36C24826Q1020 Legionella and Dental Water Line and Water Management.docx
DOCX document 75 KB Posted
- Attached to
- B533--Legionella and Dental Water Line Sampling
- Solicitation number
- 36C24826Q1020
About this file
This is a Statement of Work for Legionella and Dental Water Line Sampling and Water Management services for the Department of Veterans Affairs Veterans Health Administration Veterans Integrated Service Network 8 (VISN 8). The solicitation number is 36C24826Q1020.
The contractor shall provide comprehensive water management services including Legionella testing and remediation, dental water line sampling and analysis, and implementation of water management protocols at VA facilities within VISN 8. Key service requirements include conducting baseline water quality assessments, performing quarterly Legionella sampling and analysis, maintaining dental water line compliance with American Dental Association standards, documenting all water testing results, providing corrective action recommendations when contamination is detected, and developing facility-specific water management plans. The contractor must ensure all testing is performed by certified laboratories and that results are reported to facility leadership and appropriate health authorities as required. Services must address potable water systems, non-potable water systems, and specialized dental delivery systems. The statement of work emphasizes compliance with CDC guidelines, OSHA regulations, and VA-specific water safety protocols. The contractor is responsible for coordinating with facility engineering and infection prevention teams to implement identified corrective measures and maintain comprehensive documentation of all water system assessments and remediation activities throughout the contract period.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| C01 AWARD NOTICE DESCRIPTION.docx | DOCX document | |
| 36C24826Q1020_2 Amendment 0001.docx | DOCX document | |
| Limitations on Subcontracting.docx | DOCX document | |
| CEP Webform User Guide (004).pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Combined Synopsis-Solicitation for Commercial Products and Commercial Services
| SUBJECT* |
| Legionella and Dental Water Sampling |
GENERAL INFORMATION
| CONTRACTING OFFICE’S ZIP CODE* |
| 33637 |
| SOLICITATION NUMBER* |
| 36C24826Q1020 |
| RESPONSE DATE/TIME/ZONE |
| 08-14-2026 11am EASTERN TIME, NEW YORK, USA |
| ARCHIVE |
| 60 DAYS AFTER THE RESPONSE DATE |
| RECOVERY ACT FUNDS |
| N |
SET-ASIDE
| PRODUCT SERVICE CODE* |
| B533 |
| NAICS CODE* |
| 541620 |
| CONTRACTING OFFICE ADDRESS |
| Department of Veterans Affairs |
Network Contracting Office 8 (NCO 8) Services/Commodities 8875 Hidden River Pkwy Ste 160A Tampa FL 33637
POINT OF CONTACT*
Contract Officer Specialist Walida Moore-Saintil Walida.MooreSaintil@va.gov 813-631-2856
PLACE OF PERFORMANCE
| ADDRESS |
| James A. Haley Veterans Medical |
Primary Care Annex
New Port Richey VA Dental Clinic
Florida
POSTAL CODE
| COUNTRY |
| USA |
ADDITIONAL INFORMATION
| AGENCY’S URL |
| https://www.va.gov/plo/about/saos.asp |
| URL DESCRIPTION |
| NCO 8 |
| AGENCY CONTACT’S EMAIL ADDRESS |
| Walida.MooreSaintil@va.gov |
| EMAIL DESCRIPTION |
| Walida Moore-Saintil |
Combined Synopsis/Solicitation Notice Combined Synopsis/Solicitation Notice
DESCRIPTION
| *= Required Field |
| Combined Synopsis/Solicitation Notice |
Combined Synopsis/Solicitation Notice
Description This is a combined synopsis/solicitation for commercial products and commercial services prepared in accordance with the format Revolutionary FAR Overhaul (RFO) in Federal Acquisition Regulation (FAR) subpart 12.202, “Streamlined Procedures for Evaluation and Solicitation for Commercial Products and Commercial Services,” as supplemented with additional information included in this notice. This announcement constitutes the only solicitation; quotes are being requested, and a written solicitation document will not be issued.
This solicitation is issued as an RFQ. The solicitation document and incorporated provisions and clauses are those in effect through Federal Acquisition Circular Federal Acquisition Circular 2026-01, Effective 03/13/2026.
This solicitation is set-aside for This solicitation is for a 100% Set-Aside for Service-Disabled Veteran Owned Small Business (SDVOSB).
The associated North American Industrial Classification System (NAICS) code for this procurement is 541620, with a small business size standard of $19.0 Million.
The FSC/PSC is B533 – Special Studies/Analysis – Water Quality.
The James A. Haley Veterans Administration Medical Center (JAHVAMC) main campus at 13000 Bruce B. Downs Blvd Tampa FL, Primary Care Annex at 1315 Lake Terrace Ln. Tampa FL and New Port Richey VA Dental Clinic at 7900 Little Road New Port Richey FL. is seeking to purchase Legionella and Dental Water Line Sampling.
All interested companies shall provide quotations for the following:
Services
| ITEM NUMBER |
| DESCRIPTION OF SUPPLIES/SERVICES |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| AMOUNT |
| 4.00 |
| QTR |
| __________________ |
| __________________ |
Sampling, analysis and report on designated buildings at the James A. Haley and designated buildings for Legionella, Oxidant Residual, Potable Water Quality hot, cold-water distribution system(s), Hot water Distribution outlets, Treadmill & Therapy Pool and Cooling Towers on a quarterly basis (once per Federal Fiscal Year quarter).
Contract Period: Base
PRINCIPAL NAICS CODE: 541620 - Environmental Consulting Services PRODUCT/SERVICE CODE: B533 - Special Studies/Analysis - Water Quality
| 4.00 |
| QTR |
| __________________ |
| __________________ |
Heterotrophic Plate Count Specific Sampling (Dental Water Line Sampling):
The contractor will provide sampling, Analysis and report for the Dental Water Lines for Heterotrophic Plate Count designated buildings at the James A. Haley and designated buildings mentioned in the PWS on a quarterly basis (once per Federal Fiscal Year quarter).
Contract Period: Base
| 50.00 |
| EA |
| __________________ |
| __________________ |
Supplemental Water Sampling:
The contractor will perform supplemental water sampling (retest) for Legionella at designated buildings located at the James A. Haley and designated buildings mentioned in the PWS.
Contract Period: Base
| 50.00 |
| EA |
| __________________ |
| __________________ |
Supplemental Water Sampling:
The contractor will perform supplemental water sampling (retest) for Heterotrophic Plate Count at designated buildings located at the James A. Haley and designated buildings mentioned in the PWS.
Contract Period: Base
| 4.00 |
| EA |
| __________________ |
| __________________ |
Potable Water Quality Test Bundle:
The contractor will perform water quality testing of Total Suspended Solids (TSS), pH (Standard Method 4500H, EPA Method 150.1and 150.2), and testing of water Hardness using Standard Method 2340 and EPA Method 130.2 for a total of 3 TESTS PER QUARTER (12 PER YEAR ) at designated buildings located at the James A. Haley and designated buildings mentioned in the PWS.
Contract Period: Base
| 1.00 |
| EA |
| __________________ |
| __________________ |
Healthcare Associated Legionella Disease Prevention Plan Verification (Water Management Plan) Contract Period: Base
| 4.00 |
| QTR |
| __________________ |
| __________________ |
Sampling, analysis and report on designated buildings at the James A. Haley and designated buildings for Legionella, Oxidant Residual, Potable Water Quality hot, cold-water distribution system(s), Hot water Distribution outlets, Treadmill & Therapy Pool and Cooling Towers on a quarterly basis (once per Federal Fiscal Year quarter).
Contract Period: Option 1
| 4.00 |
| QTR |
| __________________ |
| __________________ |
Heterotrophic Plate Count Specific Sampling (Dental Water Line Sampling):
The contractor will provide sampling, Analysis and report for the Dental Water Lines for Heterotrophic Plate Count designated buildings at the James A. Haley and designated buildings mentioned in the PWS on a quarterly basis (once per Federal Fiscal Year quarter).
Contract Period: Option 1
| 50.00 |
| EA |
| __________________ |
| __________________ |
Supplemental Water Sampling:
The contractor will perform supplemental water sampling (retest) for Legionella at designated buildings located at the James A. Haley and designated buildings mentioned in the PWS.
Contract Period: Option 1
| 50.00 |
| EA |
| __________________ |
| __________________ |
Supplemental Water Sampling:
The contractor will perform supplemental water sampling (retest) for Heterotrophic Plate Count at designated buildings located at the James A. Haley and designated buildings mentioned in the PWS.
Contract Period: Option 1
| 4.00 |
| EA |
| __________________ |
| __________________ |
Potable Water Quality Test Bundle:
The contractor will perform water quality testing of Total Suspended Solids (TSS), pH (Standard Method 4500H, EPA Method 150.1and 150.2), and testing of water Hardness using Standard Method 2340 and EPA Method 130.2 for a total of 3 TESTS PER QUARTER (12 PER YEAR ) at designated buildings located at the James A. Haley and designated buildings mentioned in the PWS.
Contract Period: Option 1
| 4.00 |
| QTR |
| __________________ |
| __________________ |
Sampling, analysis and report on designated buildings at the James A. Haley and designated buildings for Legionella, Oxidant Residual, Potable Water Quality hot, cold-water distribution system(s), Hot water Distribution outlets, Treadmill & Therapy Pool and Cooling Towers on a quarterly basis (once per Federal Fiscal Year quarter).
Contract Period: Option 2
| 4.00 |
| QTR |
| __________________ |
| __________________ |
Heterotrophic Plate Count Specific Sampling (Dental Water Line Sampling):
The contractor will provide sampling, Analysis and report for the Dental Water Lines for Heterotrophic Plate Count designated buildings at the James A. Haley and designated buildings mentioned in the PWS on a quarterly basis (once per Federal Fiscal Year quarter).
Contract Period: Option 2
| 50.00 |
| EA |
| __________________ |
| __________________ |
Supplemental Water Sampling:
The contractor will perform supplemental water sampling (retest) for Legionella at designated buildings located at the James A. Haley and designated buildings mentioned in the PWS.
Contract Period: Option 2
| 50.00 |
| EA |
| __________________ |
| __________________ |
Supplemental Water Sampling:
The contractor will perform supplemental water sampling (retest) for Heterotrophic Plate Count at designated buildings located at the JamesA. Haley and designated buildings mentioned in the PWS.
Contract Period: Option 2
| 4.00 |
| EA |
| __________________ |
| __________________ |
Potable Water Quality Test Bundle:
The contractor will perform water quality testing of Total Suspended Solids (TSS), pH (Standard Method 4500H, EPA Method 150.1and 150.2), and testing of water Hardness using Standard Method 2340 and EPA Method 130.2 for a total of 3 TESTS PER QUARTER (12 PER YEAR ) at designated buildings located at the James A. Haley and designated buildings mentioned in the PWS.
Contract Period: Option 2
| 4.00 |
| QTR |
| __________________ |
| __________________ |
Sampling, analysis and report on designated buildings at the James A. Haley and designated buildings for Legionella, Oxidant Residual, Potable Water Quality hot, cold-water distribution system(s), Hot water Distribution outlets, Treadmill & Therapy Pool and Cooling Towers on a quarterly basis (once per Federal Fiscal Year quarter).
Contract Period: Option 3
| 4.00 |
| QTR |
| __________________ |
| __________________ |
Heterotrophic Plate Count Specific Sampling (Dental Water Line Sampling): The contractor will provide sampling, Analysis and report for the Dental Water Lines for Heterotrophic Plate Count designated buildings at the James A. Haley and designated buildings mentioned in the PWS on a quarterly basis (once per Federal Fiscal Year quarter).
Contract Period: Option 3
| 50.00 |
| EA |
| __________________ |
| __________________ |
Supplemental Water Sampling:
The contractor will perform supplemental water sampling (retest) for Legionella at designated buildings located at the James A. Haley and designated buildings mentioned in the PWS.
Contract Period: Option 3
| 50.00 |
| EA |
| __________________ |
| __________________ |
Supplemental Water Sampling:
The contractor will perform supplemental water sampling (retest) for Heterotrophic Plate Count at designated buildings located at the James A. Haley and designated buildings mentioned in the PWS.
Contract Period: Option 3
| 4.00 |
| EA |
| __________________ |
| __________________ |
Potable Water Quality Test Bundle:
The contractor will perform water quality testing of Total Suspended Solids (TSS), pH (Standard Method 4500H, EPA Method 150.1and 150.2), and testing of water Hardness using Standard Method 2340 and EPA Method 130.2 for a total of 3 TESTS PER QUARTER (12 PER YEAR ) at designated buildings located at the James A. Haley and designated buildings mentioned in the PWS.
Contract Period: Option 3
| 4.00 |
| QTR |
| __________________ |
| __________________ |
Sampling, analysis and report on designated buildings at the James A. Haley and designated buildings for Legionella, Oxidant Residual, Potable Water Quality hot, cold-water distribution system(s), Hot water Distribution outlets, Treadmill & Therapy Pool and Cooling Towers on a quarterly basis (once per Federal Fiscal Year quarter).
Contract Period: Option 4
| 4.00 |
| EA |
| __________________ |
| __________________ |
Heterotrophic Plate Count Specific Sampling (Dental Water Line Sampling):
The contractor will provide sampling, Analysis and report for the Dental Water Lines for Heterotrophic Plate Count designated buildings at the James A. Haley and designated buildings mentioned in the PWS on a quarterly basis (once per Federal Fiscal Year quarter).
Contract Period: Option 4
| 50.00 |
| EA |
| __________________ |
| __________________ |
Supplemental Water Sampling:
The contractor will perform supplemental water sampling (retest) for Legionella at designated buildings located at the James A. Haley and designated buildings mentioned in the PWS.
Contract Period: Option 4
| 50.00 |
| EA |
| __________________ |
| __________________ |
Supplemental Water Sampling:
The contractor will perform supplemental water sampling (retest) for Heterotrophic Plate Count at designated buildings located at the James A. Haley and designated buildings mentioned in the PWS.
Contract Period: Option 4
| 4.00 |
| EA |
| __________________ |
| __________________ |
Potable Water Quality Test Bundle:
The contractor will perform water quality testing of Total Suspended Solids (TSS), pH (Standard Method 4500H, EPA Method 150.1and 150.2), and testing of water Hardness using Standard Method 2340 and EPA Method 130.2 for a total of 3 TESTS PER QUARTER (12 PER YEAR ) at designated buildings located at the James A. Haley and designated buildings mentioned in the PWS.
Contract Period: Option 4
| GRAND TOTAL |
| __________________ |
PERFORMANCE WORK STATEMENT
Legionella and Dental Water Line Sampling & Analysis and Water Management Plan Contract
PLACE OF PERFORMANCE: James A. Haley Veterans Administration Medical Center (JAHVAMC) main campus at 13000 Bruce B. Downs Blvd Tampa FL, Primary Care Annex at 1315 Lake Terrace Ln. Tampa FL and New Port Richey VA Dental Clinic at 7900 Little Road New Port Richey FL.
SCOPE OF WORK: The Contractor will provide all management, supervision, labor, materials, supplies and equipment, and will plan, schedule, coordinate and assure effective performance of all services described herein. This agreement will include the collection of water samples and the laboratory analysis of the collected water samples. Sampling will be conducted at the James Haley VA Hospital and its associated Outpatient Clinics.
This requirement will be ONLY for the quarterly water sampling and testing for Legionella, Dental Water Line and Ground Water Sampling. Vendors selected for this award will be excluded from all sales of products and equipment required to address issues identified associated with testing results.
This is a Base plus four option year requirement.
Please note the option years may be exercised after determination that it is in the best interest of the Government and it has been determined that it is the most advantageous method of fulfilling the Government’s need for these services.
SECURITY REQUIREMENTS: The C&A requirements do not apply, and a Security Accreditation Package is not required.
DESCRIPTION OF SERVICE/GENERAL INFORMATION
Hours of Operation and Scheduling: All work shall be accomplished during normal working hours 7:00AM - 4:30PM, Monday through Friday excluding Federal Holidays.
This service is to collect water samples and analyze the collected water samples in a healthcare environment in accordance with current VA standards and directives. The contractor will demonstrate an adequate standard of care when performing the sampling and analysis of water samples by utilizing published or enunciated, peer reviewed industry appropriate standards of practice.
Sampling Requirements:
· The collection of samples will be performed in accordance with the protocol established by the laboratory used to analyze the samples and will be collected by person(s) trained/experienced/certified and knowledgeable of appropriate potable and non-portable water sampling standards of practice and laboratory sampling protocol. Samples will be stored and shipped in accordance with the laboratory sampling protocol.
· The contractor will develop an annual schedule to include the dates and times planned to perform each quarterly sampling event. The schedule will consider all federally observed holidays. The schedule will be approved by the James Haley VA Hospital point of contact.
· The contractor will confirm the dates and times of each quarterly sampling event with the James Haley VA Hospital point of contact at least two weeks prior to arrival onsite.
· The contractor will be accompanied by James Haley VA Hospital staff during the course of the sampling as necessary. The contractor will not deviate from the original provisions of the contract unless specifically.
SPECIFIC TASKS
Legionella Specific Sampling Hot and Cold Potable Water Distribution System Outlet Sampling
· The contractor will sample outlets on designated buildings (Main Campus) hot and cold water distribution system(s) for Legionella on a quarterly basis (once per Federal Fiscal Year quarter).
· The Contractor will develop a routine sampling plan utilizing appropriate standards of practice to accommodate a stratified, random sampling methodology to ensure that samples are representative of all water lines and outlets during each quarterly sampling event. In addition to the protocol to be used for identifying the random sampling locations, the sampling plan will include, but is not limited to the following content:
· The sampling plan will include a means of easily identifying each sampled location (e.g., drawing, matrix, etc.)
· The sampling plan will include a means of identifying the distribution system (i.e., hot or cold) from which the sample was collected.
· Water Samples will be randomly collected from points in the water distribution systems listed in table 1 where the end user comes in contact with the water (e.g., faucets, showers, ice machines, and drinking fountains) and will be inclusive of all water lines and outlets. Samples will be collected in the quantities listed in table 1.
· The COR shall be notified immediately (within 1 hour) of any hot water temperatures greater than 110 degrees F.
Cooling Tower System Sampling
· The Contractor will sample the cooling tower system(s) for Legionella on a quarterly basis (once per Federal Fiscal Year quarter).
· The contractor will develop a routine sampling plan utilizing appropriate standards of practice to accommodate an appropriate sampling methodology to ensure that samples are representative of the entire cooling tower system during each annual sampling event. The sampling plan will include, but is not limited to the following content and will be approved by the James Haley VA Hospital point of contact:
· The sampling plan will include a means of easily identifying each sampled location (e.g., drawing, matrix, etc.).
· The sampling plan will include a means of identifying the system from which the sample was collected.
· At a minimum, water samples will be collected from each cooling tower system at the basin or sump of the cooling tower at a location distant from the incoming make-up water.
· At the time each water sample is taken, the contractor will test and document the following for each sample: Water temperature, level of residual biocide, and pH. These water quality parameters will be tested in the field using appropriate test instruments, properly calibrated and traceable to a NIST standard.
Table No. 1 – Test Frequencies and Quantities
Main Hospital and Primary Care Annex & NPR (Dental)
| Sampled System/Area |
| Frequency |
| * Legionella Test Bundle |
| Total Heterotrophic Plate Count |
| Oxidant Residual |
| Water Quality Bundle |
| Hot Water Distribution Outlets |
| Quarterly |
| 75 |
| Cold Water Distribution Outlets |
| Quarterly |
| 75 |
| Potable Water Supply Points of Entry |
| Quarterly |
| 3 |
| 3 |
| 3 |
| Treadmill & Therapy Pool |
| Quarterly |
| 2 |
| Cooling Towers |
| Quarterly |
| 10 |
| 10 |
| 10 |
| Dental (PCA, TPA, Pasco) |
| Quarterly |
Sample Analysis
· Once collected, that contractor will have the samples processed by a testing laboratory with experience in microbial testing of potable and non-potable water.
· Analysis of water samples will be performed by a laboratory currently certified by the Centers for Disease Control and Prevention (CDC) Environmental Legionella Isolation Techniques Evaluation (ELITE) program as proficient at performing the culture of Legionella from environmental samples. Information about ELITE certified laboratories can be found at https://wwwn.cdc.gov/elite/Public/MemberList.aspx .
· In addition to the requirement for current CDC ELITE certification, the laboratory performing the analysis of water samples will have an environmental microbiology accreditation by a nationally recognized accrediting body (e.g., A2LA, NELAP).
· The laboratory will analyze each water sample for Legionella by performing the tests listed in the Legionella Test Bundle identified in table 2. The laboratory will have the capabilities of determining if the Legionella pneumophila is serogroup 1.
· When appropriate, the laboratory will concentrate water samples prior to plating the samples on selective media to increase the sensitivity of the assay. The Limit of Detection (LOD) used by the laboratory shall not be less than 0.4 CFU/ml. Example – an LOD of 0.01 CFU/ml is NOT approved at this time.
· The laboratory will neutralize biocides that have been added to the building’s potable water distribution systems prior to analysis.
· Rapid testing methods, such as polymerase chain reaction (PCR) and direct fluorescent antibody (DFA), are not permitted for the detection of Legionella in the water samples.
· The laboratory shall have the capability to store specimens in the event that molecular testing is required to investigate a possible hospital –acquired Legionella disease case.
Table 2 – Legionella Test Bundle
Temperature
Residual Oxidant pH
Legionella Serotypes - Lpn S1, Lpn S2-14, Legionella spp
Legionella Analysis Reports
· Once analyzed, the laboratory will prepare and submit an analysis report to the James Haley VA Hospital point of contact.
· The analysis report will include an enumeration of Legionella concentrations for each result above the quantification limit.
· The analysis report will include the serogroup for all results determined to be above the quantification limit.
· All quantifiable/enumerated results will be reported in CFU/ml. All results determined to be below the quantification limit will be reported as “Negative”.
· Analysis reports will be submitted via email and hard copy to the James Haley VA Hospital point of contact.
· Analysis report data in CEOSH Excel spreadsheet format shall be sent via email to James Haley VA Hospital contact.
· The laboratory will have the capability to provide access to all sampling reports and supporting data through an internet-based tool at all times.
Oxidant Residual Sampling Hot and Cold Potable Water Distribution System Outlet Sampling
· The contractor will sample outlets on each building’s hot and cold water distribution system(s) for oxidant residual on a quarterly basis (once per Federal Fiscal Year quarter).
· The contractor will develop a routine sampling plan utilizing appropriate standards of practice to accommodate a stratified, random sampling methodology to ensure that samples are representative of all water lines and outlets during each quarterly sampling event. In addition to the protocol to be used for identifying the random sampling locations, the sampling plan will include, but is not limited to the following content and will be by the James Haley VA Hospital point of contact:
· The sampling plan will include a means of easily identifying each sampled location (e.g., drawing, matrix, etc.)
· The sampling plan will include a means of identifying the distribution system (i.e., hot or cold) from which the sample was collected.
· Water samples will be randomly collected from points in the water distribution systems listed in table 1 where the end user comes in contact with the water (e.g., faucets, showers, ice machines, and drinking fountains) and will be inclusive of all water lines and outlets. Samples will be collected in the quantities listed in table 1.
· The contractor will identify the applicable oxidant for which sampling and analysis will be performed and analyze samples for that oxidant only.
Oxidant Residual Sample Analysis
· Once collected, the contractor will have the samples processed by a testing laboratory with experience in testing of potable and non-potable water.
· Analysis of water samples will be performed by a laboratory currently certified by the Florida Department of Health to perform microbiological analysis of public drinking water. The laboratory will be proficient at performing the analysis of oxidant residual using ASTM method D1253-86: Standard Test Method for Residual Chlorine in Water from environmental samples.
· In addition to the requirement for current Florida DOH certification, the laboratory performing the analysis of water samples will have an environmental microbiology accreditation by a nationally recognized accrediting body (e.g., A2LA, NELAP).
· The laboratory will analyze each water sample for oxidant residual using ASTM method D1253-86: Standard Test Method for Residual Chlorine in Water or equivalent method utilized to quantify the residual concentration of the oxidant in use.
Oxidant Residual Analysis Reports Once analyzed, the laboratory will prepare and submit an analysis report to the James Haley VA Hospital point of contact.
· The analysis report will include an enumeration of oxidant residual concentrations for each result above the quantification limit.
· All qualifiable/enumerated results will be reported in mg/L.
· All results will be compared against the following minimum oxidant residual concentrations as applicable:
1. Chlorine (as free Chlorine) – 0.5mg/L
2. Monochloramine – 0.5mg/L
3. Chlorine Dioxide – 0.3mg/L
· All sample results exceeding the defined action levels will be conspicuously identified in the analysis report
· Analysis reports will be submitted via email and hard copy to the James Haley VA Hospital point of contact.
· The laboratory will have the capability to provide access to all sampling reports and supporting data through an internet-based tool at all times.
· Oxidant residual results will be reported within 3 days (48-72 hours for analysis and 1 day for handling).
Potable Water Quality Supply Sampling
· The contractor will sample outlets on each building’s potable water supply for water quality on a quarterly basis (once per Federal Fiscal Year quarter).
· The contractor will develop a routine sampling plan utilizing appropriate standards of practice to accommodate an appropriate sampling methodology to ensure that samples are representative of incoming supply of potable water during each annual sampling event. The sampling plan will include, but is not limited to the following content and will be approved by the James Haley VA Hospital point of contact:
· The sampling plan will include a means of easily identifying the sampled location (e.g., drawing, matrix, etc.)
· The sampling plan will include a means of identifying the system from which the sample was collected.
· At a minimum, water samples will be collected from the incoming potable water supply to the buildings.
· Samples will be collected in the quantities listed in table 1.
· The temperature of each sample will be taken at the time of collection.
Potable Water Quality Analysis
· Once collected, that contractor will have the samples processed by a testing laboratory with experience in testing of potable and non-potable water.
· Analysis of water samples will be performed by a laboratory currently certified by the Florida Department of Health (DOH) to perform microbiological analysis of public drinking water. The laboratory will be proficient at performing the water quality test methods listed in table 3.
· In addition to requirement for current Florida DOH certification, the laboratory performing the analysis of water samples will have an environmental microbiology accreditation by a nationally recognized accrediting body (e.g., A2LA, NELAP).
· The laboratory will analyze each water sample for the total suspended solids, pH, and hardness using the approved test methods listed in table 3.
Potable Water Quality Analysis Reports
· Once analyzed, the laboratory will prepare and submit an analysis report to the James Haley VA Hospital point of contact.
· The analysis report will include an enumeration of water quality concentrations for each result above the quantification limit.
· All quantifiable/enumerated will be reported in the following units:
1. TSS - mg/L
2. Hardness – mg/L as CaCO3
3. pH – pH units
· All results will be compared against the following maximum and minimum drinking water quality standards as applicable. All sample results determined to be above or below the drinking water quality standards will be conspicuously identified in the analysis report.
· Water temperatures taken at the time the sample was collected will be included on the analysis report for each sample.
· Analysis reports will be submitted via email and hard copy to the James Haley VA Hospital point of contact.
· The laboratory will have the capability to provide access to all sampling reports and supporting data through an internet-based tool at all times.
· Water Quality results will be reported within 3 days (48-72 hours for analysis and 1 day for handling).
· The laboratory will have the capability to provide access to all sampling reports and supporting data through an internet-based tool at all times.
Table No. 3 – Water Quality Test Bundle
| Test |
| Acceptable Methods |
| Total Suspended Solids (TSS) |
| · EPA Method: 160.2 |
| pH |
| · Standard Method 4500H |
· EPA Method 150.1
· EPA Method 150.2
| Hardness |
| · Standard Method 2340 |
· EPA Method 130.2
Heterotrophic Plate Count Specific Sampling (Dental Water Line Sampling)
· The contractor will sample the contractor will sample Dental Water Lines for Heterotrophic Plate Count on a quarterly basis (once per Federal Fiscal Year quarter).
· Contractor will develop a routine sampling plan utilizing appropriate standards of practice to accommodate a sampling methodology to ensure that samples are representative of all water lines and outlets during each quarterly sampling event. The sampling plan will be consistent with the James Haley VA Hospital Dental Service Waterline Testing and Treatment Standard Operating Procedure.
· Dental Water Line sampling requires the manipulation of instruments and equipment. Special instructions or assistance from James Haley VA Hospital will be necessary to collect the samples appropriately and safety and in order to prevent damage to equipment.
· In addition to protocol to be used for identifying the sampling locations, the sampling plan will include, but is not limited to the following content and will be approved by the James Haley VA Hospital point of contact:
· The sampling plan will include a means of easily identifying each sampled location (e.g., drawing, matrix, etc.)
· The sampling plan will include a means of identifying the distribution system (i.e., hot or cold) from which the sample was collected.
· Samples will be collected in the quantities listed in table 1 and as defined in the James Haley VA Hospital Dental Service Waterline Testing and Treatment Standard Operating Procedure.
Heterotrophic Plate Count Sample Analysis
· Once collected, the contractor will have the samples processed by a testing laboratory with experience in microbial testing of potable and non-potable water.
· Analysis of water samples will be performed by a laboratory currently certified by the Florida Department of Health to perform microbiological analysis of public drinking water. The laboratory will be proficient at performing the analysis of Heterotrophic Plate Count (HPC) using EPA/ELAP method SM 9215C from environmental samples.
· In addition to the requirement for current Florida EPA certification, the laboratory performing the analysis of water samples will have an environmental microbiology accreditation by a nationally recognized accrediting body (e.g., A2LA, NELAP).
· The laboratory will analyze each water sample for Heterotrophic Plate Count (HPC) using EPA/ELAP method SM 9215C.
Heterotrophic Plate Count Analysis Report
· Once analyzed, the laboratory will prepare and submit an analysis report to the James Haley VA Hospital point of contact.
· The analysis report will include an enumeration of Heterotrophic Plate Count concentrations for each result above the quantification limit.
· All quantified/enumerated results will be reported in CFU/ml. All results determined to be below the quantification limit will be reported as “Negative”.
· All results will be compared against the action levels listed in the James Haley VA Hospital Dental Service Waterline Testing and Treatment Standard Operating Procedure and identify the appropriate corrective actions. All sample results exceeding the defined action levels will be conspicuously identified in the analysis report.
· Analysis reports will be submitted via email and hard copy to the James Haley VA Hospital point of contact.
· The laboratory will have the capability to provide access to all sampling reports and supporting data through an internet-based tool at all times.
· Heterotrophic Plate Count results will be reported within 3 days (48- hours for culture growth @35 degrees Celsius and 1 day for handling).
· The laboratory will have the capability to provide access to all sampling reports and supporting data through an internet-based tool at all times.
Supplemental Water Sampling In addition to the planned sampling previously identified, supplemental water sampling will be performed when determined necessary and only when authorized by the James Haley VA Hospital point of contact. The number of samples to be taken will vary depending on facility need. For the purpose of bidding, the contractor will provide a proposal that considers sampling and analysis.
Table No. 4
| Legionella Test Bundle |
| 50 |
| Total Heterotrophic Plate Count |
| 50 |
| Oxidant Residual |
| 50 |
| Bacterial Endotoxin |
| 50 |
| Temperature |
| 50 |
| pH |
| 50 |
| Hardness |
| 50 |
| Suspended Solids |
| 50 |
Healthcare Associated Legionella Disease Prevention Plan (Water Management Plan) Verification The Contractor shall perform onsite survey of the Client’s Water System(s) in Buildings 1, 30, 38, 54, 53, 68, and 100 including review of existing Water Management Plan. Based on information gathered in the site survey, the Contractor may collect hazard control profile data; locations will be determined during the site survey.
Water Management Plan documents will include:
· Executive Summary -Program Goals
· Master Document List
· Water Management Team Identification
· Water System Surveys
· Process Flow Documents
· System Analysis
· Program Controls Summary-control measures, control locations, control limits, monitoring, corrective actions
· Validation Criteria
· Validation Response Plan/Contingency Response Plan
· Verification and Validation Schedule
· Supporting Documents
· Risk Characterization Matrix COMPLIANCE. The contractor shall be fully responsible for compliance with all VA, local, state, and Federal occupational safety laws, rules, and regulations. The contractor shall follow life and safety codes and take necessary actions to avoid conditions that may be hazardous to the health and safety of hospital personnel and patients. The contractor is responsible for meeting all applicable OSHA and VA guidelines for safe working procedures; example lockout/tag out if applicable. All work for the duration of the contract shall be performed by certified trained technicians.
CONTRACTOR EMPLOYEES. Contractor personnel shall present a neat appearance and be easily recognized as contract employees.
CHANGES TO STATEMENT OF WORK. Any changes to this SOW shall be authorized and approved only through written correspondence from the CO. A copy of each change will be kept in a project folder along with all other products of the project. Costs incurred by the contractor through the actions of parties other than the CO (or designee) shall be borne by the contractor.
HOURS OF OPERATION AND SCHEDULING:
All work will be completed after “Normal” (8 am to 5 pm) business hours and on weekends National Holidays observed by the Federal Government are:
· New Year’s Day……………………………………………….…January
| · Martin Luther King’s Birthday | 3rd Monday in January |
| · President’s Day | 3rd Monday in February |
| · Memorial Day | Last Monday in May |
| · Juneteenth | June 19th |
| · Independence Day | July 4th |
| · Labor Day | 1st Monday in September |
| · Columbus Day | 2nd Monday in October |
| · Veteran’s Day | November 11th |
| · Thanksgiving Day | Last Thursday in November |
| · Christmas Day | December 25th |
Note: This includes any other day declared by the President of the United States to be a national holiday.
QUALITY ASSURANCE SURVEILLANCE PLAN (QASP)
The contractor shall be evaluated in accordance with the following QASP.
1. PURPOSE
This Quality Assurance Surveillance Plan (QASP) provides a systematic method to evaluate performance for the stated contract. This QASP explains the following:
· What shall be monitored.
· How monitoring shall take place.
· Who shall conduct the monitoring.
· How monitoring efforts and results shall be documented.
This QASP does not detail how the contractor accomplishes the work. Rather, the QASP is created with the premise that the contractor is responsible for management and quality control actions to meet the terms of the contract. It is the Government’s responsibility to be objective, fair, and consistent in evaluating performance.
This QASP is a “living document” and the Government may review and revise it on a regular basis. However, the Government shall coordinate changes with the contractor. Copies of the original QASP and revisions shall be provided to the contractor and Government officials implementing surveillance activities.
2. GOVERNMENT ROLES AND RESPONSIBILITIES
The following personnel shall oversee and coordinate surveillance activities.
Contracting Officer (CO) - The CO shall ensure performance of all necessary actions for effective contracting, ensure compliance with the contract terms, and shall safeguard the interests of the Department of Veteran Affairs (VA) in the contractual relationship. The CO shall also assure that the contractor receives impartial, fair, and equitable treatment under this contract. The CO is ultimately responsible for the final determination of the adequacy of the contractor’s performance.
Assigned Contracting Officer: Walida Moore-Saintil Contracting Officer’s Representative (COR) - The COR is responsible for technical administration of the contract and shall assure proper Government surveillance of the contractor’s performance. The COR shall keep a quality assurance file. The COR is not empowered to make any contractual commitments or to authorize any contractual changes on the Government’s behalf.
Assigned COR: James Watson and Jennifer Eakes
3. CONTRACTOR REPRESENTATIVES
The following employees of the contractor serve as the contractor’s program manager for this contract.
1. Program Manager -
2. Other Contractor Personnel -
4. PERFORMANCE STANDARDS:
Performance standards define desired services. The Government performs surveillance to determine if the contractor exceeds, meets, or does not meet these standards.
The Performance Requirements are listed below. The Government shall use these standards to determine contractor performance and shall compare contractor performance to the Acceptable Quality Level (AQL).
| ID |
| Performance Standard |
| Quality Standard |
| Method of Surveillance |
| Incentives |
| 1 |
| The contractor technician must have through knowledge and experience of water sampling established by the laboratories and applicable field analysis parameters. |
| The technician is |
knowledgeable and experienced in water sampling protocols established by the laboratories and applicable field analysis parameters.
| Direct Observation by COR/Project Manager |
| · Incentives: Favorable contactor performance evaluation |
· Disincentive: Unfavorable contractor performance evaluation
· Repeated violation may result in termination of services
| 2 |
| The contractor must complete all quarterly sampling, analysis, and report submissions within specified timeframes during the Contract Performance Period. |
| Contractor shall provide written reports on all sampling and analysis activities within 10 days of sample date. |
| Direct Observation by COR/Project Manager |
| · Incentives: Favorable contactor performance evaluation |
· Disincentive: Unfavorable contractor performance evaluation
Repeated violation may result in termination of services
| 3 |
| The contractor shall respond to all follow up (repeat) sampling requests within 48 hours of notification. |
| Contractor shall provide written reports on all sampling and analysis activities within 10 days of sample date. |
| Direct Observation by COR/Project Manager |
| · Incentives: Favorable contactor performance evaluation |
· Disincentive: Unfavorable contractor performance evaluation
Repeated violation may result in termination of services
5. INCENTIVES/DISINCENTIVES
The Government shall use favorable contractor performance evaluations as incentives. Incentives/Disincentives shall be based on exceeding, meeting, or not meeting performance standards.
6. PROCEDURES/METHODS OF QA SURVEILLANCE
Various methods exist to monitor performance. The COR shall use the surveillance methods listed below in the administration of this QASP.
a. Direct Observation. Direct observation can be performed periodically or through 100% surveillance.
b. Students complaints. Any complaint data is reviewed by the CO/COR and any validated complaints against a contractor will be further investigated.
7. RATINGS
Metrics and methods are designed to determine if performance exceeds, meets, or does not meet a given standard and acceptable quality level. A rating scale shall be used to determine a positive, neutral, or negative outcome. The following ratings shall be used:
Positive Outcome: No more than 1incident of not meeting the performance standard during the period of performance.
Neutral Outcome: No more than 3 incidents of not meeting the performance standard during the period of performance.
Negative Outcome: More than 3 incidents of not meeting the performance standard during the period of performance.
8. DOCUMENTING PERFORMANCE
a. Acceptable Performance The Government shall document positive performance. Any report may become a part of the supporting documentation for any contractual action.
b. Unacceptable performance When unacceptable performance occurs, the COR shall inform the Contracting Officer (CO). This shall normally be in writing unless circumstances necessitate verbal communication. In any case the COR shall document the discussion and place it in their respective file.
When the COR determines formal written communication is required, the COR shall prepare a Contract Discrepancy Report (CDR), and present it to the CO. The CO will in turn review and submit to the contractor’s program manager for corrective action.
The contractor shall acknowledge receipt of the CDR in writing. The CDR shall specify if the contractor is required to prepare a corrective action plan to document how the contractor shall correct the unacceptable performance and avoid a recurrence. The CDR shall also state how long after receipt the contractor has to present this corrective action plan to the COR. The Government shall review the contractor's corrective action plan to determine acceptability.
Any CDRs may become a part of the supporting documentation for any contractual action deemed necessary by the CO.
9. FREQUENCY OF MEASUREMENT
a. Frequency of Measurement.
During contract performance, the COR will periodically analyze whether the frequency of surveillance is appropriate for the work being performed.
b. Frequency of Performance Assessment Meetings.
The COR shall conduct a performance assessment meeting with the contractor if negative trends are identified, otherwise an annual performance assessment report will be completed and uploaded into the Contractor Performance Assessment Reporting System (CPARS).
10. CONFIDENTIALITY AND NONDISCLOSURE
No sensitive data will be accessed or created for this contract.
11. VA INFORMATION AND INFORMATION SYSTEM SECURITY/PRIVACY LANGUAGE
VA INFORMATION CUSTODIAL LANGUAGE:
· Contractors, contractor personnel, subcontractors, and subcontractor personnel shall be subject to the same Federal laws, regulations, standards, and VA Directives and Handbooks as VA and VA personnel regarding information and information system security.
· If VA determines that the contractor has violated any of the information confidentiality, privacy, and security provisions of the contract, it shall be sufficient grounds for VA to withhold payment to the contractor or third party or terminate the contract for default or terminate for cause under Federal Acquisition Regulation (FAR) part 12.
· A contractor/subcontractor shall request logical (technical) or physical access to VA information and VA information systems for their employees, subcontractors, and affiliates only to the extent necessary to perform the services specified in the contract, agreement, or task order.
· All contractors, subcontractors, and third-party servicers and associates working with VA information are subject to the same investigative requirements as those of VA appointees or employees who have access to the same types of information. The level and process of background security investigations for contractors must be in accordance with VA Directive and Handbook 0710, Personnel Suitability and Security Program. The Office for Operations, Security, and Preparedness is responsible for these policies and procedures.
SECURITY INCIDENT INVESTIGATION:
· The term “security incident” means an event that has, or could have, resulted in unauthorized access to, loss or damage to VA assets, or sensitive information, or an action that breaches VA security procedures. The contractor/subcontractor shall immediately notify the COR and simultaneously, the designated ISO and Privacy Officer for the contract of any known or suspected security/privacy incidents, or any unauthorized disclosure of sensitive information, including that contained in system(s) to which the contractor/subcontractor has access.
· To the extent known by the contractor/subcontractor, the contractor/subcontractor’s notice to VA shall identify the information involved, the circumstances surrounding the incident (including to whom, how, when, and where the VA information or assets were placed at risk or compromised), and any other information that the contractor/subcontractor considers relevant.
· With respect to unsecured protected health information, the business associate is deemed to have discovered a data breach when the business associate knew or should have known of a breach of such information. Upon discovery, the business associate must notify the covered entity of the breach. Notifications need to be made in accordance with the executed business associate agreement.
· In instances of theft or break-in or other criminal activity, the contractor/subcontractor must concurrently report the incident to the appropriate law enforcement entity (or entities) of jurisdiction, including the VA OIG and Security and Law Enforcement. The contractor, its employees, and its subcontractors and their employees shall cooperate with VA and any law enforcement authority responsible for the investigation and prosecution of any possible criminal law violation(s) associated with any incident. The contractor/subcontractor shall cooperate with VA in any civil litigation to recover VA information, obtain monetary or other compensation from a third party for damages arising from any incident, or obtain injunctive relief against any third party arising from, or related to, the incident.
LIQUIDATED DAMAGES FOR DATA BREACH:
· Consistent with the requirements of 38 U.S.C. §5725, a contract may require access to sensitive personal information. If so, the contractor is liable to VA for liquidated damages in the event of a data breach or privacy incident involving any SPI the contractor/subcontractor processes or maintains under this contract.
· The contractor/subcontractor shall provide notice to VA of a “security incident” as set forth in the Security Incident Investigation section above. Upon such notification, VA must secure from a non-Department entity or the VA Office of Inspector General an independent risk analysis of the data breach to determine the level of risk associated with the data breach for the potential misuse of any sensitive personal information involved in the data breach. The term 'data breach' means the loss, theft, or other unauthorized access, or any access other than that incidental to the scope of employment, to data containing sensitive personal information, in electronic or printed form, that results in the potential compromise of the confidentiality or integrity of the data. Contractor shall fully cooperate with the entity performing the risk analysis. Failure to cooperate may be deemed a material breach and grounds for contract termination.
SECURITY CONTROLS COMPLIANCE TESTING:
On a periodic basis, VA, including the Office of Inspector General, reserves the right to evaluate any or all the security controls and privacy practices implemented by the contractor under the clauses contained within the contract. With 10 working-days’ notice, at the request of the government, the contractor must fully cooperate and assist in a government- sponsored security controls assessment at each location wherein VA information is processed or stored, or information systems are developed, operated, maintained, or used on behalf of VA, including those initiated by the Office of Inspector General. The government may conduct a security control assessment on shorter notice (to include unannounced assessments) as determined by VA in the event of a security incident or at any other time.
12. RECORDS MANAGEMENT LANGUAGE FOR CONTRACTS
RECORDS MANAGEMENT OBLIGATIONS
A. Applicability This clause applies to all Contractors whose employees create, work with, or otherwise handle Federal records, as defined in Section B, regardless of the medium in which the record exists.
B. Definitions “Federal record” as defined in 44 U.S.C. § 3301, includes all recorded information, regardless of form or characteristics, made or received by a Federal agency under Federal law or in connection with the transaction of public business and preserved or appropriate for preservation by that agency or its legitimate successor as evidence of the organization, functions, policies, decisions, procedures, operations, or other activities of the United States Government or because of the informational value of data in them.
The term Federal record:
· includes [Agency] records.
· does not include personal materials.
· applies to records created, received, or maintained by Contractors pursuant to their [Agency] contract.
· may include deliverables and documentation associated with deliverables.
C. Requirements
1. Contractor shall comply with all applicable records management laws and regulations, as well as National Archives and Records Administration (NARA) records policies, including but not limited to the Federal Records Act (44 U.S.C. chs.
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .