36C24826Q0700_1.docx
DOCX document 141 KB Posted
- Solicitation number
- 36C24826Q0700
About this file
This is a Solicitation/Contract/Order (SF 1449) for commercial products and services issued by the Department of Veterans Affairs, Veterans Health Administration, Network Contracting Office 8 (NCO 8) for the Lee County VA Health Care Clinic in Cape Coral, Florida. The solicitation number is 36C24826Q0700, with an offer due date of June 29, 2026 at 2:00 PM EDT and an effective contract period from July 10, 2026 through December 30, 2026. This is a small business set-aside (100% designated for small business) for the procurement and installation of 40 new exterior impact glass panels to replace existing broken and damaged panels in the facility's curtain wall system. The work must be completed within 60 days of glass panel production and receipt, with the entire contract duration not to exceed 180 days from award. The contractor is responsible for all removal of existing panels, material disposal, surface preparation, new panel installation, and building restoration, as well as providing all labor, equipment, materials, supervision, insurance, and weekly/daily progress reports during the project.
The contract specification requires impact-resistant glass panels meeting Florida hurricane code requirements with specific construction details: 5/16" blue-green fully tempered glass, VRE-59 #2 edge deletion, 7/16" airspace with argon fill, 1/2" black silicone sightline, and 1/4" clear heat-strengthened glass. The contractor must conduct measurements and verification, engage the glass manufacturer, provide a 12"x12" sample for color and construction acceptance, coordinate with a VA Contracting Officer's Representative (COR), obtain background security checks for all personnel, and maintain workers' compensation and liability insurance. Work is scheduled during normal business hours (Monday-Friday, 8:00 AM to 6:00 PM EST) with after-hours work requiring seven days' notice and COR approval. A mandatory site visit is scheduled for June 22, 2026 at 9:00 AM at the facility location. The contract incorporates FAR clauses for commercial products and services, includes provisions addressing security prohibitions, DEI compliance, insurance requirements, subcontracting limitations (50% for services), and electronic payment processing through SAM with invoicing submitted in arrears upon completion and acceptance of all services.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| RFQ Amend 36C24826Q0700 0001.pdf | ||
| RFQ 36C24826Q0700_1.pdf | ||
| East End Windows.pdf | ||
| W1.pdf | ||
| RFQ 36C24826Q0700_1.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
36C24826Q0700
PAGE 1 OF
1. REQUISITION NO.
2. CONTRACT NO.
3. AWARD/EFFECTIVE DATE
4. ORDER NO.
5. SOLICITATION NUMBER
6. SOLICITATION ISSUE DATE
a. NAME
b. TELEPHONE NO. (No Collect Calls)
8. OFFER DUE DATE/LOCAL
TIME
9. ISSUED BY
CODE
10. THIS ACQUISITION IS
UNRESTRICTED OR
SET ASIDE:
% FOR:
SMALL BUSINESS
HUBZONE SMALL
BUSINESS
SERVICE-DISABLED
VETERAN-OWNED
SMALL BUSINESS
WOMEN-OWNED SMALL BUSINESS
(WOSB) ELIGIBLE UNDER THE WOMEN-OWNED
SMALL BUSINESS PROGRAM
EDWOSB
8(A)
NAICS:
SIZE STANDARD:
11. DELIVERY FOR FOB DESTINA-
TION UNLESS BLOCK IS
MARKED
SEE SCHEDULE
12. DISCOUNT TERMS
13a. THIS CONTRACT IS A
RATED ORDER UNDER
DPAS (15 CFR 700)
13b. RATING
14. METHOD OF SOLICITATION
RFQ
IFB
RFP
15. DELIVER TO
CODE
16. ADMINISTERED BY
CODE
17a. CONTRACTOR/OFFEROR
CODE
FACILITY CODE
18a. PAYMENT WILL BE MADE BY
CODE
TELEPHONE NO.
UEI:
EFT:
PHONE:
FAX:
17b. CHECK IF REMITTANCE IS DIFFERENT AND PUT SUCH ADDRESS IN OFFER 18b. SUBMIT INVOICES TO ADDRESS SHOWN IN BLOCK 18a UNLESS BLOCK BELOW IS CHECKED
SEE ADDENDUM
19.
20.
21.
22.
23.
24.
ITEM NO.
SCHEDULE OF SUPPLIES/SERVICES
QUANTITY
UNIT
UNIT PRICE
AMOUNT
(Use Reverse and/or Attach Additional Sheets as Necessary)
25. ACCOUNTING AND APPROPRIATION DATA
26. TOTAL AWARD AMOUNT (For Govt. Use Only) 27a. SOLICITATION INCORPORATES BY REFERENCE FAR 52.212-1, 52.212-4. FAR 52.212-3 AND 52.212-5 ARE ATTACHED. ADDENDA
ARE
ARE NOT ATTACHED.
27b. CONTRACT/PURCHASE ORDER INCORPORATES BY REFERENCE FAR 52.212-4. FAR 52.212-5 IS ATTACHED. ADDENDA
ARE
ARE NOT ATTACHED
28. CONTRACTOR IS REQUIRED TO SIGN THIS DOCUMENT AND RETURN _______________
29. AWARD OF CONTRACT: REF. ___________________________________ OFFER
COPIES TO ISSUING OFFICE. CONTRACTOR AGREES TO FURNISH AND
DATED ________________________________. YOUR OFFER ON SOLICITATION
DELIVER ALL ITEMS SET FORTH OR OTHERWISE IDENTIFIED ABOVE AND ON ANY
(BLOCK 5), INCLUDING ANY ADDITIONS OR CHANGES WHICH ARE
ADDITIONAL SHEETS SUBJECT TO THE TERMS AND CONDITIONS SPECIFIED
SET FORTH HEREIN IS ACCEPTED AS TO ITEMS:
30a. SIGNATURE OF OFFEROR/CONTRACTOR 31a. UNITED STATES OF AMERICA (SIGNATURE OF CONTRACTING OFFICER) 30b. NAME AND TITLE OF SIGNER (TYPE OR PRINT) 30c. DATE SIGNED 31b. NAME OF CONTRACTING OFFICER (TYPE OR PRINT) 31c. DATE SIGNED
AUTHORIZED FOR LOCAL REPRODUCTION
(REV. NOV 2021)
PREVIOUS EDITION IS NOT USABLE
Prescribed by GSA - FAR (48 CFR) 53.212
7. FOR SOLICITATION
INFORMATION CALL:
STANDARD FORM 1449
SOLICITATION/CONTRACT/ORDER FOR COMMERCIAL PRODUCTS AND COMMERCIAL SERVICES
OFFEROR TO COMPLETE BLOCKS 12, 17, 23, 24, & 30
36C24826Q0700 06-04-2026 Michael A Shook 813 927 7566 06-29-2026 14:00
EDT
36C248 Department of Veterans Affairs Network Contracting Office 8 (NCO 8) 10,000 Bay Pines Blvd Bay Pines
FL
33744 X X Y 238150 750 Employees Net 30 Days N/A X
MCC: 90D
Department Of Veteran Affairs Lee County (VA) Health Care Clinic Warehouse 2489 Diplomat Pkwy E.
Cape Coral
FL
33909 36C248 Department of Veterans Affairs Network Contracting Office 8 (NCO 8) C.W. Bill Young VA Medical Center 10000 Bay Pines Blvd.
Bay Pines
FL
33744
Department of Veterans Affairs
FMS-VA-2(101)
Financial Services Center PO Box 149971 Austin
TX
78714-9971 See CONTINUATION Page Lee County Veterans Healthcare Center has a requirement for LCHCC Exterior Glass Panel Replacement . Please reference section 6 and 8 of this page for solicitation date and times Please complete and sign all pages in this document that require such.
See CONTINUATION Page X X One Table of Contents
| SECTION A | 1 |
| A.1 SF 1449 SOLICITATION/CONTRACT/ORDER FOR COMMERCIAL PRODUCTS AND COMMERCIAL SERVICES | 1 |
| SECTION B - CONTINUATION OF SF 1449 BLOCKS | 3 |
| B.1 CONTRACT ADMINISTRATION DATA | 3 |
| B.2 PRICE/COST SCHEDULE | 14 |
| ITEM INFORMATION | 14 |
| B.3 DELIVERY SCHEDULE | 15 |
| SECTION C - CONTRACT CLAUSES | 16 |
| C.1 52.212-4 CONTRACT TERMS AND CONDITIONS—COMMERCIAL PRODUCTS AND COMMERCIAL SERVICES (NOV 2023) | 16 |
| C.2 52.219-14 LIMITATIONS ON SUBCONTRACTING (NOV 2025) (DEVIATION) | 21 |
| C.3 52.222-90 ADDRESSING DEI DISCRIMINATION BY FEDERAL CONTRACTORS (DEVIATION APR 2026) | 23 |
| C.4 52.228-5 INSURANCE—WORK ON A GOVERNMENT INSTALLATION (JAN 1997) | 24 |
| C.5 52.240-91 SECURITY PROHIBITIONS AND EXCLUSIONS (NOV 2025) (DEVIATION) ALTERNATE I (NOV 2025) | 25 |
| C.6 52.252-2 CLAUSES INCORPORATED BY REFERENCE (FEB 1998) | 34 |
| SECTION D - CONTRACT DOCUMENTS, EXHIBITS, OR ATTACHMENTS | 36 |
| SECTION E - SOLICITATION PROVISIONS | 37 |
| E.1 52.212-1 INSTRUCTIONS TO OFFERORS—COMMERCIAL PRODUCTS AND COMMERCIAL SERVICES (SEP 2023) | 37 |
| E.2 52.212-2 EVALUATION—COMMERCIAL PRODUCTS AND COMMERCIAL SERVICES (NOV 2021) | 44 |
| E.3 52.216-1 TYPE OF CONTRACT (NOV 2025) (DEVIATION) | 44 |
| E.4 52.240-90 SECURITY PROHIBITIONS AND EXCLUSIONS REPRESENTATIONS AND CERTIFICATIONS (NOV 2025) (DEVIATION) | 45 |
| E.5 52.252-1 SOLICITATION PROVISIONS INCORPORATED BY REFERENCE (FEB 1998) | 49 |
SECTION B - CONTINUATION OF SF 1449 BLOCKS
B.1 CONTRACT ADMINISTRATION DATA
1. Contract Administration: All contract administration matters will be handled by the following individuals:
a. CONTRACTOR:
b. GOVERNMENT: Contracting Officer 36C248 Department of Veterans Affairs Network Contracting Office 8 (NCO 8)
10,000 Bay Pines Blvd Bay Pines FL 33744
2. CONTRACTOR REMITTANCE ADDRESS: All payments by the Government to the contractor will be made in accordance with:
| [X] |
| 52.232-33, Payment by Electronic Funds Transfer—System For Award Management, or |
| [] |
| 52.232-36, Payment by Third Party |
3. INVOICES: Invoices shall be submitted in arrears:
| a. Quarterly | [] |
| b. Semi-Annually | [] |
| c. Other | [X] In arrears after completion and acceptance of all services. |
4. GOVERNMENT INVOICE ADDRESS: All Invoices from the contractor shall be submitted electronically in accordance with VAAR Clause 852.232-72 Electronic Submission of Payment Requests.
ACKNOWLEDGMENT OF AMENDMENTS: The offeror acknowledges receipt of amendments to the Solicitation numbered and dated as follows:
| AMENDMENT NO |
| DATE |
Impact Glass Panel Replacement Project Lee County Health Care Clinic Cape Coral, FL
STATEMENT OF WORK
1. General: The Department of Veterans Affairs, Lee County Health Clinic (LCHC), 2489 Diplomat Parkway East, Cape Coral, FL 33909-5422, has a requirement for a non-personal services contract to procure new impact glass panels, remove existing broken and damaged impact glass panels and install new impact glass panels in the building’s curtain wall system.
A site visit will be made available for all those who want to attend (we greatly encourage attendance) prior to submitting a quote. The site visit will be conducted on the 22nd of June 2026 at 9am at The Department of Veterans Affairs, Lee County Health Clinic (LCHC), 2489 Diplomat Parkway East, Cape Coral, FL 33909. Participants for the site visit will meet with the contracting officer and the SME for the requiring service in the lobby of the main building. Parking can be difficult, please allow yourself extra time to find parking.
We will have a sign in sheet available for you to sign, the COR will stay in the lobby until 9:20 a.m. before departing for the location(s) where the work will be performed. Please check local forecast and dress accordingly for this outside site visit, the site visit will not be canceled for weather related conditions unless it becomes a safety concern.
The contractor shall provide all personnel, equipment, supplies, facilities, transportation, tools, materials, insurance required and other items necessary to remove/install 40 (forty) new impact glass panels. Glass panels are located throughout the facility. The Contractor is responsible for verifying all window measurements. The Contractor is responsible for disposal of old glass panels.
2. Window Specifications: The glass panels will be replaced with units that meet hurricane impact requirements for the area of Florida and maintain Emergency Preparedness for projectile as required by National and State Codes.
Glass unit characteristics are listed below:
a) 5/16" Blue Green (or closest match to original color), fully tempered.
b) VRE-59 #2, edge deletion
c) 7/16" airspace - mill finish, Argon filled
d) Sightline: 1/2" silicone (Black)
e) 1/4" Clear, heat strengthened
f) .045" clear PVB
3. General Requirements:
a) The Contractor shall be responsible for providing a 12”x12” glass panel product sample for color acceptance and glass panel construction acceptance.
b) The Contractor shall be responsible for measuring and verifying all glass panel sizes.
c) The Contractor shall be responsible for contracting the manufacturer of the required glass panels.
d) The Contractor shall be responsible remove of existing glass panels, gaskets, and other materials. The contractor shall be responsible legally and properly dispose of old glass and materials.
e) The Contractor shall be responsible for the preparation of surfaces for new glass panels installation.
f) The Contractor shall be responsible for installation of new glass panels and gaskets as well as sealing the windows in place.
g) The Contractor shall be responsible for establishing connections to building structure, returning the building to its constructed state.
h) The Contractor shall be responsible to supply a lift or any other (if necessary) as required for glass panel installation. The Government/VA will not furnish any equipment or materials.
i) The exterior glass panels shall meet original specifications provided.
j) All work shall be performed with limited interruption to facility.
k) Upon completion all work shall be inspected and accepted by VA.
l) The contractor is responsible for any damage caused by contractor to Government property during execution of work and will repair, at no cost, to the Government.
m) The contractor personnel shall wear attire or uniforms appropriate for accomplishment of their work and wear identifying badging or ID of the individual and/or company.
n) It is the responsibility of the contract personnel to park in the appropriate designated parking areas.
o) All work shall be conducted in a safe manner and in compliance with all applicable OSHA regulations.
p) The contractor shall always be escorted by a VA employee while performing this contract.
q) The contractor shall wear visible contractor identification, provided by the contractor, while performing this contract.
r) Smoking is not permitted within or around VA Facilities.
s) The Contractor shall be responsible for providing a weekly written progress report during glass panel ordering and glass panel manufacturing which contains manufacture name, production percentage, production issues, projected delivery date and projected installation start date.
t) The Contractor shall be responsible for providing a daily written progress report annotating issues, glass panels installed and location and next day installation schedule.
u) The Contractor shall be responsible for providing a copy of Liability insurance and a copy of Workers Compensation Insurance.
v) The Contractor owner/company principal shall be responsible for attending, in person, the VA onsite Glass Panel walk through. If Contractor is utilizing a sub-contractor, said sub-contractor shall and must be present for the walk through.
4. Performance Standard: The Government representative shall be responsible for monitoring the Contractor's performance. Performance deficiencies or poor performance identified during the term of the contract shall be documented by the Government and reported to the Contractor. Upon notification of deficiencies or poor performance, the Contractor shall be given a reasonable time to take corrective action. If determined appropriate, the Contracting Officer, Government representative and/or other VA staff members shall meet with representatives of the Contractor to review performance and resolve issues. All deficiencies or poor performance shall be documented and MUST be corrected within the timeframe specified by the Government. The Contractor shall notify the Contracting Officer and the Government representative when correction(s) have been made. If the appropriate correction is not made within the timeframe specified, the Government shall have the right to terminate the contract in its entirety. Nothing in this section is intended to modify or waive the government’s rights outlined in 52.212-4.
5. Period of Performance: All glass removal and installation shall be completed within 60 days after glass panels are produced and received by the contractor. The entire contract will be 180 days from contract award. If for any reason the scheduled time cannot be met, the contractor is required to explain why in writing to the Contracting Officer, including a firm commitment of when the work shall be completed. This notice to the CO shall cite the reasons for the delay, and the impact on the overall contract. The Contracting Officer will then review the facts and issue a response in accordance with applicable regulations.
6. HOURS OF COVERAGE: Normal hours of operation are Monday through Friday from 8:00 am to 6:00 pm EST time. After hours and weekend work will be per COR approval with 7 calendar days’ notice prior to work. All work is expected to be performed generally on normal hours of coverage unless requested or approved by the COR or his/her designer.
A. Before commencement of work, the Contractor shall confer with the VHA COR and Contracting Officer to agree on a sequence of procedures; means of access to premises and building. All work performed, including delivery of materials and equipment, shall be made with minimal interference to Government operations and personnel.
B. Federal Holidays observed by Veterans Health Administration and the Clinic is closed are:
1. Federal Holidays are as follows:
| New Year’s Day |
| Independence Day |
| Birthday of Martin Luther King, Jr. |
| Labor Day |
| Inauguration Day |
| Columbus Day |
| Washington’s Birthday |
| Veterans Day |
| Memorial Day |
| Thanksgiving Day |
| Juneteenth National Independence Day |
| Christmas Day |
For actual dates observed, see the following link:
https://www.opm.gov/policy-data-oversight/pay-leave/federal-holidays/
7. IDENTIFICATION, PARKING, NO SMOKING, & VA REGULATIONS:
The Contractor's FSEs shall wear visible badge identification issued by VAHCS Police Section at all times while on the premises of VAHCS. It is the responsibility of the Contractor to park in the appropriate designated parking areas (COR will specify). LCHCC shall not invalidate or make reimbursement for parking violations of the Contractor under any conditions.
Smoking is strictly prohibited anywhere on the Veterans Affairs Health Care Facilities, to include main facility, and any other buildings at or on the premises and in all personnel and business vehicles parked on the LCHCC campus.
Possession of weapons is prohibited inside the facility and on the exterior grounds of the facility. Enclosed containers, including tool kits, shall be subject to search. Violations of VA regulations may result in citation answerable in the United States (Federal) District Court, not a local district, state, or municipal court.
8. INFORMATION SECURITY: In accordance with Appendix A, Handbook 6500.6 Checklist blocks 7, the C&A requirements do not apply to this requirement, and Security Accreditation Package is not required. The nature of this requirement is technical; however, there is no information to be protected.
9. SECURITY BACKGROUND CHECKS: All Contractor and Subcontractor employees working on the project shall have passed a local Sheriff/Police Department, finger printing and background check prior to working at the Lee County Health Care Clinic. The Prime Contractor is responsible for each background check payment and background check results submittal to the COR.
10. POINTS OF CONTACT AND PHYSICAL LOCATION: Access to worksite shall be coordinated through COR.
Lee County (VA) Health Care Clinic Facility 2489 Diplomat Pkwy E.
Cape Coral, FL 33909
11. PERIOD OF PERFORMANCE: Commencement of work shall begin within 10 days of receipt of written Notice to Proceed (NTP) and should last no longer than a duration of 180 calendar days after date NTP is issued.
12. SUBMITTALS:
A. Contractor shall submit all required material/shop drawing submittals to the Contracting Officer representative within 10 calendar days of award, or as agreed to by the Contracting Officer for approval. No materials shall be installed prior to approval.
Approval by COR is required.
B. All material submittals and shop drawings shall have the Project Title, Project Number, and Contract number clearly indicated.
C. Material submittals and shop drawings shall be checked and signed by the Contractor’s Quality Control Manager prior to submission to the Government.
D. Submittals shall be legible and shall include all technical data needed to verify that the item meets requirements of listed specifications, and applicable codes.
E. Contractors shall utilize Material Approval Submittal (or similar template) for use as cover sheet when submitting to Government for approval. Forms shall be provided to contractor at post-award, pre-construction conference.
13. COMMENCEMENT, COMPLETION, AND PAYMENT FOR WORK:
The Contractor shall be required to commence work required at the time specified on the Notice to Proceed (NTP), execute the work, and complete the entire work not later than the completion time specified on the NTP. The time stated for completion shall include final cleanup of the premises. At the government’s option, it may choose to specify a two-stage performance period. For example, separating material lead-time from construction days can considerably decrease the length of time occupied buildings are inconvenienced by construction.
A. Before commencement of work, the Contractor shall confer with the VA COR and Contracting Office to agree on a sequence of procedures; means of access to premises and building; space for storage of materials and equipment; delivery of materials and use of approaches; use of corridors, stairways, elevators, and similar means of communications; location of partitions, eating spaces, and restrooms for the Contractor employees; and the like. Delivery of materials and equipment shall be made with minimal interference to Government operations and personnel.
B. The Contractor shall be paid monthly upon submission of proper invoices for work completed. If the performance period exceeds 30 days and a progress schedule (approved by the Government) has been submitted, partial payment(s) may be authorized. Final payment shall be withheld until all discrepancies are corrected and as-built drawings are approved by the Government.
C. The contractor shall coordinate no less than weekly progress meetings with the COR and/or Contracting Officer to discuss at a minimum; progression of work, projected progress versus actual progress, action items due from the contractor, submittals, invoicing, payroll submission and associated 1413’s, change order request, RFI’s, safety action items due from the government, and any other significant issues that require attention. The contractor also shall document the meeting minutes and forward a signed copy to the COR for concurrence of the documentation. Copies of all minutes shall be forwarded to the Contracting Officer and COR. In the event of any discrepancies, the Contracting Officer or COR shall be notified immediately for clarification. Contractor shall use the Meeting Minutes form (or similar template) provided for use at the post-award, pre-construction conference.
14. MODIFICATIONS: Modifications for this project shall be submitted to the assigned COR who shall then submit a formal request to the Contracting Officer (CO). Work, time, cost, or scope changes are not allowed to commence prior to Contracting Officer’s signed and/or written approval via fully executed Standard Form (SF) 30 modification.
15. GENERAL REQUIREMENTS FOR PRIVIACY INFORMATION:
a. Information Systems Officer, Information Protection: The contractor will not have access to VA Desktop computers, nor will they have access to online resources belonging to the government while conducting services.
b. Privacy Officer: The contractor will not have access to Patient Health Information (PHI) nor will they have the capability of accessing patient information during the services provided to the VA.
c. Records Manager: There will be no federal records created, maintained, used or dispositioned with this contract; regardless of format [paper, electronic, etc.] or mode of transmission [e-mail, fax, etc.].
16. RECORD MANAGEMENT OBLIGATIONS LANGUAGE
A. Applicability This clause applies to all Contractors whose employees create, work with, or otherwise handle Federal records, as defined in Section B, regardless of the medium in which the record exists.
B. Definitions “Federal record” as defined in 44 U.S.C. § 3301, includes all recorded information, regardless of form or characteristics, made or received by a Federal agency under Federal law or in connection with the transaction of public business and preserved or appropriate for preservation by that agency or its legitimate successor as evidence of the organization, functions, policies, decisions, procedures, operations, or other activities of the United States Government or because of the informational value of data in them.
The term Federal record: includes Bay Pines VA Healthcare System records. Does not include personal materials. Applies to records created, received, or maintained by Contractors pursuant to their Bay Pines VA Healthcare System contract. may include deliverables and documentation associated with deliverables.
C. Requirements
1. Contractor shall comply with all applicable records management laws and regulations, as well as National Archives and Records Administration (NARA) records policies, including but not limited to the Federal Records Act (44 U.S.C. chs. 21, 29, 31, 33), NARA regulations at 36 CFR Chapter XII Subchapter B, and those policies associated with the safeguarding of records covered by the Privacy Act of 1974 (5 U.S.C. 552a). These policies include the preservation of all records, regardless of form or characteristics, mode of transmission, or state of completion.
2. In accordance with 36 CFR 1222.32, all data created for Government use and delivered to, or falling under the legal control of, the Government are Federal records subject to the provisions of 44 U.S.C. chapters 21, 29, 31, and 33, the Freedom of Information Act (FOIA) (5 U.S.C. 552), as amended, and the Privacy Act of 1974 (5 U.S.C. 552a), as amended and must be managed and scheduled for disposition only as permitted by statute or regulation.
3. In accordance with 36 CFR 1222.32, Contractor shall maintain all records created for Government use or created in the course of performing the contract and/or delivered to, or under the legal control of the Government and must be managed in accordance with Federal law. Electronic records and associated metadata must be accompanied by sufficient technical documentation to permit understanding and use of the records and data.
4. Bay Pines VA Healthcare System and its contractors are responsible for preventing the alienation or unauthorized destruction of records, including all forms of mutilation. Records may not be removed from the legal custody of Bay Pines VA Healthcare System or destroyed except for in accordance with the provisions of the agency records schedules and with the written concurrence of the Head of the Contracting Activity. Willful and unlawful destruction, damage or alienation of Federal records is subject to the fines and penalties imposed by 18 U.S.C. 2701. In the event of any unlawful or accidental removal, defacing, alteration, or destruction of records, Contractor must report to Bay Pines VA Healthcare System. The agency must report promptly to NARA in accordance with 36 CFR 1230.
5. The Contractor shall immediately notify the appropriate Contracting Officer upon discovery of any inadvertent or unauthorized disclosures of information, data, documentary materials, records or equipment. Disclosure of non-public information is limited to authorized personnel with a need-to-know as described in the contract. The Contractor shall ensure that the appropriate personnel, administrative, technical, and physical safeguards are established to ensure the security and confidentiality of this information, data, documentary material, records and/or equipment is properly protected. The Contractor shall not remove material from Government facilities or systems, or facilities or systems operated or maintained on the Government’s behalf, without the express written permission of the Head of the Contracting Activity. When information, data, documentary material, records and/or equipment is no longer required, it shall be returned to Bay Pines VA Healthcare System control, or the Contractor must hold it until otherwise directed. Items returned to the Government shall be hand carried, mailed, emailed, or securely electronically transmitted to the Contracting Officer or address prescribed in the contract. Destruction of records is EXPRESSLY PROHIBITED unless in accordance with Paragraph (4).
6. The Contractor is required to obtain the Contracting Officer's approval prior to engaging in any contractual relationship (sub-contractor) in support of this contract requiring the disclosure of information, documentary material and/or records generated under, or relating to, contracts. The Contractor (and any sub-contractor) is required to abide by Government and Bay Pines VA Healthcare System guidance for protecting sensitive, proprietary information, classified, and controlled unclassified information.
7. The Contractor shall only use Government IT equipment for purposes specifically tied to or authorized by the contract and in accordance with Bay Pines VA Healthcare System policy.
8. The Contractor shall not create or maintain any records containing any non-public Bay Pines VA Healthcare System information that are not specifically tied to or authorized by the contract.
9. The Contractor shall not retain, use, sell, or disseminate copies of any deliverable that contains information covered by the Privacy Act of 1974 or that which is generally protected from public disclosure by an exemption to the Freedom of Information Act.
10. The Bay Pines VA Healthcare System owns the rights to all data and records produced as part of this contract. All deliverables under the contract are the property of the U.S. Government for which Bay Pines VA Healthcare System shall have unlimited rights to use, dispose of, or disclose such data contained therein as it determines to be in the public interest. Any Contractor rights in the data or deliverables must be identified as required by FAR 52.227-11 through FAR 52.227-20.
11. Training. All Contractor employees assigned to this contract who create, work with, or otherwise handle records are required to take [Agency]-provided records management training. The Contractor is responsible for confirming training has been completed according to agency policies, including initial training and any annual or refresher training.
Note: To the extent an agency requires contractors to complete records management training, the agency must provide the training to the contractor.] D. Flow down of requirements to subcontractors
1. The Contractor shall incorporate the substance of this clause, its terms and requirements including this paragraph, in all subcontracts under this [contract vehicle], and require written subcontractor acknowledgment of same.
2. Violation by a subcontractor of any provision set forth in this clause will be attributed to the Contractor.
VA INFORMATION AND INFORMATION SYSTEM SECURITY/PRIVACY LANGUAGE
VA INFORMATION CUSTODIAL LANGUAGE:
a. Contractors, contractor personnel, subcontractors, and subcontractor personnel shall be subject to the same Federal laws, regulations, standards, and VA Directives and Handbooks as VA and VA personnel regarding information and information system security.
b. If VA determines that the contractor has violated any of the information confidentiality, privacy, and security provisions of the contract, it shall be sufficient grounds for VA to withhold payment to the contractor or third party or terminate the contract for default or terminate for cause under Federal Acquisition Regulation (FAR) part 12.
c. A contractor/subcontractor shall request logical (technical) or physical access to VA information and VA information systems for their employees, subcontractors, and affiliates only to the extent necessary to perform the services specified in the contract, agreement, or task order.
d. All contractors, subcontractors, and third-party servicers and associates working with VA information are subject to the same investigative requirements as those of VA appointees or employees who have access to the same types of information. The level and process of background security investigations for contractors must be in accordance with VA Directive and Handbook 0710, Personnel Suitability and Security Program. The Office for Operations, Security, and Preparedness is responsible for these policies and procedures.
17. SECURITY INCIDENT INVESTIGATION:
a. The term “security incident” means an event that has, or could have, resulted in unauthorized access to, loss or damage to VA assets, or sensitive information, or an action that breaches VA security procedures. The contractor/subcontractor shall immediately notify the COR and simultaneously, the designated ISO and Privacy Officer for the contract of any known or suspected security/privacy incidents, or any unauthorized disclosure of sensitive information, including that contained in system(s) to which the contractor/subcontractor has access.
b. To the extent known by the contractor/subcontractor, the contractor/subcontractor’s notice to VA shall identify the information involved, the circumstances surrounding the incident (including to whom, how, when, and where the VA information or assets were placed at risk or compromised), and any other information that the contractor/subcontractor considers relevant.
c. With respect to unsecured protected health information, the business associate is deemed to have discovered a data breach when the business associate knew or should have known of a breach of such information. Upon discovery, the business associate must notify the covered entity of the breach. Notifications need to be made in accordance with the executed business associate agreement.
d. In instances of theft or break-in or other criminal activity, the contractor/subcontractor must concurrently report the incident to the appropriate law enforcement entity (or entities) of jurisdiction, including the VA OIG and Security and Law Enforcement. The contractor, its employees, and its subcontractors and their employees shall cooperate with VA and any law.
enforcement authority responsible for the investigation and prosecution of any possible criminal law violation(s) associated with any incident. The contractor/subcontractor shall cooperate with VA in any civil litigation to recover VA information, obtain monetary or other compensation from a third party for damages arising from any incident, or obtain injunctive relief against any third party arising from, or related to, the incident.
18. LIQUIDATED DAMAGES FOR DATA BREACH:
a. Consistent with the requirements of 38 U.S.C. §5725, a contract may require access to sensitive personal information. If so, the contractor is liable to VA for liquidated damages in the event of a data breach or privacy incident involving any SPI the contractor/subcontractor processes or maintains under this contract.
b. The contractor/subcontractor shall provide notice to VA of a “security incident” as set forth in the Security Incident Investigation section above. Upon such notification, VA must secure from a non-Department entity or the VA Office of Inspector General an independent risk analysis of the data breach to determine the level of risk associated with the data breach for the potential misuse of any sensitive personal information involved in the data breach. The term 'data breach' means the loss, theft, or other unauthorized access, or any access other than that incidental to the scope of employment, to data containing sensitive personal information, in electronic or printed form, that results in the potential compromise of the confidentiality or integrity of the data. Contractor shall fully cooperate with the entity performing the risk analysis. Failure to cooperate may be deemed a material breach and grounds for contract termination.
19. SECURITY CONTROLS COMPLIANCE TESTING: On a periodic basis, VA, including the Office of Inspector General, reserves the right to evaluate any or all of the security controls and privacy practices implemented by the contractor under the clauses contained within the contract. With 10 working-days’ notice, at the request of the government, the contractor must fully cooperate and assist in a government-sponsored security controls assessment at each location wherein VA information is processed or stored, or information systems are developed, operated, maintained, or used on behalf of VA, including those initiated by the Office of Inspector General. The government may conduct a security control assessment on shorter notice (to include unannounced assessments) as determined by VA in the event of a security incident or at any other time.
Contractor will be required to comply with physical security guidelines by either checking in with the VA Police each time they come on-site to perform contracted services or by obtaining a VA Contractor ID badge from the VA Police.
Contractor may not have access to any VA sensitive information under this contract. Contractor must be escorted at all times while performing work in sensitive areas with patient information.
Each Contractor employee must be escorted at all times by a VA employee (or)Contractor employee working on-site must complete training course “VA Privacy and Information Security Awareness and Rules of Behavior”
20. VA ACQUISITION REGULATION SOLICITATION PROVISION AND CONTRACT CLAUSE
21. ACRONYMS:
A. ABAAS - Architectural Barriers Act Accessibility Standard B. ADAAG - Americans with Disabilities Act Accessibility Guidelines.
C. AIA - American Institute of Architects' AIA D. CAC - Certified Asbestos Consultant E. CADD - Computer Aided Design and Drawing F. CO - Contracting Officer. The Federal employee who is warranted by the Government to enter into contracts on behalf of the Government and is the only person authorized to make changes to those contracts.
G. COR - Contracting Officer's Representative. Individual designated by the CO to place orders, furnish technical guidance, advice, certify invoices, and provide general supervision of the work performed under the executed contract.
H. EOSH - Environmental and Occupational Safety and Health I. EPA - Environmental Protection Agency J. FSE - Field Service Engineer K. HIPAA - Health Insurance Portability and Accountability Act of 1996 L. ICRA - Infection Control Risk Assessment M. IPRM - Information Protection Risk Management N. ILSM - Interim Life Safety Measures O. ISO - International Standards Organization P. LBVAHCS - Long Beach VA Health Care System Q. MOU - Memorandum of Understanding R. NFPA - National Fire Protection Association S. NTP - Notice to Proceed T. OEM - Original Equipment Manufacturer U. OSHA - Occupational Safety and Health Administration V. SF - Standard Form W. SME - Subject Matter Expert X. SOW – Statement of Work Y. TIL – Technical Information Library Z. TWA - Time-Weighted Average AA. VA – Veteran Affairs AB. VAHCS – Veteran Affairs Health Care System AC. VHA - Veterans Health Administration
(END OF SOW)
B.2 PRICE/COST SCHEDULE
ITEM INFORMATION
| ITEM NUMBER |
| DESCRIPTION OF SUPPLIES/SERVICES |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| AMOUNT |
| 1.00 |
| JB |
| __________________ |
| __________________ |
PROVIDE ALL PARTS, LABOR, EQUIPMENT, MATERIALS, SUPERVISION TO REMOVE AND INSTALL FOURTY (40) NEW EXTERIOR IMPACT GLASS PANELS AT THE LEE COUNTY VA MEDICAL CENTER IN ACCORDANCE WITH THE STATEMENT OF WORK Contract Period: Base POP Begin: 07-10-2026 POP End: 12-30-2026 PRINCIPAL NAICS CODE: 332321 - Metal Window and Door Manufacturing PRODUCT/SERVICE CODE: 9340 - Glass Fabricated Materials
| GRAND TOTAL |
| __________________ |
B.3 DELIVERY SCHEDULE
| ITEM NUMBER |
| SHIPPING INFORMATION |
| QUANTITY |
| DELIVERY DATE |
| 0001 |
| SHIP TO: |
| Lee County VA Clinic |
2489 Diplomat Parkway East Warehouse Cape Coral, FL 33909 5422
USA
| 1.00 |
| 12-30-2026 |
| MARK FOR: |
| Michael D. Sterrett |
(239) 652-1800 20429 michael.sterrett@va.gov
| FOB: |
| DESTINATION |
Page 1 of Page 1 of
SECTION C - CONTRACT CLAUSES
C.1 52.212-4 CONTRACT TERMS AND CONDITIONS—COMMERCIAL PRODUCTS AND COMMERCIAL SERVICES (NOV 2023)
(a) Inspection/Acceptance. The Contractor shall only tender for acceptance those items that conform to the requirements of this contract. The Government reserves the right to inspect or test any supplies or services that have been tendered for acceptance. The Government may require repair or replacement of nonconforming supplies or reperformance of nonconforming services at no increase in contract price. If repair/replacement or reperformance will not correct the defects or is not possible, the Government may seek an equitable price reduction or adequate consideration for acceptance of nonconforming supplies or services. The Government must exercise its post-acceptance rights—
(1) Within a reasonable time after the defect was discovered or should have been discovered; and
(2) Before any substantial change occurs in the condition of the item, unless the change is due to the defect in the item.
(b) Assignment. The Contractor or its assignee may assign its rights to receive payment due as a result of performance of this contract to a bank, trust company, or other financing institution, including any Federal lending agency in accordance with the Assignment of Claims Act (31 U.S.C. 3727). However, when a third party makes payment (e.g., use of the Governmentwide commercial purchase card), the Contractor may not assign its rights to receive payment under this contract.
(c) Changes. Changes in the terms and conditions of this contract may be made only by written agreement of the parties.
(d) Disputes. This contract is subject to 41 U.S.C. chapter 71, Contract Disputes. Failure of the parties to this contract to reach agreement on any request for equitable adjustment, claim, appeal or action arising under or relating to this contract shall be a dispute to be resolved in accordance with the clause at Federal Acquisition Regulation (FAR) 52.233-1, Disputes, which is incorporated herein by reference. The Contractor shall proceed diligently with performance of this contract, pending final resolution of any dispute arising under the contract.
(e) Definitions. The clause at FAR 52.202-1, Definitions, is incorporated herein by reference.
(f) Excusable delays. The Contractor shall be liable for default unless nonperformance is caused by an occurrence beyond the reasonable control of the Contractor and without its fault or negligence such as, acts of God or the public enemy, acts of the Government in either its sovereign or contractual capacity, fires, floods, epidemics, quarantine restrictions, strikes, unusually severe weather, and delays of common carriers. The Contractor shall notify the Contracting Officer in writing as soon as it is reasonably possible after the commencement of any excusable delay, setting forth the full particulars in connection therewith, shall remedy such occurrence with all reasonable dispatch, and shall promptly give written notice to the Contracting Officer of the cessation of such occurrence.
(g) Invoice.
(1) The Contractor shall submit an original invoice and three copies (or electronic invoice, if authorized) to the address designated in the contract to receive invoices. An invoice must include—
(i) Name and address of the Contractor;
(ii) Invoice date and number;
(iii) Contract number, line item number and, if applicable, the order number;
(iv) Description, quantity, unit of measure, unit price and extended price of the items delivered;
(v) Shipping number and date of shipment, including the bill of lading number and weight of shipment if shipped on Government bill of lading;
(vi) Terms of any discount for prompt payment offered;
(vii) Name and address of official to whom payment is to be sent;
(viii) Name, title, and phone number of person to notify in event of defective invoice; and
(ix) Taxpayer Identification Number (TIN). The Contractor shall include its TIN on the invoice only if required elsewhere in this contract.
(x) Electronic funds transfer (EFT) banking information.
(A) The Contractor shall include EFT banking information on the invoice only if required elsewhere in this contract.
(B) If EFT banking information is not required to be on the invoice, in order for the invoice to be a proper invoice, the Contractor shall have submitted correct EFT banking information in accordance with the applicable solicitation provision, contract clause (e.g., 52.232-33, Payment by Electronic Funds Transfer—System for Award Management, or 52.232-34, Payment by Electronic Funds Transfer—Other Than System for Award Management), or applicable agency procedures.
(C) EFT banking information is not required if the Government waived the requirement to pay by EFT.
(2) Invoices will be handled in accordance with the Prompt Payment Act (31 U.S.C. 3903) and Office of Management and Budget (OMB) prompt payment regulations at 5 CFR part 1315.
(h) Patent indemnity. The Contractor shall indemnify the Government and its officers, employees and agents against liability, including costs, for actual or alleged direct or contributory infringement of, or inducement to infringe, any United States or foreign patent, trademark or copyright, arising out of the performance of this contract, provided the Contractor is reasonably notified of such claims and proceedings.
(i) Payment.—
(1) Items accepted. Payment shall be made for items accepted by the Government that have been delivered to the delivery destinations set forth in this contract.
(2) Prompt payment. The Government will make payment in accordance with the Prompt Payment Act (31 U.S.C. 3903) and prompt payment regulations at 5 CFR part 1315.
(3) Electronic Funds Transfer (EFT). If the Government makes payment by EFT, see 52.212-5(b) for the appropriate EFT clause.
(4) Discount. In connection with any discount offered for early payment, time shall be computed from the date of the invoice. For the purpose of computing the discount earned, payment shall be considered to have been made on the date which appears on the payment check or the specified payment date if an electronic funds transfer payment is made.
(5) Overpayments. If the Contractor becomes aware of a duplicate contract financing or invoice payment or that the Government has otherwise overpaid on a contract financing or invoice payment, the Contractor shall—
(i) Remit the overpayment amount to the payment office cited in the contract along with a description of the overpayment including the—
(A) Circumstances of the overpayment (e.g., duplicate payment, erroneous payment, liquidation errors, date(s) of overpayment);
(B) Affected contract number and delivery order number, if applicable;
(C) Affected line item or subline item, if applicable; and
(D) Contractor point of contact.
(ii) Provide a copy of the remittance and supporting documentation to the Contracting Officer.
(6) Interest.
(i) All amounts that become payable by the Contractor to the Government under this contract shall bear simple interest from the date due until paid unless paid within 30 days of becoming due. The interest rate shall be the interest rate established by the Secretary of the Treasury as provided in 41 U.S.C. 7109, which is applicable to the period in which the amount becomes due, as provided in (i)(6)(v) of this clause, and then at the rate applicable for each six-month period as fixed by the Secretary until the amount is paid.
(ii) The Government may issue a demand for payment to the Contractor upon finding a debt is due under the contract.
(iii) Final decisions. The Contracting Officer will issue a final decision as required by 33.211 if—
(A) The Contracting Officer and the Contractor are unable to reach agreement on the existence or amount of a debt within 30 days;
(B) The Contractor fails to liquidate a debt previously demanded by the Contracting Officer within the timeline specified in the demand for payment unless the amounts were not repaid because the Contractor has requested an installment payment agreement; or
(C) The Contractor requests a deferment of collection on a debt previously demanded by the Contracting Officer (see 32.607-2).
(iv) If a demand for payment was previously issued for the debt, the demand for payment included in the final decision shall identify the same due date as the original demand for payment.
(v) Amounts shall be due at the earliest of the following dates:
(A) The date fixed under this contract.
(B) The date of the first written demand for payment, including any demand for payment resulting from a default termination.
(vi) The interest charge shall be computed for the actual number of calendar days involved beginning on the due date and ending on—
(A) The date on which the designated office receives payment from the Contractor;
(B) The date of issuance of a Government check to the Contractor from which an amount otherwise payable has been withheld as a credit against the contract debt; or
(C) The date on which an amount withheld and applied to the contract debt would otherwise have become payable to the Contractor.
(vii) The interest charge made under this clause may be reduced under the procedures prescribed in FAR 32.608-2 in effect on the date of this contract.
(j) Risk of loss. Unless the contract specifically provides otherwise, risk of loss or damage to the supplies provided under this contract shall remain with the Contractor until, and shall pass to the Government upon:
(1) Delivery of the supplies to a carrier, if transportation is f.o.b. origin; or
(2) Delivery of the supplies to the Government at the destination specified in the contract, if transportation is f.o.b. destination.
(k) Taxes. The contract price includes all applicable Federal, State, and local taxes and duties.
(l) Termination for the Government's convenience. The Government reserves the right to terminate this contract, or any part hereof, for its sole convenience. In the event of such termination, the Contractor shall immediately stop all work hereunder and shall immediately cause any and all of its suppliers and subcontractors to cease work. Subject to the terms of this contract, the Contractor shall be paid a percentage of the contract price reflecting the percentage of the work performed prior to the notice of termination, plus reasonable charges the Contractor can demonstrate to the satisfaction of the Government using its standard record keeping system, have resulted from the termination. The Contractor shall not be required to comply with the cost accounting standards or contract cost principles for this purpose. This paragraph does not give the Government any right to audit the Contractor's records. The Contractor shall not be paid for any work performed or costs incurred which reasonably could have been avoided.
(m) Termination for cause. The Government may terminate this contract, or any part hereof, for cause in the event of any default by the Contractor, or if the Contractor fails to comply with any contract terms and conditions, or fails to provide the Government, upon request, with adequate assurances of future performance. In the event of termination for cause, the Government shall not be liable to the Contractor for any amount for supplies or services not accepted, and the Contractor shall be liable to the Government for any and all rights and remedies provided by law. If it is determined that the Government improperly terminated this contract for default, such termination shall be deemed a termination for convenience.
(n) Title. Unless specified elsewhere in this contract, title to items furnished under this contract shall pass to the Government upon acceptance, regardless of when or where the Government takes physical possession.
(o) Warranty. The Contractor warrants and implies that the items delivered hereunder are merchantable and fit for use for the particular purpose described in this contract.
(p) Limitation of liability. Except as otherwise provided by an express warranty, the Contractor will not be liable to the Government for consequential damages resulting from any defect or deficiencies in accepted items.
(q) Other compliances. The Contractor shall comply with all applicable Federal, State and local laws, executive orders, rules and regulations applicable to its performance under this contract.
(r) Compliance with laws unique to Government contracts. The Contractor agrees to comply with 31 U.S.C. 1352 relating to limitations on the use of appropriated funds to influence certain Federal contracts; 18 U.S.C. 431 relating to officials not to benefit; 40 U.S.C. chapter 37, Contract Work Hours and Safety Standards; 41 U.S.C. chapter 87, Kickbacks; 49 U.S.C. 40118, Fly American; and 41 U.S.C. chapter 21 relating to procurement integrity.
(s) Order of precedence. Any inconsistencies in this solicitation or contract shall be resolved by giving precedence in the following order:
(1) The schedule of supplies/services.
(2) The Assignments, Disputes, Payments, Invoice, Other Compliances, Compliance with Laws Unique to Government Contracts, and Unauthorized Obligations paragraphs of this clause;
(3) The clause at 52.212-5.
(4) Addenda to this solicitation or contract, including any license agreements for computer software.
(5) Solicitation provisions if this is a solicitation.
(6) Other paragraphs of this clause.
(7) The Standard Form 1449.
(8) Other documents, exhibits, and attachments
(9) The specification.
(t) [Reserved]
(u) Unauthorized Obligations.
(1) Except as stated in paragraph (u)(2) of this clause, when any supply or service acquired under this contract is subject to any End User License…