36C24826Q0899 0001.docx
DOCX document 19 KB Posted
- Attached to
- 6515--C-Arm Imaging Table Federal contract opportunity
- Solicitation number
- 36C24826Q0899
About this file
This file is an Amendment of Solicitation/Modification of Contract (Standard Form 30) issued by the Department of Veterans Affairs Network Contracting Office 8 (NCO 8) on July 13, 2026, for solicitation number 36C24826Q0899. The amendment serves solely to issue Questions and Answers clarifications with no changes to the terms and conditions of the underlying solicitation. The contracting officer is Moneque Rodriguez.
The Questions and Answers address five key specifications for the C-Arm Imaging Table requirement at C.W. Bill Young VA Medical Center in Bay Pines, Florida: (1) a 4-motion table (MPN: STI-SL-4) is required with a matching facial cut-out filler pad; (2) only the standard handheld controller is sufficient, not a motorized foot-pedal control interface; (3) delivery is FOB Destination to Warehouse 110 dock only, without white glove inside delivery or final placement services; (4) the contractor is not responsible for crating material disposal; and (5) the standard manufacturer's warranty covering 4 years on structural elements and 1 year on electrical components for STI tables is fully compliant and no extended warranty is required.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| 36C24826Q0899.docx | DOCX document |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
5. PROJECT NUMBER (if applicable)
CODE
7. ADMINISTERED BY
2. AMENDMENT/MODIFICATION NUMBER
CODE
6. ISSUED BY
8. NAME AND ADDRESS OF CONTRACTOR
4. REQUISITION/PURCHASE REQ. NUMBER
3. EFFECTIVE DATE
9A. AMENDMENT OF SOLICITATION NUMBER
9B. DATED
PAGE OF PAGES
10A. MODIFICATION OF CONTRACT/ORDER NUMBER
10B. DATED
BPA NO.
1. CONTRACT ID CODE
FACILITY CODE
CODE
Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods:
The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers
E. IMPORTANT:
is extended,
(a) By completing Items 8 and 15, and returning __________ copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted; or (c) By separate letter or electronic communication which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY is not extended.
12. ACCOUNTING AND APPROPRIATION DATA
(REV. 11/2016)
is required to sign this document and return ___________ copies to the issuing office.
is not, A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT ORDER NO. IN ITEM 10A.
15C. DATE SIGNED
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).
RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by letter or electronic communication, provided each letter or electronic communication makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER
Contractor
16C. DATE SIGNED
14. DESCRIPTION OF AMENDMENT/MODIFICATION
16B. UNITED STATES OF AMERICA
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15A. NAME AND TITLE OF SIGNER
16A. NAME AND TITLE OF CONTRACTING OFFICER
15B. CONTRACTOR/OFFEROR
STANDARD FORM 30
PREVIOUS EDITION NOT USABLE
Prescribed by GSA - FAR (48 CFR) 53.243 (Type or print) (Type or print) (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
(Number, street, county, State and ZIP Code) (If other than Item 6) (Specify type of modification and authority) (such as changes in paying office, appropriation date, etc.)
(If required)
(SEE ITEM 11)
(SEE ITEM 13)
(X)
CHECK
ONE
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS,
IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
(Signature of person authorized to sign) (Signature of Contracting Officer) 07-13-2026 516-26-3-213-0253 36C248 Department of Veterans Affairs Network Contracting Office 8 (NCO 8) 10,000 Bay Pines Blvd Bay Pines
FL
33744 36C248 Department of Veterans Affairs Network Contracting Office 8 (NCO 8) C.W. Bill Young VA Medical Center 10000 Bay Pines Blvd.
Bay Pines
FL
33744 To all Offerors/Bidders
36C24826Q0899 07-08-2026
X X X 516-3660160-213-820100-3131 010040175 The purpose of this amendment is to issue Questions and Answers only. See Page 2 of this amendment.
There are no changes to the terms and conditions of this solicitation.
Moneque Rodriguez Contracting Officer Questions and Answers
1. Could the government please clarify whether a 2-motion table or a 4-motion table (MPN: STI-SL-4) is required to meet the minimum needs of the clinic?
4 motion and they require the table to include a matching facial cut-out filler pad.
2. Does the VA require both the handheld controller and a motorized foot-pedal control interface, or is the standard handheld controller sufficient?
The standard handheld controller is sufficient.
3. Is the contractor responsible solely for FOB Destination Dock Delivery to Warehouse 110, or does the customer require "White Glove" inside delivery, uncrating, and final placement within the active procedural clinic?
Delivery to the dock since the table will need to be tagged, inspected and coordinated for current table removal and replacement.
4. If inside delivery or assembly staging is required, will the contractor be responsible for the immediate haul-away and disposal of all crating material, or will the facility handle pallet disposal via the warehouse docks?
N/A
5. Will the standard manufacturer's warranty (which natively covers 4 years on structural elements and 1 year on electrical components for STI tables) be fully compliant, or does the VA require a specialized, extended comprehensive warranty built into the line-item pricing?
Standard manufacturer's warranty.
The purpose of this amendment is to issue Questions and Answers only. See Page 2 of this amendment.
File details come from the government source that posted it. Updated .