of any provision set forth in this clause will be attributed to the Contractor.
B.2 PRICE/COST SCHEDULE
ITEM INFORMATION
ITEM
NUMBE
R
DESCRIPTION OF
SUPPLIES/SERVI
CES
QUANTI
TY
UNI
T UNIT PRICE AMOUNT
4.00 QT _______________
Contractor shall maintain referenced chillers and ancillary equipment, including oil pumps, oil heaters, oil pressure transducers, and oil temperature, in good operating condition in accordance with manufacture's recommendations IAW to the SOW.
Contract Period: Base POP Begin: 12-15-2026 POP End: 12-14-2027 PRINCIPAL NAICS CODE: 238220 - Plumbing, Heating, and Air-Conditioning Contractors PRODUCT/SERVICE CODE: J065 - Maintenance, Repair, and Rebuilding of Equipment - Medical, Dental, and Veterinary Equipment and Supplies
1.00 JB _______________
Contractor shall perform annual preventative maintenance procedures and) oil analysis on each referenced in accordance with manufacture's recommendations IAW to the
SOW.
POP End: 12-14-2027 PRINCIPAL NAICS CODE: 238220 - Plumbing, Heating, and Air-Conditioning Contractors PRODUCT/SERVICE CODE: J065 - Maintenance, Repair,
4.00 EA _______________
Contractor shall perform four (4) Eddy Currents per year alternating between even and odd numbered chillers every other year on both evaporator and condenser in accordance with manufacture's recommendations and the SOW.
POP End: 12-14-2027 PRINCIPAL NAICS CODE: 238220 - Plumbing, Heating, and Air-Conditioning Contractors PRODUCT/SERVICE CODE: J065 - Maintenance, Repair, Contractor shall perform 10-year tear downs maintenance procedures on chiller 2 in accordance with manufacture's recommendations and SOW.
POP End: 12-14-2027 PRINCIPAL NAICS CODE: 238220 - Plumbing, Heating, and Air-Conditioning Contractors PRODUCT/SERVICE CODE: J065 - Maintenance, Repair, Contractor shall maintain referenced chillers and ancillary equipment, including oil pumps, oil heaters, oil pressure transducers, and oil temperature, in good operating condition
Contract Period: Option 1 POP Begin: 12-15-2027 POP End: 12-14-2028 PRINCIPAL NAICS CODE: 238220 - Plumbing, Heating, and Air-Conditioning Contractors PRODUCT/SERVICE CODE: J065 - Maintenance, Repair, Contractor shall perform annual preventative maintenance procedures and) oil analysis on each referenced in
POP End: 12-14-2028 PRINCIPAL NAICS CODE: 238220 - Plumbing, Heating, and Air-Conditioning Contractors PRODUCT/SERVICE CODE: J065 - Maintenance, Repair, Contractor shall perform four (4) Eddy Currents per year alternating between even and odd numbered chillers every
POP End: 12-14-2028 PRINCIPAL NAICS CODE: 238220 - Plumbing, Heating, and Air-Conditioning Contractors PRODUCT/SERVICE CODE: J065 - Maintenance, Repair, Contractor shall perform 10-year tear downs maintenance
POP Begin: 12-15-2027 POP End: 12-14-2028 PRINCIPAL NAICS CODE: 238220 - Plumbing, Heating, and Air-Conditioning Contractors PRODUCT/SERVICE CODE: J065 - Maintenance, Repair, Contractor shall maintain referenced chillers and ancillary equipment, including oil pumps, oil heaters, oil pressure transducers, and oil temperature, in good operating condition
Contract Period: Option 2 POP Begin: 12-15-2028 POP End: 12-14-2029 PRINCIPAL NAICS CODE: 238220 - Plumbing, Heating, and Air-Conditioning Contractors PRODUCT/SERVICE CODE: J065 - Maintenance, Repair, Contractor shall perform annual preventative maintenance procedures and) oil analysis on each referenced in
POP End: 12-14-2029 PRINCIPAL NAICS CODE: 238220 - Plumbing, Heating, and Air-Conditioning Contractors PRODUCT/SERVICE CODE: J065 - Maintenance, Repair, Contractor shall perform four (4) Eddy Currents per year alternating between even and odd numbered chillers every
POP Begin: 12-15-2028 POP End: 12-14-2029 PRINCIPAL NAICS CODE: 238220 - Plumbing, Heating, and Air-Conditioning Contractors PRODUCT/SERVICE CODE: J065 - Maintenance, Repair, Contractor shall perform 10-year tear downs maintenance
POP End: 12-14-2029 PRINCIPAL NAICS CODE: 238220 - Plumbing, Heating, and Air-Conditioning Contractors PRODUCT/SERVICE CODE: J065 - Maintenance, Repair, Contractor shall maintain referenced chillers and ancillary equipment, including oil pumps, oil heaters, oil pressure transducers, and oil temperature, in good operating condition
Contract Period: Option 3 POP Begin: 12-15-2029 POP End: 12-14-2030 PRINCIPAL NAICS CODE: 238220 - Plumbing, Heating, and Air-Conditioning Contractors PRODUCT/SERVICE CODE: J065 - Maintenance, Repair, Contractor shall perform annual preventative maintenance procedures and) oil analysis on each referenced in
POP End: 12-14-2030 PRINCIPAL NAICS CODE: 238220 - Plumbing, Heating, and Air-Conditioning Contractors PRODUCT/SERVICE CODE: J065 - Maintenance, Repair, Contractor shall perform four (4) Eddy Currents per year alternating between even and odd numbered chillers every
POP End: 12-14-2030 PRINCIPAL NAICS CODE: 238220 - Plumbing, Heating, and Air-Conditioning Contractors PRODUCT/SERVICE CODE: J065 - Maintenance, Repair, Contractor shall perform 10-year tear downs maintenance
POP End: 12-14-2030 PRINCIPAL NAICS CODE: 238220 - Plumbing, Heating, and Air-Conditioning Contractors PRODUCT/SERVICE CODE: J065 - Maintenance, Repair, Contractor shall maintain referenced chillers and ancillary equipment, including oil pumps, oil heaters, oil pressure transducers, and oil temperature, in good operating condition
Contract Period: Option 4 POP Begin: 12-15-2030 POP End: 12-14-2031
PRINCIPAL NAICS CODE: 238220 - Plumbing, Heating, and Air-Conditioning Contractors PRODUCT/SERVICE CODE: J065 - Maintenance, Repair, Contractor shall perform annual preventative maintenance procedures and) oil analysis on each referenced in
POP End: 12-14-2031 PRINCIPAL NAICS CODE: 238220 - Plumbing, Heating, and Air-Conditioning Contractors PRODUCT/SERVICE CODE: J065 - Maintenance, Repair, Contractor shall perform four (4) Eddy Currents per year alternating between even and odd numbered chillers every
POP End: 12-14-2031 PRINCIPAL NAICS CODE: 238220 - Plumbing, Heating, and Air-Conditioning Contractors PRODUCT/SERVICE CODE: J065 - Maintenance, Repair, Contractor shall perform 10-year tear downs maintenance
POP End: 12-14-2031 PRINCIPAL NAICS CODE: 238220 - Plumbing, Heating, and Air-Conditioning Contractors PRODUCT/SERVICE CODE: J065 - Maintenance, Repair, GRAND TOTAL _______________
SECTION C - CONTRACT CLAUSES
C.1 52.212-4 CONTRACT TERMS AND CONDITIONS—COMMERCIAL
PRODUCTS AND COMMERCIAL SERVICES (OCT 2025) (DEVIATION)
(a) Definitions. The clause at Federal Acquisition Regulation (FAR) 52.202-1, Definitions, is incorporated by reference.
(b) Inspection/Acceptance. The Contractor shall only tender for acceptance those items that conform to the requirements of this contract. The Government reserves the right to inspect or test any supplies or services that have been tendered for acceptance. The Government may require repair or replacement of nonconforming supplies or reperformance of nonconforming services at no increase in contract price. If repair/replacement or reperformance will not correct the defects or is not possible, the Government may seek an equitable price reduction or adequate consideration for acceptance of nonconforming supplies or services. The Government must exercise its post acceptance rights—
(1) Within a reasonable time after the defect was discovered or should have been discovered;
and
(2) Before any substantial change occurs in the condition of the item, unless the change is due to the defect in the item.
(c) Assignment. The Contractor or its assignee may assign its rights to receive payment due as a result of performance of this contract to a bank, trust company, or other financing institution, including any Federal lending agency in accordance with the Assignment of Claims Act (31 U.S.C. 3727). However, when a third party makes payment (e.g., use of the Governmentwide commercial purchase card), the Contractor may not assign its rights to receive payment under this contract.
(d) Changes. Changes in the terms and conditions of this contract may be made only by written agreement of the parties.
(e) Disputes. This contract is subject to 41 U.S.C. chapter 71, Contract Disputes. Failure of the parties to this contract to reach agreement on any request for equitable adjustment, claim, appeal or action arising under or relating to this contract shall be a dispute to be resolved in accordance with the clause FAR 52.233-1, Disputes, which is incorporated in this contract by reference. The Contractor shall proceed diligently with performance of this contract, pending final resolution of any dispute arising under the contract.
(f) Excusable delays. The Contractor shall be liable for default unless nonperformance is caused by an occurrence beyond the reasonable control of the Contractor and without its fault or negligence. Examples of occurrences include acts of God or the public enemy, acts of the Government in either its sovereign or contractual capacity, fires, floods, epidemics, quarantine restrictions, strikes, unusually severe weather, and delays of common carriers. When an excusable delay occurs, the Contractor shall—
(1) Notify the Contracting Officer in writing as soon as possible;
(2) Remedy the delay as quickly as possible; and
(3) Notify the Contracting Officer when the occurrence is over.
(g) Invoice. The Government will handle invoices according to the Prompt Payment Act (31 U.S.C. 3903) and 5 CFR part 1315. The Contractor shall submit invoices to the address designated in the contract to receive invoices. An invoice must include the information required by 5 CFR part 1315.9(b).
(h) Patent indemnity. The Contractor shall indemnify the Government and its officers, employees, and agents against liability, including costs, for actual or alleged direct or contributory infringement of, or inducement to infringe, any United States or foreign patent, trademark, or copyright, arising out of the performance of this contract, provided the Contractor is reasonably notified of such claims and proceedings.
(i) Payment—
(1) Items accepted. Payment shall be made for items accepted by the Government that have been delivered to the delivery destinations set forth in this contract.
(2) Prompt payment. The Government will make payment in accordance with the Prompt Payment Act (31 U.S.C. 3903) and prompt payment regulations at 5 CFR part 1315.
(3) Discount. In connection with any discount offered for early payment, time shall be computed from the date of the invoice. For the purpose of computing the discount earned, payment shall be considered to have been made on the date that appears on the payment check or the specified payment date if an electronic funds transfer payment is made.
(4) Overpayments. If the Contractor becomes aware of a duplicate contract financing or invoice payment or that the Government has otherwise overpaid on a contract financing or invoice payment, the Contractor shall—
(i) Remit the overpayment amount to the payment office cited in the contract along with a description of the overpayment including the—
(A) Circumstances of the overpayment (e.g., duplicate payment, erroneous payment, liquidation errors, date(s) of overpayment);
(B) Affected contract number and delivery order number, if applicable;
(C) Affected line item or subline item, if applicable;
(D) Contractor point of contact; and
(ii) Provide a copy of the remittance and supporting documentation to the Contracting Officer.
(5) Interest.
(i) All amounts that become payable by the Contractor to the Government under this contract shall bear simple interest from the date due until paid unless paid within 30 days of becoming due. The interest rate shall be the interest rate established by the Secretary of the
Treasury as provided in 41 U.S.C. 7109, which is applicable to the period in which the amount becomes due, as provided in (i)(6)(v) of this clause, and then at the rate applicable for each six-month period as fixed by the Secretary until the amount is paid.
(ii) The Government may issue a demand for payment to the Contractor upon finding a debt is due under the contract.
(iii) Final decisions. The Contracting Officer will issue a final decision as required by FAR part 33 if—
(A) The Contracting Officer and the Contractor are unable to reach agreement on the existence or amount of a debt within 30 days;
(B) The Contractor fails to liquidate a debt previously demanded by the Contracting Officer within the timeline specified in the demand for payment unless the amounts were not repaid because the Contractor has requested an installment payment agreement; or
(C) The Contractor requests a deferment of collection on a debt previously demanded by the Contracting Officer (see FAR part 32).
(iv) If a demand for payment was previously issued for the debt, the demand for payment included in the final decision shall identify the same due date as the original demand for payment.
(v) Amounts shall be due at the earliest of the following dates:
(A) The date fixed under this contract.
(B) The date of the first written demand for payment, including any demand for payment resulting from a termination for cause.
(vi) The interest charge shall be computed for the actual number of calendar days involved beginning on the due date and ending on-
(A) The date on which the designated office receives payment from the Contractor;
(B) The date of issuance of a Government check to the Contractor from which an amount otherwise payable has been withheld as a credit against the contract debt; or
(C) The date on which an amount withheld and applied to the contract debt would otherwise have become payable to the Contractor.
(vii) The interest charge made under this clause may be reduced under the procedures for interest credits prescribed in FAR part 32 in effect on the date of this contract.
(j) Risk of loss. Unless the contract specifically provides otherwise, risk of loss or damage to the supplies provided under this contract shall remain with the Contractor until, and shall pass to the Government upon—
(1) Delivery of the supplies to a carrier, if transportation is f.o.b. origin; or
(2) Delivery of the supplies to the Government at the destination specified in the contract, if transportation is f.o.b. destination.
(k) Taxes. The contract price includes all applicable Federal, State, and local taxes and duties.
(l) Termination for the Government's convenience. The Government reserves the right to terminate this contract, or any part hereof, for its sole convenience. In the event of such termination, the Contractor shall immediately stop all work and shall immediately cause any and all of its suppliers and subcontractors to cease work. Subject to the terms of this contract, the Contractor shall be paid a percentage of the contract price reflecting the percentage of the work performed prior to the notice of termination, plus reasonable charges the Contractor can demonstrate to the satisfaction of the Government using its standard record keeping system, have resulted from the termination. The Contractor shall not be required to comply with the cost accounting standards or contract cost principles for this purpose. This paragraph does not give the Government any right to audit the Contractor's records. The Contractor shall not be paid for any work performed or costs incurred which reasonably could have been avoided.
(m) Termination for cause. The Government may terminate this contract, or any part hereof, for cause in the event of any default by the Contractor, or if the Contractor fails to comply with any contract terms and conditions, or fails to provide the Government, upon request, with adequate assurances of future performance. The Government will send a cure notice to the Contractor, unless the reason for the termination is late delivery. In the event of termination for cause, the Government shall not be liable to the Contractor for any amount for supplies or services not accepted, and the Contractor shall be liable to the Government for any and all rights and remedies provided by law.
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .