Attachment 5 - Base Offer Price Breakdown.xlsx
XLSX spreadsheet 19 KB Posted
- Solicitation number
- 36C24826R0132
About this file
This is a Base Offer Price Breakdown template for Solicitation No. 36C24826R0132, a Department of Veterans Affairs project to replace the roofing system on Building 1 at the Bruce W. Carter VA Medical Center in Miami, Florida (Project Number 546-24-129). The template is designed for offerors to submit detailed pricing organized by the 16 standard construction divisions, requiring separate line-item entries for labor costs and material costs for each division, with automatic calculation of totals. Additionally, the template includes a secondary breakdown by specific roof areas (designated A through Z, plus Main Entrance Porch and two mechanical areas) to support the Statement of Work requirement prohibiting lump-sum pricing, ensuring granular cost visibility across the approximately 214,637 square feet of roofing work.
The pricing structure allows offerors to input overhead percentage, profit percentage, and bond percentage, which are automatically calculated and summed to arrive at the Total Base Offer Cost that must reconcile with CLIN 0001 on the SF 1442. All division subtotals and roof area breakdowns must align with each other to ensure consistency and accuracy. This template enforces detailed cost accounting aligned with the project's phased construction approach, including demolition, new roofing installation, photovoltaic panel removal and reinstallation, and Lightning Protection System replacement, with a performance period of 1,095 calendar days after Notice to Proceed.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Base Offer
| Base Offer Cost Breakdown | |
| Solicitation No. 36C24826R0132 | |
| Project Number: | 546-24-129 |
Edward L Roy: VA assigned project #
| Date: | |
| Project Title | Replace Miami VAMC Building 1 Roof |
Edward L Roy: VA assigned Project Title
| Project Location | Bruce W. Carter VA Medical Center, 1201 NW 16th Street, Miami, FL 33125 | ||
| Offeror Name | |||
| Offeror Street | |||
| Offeror City | State | Zip |
Item Description Labor Cost Edward L Roy: Enter all Labor Costs by Division
| Material Cost | |
| Edward L Roy: Enter all Material Costs by Division | Total Cost |
Edward L Roy: This Column is the sum of the Division's Labor and Material Costs
| Division 1 | General Requirements | $ - 0 | $ - 0 | $ - 0 |
| Division 2 | Existing Conditions | - 0 | - 0 | - 0 |
| Division 3 | Concrete | - 0 | - 0 | - 0 |
| Division 4 | Masonry | - 0 | - 0 | - 0 |
| Division 5 | Metals | - 0 | - 0 | - 0 |
| Division 6 | Wood and Plastic | - 0 | - 0 | - 0 |
| Division 7 | Thermal & Moisture Protect | - 0 | - 0 | - 0 |
| Division 8 | Doors and Windows | - 0 | - 0 | - 0 |
| Division 9 | Finishes | - 0 | - 0 | - 0 |
| Division 10 | Specialties | - 0 | - 0 | - 0 |
| Division 11 | Equipment | - 0 | - 0 | - 0 |
| Division 12 | Furnishings | - 0 | - 0 | - 0 |
| Division 13 | Special Construction | - 0 | - 0 | - 0 |
| Division 14 | Conveying Equipment | - 0 | - 0 | - 0 |
| Division 21 | Fire Suppression | - 0 | - 0 | - 0 |
| Division 22 | Plumbing | - 0 | - 0 | - 0 |
| Division 23 | HVAC | - 0 | - 0 | - 0 |
| Division 26 | Electrical | - 0 | - 0 | - 0 |
| Division 27 | Communications | - 0 | - 0 | - 0 |
| Division 28 | Electronic Safety & Security | - 0 | - 0 | - 0 |
| Division 31 | Earthwork | - 0 | - 0 | - 0 |
| Division 32 | Exterior Improvements | - 0 | - 0 | - 0 |
| Division 33 | Utilities | - 0 | - 0 | - 0 |
| Division 34 | Transportation Subtotal | - 0 | - 0 | - 0 |
| Division Subtotals : | $ - 0 | $ - 0 | $ - 0 |
Overhead % 0.00% Edward L Roy: Enter Overhead % here. This % will be multiplied by the Division Total Cost Subtotal (cell F36).
Edward L Roy: Date Offer Prepared/Submitted
| - 0 | |||
| Profit % | 0.00% | ||
| Edward L Roy: Enter Profit % here.This % will be multiplied by the sum of the Division Total Cost subtotal (cell F36) plus the calculated Overhead (cell F38). | - 0 | ||
| Bond % | 0.00% |
Edward L Roy: Enter Bond % here. This % will be multiplied by the sum of the Division Total Cost Subtotal (cell F36), the amount of calculated Overhead (cell F38) and the amount of calculated Profit (cell F39).
Edward L Roy: Enter all Labor Costs by Division
| - 0 | ||
| Overhead/Profit Subtotals : | $ - 0 |
Edward L Roy: Sum of Overhead, Profit and Bond %.
Edward L Roy: Enter all Material Costs by Division Edward L Roy: This Column is the sum of the Division's Labor and Material Costs Total Base Offer Cost $ - 0 $ - 0 $ - 0
Offerors shall provide additional price breakdown to avoid lump sum This price offer breakdown is the overall base offer price for Government price analysis
| Total Base Offer Cost must equal CLIN 0001 on the SF 1442. |
| Attachment 4 – Base Offer Price Breakdown (Rev. November 2026) |
Breakdown by Roof Area
| Breakdown by Roof Area (SOW 5.5 – No Lump Sum) | |||
| Solicitation 36C24826R0132 | Project 546-24-129 | Replace Miami VAMC Building 1 Roof | |||
| Roof Area | Labor Cost | Material Cost | Total Cost |
| A | $0.00 | ||
| AA | $0.00 | ||
| B | $0.00 | ||
| BB | $0.00 | ||
| C | $0.00 | ||
| D | $0.00 | ||
| E | $0.00 | ||
| F | $0.00 | ||
| G | $0.00 | ||
| H | $0.00 | ||
| I | $0.00 | ||
| J | $0.00 | ||
| L | $0.00 | ||
| M | $0.00 | ||
| O | $0.00 | ||
| P | $0.00 | ||
| Q | $0.00 | ||
| R | $0.00 | ||
| S | $0.00 | ||
| T | $0.00 | ||
| U | $0.00 | ||
| V | $0.00 | ||
| W | $0.00 | ||
| X | $0.00 | ||
| Y | $0.00 | ||
| Z | $0.00 | ||
| Main Entrance Porch | $0.00 | ||
| Mech Area #42 | $0.00 | ||
| Mech Area #43 | $0.00 | ||
| Roof Area Subtotal | $0.00 | $0.00 | $0.00 |
| Must equal Division Subtotals: | $0.00 | OK | |