This file is a set of construction drawings and general notes for a renovation project at a Department of Veterans Affairs facility.
The project involves the renovation of the ground floor halls and walls at James A. Haley VA Hospital, located at 13000 Bruce B. Downs Boulevard, Tampa, Florida. The scope of work includes replacement of flooring, ceilings, doors, hardware, light fixtures, crash rails, handrails, drinking fountains, and miscellaneous elements directly related to hallways, encompassing architectural, mechanical, plumbing, and electrical work. The project is identified as contract number 673-21-153 and is dated September 20, 2024. The design team includes AESUS Design Group and MPE Engineers as the architect and consultants.
The drawings establish comprehensive requirements for contractor performance, including phasing plans that must maintain continuous hospital operations during construction, infection control risk assessment protocols, and coordination with the VA Contracting Officer. The contractor is responsible for all demolition, removal of hazardous materials (including asbestos, lead-based paint, and PCBs), temporary construction barriers, and protection of existing utilities and equipment. Work must comply with applicable codes including the 2020 Florida Building Code, NFPA 101 Life Safety Code, and OSHA standards. The contractor must submit a detailed construction schedule, coordinate utility shutdowns with advance notice, perform work during standard day shift hours unless approved otherwise, and maintain the facility in operational condition throughout construction. The drawings include detailed symbol legends, abbreviations, general notes, and specifications for demolition, new construction, finishes, equipment installation, and hazardous materials handling.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| 07 673-21-153_HallsAndWalls_Specs.pdf | ||
| 36C24826Q0451.docx | DOCX document |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
DX
A3-301
X
XX
X
DETAIL FLAG NUMBER
DOOR NUMBER
AE-501
BUILDING SECTION CUT
OTHER SECTION CUT
SHEET WHERE APPEARS (TYPICAL)
AE-301
AA
SHEET WHERE APPEARS
ELEVATION NUMBER
SHEET WHERE APPEARS
xxxx
EXISTING COLUMN CENTER LINEA
X
WINDOW TAG
AE-301
AA
AE-301
AA
ELEVATION NUMBER
AE-710
4 2
DASHED LINE
AROUND
AREA DETAILED
PLAN OR DETAIL NUMBERX
Approved: Associate Director
Approved: Chief Facilities Management
Approved: Manager / Engineer
Approved: Director
Approved: Union representative
Approved: Safety Officer
EQ-X
CPT1
W-X
E
EA EACH
E EAST
EWC ELECTRIC WATER COOLER
ELEC ELECTRIC (AL)
EL ELEVATION
ELEV ELEVATOR
EMER EMERGENCY
ENGR ENGINEER
EQ EQUAL
EQUIP EQUIPMENT
EXIST EXISTING
ETR EXISTING TO REMAIN
EXP EXPANSION
EXP BT EXPANSION BOLT
EJ EXPANSION JOINT
EXP EXPOSED
EXT EXTERIOR
EIFS EXTERIOR INSULATION AND
FINISH SYSTEM
F
FWC FABRIC WALL COVERING
FT FEET, FOOT
FGL FIBERGLASS
FIN FINISH
FIN GR FINISH GRADE
FDV FIRE DEPARTMENT VALVE
FE FIRE EXTINGUISHER
FEC FIRE EXTINGUISHER
CABINET
FHC FIRE HOSE CABINET
FP FIREPROOF
FIXT FIXTURE
FLASH FLASHING
FLEX FLEXIBLE
FLR FLOOR
FD FLOOR DRAIN
FLUOR FLUORESCENT
FTG FOOTING
FDTN FOUNDATION
FRMG FRAMING
FURN FURNACE, FURNITURE
G
GA GAGE
GALV GALVANIZED
GC GENERAL CONTRACTOR
GEN GENERATOR
GL GLASS
GL BLK GLASS BLOCK
GB GRAB BAR
GR GRADE
GRAN GRANITE
GFCI GROUND FAULT CIRCUIT INTERRUPTER
GUT GUTTER
GYP BD GYPSUM BOARD
H
HNDRL HANDRAIL
HDW HARDWARE
HDWD HARDWOOD
HD HEAD
HVAC HEATING, VENTILATING, AIR CONDITIONING
HT HEIGHT
HPT HIGH POINT
HC HOLLOW CORE
HM HOLLOW METAL
HORIZ HORIZONTAL
HB HOSE BIBB
HOSP HOSPITAL
HR HOUR
I
IN INCH
INFO INFORMATION
ID INSIDE DIAMETER
INSUL INSULATED,INSULATION
INT INTERIOR
J
JAN JANITOR
JT JOINT
K
KPL KICKPLATE
KIT KITCHEN
KB KNEE BRACE
L
LAB LABORATORY
LAM LAMINATE
LC LAUNDRY CHUTE
LV LAVATORY
LT LIGHT
LD LINEAR DIFFUSER
L CL LINEN CLOSET
LL LIVE LOAD
LLV LONG LEG VERTICAL
LPT LOW POINT
M
MACH MACHINE
MH MANHOLE
MFD MANUFACTURED
MFR MANUFACTURER
MRB MARBLE BASE
MRF MARBLE FLOOR
MKR BD MARKER BOARD
MO MASONRY OPENING
MATL MATERIAL
MAX MAXIMUM
MECH MECHANICAL
MED MEDICAL
MC MEDICINE CABINET
MEMB MEMBRANE
MTL METAL
MIN MINIMUM, MINUTE
MISC MISCELLANEOUS
MOD MODIFIED
MLDG MOLDING
N
NAT FIN NATURAL FINISH
NOM NOMINAL
N NORTH
NA NOT APPLICABLE
NIC NOT IN CONTRACT
NTS NOT TO SCALE
NO NUMBER
O
OFF OFFICE
OC ON CENTER
OPNG OPENING
OPP OPPOSITE
OPH OPPOSITE HAND
ORCH ORCHESTRA
ORN ORNAMENTAL
OD OUTSIDE DIAMETER
OH OVERHANG, OVERHEAD
OF/CI OWNER FURNISHED/
CONTRACTOR INSTALLED
O OXYGEN
P
P PAINT
PR PAIR
PNL PANEL
PTD PAPER TOWEL DISPENSER
PTN PARTITION
PERF PERFORATED
PC PIECE
PLAM PLASTIC LAMINATE
PLAS PLASTIC, PLASTER
PSF POUNDS PER SQUARE FOOT
PSI POUNDS PER SQUARE INCH
PCC PRECAST CONCRETE
PREFAB PREFABRICATE
PREFIN PREFINISH
PROD PRODUCTION
Q
QTY QUANTITY
QT QUARRY TILE
A
AFF ABOVE FINISHED FLOOR
ACST ACOUSTIC (AL)
ACT ACOUSTICAL CEILING TILE
APC ACOUSTICAL PANEL CEILING
AWP ACOUSTICAL WALL PANEL
AWT ACOUSTICAL WALL
ADJ ADJUSTABLE
A/C AIR CONDITIONING
AHU AIR HANDLING UNIT
ALT ALTERNATE
ALUM ALUMINUM
AB ANCHOR BOLT
AL ANGLE
APPROX APPROXIMATE
ARCH ARCHITECT (URAL)
ASPH ASPHALT
ASSY ASSEMBLY
AUTO AUTOMATIC
AWN AWNING
B
BALC BALCONY
BSMT BASEMENT
BM BEAM, BENCHMARK
BR BEDROOM
BLKG BLOCKING
BD BOARD
BOT BOTTOM
BRKT BRACKET
BRK BRICK
B CL BROOM CLOSET
BLDG BUILDING
BLT IN BUILT-IN
BUR BUILT-UP ROOFING
C
CAB CABINET
CPT CARPET
CSMT CASEMENT
CI CAST IRON
CB CATCH BASIN
CLG CEILING
CEM CEMENT
CL CENTER LINE
CER CERAMIC
CT CERAMIC TILE
CO CLEANOUT, CASED OPENING
CLR CLEAR, COLOR
CLO CLOSET
COL COLUMN
CMPST COMPOSITE
CONC CONCRETE
CMU CONCRETE MASONRY UNIT
CONSTR CONSTRUCTION
CONT CONTINUOUS
CONTR CONTRACTOR
COTR CONTRACTING OFFICER
CJ CONTROL JOINT
COP COPING
CU COPPER
CG CORNER GUARD
CORR CORRIDOR
CNTR COUNTER
CSK COUNTER SUNK
D
DMPF DAMPPROOFING
DL DEAD LOAD
DEMO DEMOLITION
DET DETAIL
DIA DIAMETER
DIFF DIFFUSER
DIM DIMENSION
DR DOOR, DRAIN
DH DOUBLE HUNG
DN DOWN
DS DOWNSPOUT
DWR DRAWER
DWG DRAWING
DF DRINKING FOUNTAIN
DUPL DUPLICATE
R
R RADIUS, RISER
RWD REDWOOD
REF REFERENCE, REFRIGERATOR
REINF REINFORCE
REQD REQUIRED
RB RESILIENT BASE
RF RESILIENT FLOORING
RA RETURN AIR
REV REVISION
RD ROOF DRAIN
RM ROOM
RO ROUGH OPENING
RS ROUGH SAWN
S
SCHED SCHEDULE
SECT SECTION
SHTHG SHEATHING
SHT SHEET
SHV SHELVING
SIM SIMILAR
S SOUTH
SP FIN SPECIAL FINISH
SPEC SPECIFICATION
SQ SQUARE
SF SQUARE FEET
SST STAINLESS STEEL
STD STANDARD
STL STEEL
STL JST STEEL JOIST
STOR STORAGE
STRUCT STRUCTURAL
S4S SURFACED FOUR SIDES
SUSP SUSPEND
SW SWITCH
SYMM SYMMETRICAL
T
TK BD TACKBOARD
TEL TELEPHONE
TV TELEVISION
TMPD TEMPERED
TEMP TEMPORARY
TER TERRAZZO
THK THICKNESS
TPD TOILET PAPER DISPENSER
T&G TONGUE AND GROOVE
TOS TOP OF SLAB, STEEL
T TREAD
TYP TYPICAL
U
UC UNDERCUT
UNFIN UNFINISH
UNO UNLESS NOTED OTHERWISE
V
VAC VACUUM
VR VAPOR RETARDER
VNR VENEER
VP VENEER PLASTER
VIF VERIFY IN FIELD
VERT VERTICAL
VEST VESTIBULE
VCT VINYL COMPOSITION TILE
VWC VINYL WALL COVERING
W
W CAB WALL CABINETS
WC WALL COVERING, WATER CLOSET
WP WATERPROOFING, WEATHER
PROOF, WORKING POINT
WT WEIGHT
WWF WELDED WIRE FABRIC
W
WF WIDE FLANGE
WDW WINDOW
W/ WITH
W/O WITHOUT
WD WOOD
WDP WOOD PANELING
13000 Bruce B Downs Blvd
Department of Veterans Affairs
KEYED NOTE
WALL TYPE
X
X WINDOW TREATMENT TYPE
EQUIPMENT
INTERIOR FINISH TYPE
FURNITURE, FIXTURE, EQUIPMENT
CONTRACT LIMIT LINE
COLUMN CENTER LINE
NEW WALL
DEMOLITION
EXISTING WALL
NORTH
Tampa FL VA Health Care System
APPROVED FOR CONSTRUCTION
Project No: 673-21-153
Tampa, FL, 33612
DESIGN TEAM
ABBREVIATIONS OWNER
CODE REFERENCES
BUILDING CODE:
2020 FBC - INTERNATIONAL BUILDING CODE
2020 FBC - EXISTING BUILDING CODE
2020 FBC - INTERNATIONAL ENERGY CONSERVATION CODE
2020 FFPC - NFPA
ACCESSIBILITY CODE & GUIDELINES:
ABAAS & BFDG
MECHANICAL CODE:
2020 FBC - INTERNATIONAL MECHANICAL CODE
PLUMBING CODE:
2020 FBC - INTERNATIONAL PLUMBING CODE
ELECTRICAL CODE:
2020 FBC - INTERNATIONAL ELECTRICAL CODE
PROJECT DESCRIPTION
FACILITY MAP
SYMBOL LEGEND
BUILDING INFORMATION
DESCRIPTION OF BUILDING: GROUND FLOOR BUILDING 1.
GENERAL NOTES
VICINITY MAP
THIS PROJECT SCOPE SHALL INCLUDE BUT NOT BE LIMITED TO THE RENOVATION OF THE
HALL AND WALLS ON THE GROUND FLOOR OF BUILDING ONE AT THE JAMES A. HALEY VA
HOSPITAL, LOCATED AT 13000 BRUCE B. DOWNS BOULEVARD, TAMPA, FLORIDA. THE
SCOPE OF WORK INCLUDES THE REPLACEMENT OF FLOORING, CEILINGS, DOORS,
HARDWARE, LIGHT FIXTURES, CRASH RAILS, HANDRAILS, DRINKING FOUNTAINS AND
MISCELLANEOUS ELEMENTS THAT ARE DIRECTLY RELATED TO THE HALLWAYS.
THIS WORK SHALL INCLUDE BUT NOT BE LIMITED TO ARCHITECTURAL, MECHANICAL,
PLUMBING, & ELECTRICAL.
DESCRIPTIONSYMBOL
Renovate Halls and Walls on the Ground Floor - 673-21-153
James A Haley VA Hospital, Tampa, FL Department of Veterans Affairs
Architect
MPE Engineers
1050 E. Southern Ave. Suite 5, Tempe, Arizona 85282
AESUS Design Group
1050 E. Southern Ave. Suite 5, Tempe, Arizona 85282
AESUS Design Group
Orlando Gonzales (ogonzales@aesusdesign.com)
480-454-2861
David Combs (dcombs@aesusdesign.com)
480-454-2861
NORTH
PROJECT AREA
PROJECT SITE
NFPA
NFPA 101 LIFE SAFETY CODE
NFPA NATIONAL FIRE CODES
NFPA 900 (OSHA)
James A Haley VA Hospital, Tampa, FL
A. ANY CHANGES MUST BE APPROVED BY COR BEFORE DOING ANY
ADDITIONAL WORK. WORK SCHEDULE TO BE PERFORMED DURING
REGULAR DAY SHIFT HOURS (8AM-4:30PM) ANY WORK OUTSIDE OF
REGULAR SCHEDULE REQUIRES APPROVAL FROM COR.
B. COORDINATE STAGING AREA WITH COR, AND FIND INTERIOR
COVERED STORAGE ON SITE FOR MATERIALS THAT MUST BE
PROTECTED FROM ELEMENTS - COORDINATE WITH COR.
C. PERFORM WORK IN ACCORDANCE WITH VHA DIRECTIVE 2004-012
SAFETY AND HEALTH DURING CONSTRUCTION ACTIVITIES AND VHA
DIRECTIVE 7701 OCCUPATIONAL SAFETY AND HEALTH (OSH) .
D. WORK PERFORMED FOR THIS PROJECT MAY INTERRUPT SERVICE TO
ADJACENT AREAS AT TIMES BUT WILL NOT INTERRUPT OVERALL
FACILITY OPERATION. SEE ELECTRICAL FOR POWER INTERRUPTION
AND OUTAGE REQUIREMENTS.
E. CONTRACTOR TO VERIFY ALL DETAILS AGAINST EXISTING
CONDITIONS PRIOR TO PURCHASE OF EQUIPMENT AND PRIOR TO
CONSTRUCTION. CONTRACTOR IS RESPONSIBLE FOR BRINGING ANY
DISCREPANCIES IN PLANS AND EXISTING SITE CONDITIONS TO
IMMEDIATE ATTENTION OF CONTRACTING OFFICER
REPRESENTATIVE.
F. CONTRACTOR SHALL PERFORM ALL WORK AND PROVIDE ALL
MATERIALS IN ACCORDANCE WITH VA MASTER CONSTRUCTION
SPECIFICATIONS, WHICH CAN BE FOUND AT
HTTP://WWW.CFM.VA.GOV/TIL/. WHERE DISCREPANCIES ARE FOUND
THE MORE STRINGENT SHALL APPLY.
G. NOT ALL KEYNOTES ARE ON ALL SHEETS.
1050 E. Southern Ave, Suite #D, Tempe, Arizona 85282, (480) 751-9542designgroup
Architecture, Engineering, and Sustainable Design
AESUS
Drawing Title: Project Title:
Date
Location
Checked
Building Number:
Project Number:
Drawing Number:
Drawn
CONSULTANTS: ARCHITECT/ENGINEERS: Office of Construction and Facilities Management
AE RENOVATE GROUND FLOOR
HALLS AND WALLS
Location:
Sept 20, 2024 o n e e ig h th in c h o n e fo o t
B
A
C
D
E
F th re e in c h e s o n e fo o t o n e a n d o n e h a lf in c h e s o n e fo o t o n e in c h o n e fo o t th re e q u a rt e rs in c h o n e fo o t o n e h a lf in c h o n e fo o t th re e e ig h th s in c h o n e fo o t o n e q u a rt e r in c h o n e fo o t
VA FORM
08-6231
1 2 3 4 5 6 87 9
F
E
D
C
B
A
97 8654321
673-21-153
JAMES A. HALEY VA HOSPITAL
13000 BRUCE B. DOWNS BLVD. TAMPA, FL, 33612
AESUS
B45
VA FORM
08-6231
Final Submittal
AESUS
GI.001
COVER SHEET
ICRA INFECTION CONTROL RISK ASSESSMENT
Revision DATE
09.20.2024
ISSUED SHEETS
Sheet Number Sheet Name
GENERAL
GI.001 COVER SHEET
GI.002 SHEET INDEX
GI.003 GENERAL NOTES
GI.004 GENERAL NOTES
GI.005 ICRA NOTES
GI.006 ICRA AND TEMPORARY SINAGE DETAILS
ARCHITECTURAL
AS.100 OVERALL FLOOR PLAN
AS.200 OVERALL PHASING PLANS
AD.200 FLOOR PLAN DEMO WING A
AD.201 FLOOR PLAN DEMO WING B
AD.202 FLOOR PLAN DEMO WING C
AD.203 FLOOR PLAN DEMO WING D
AD.204 FLOOR PLAN DEMO WING E
AD.301 RCP DEMO WING A
AD.302 RCP DEMO WING B
AD.303 RCP DEMO WING C
AD.304 RCP DEMO WING D
AD.305 RCP DEMO WING E
AD.400 INTERIOR ELEVATIONS WING A DEMO
AD.401 INTERIOR ELEVATIONS WING A DEMO
AD.402 INTERIOR ELEVATIONS WING A DEMO
AD.410 INTERIOR ELEVATIONS WING B DEMO
AD.411 INTERIOR ELEVATIONS WING B DEMO
AD.420 INTERIOR ELEVATIONS WING C DEMO
AD.430 INTERIOR ELEVATIONS WING D DEMO
AD.431 INTERIOR ELEVATIONS WING D DEMO
AD.432 INTERIOR ELEVATIONS WING D DEMO
AD.440 INTERIOR ELEVATIONS WING E DEMO
AE.201 FLOOR PLAN WING A
AE.202 FLOOR PLAN WING B
AE.203 FLOOR PLAN WING C
AE.204 FLOOR PLAN WING D
AE.205 FLOOR PLAN WING E
AC.301 RCP WING A
AC.302 RCP WING B
AC.303 RCP WING C
AC.304 RCP WING D
AC.305 RCP WING E
AE.400 INTERIOR ELEVATIONS WING A
AE.401 INTERIOR ELEVATIONS WING A
AE.402 INTERIOR ELEVATIONS WING A
AE.410 INTERIOR ELEVATIONS WING B
AE.411 INTERIOR ELEVATIONS WING B
AE.420 INTERIOR ELEVATIONS WING C
AE.430 INTERIOR ELEVATIONS WING D
AE.431 INTERIOR ELEVATIONS WING D
AE.432 INTERIOR ELEVATIONS WING D
AE.440 INTERIOR ELEVATIONS WING E
AE.501 CEILING DETAILS
AE.524 LOCKERS, ACCESSORIES, WALL PROT, EQUIP, FLOORING
TRANSITION DETAILS
AE.531 DOOR, SAFETY GLAZING AND LOUVER INFORMATION
AI.101 FINISH MATERIALS
AI.102 ROOM FINISH LEGEND AND SCHEDULE
AI.103 FLOOR FINISH PLAN WING A
AI.104 FLOOR FINISH PLAN WING B
AI.105 FLOOR FINISH PLAN WING C
AI.106 FLOOR FINISH PLAN WING D
AI.107 FLOOR FINISH PLAN WING E
AI.108 WALL FINISH PLAN WING A
AI.109 WALL FINISH PLAN WING B
AI.110 WALL FINISH PLAN WING C
AI.111 WALL FINISH PLAN WING D
AI.112 WALL FINISH PLAN WING E
MECHANICAL
M001 MECHANICAL SYMBOLS, ABBREVIATIONS & SCHEDULES
MD201 MECHANICAL LEVEL 01 DEMO WING A
MD202 MECHANICAL LEVEL 01 DEMO WING B
MD203 MECHANICAL LEVEL 01 DEMO WING C
MD204 MECHANICAL LEVEL 01 DEMO WING D
MD205 MECHANICAL LEVEL 01 DEMO WING E
M201 MECHANICAL LEVEL 01 WING A
M202 MECHANICAL LEVEL 01 WING B
M203 MECHANICAL LEVEL 01 WING C
M204 MECHANICAL LEVEL 01 WING D
M205 MECHANICAL LEVEL 01 WING E
PLUMBING
P001 PLUMBING SYMBOLS & ABBREVIATIONS
P201 PLUMBING LEVEL 01 WING A
P202 PLUMBING LEVEL 01 WING B
P203 PLUMBING LEVEL 01 WING C
P204 PLUMBING LEVEL 01 WING D
P205 PLUMBING LEVEL 01 WING E
FIRE PROTECTION
F201 FIRE PROTECTION LEVEL 01 WING A
F202 FIRE PROTECTION LEVEL 01 WING B
F203 FIRE PROTECTION LEVEL 01 WING C
F204 FIRE PROTECTION LEVEL 01 WING D
F205 FIRE PROTECTION LEVEL 01 WING E
ELECTRICAL
E.000 SYMBOLS AND ABBREVIATIONS
ED.101 ELECTRICAL DEMOLITION - OVERALL
ED.101A ELECTRICAL DEMO PLAN - AREA A
ED.101B ELECTRICAL DEMO PLAN - AREA B
ED.101C ELECTRICAL DEMO PLAN - AREA C
ED.101D ELECTRICAL DEMO PLAN - AREA D
ED.101E ELECTRICAL DEMO PLAN - AREA E
EP.101 ELECTRICAL POWER PLAN - OVERALL
EP.101A ELECTRICAL POWER PLAN - AREA A
EP.101B ELECTRICAL POWER PLAN - AREA B
EP.101C ELECTRICAL POWER PLAN - AREA C
EP.101D ELECTRICAL POWER PLAN - AREA D
EP.101E ELECTRICAL POWER PLAN - AREA E
EL.101 ELECTRICAL LIGHTING PLAN - OVERALL
EL.101A ELECTRICAL LIGHTING PLAN - AREA A
EL.101B ELECTRICAL LIGHTING PLAN - AREA B
EL.101C ELECTRICAL LIGHTING PLAN - AREA C
EL.101D ELECTRICAL LIGHTING PLAN - AREA D
EL.101E ELECTRICAL LIGHTING PLAN - AREA E
ELP.101 PHOTOMETRIC (NORMAL)
ELP.102 PHOTOMETRIC (LIFE SAFTEY)
HAZARDOUS MATERIALS
ASB.1 HAZARDOUS MATERIALS PLANS
ASB.2 HAZARDOUS MATERIALS PLANS
ASB.3 HAZARDOUS MATERIALS PLANS
ASB.4 HAZARDOUS MATERIALS PLANS
ASB.5 HAZARDOUS MATERIALS PLANS
ASB.6 HAZARDOUS MATERIALS PLANS
ASB.7 HAZARDOUS MATERIALS PLANS
ASB.8 HAZARDOUS MATERIALS PLANS
1050 E. Southern Ave, Suite #D, Tempe, Arizona 85282, (480) 751-9542designgroup
Architecture, Engineering, and Sustainable Design
AESUS
Drawing Title: Project Title:
Date
Location
Checked
Building Number:
Project Number:
Drawing Number:
Drawn
CONSULTANTS: ARCHITECT/ENGINEERS: Office of Construction and Facilities Management
AE RENOVATE GROUND FLOOR
HALLS AND WALLS
Location:
Sept 20, 2024 o n e e ig h th in c h o n e fo o t
B
A
C
D
E
F th re e in c h e s o n e fo o t o n e a n d o n e h a lf in c h e s o n e fo o t o n e in c h o n e fo o t th re e q u a rt e rs in c h o n e fo o t o n e h a lf in c h o n e fo o t th re e e ig h th s in c h o n e fo o t o n e q u a rt e r in c h o n e fo o t
VA FORM
08-6231
1 2 3 4 5 6 87 9
F
E
D
C
B
A
97 8654321
673-21-153
JAMES A. HALEY VA HOSPITAL
13000 BRUCE B. DOWNS BLVD. TAMPA, FL, 33612
AESUS
B45
VA FORM
08-6231
Final Submittal
AESUS
GI.002
SHEET INDEX
GENERAL
1. CONTRACTOR SHALL SUBMIT REQUEST FOR INFORMATION (RFI'S)
REGARDING ANY KNOWN DISCREPANCIES WITH THE CONTRACT
DOCUMENTS OR UNFORESEEN SITE CONDITIONS TO THE VA AND THE
ARCHITECT FOR CLARIFICATION PRIOR TO NOTICE TO PROCEED.
2. DIMENSIONS SHALL NOT BE SCALED FROM THE PLANS, SECTIONS,
ELEVATIONS OR DETAILS. ALL DRAWINGS ARE APPROXIMATE AND ARE
GIVEN FOR ESTIMATING PURPOSES.
3. THE CONTRACTOR SHALL FURNISH ALL MATERIALS, LABOR, EQUIPMENT,
TRANSPORTATION AND SERVICES NECESSARY FOR THE SATISFACTORY
COMPLETION OF THE WORK.
4. A PRE-CONSTRUCTION CONFERENCE BETWEEN THE VA COR, OTHER VA
PROJECT STAKE HOLDERS, THE ARCHITECT, AND THE CONTRACTOR WITH
ALL OF HIS MAJOR SUBCONTRACTORS SHALL BE HELD IMMEDIATELY
AFTER SIGNING OF THE OWNER-CONTRACTOR AGREEMENT AND PRIOR
TO THE START OF ANY WORK.
5. UNLESS OTHERWISE NOTED, DIMENSIONS ARE TO COLUMN CENTERLINE,
FACE OF FINISH PARTITION, FACE OF MASONRY WALLS AND FACE OF
EXISTING WALLS.
6. ALL CUTTING AND PATCHING SHALL BE DONE BY THE GENERAL
CONTRACTOR AS OUTLINED IN THE GENERAL CONDITIONS OF THE
SPECIFICATIONS. PATCHES IN FINISH SURFACES SHALL MATCH THE
ADJACENT SURFACES IN MATERIAL, FINISH AND QUALITY.
7. ALL SOUND RATED WALLS OR PARTITIONS SHALL EXTEND TO THE
UNDERSIDE OF THE STRUCTURE OR DECK ABOVE UNLESS OTHERWISE
NOTED. THESE PARTITIONS SHALL BE ENTIRELY SEALED OFF WITH
CLOSURE GASKETS AND/OR ACOUSTICAL SEALANT AT BOTTOM, TOP,
SIDES AND ANT OTHER ABUTMENT WHERE A SOUND LEAK WOULD
OTHERWISE OCCUR. ALL PENETRATIONS SUCH AS PIPING, CONDUITS,
DUCTS, ETC., IN SUCH PARTITIONS SHALL BE PACKED AND SEALED ALONG
THE PERIMETER OF THE PENETRATION.
8. DUE TO MANUFACTURER'S VARIATION WITH SIZE OF EQUIPMENT,
CASEWORK, PLUMBING FIXTURES, ETC., ALL DIMENSIONS REFERRING TO
THE SPACE WHERE SUCH ITEMS ARE BUILT-IN SHALL BE VERIFIED WITH
THE ITEM SUPPLIED.
9. GENERAL CONTRACTOR AND THE SUBCONTRACTORS THAT ARE A
SERVICE PROVIDER TO THE VETERANS AND VETERAN AFFAIRS
HEALTHCARE ARE TO WEAR APPROPRIATE ATTIRE, I.E. CLEAN CLOTHING
IN THE COMMON AREA EXCLUDING THE WORK AREA.
10. CUTTING OF HOLES THROUGH CONCRETE SHALL BE BY DIAMOND CORE
DRILL OR PNEUMATIC HAMMER. IMPACT ELECTRIC MANUAL HAMMER TYPE
DRILLS WILL NOT BE ALLOWED.
11. JACKHAMMER NO HEAVIER THAN 70 LBS SHALL BE USED WHEN REMOVING
LIGHT-WEIGHT LATEX MASTIC CONCRETE TOPPINGS.
12. CONTRACTOR TO PROVIDE COLOR COPIES OF MARKED-UP RECORD SET
PLANS TO VA CONTRACTING OFFICER UPON PROJECT COMPLETION.
13. SPECIAL TOOLS: IF ANY PART OF EQUIPMENT FURNISHED UNDER THIS
CONTRACT REQUIRES SPECIAL TOOLS FOR MAINTENANCE, ADJUSTMENT,
SETTINGS OR DISASSEMBLY/REASSEMBLY, THESE TOOLS SHALL BE
FURNISHED WITH EQUIPMENT AS A STANDARD ACCESSORY.
14. THE CONTRACTOR SHALL TAKE FIELD MEASUREMENTS AND VERIFY FIELD
CONDITIONS WITH THE CONTRACT DOCUMENTS BEFORE COMMENCING
ACTIVITIES. THE CONTRACTOR SHALL VERIFY AND RELATIVE TO THE
SURROUNDING CONSTRUCTION. PRIOR TO SUBMISSION OF BIDS, THE VA
CONTRACTING OFFICER AND D.O.R. SHALL BE NOTIFIED IN WRITING OF
ANY CONFLICTS, ERRORS OR OMISSIONS. NO ADDITIONAL CHARGES BY
CONTRACTOR SHALL BE ALLOWED FOR DISCREPANCIES BETWEEN
EXISTING CONDITIONS AND NEW CONSTRUCTION THAT COULD HAVE BEEN
IDENTIFIED DURING EXAMINATION.
15. CONTRACTOR TO PATCH AND REPAIR ALL WALLS, FLOORS, CEILINGS AND
OTHER ITEMS DAMAGED DURING CONSTRUCTION TO MATCH
EXISTING/INTENDED FUNCTIONS AND CONDITIONS.
16. CONTRACTOR TO LOCATE ALL "V.A. RETAINED" MATERIAL TO THE
LOCATION DIRECTED BY VA CONTRACTING OFFICER; VA CONTRACTING
OFFICER WILL COORDINATE WITH CONTRACTOR.
17. ALL MATERIAL NOT IDENTIFIED AS "V.A. RETAINED" IS TO BE REMOVED
FROM THE WORK AREA BY CONTRACTOR.
18. REMOVE AND RELOCATE OR REROUTE ANY UTILITIES WHICH PRESENT AN
OBSTRUCTION TO GENERAL CONSTRUCTION FOR THIS PROJECT. PRIOR
TO REMOVAL REPORT FINDINGS TO COR.
19. PROVIDE SEISMIC SUPPORT & BRACING TO ALL UTILITIES & GENERAL
CONSTRUCTION IN PROJECT.
20. UTILITIES SHALL BE RUN CONCEALED EXCEPT IN UNFINISHED AREAS.
21. ALL PENETRATIONS THROUGH FLOORS AND SMOKE BARRIERS SHALL BE
TIGHTLY SEALED AND FIRE-STOPPED. ANY EXISTING CORE CUTS ARE TO
BE FILLED WITH SIMILAR MATERIAL USING 12- GAUGE BACKING PLATE.
22. CONTRACTOR TO MAINTAIN EXISTING CORRIDOR RATINGS DURING
CONSTRUCTION.
23. CONTRACTOR TO PROVIDE 5/8" TYPE "X" GYP. BOARD INTERIOR
TEMPORARY WALL SEPARATING OCCUPIED SPACES FROM PROJECT
AREA(S). BARRIER TO BE AIR-TIGHT FLOOR TO CEILING WITH SECURED
OPENING. FOR EXTERIOR, CONTRACTOR TO PROVIDE 5/8" FIRE-RATED
DENSGLASS FOR TEMPORARY WALL SEPARATING OCCUPIED SPACES
FROM PROJECT AREA(S). PROVIDE WALK- OFF\ MATS AT INTERIOR ENTRY
TO PROJECT AREA.
24. PROVIDE 6" SOUND-ATTENUATING BLANKET OVER ALL ROOMS EXCEPT
WAITING AREAS, CORRIDORS AND ROOMS WITH HARD GYPSUM BOARD
LIDS. PROVIDE 6" SOUND-ATTENUATING BLANKET OVER CONFERENCE
ROOMS. ALL WALLS SHALL HAVE SOUND BATTS ACHIEVING MINIMUM
STC-44. THE ENCLOSURE IN THE INTERSTITIAL SPACE SHALL BE STC-45.
CAULK AND SEAL ALL WALL PENETRATIONS, AND SEAL EDGES OF GYPSUM
BOARD.
25. SPRAY FIREPROOFING ON ALL STRUCTURAL STEEL MEMBERS
ACCORDING TO FIREPROOFING IBC TABLE 601.
26. ALL PRODUCTS & MANUFACTURERS SHALL BE VERIFIED WITH VA COR
THROUGH SUBMITTAL PROCESS.
27. THE GENERAL CONTRACTOR & ALL SUBCONTRACTORS SHALL CAREFULLY
& THOROUGHLY EXAMINE THE PROJECT SITE, FIELD VERIFY ALL
CONDITIONS, GRADES, ELEVATIONS & DIMENSIONS OF THE VARIOUS
FEATURES OF THE EXISTING SITE CONDITIONS. ANY DISCREPANCIES &/OR
CONDITIONS NEEDING CLARIFICATION SHALL BE REPORTED IMMEDIATELY
TO THE VA COR BEFORE BEGINNING WORK.
28. THE GENERAL CONTRACTOR & ALL SUBCONTRACTORS SHALL BE SOLELY
RESPONSIBLE FOR THE ENFORCEMENT OF ALL REQUIREMENTS &
REGULATIONS & SHALL PERFORM ALL WORK ON THIS PROJECT IN
COMPLIANCE WITH O.S.H.A., ALL LOCAL, STATE AND FEDERAL SAFETY AND
HEALTH STANDARDS, LAWS AND REGULATIONS. ALL CONSTRUCTION
FABRICATION & INSTALLATIONS SHALL CONFORM TO THE LATEST
ADOPTED EDITIONS OF FEDERAL, STATE AND LOCAL CODES,
REGULATIONS & ORDINANCES OF THE GOVERNING AGENCY HAVING
JURISDICTION OVER THE PROJECT.
29. DUE TO THE REPROGRAPHICS PROCESS, THESE PLANS MAY NOT BE
ACCURATE TO SCALE. ALL DIMENSIONS SHALL TAKE PRECEDENCE OVER
THE SCALE SHOWN & IN NO CASE SHALL WORKING DIMENSIONS BE
SCALED FROM THE PLANS, SECTIONS, ELEVATIONS OR DETAILS.
30. ALL PROPERTY LINES, EASEMENTS AND BUILDINGS, BOTH EXISTING AND
PROPOSED, THAT HAVE BEEN DIVULGED TO THE ARCHITECT, ARE SHOWN
ON THE SITE PLAN.
GENERAL CONTINUED
31. THE STRUCTURAL, MECHANICAL, PLUMBING & ELECTRICAL DRAWINGS
ARE
SUPPLEMENTARY TO THE ARCHITECTURAL DRAWINGS. SHOULD THERE
BE
ANY DISCREPANCY BETWEEN THE VARIOUS DRAWINGS, IT SHALL BE
BROUGHT TO THE ARCHITECT'S ATTENTION FOR CLARIFICATION.
32. THE CONTRACTOR SHALL CONSULT THE ELECTRICAL, MECHANICAL, &
PLUMBING DRAWINGS FOR LOCATION OF ALL ROUGH OPENINGS
THROUGH
WALLS & FLOOR SLABS & NOTIFY THE ARCHITECT OF ANY ITEMS THAT DO
NOT CONFORM WITH THE INTENT INDICATED ON THESE DRAWINGS.
33. THE CONTRACTOR SHALL COORDINATE WITH THE VA'S REPRESENTATIVE
FOR INSTALLATION OF ANY SPECIAL EQUIPMENT NOT SHOWN IN THESE
DRAWINGS. THE CONTRACTOR SHALL VERIFY EQUIPMENT LOCATIONS
WITH THE VA'S REPRESENTATIVE AND/OR EQUIPMENT MANUFACTURER
FOR PROPER SIZE AND LOCATION OF FOUNDATION OR SLAB
DEPRESSIONS, DRAINS, AND WARPS..
34. THE CONTRACTOR SHALL TAKE ALL NECESSARY PRECAUTIONS TO
LOCATE & PROTECT ANY UNDERGROUND OR CONCEALED CONDUIT,
PLUMBING, OR OTHER UTILITIES WHERE NEW WORK IS BEING
PERFORMED.
35. LARGER SCALE DETAILS GOVERN OVER SMALLER SCALE DETAILS.
36. THE CONTRACTOR SHALL COMPLY WITH SAFETY RESTRICTIONS AS
REQUIRED FOR WORKERS AND PEDESTRIAN PROTECTION DURING THE
ENTIRE CONSTRUCTION PROCESS.
37. RUBBISH AND DEBRIS RESULTING FROM THE WORK OF VARIOUS TRADES
SHALL BE REGULATED, COLLECTED AND REMOVED FROM THE PROJECT
SITE AND LEGALLY DISPOSED OF PRIOR TO DELIVERY OF MATERIALS TO
THE CONSTRUCTION ZONE AND AT THE END OF THE WORK SHIFT. THE
CONTRACTOR SHALL COORDINATE WITH THE VA'S REPRESENTATIVE FOR
AN ACCEPTABLE ACCESS ROUTE AND TIME. UNDER NO CIRCUMSTANCES
SHALL THE CONTRACTOR, HIS SUBCONTRACTORS, OR ANY OF THEIR
EMPLOYEES USE ANY AREA OUTSIDE THE CONSTRUCTION ZONE WITHOUT
PRIOR CLEARANCE FROM THE VA'S REPRESENTATIVE.
38. ANY REVISION OR ADDITIONAL WORK REQUIRED DUE TO FIELD
CONDITIONS OR LOCAL GOVERNING AUTHORITIES SHALL BE BROUGHT TO
THE ATTENTION OF THE ARCHITECT AND CONTRACTING OFFICER BEFORE
PROCEEDING REGARDLESS OF COST, TIME OR MATERIAL INCREASE.
39. THE CONTRACTOR SHALL BE RESPONSIBLE FOR PROTECTING ALL
FINISHES & MATERIALS, & FOR REPAIRING AND/OR REPLACING ALL ITEMS
THAT ARE DAMAGED OR SOILED DURING CONSTRUCTION AS REQUIRED
TO THE VA CONTRACTING OFFICER'S APPROVAL AT NO ADDITIONAL COST
TO THE VA.
40. ALL CONSTRUCTION SHALL BE IN ACCORDANCE WITH THE CODES LISTED
UNDER THE PROJECT DATA HEADING ON THIS SHEET. IT SHALL BE THE
CONTRACTOR'S RESPONSIBILITY TO BE FAMILIAR WITH ALL CODES AND
ORDINANCES, CITY OR STATE, AS REQUIRED FOR THE CONSTRUCTION OF
THIS PROJECT. WHERE ANY CONFLICTS OCCUR BETWEEN FEDERAL,
STATE AND LOCAL LAWS, CODES, ORDINANCES, AND REGULATIONS, THE
MOST STRINGENT SHALL GOVERN.
41. ALL MATERIALS AND WORKMANSHIP SHALL CONFORM TO THE
REQUIREMENTS OF BOTH THE VA AND FAR.
42. ALL ITEMS TO BE REMOVED AND RELOCATED SHALL BE HANDLEDWITH
PROPER CARE AND STORED IN A SAFE LOCATION TO PREVENT DAMAGE.
DAMAGED ITEMS WILL NEED TO BE REPLACED AT CONTRACTOR'S
EXPENSE.
43. THE CONTRACTOR SHALL PROVIDE WRITTEN REQUESTS FOR UTILITY
SHUTDOWNS TO THE VA'S REPRESENTATIVE AT LEAST 14 DAYS PRIOR TO
THE EVENT. WORK REQUIRING SHUTDOWNS MAY BE REQUIRED TO BE
PERFORMED OUTSIDE NORMAL WORK HOURS.
44. IF WORK ADJOINS AREAS THAT WILL BE OCCUPIED DURING
CONSTRUCTION, THE CONTRACTOR AND SUBCONTRACTORS SHALL
COOPERATE WITH THE VA TO MAINTAIN CONTINUOUS OPERATION. IF
CONFLICTS OCCUR, THE INTERESTS OF THE VA SHALL GOVERN. THE
CONTRACTOR SHALL MAKE EVERY EFFORT TO MINIMIZE THE IMPACT OF
CONSTRUCTION IN AFFECTED AREAS.
45. DUST SCREENS OF EITHER PLASTIC CURTAINS OR PLYWOOD PARTITIONS
SHALL BE MAINTAINED ADJACENT TO & SEPARATING AREAS OF
CONSTRUCTION FROM ADJOINING OCCUPIED AREAS. SCREENS SHALL
EXTEND A DISTANCE TO ALLOW WORK WITHOUT DISRUPTING THE
ADEQUATE FUNCTIONING OF THE FACILITY CIRCULATION. SCREENS SHALL
BE RELOCATED AS NECESSARY FOR EA. PHASE OF THE PROJECT.
CONTRACTOR SHALL COORDINATE WITH COR FOR THE SCREEN
LOCATIONS.
46. ALL REQUIRED EXITS FROM OCCUPIED PORTIONS OF THE BUILDING MUST
BE MAINTAINED AT ALL TIMES. THE CONTRACTOR SHALL ESTABLISH
PROCEDURES TO MINIMIZE CIRCULATION OF CONSTRUCTION PERSONNEL
AND MATERIALS THROUGH OCCUPIED PORTIONS OF THE BUILDING. THE
CONTRACTOR SHALL IMMEDIATELY CLEAN DUST AND DIRT FROM
CORRIDOR AREAS NOT PROTECTED BY DUST SCREENS.
47. STORAGE OF ALL MATERIALS, EQUIPMENT & SUPPLIES SHALL BE LIMITED
TO SCHEDULED AREAS OF WORK IN PROGRESS, OR DESIGNATED
EXTERIOR LOCATIONS APPROVED BY & ARRANGED W/ THE VA COR.
48. THE CONTRACTOR SHALL PROVIDE ALL NECESSARY BLOCKING, BACKING,
FRAMING, HANGERS OR OTHER SUPPORT FOR ALL FIXTURES, EQUIPMENT,
CASEWORK, FURNISHINGS AND ALL OTHER ITEMS AS REQUIRED,
INCLUDING BUT NOT LIMITED TO: TOWEL BARS, GRAB BARS, WINDOW
TREATMENT, TELEPHONE BACKBOARDS, WATER HEATERS, AND
CABINETRY.
49. THE GENERAL CONTRACTOR SHALL NOT MAKE ANY SUBSTITUTION OF
MATERIALS OR EQUIPMENT WITHOUT THE WRITTEN CONSENT OF THE
VA REPRESENTATIVE.
50. COMPLETED CONSTRUCTION SHALL BE CLEANED, LABELS REMOVED, &
ALL
OTHER TOUCH-UP COMPLETED TO THE SATISFACTION OF THE VA
REPRESENTATIVE PRIOR TO FINAL ACCEPTANCE.
51. WHERE PAVING, WALKS AND/OR LANDSCAPED AREAS ARE DISTURBED OR
DAMAGED DURING CONSTRUCTION, THEY SHALL BE REPAIRED OR
REPLACED TO MATCH EXISTING CONDITIONS AT CONTRACTORS EXPENSE.
52. THE GENERAL CONTRACTOR SHALL NOTIFY THE CONTRACTING OFFICER
IMMEDIATELY OF ANY SPECIFIED MATERIALS OR EQUIPMENT WHICH ARE
EITHER UNAVAILABLE OR WILL CAUSE A DELAY IN THE CONSTRUCTION
COMPLETION SCHEDULE.
53. ALL GYPSUM BOARD SURFACES, WALLS AND CEILINGS SHALL BE TAPED
AND FEATHERED SMOOTH TO RECEIVE WALL FINISH. ALL WALLS AND
CEILINGS SHALL RECEIVE A MINIMUM OF ONE COAT SEALER AND PAINT TO
COVER. WATER RESISTANT TYPE "GREEN" BOARD SHALL BE USED IN ALL
RESTROOMS, SHOWERS, AND EXTERIOR AREAS.
54. ALL SUBCONTRACTORS SHALL MAINTAIN THE PREMISES CLEAN AND FREE
FROM ALL TRASH AND DEBRIS. THE FIXTURES, EQUIPMENT, GLAZING,
FLOORS, ETC. SHALL BE LEFT CLEAN AND READY FOR EITHER THE NEXT
TRADE OR OCCUPANCY.
55. NO HAZARDOUS MATERIALS SHALL BE USED OR STORED AT THE PROJECT
SITE WHICH EXCEED THE QUANTITIES LISTED IN U.B.C. TABLE 3-D AND 3-E.
56. THE CONTRACTOR SHALL THOROUGHLY CAULK, FLASH &/OR SEAL
AROUND
ALL WALL &/OR ROOF PENETRATIONS THAT ARE MADE AS PART OF THE
CONTRACT WORK TO CREATE A WATERTIGHT CONDITION.
57. ALL EXIT DOORS ARE TO BE OPERABLE FROM THE INSIDE WITHOUT THE
USE OFA KEY OR SPECIAL KNOWLEDGE. FLUSH BOLTS OR SURFACE
BOLTS ARE PROHIBITED (ALSO APPLIES TO GATES).
58. THE MAXIMUM EFFORT REQUIRED TO OPERATE DOORS SHALL NOT
EXCEED 5 LBS. FOR EXTERIOR DOORS AND 5 LBS. FOR INTERIOR DOORS,
SUCH PULL OR PUSH EFFORT BEING APPLIED AT RIGHT ANGLES TO
HINGED DOORS, AND AT THE CENTER PLANE OF SLIDING OR FOLDING
DOORS. WHEN FIRE DOORS ARE REQUIRED, THE MAXIMUM EFFORT TO
OPERATE THE DOOR MAY BE INCREASED TO 15 LBS WHEN ALLOWED BY
AUTHORITY HAVING JURISDICTION.
GENERAL CONTINUED
61. ALL DOOR HARDWARE TO BE LEVER-TYPE AND SHALL BE INSTALLED @
3'-0" A.F.F., UNLESS OTHERWISE NOTED.
62. PROVIDE FLOOR MOUNTED STOPS, 4" MAX. FROM WALL FOR ALL DOORS
UNLESS OTHERWISE NOTED.
63. ALL PRIMARY ENTRANCES TO THE BUILDING SHALL BE ACCESSIBLE PER
NFPA 101. BUILDING ENTRANCES SHALL BE IDENTIFIED BY SIGN WITH THE
INTERNATIONAL SYMBOL OF ACCESSIBILITY, A WHITE FIGURE ON A BLUE
BACKGROUND, PER NFPA 101.
64. THE PATH OF EXIT TRAVEL SHALL BE IDENTIFIED BY EXIT SIGNS PER NFPA
101. EXIT SIGNS SHALL BE READILY VISIBLE FROM ANY DIRECTION OF
APPROACH. EXIT SIGNS SHALL BE LOCATED AS NECESSARY TO CLEARLY
INDICATE THE DIRECTION OF EXIT TRAVEL. ALL EXIT SIGNS SHALL BE
INTERNALLY ILLUMINATED WITH MINIMUM 6" HIGH LETTERS PER NFPA 101,
C.F.C. SECTION 12.108(a). THE CONTRACTOR SHALL COORDINATE
LOCATION OF ALL EXIT SIGNS WITH VA COR AND ARCHITECT PRIOR TO
INSTALLATION.
65. EACH VENT SHALL RISE VERTICALLY TO A POINT NOT LESS THAN SIX (6)
INCHES ABOVE THE FLOOD-LEVEL RIM OF THE FIXTURE SERVED BEFORE
OFFSETTING HORIZONTALLY OR BEFORE BEING CONNECTED TO ANY
OTHER VENT.
66. NO HVAC DUCTS TO HAVE A CROSS SECTIONAL AREA OF 6 SQUARE FEET
OR GREATER.
67. THE CONTRACTOR SHALL PROVIDE WITH CD / DVD ELECTRONIC COPY OF
ASBUILT. PER SECTION: 010000 1.14.
GOVERNING CODES
GENERAL: THE VA HAS ADOPTED THE LATEST EDITION OF THE FOLLOWING
CODES AND STANDARDS AS A MINIMUM FOR ALL PROJECTS PERFORMED IN THE
MODERNIZATION, ALTERATION, ADDITION, OR IMPROVEMENT OF ITS REAL
PROPERTY AND THE CONSTRUCTION OF NEXT STRUCTURES. VA DESIGN
MANUALS AND MASTER SPECIFICATIONS SPECIFY OTHER CODES AND
STANDARDS THE VA FOLLOWS ON ITS PROJECTS:
1. VA DIRECTIVES, DESIGN MANUALS, MASTER SPECIFICATIONS, VA
NATIONAL CAD STANDARD APPLICATION GUIDE AND OTHER GUIDANCE IN
THE TECHNICAL INFORMATION LIBRARY (TIL) HTTP://.CFM.VA.GOV/TIL/
2. INTERNATIONAL BUILDING CODE (IBC) INCLUDING INTERNATIONAL
MECHANICAL AND PLUMBING CODES
3. NATIONAL FIRE PROTECTION ASSOCIATION (NFPA) 101 LIFE SAFETY CODE
(SEE NOTES BELOW)
4. NFPA NATIONAL FIRE CODES Y/WITH THE EXCEPTION OF NFPA 5000 AND
NFPA 900 OCCUPATIONAL, SAFETY AND HEALTH ADMINISTRATION (OSHA
STANDARDS.
5. VA SEISMIC DESIGN REQUIREMENTS, H-- 18--8.
6. NATIONAL STANDARD PLUMBING CODE (NSPC).
7. SAFETY CODE FOR ELEVATORS AND ESCALATORS A 17. 1, PUBLISHED BY
AMERICAN SOCIETY OF MECHANICAL ENGINEERS (ASME).
8. ASME BOILER AND PRESSURE VESSEL CODE.
9. ASME CODE FOR PRESSURE PIPING.
10. UNIFORM FEDERAL ACCESSIBILITY STANDARDS (UFAS), INCLUDING VA
SUPPLEMENT BARRIER FREE DESIGN GUIDE.
11. BUILDING CODE REQUIREMENTS FOR REINFORCED CONCRETE (API 318),
PUBLISHED BY THE AMERICAN CONCRETE INSTITUTE.
12. MANUAL OF STEEL CONSTRUCTION, LOAD AND RESISTANCE FACTOR
DESIGN SPECIFICATIONS FOR STRUCTURAL STEEL BUILDINGS, PUBLISHED
BY THE AMERICAN INSTITUTE OF STEEL CONSTRUCTION (AISC).
13. ENERGY POLICY ACT OF 2005 (EPACT).
14. DOE INTERIM FINAL RULE: ENERGY CONSERVATION STANDARDS FOR NEY/
FEDERAL, COMMERCIAL AND MULTI-FAMILY HIGH-RISE RESIDENTIAL
BUILDINGS AND NEW L0W RISE RESIDENTIAL BUILDINGS,10 CFR PARTS
433, 434 AND 455.
15. FEDERAL LEADERSHIP IN HIGH PERFORMANCE AND SUSTAINABLE
BUILDINGS: MEMORANDUM OF UNDERSTANDING (MOU).
16. EXECUTIVE ORDER 13423: STRENGTHENING FEDERAL ENVIRONMENTAL,
ENERGY, TRANSPORTATION MANAGEMENT.
17. THE PROVISIONS FOR CONSTRUCTION AND SAFETY SIGNS, STATED IN
GENERAL REQUIREMENTS SECTION 01 010 OF THE VA MASTER
CONSTRUCTION SPECIFICATION.
18. VENTILATION FOR ACCEPTABLE INDOOR AIR QUALITY -- ASHRAE
STANDARD 62.1 -- 2007, PUBLISHED BY THE AMERICAN S0CIEfY OF HEX
\TING, REFRIGERATING AND AIR--CONDITIONING ENGINEERS, INC. SAFETY
STANDARD FOR REFRIGERATION SYSTEMS -- ASHRAE STANDARD 15--
2007, PUBLISHED BY THE AMERICAN SOCIETY OF HEATING,
REFRIGERATING AND AIR-- CONDITIONING ENGINEERS, INC. GREENlNG
THE GOVERNMENT THROUGH LEADERSHIP IN ENVIRONMENTAL
MANAGEMENT-EXECUTIVE ORDER 13148.
19. DESIGN GUIDE FOR HUMIDITY CONTROL IN COMMERCIAL AND
INSTITUTIONAL BUILDINGS; 2001, PUBLISHED BY THE AMERICAN SOCIETY
OF HEATING, REFRIGERATING AND AIR-CONDITIONING ENGINEERS, INC.
20. THE JOINT COMMISSION (TJC) ENVIRONMENT OF CARE EMERGENCY
MANAGEMENT AND LIFE SAFETY STANDARDS.
21. VHA NATIONAL CENTER FOR PATIENT SAFETY, DEPARTMENT OF
VETERANS AFFAIRS (MOST CURRENT ED.).
HTTPS://WWW.PATIENTSAFETY.VA.GOV/
NOTE
1. NFPA101 PRIMARILY ADDRESSES LIFE SAFETY AND FIRE PROTECTION
FEATURES WHILE THE IBC ADDRESSES A WIDE RANGE OF
CONSIDERATIONS, INCLUDING, BUT NOT LIMITED TOO STRUCTURAL
STRENGTH, STABILITY, SANITATION, ADEQUATE LIGHT AND VENTILATION,
AND ENERGY CONSERVATION. VA BUILDINGS MUST MEET THE
REQUIREMENTS OF NFPA 101 AND DOCUMENTS REFERENCED BY NFPA101
IN ORDER TO COMPLY WITH THE ACCREDITATION REQUIREMENTS OF THE
JOINT COMMISSION. THEREFORE, DESIGNS SHALL COMPLY WITH THE
REQUIREMENTS OF THE LATEST EDITION OF NFPA 101 AND DOCUMENTS
REFERENCED THEREIN. DESIGN FEATURES NOT ADDRESSED BY NFPA 101
OR DOCUMENTS REFERENCED THEREIN SHALL COMPLY WITH THE
REQUIREMENTS OF THE LATEST EDITION OF THE IBD 0R AS OTHERWISE
ADDRESSED ABOVE IN THIS PROGRAM GUIDE. FOR DESIGN FEATURES
THAT ARE ADDRESSED BY BOTH THE IBC AS Y/ELL AS NFPA 101 OR A
DOCUMENT REFERENCED BY NFPA101, THE REQUIREMENTS OF NFPA 101
0R THE DOCUMENT REFERENCED BY NFPA101 SHALL BE USED
EXCLUSIVELY (THIS APPLIES EVEN IF THE IBC REQUIREMENTS ARE
DIFFERENT).
2. CONFLICTS BETWEEN NATIONALLY RECOGNIZED CODES AND STANDARDS
AND VA REQUIREMENTS - SHOULD A CONFLICT EXIST BETWEEN VA
REQUIREMENTS AND VA ADOPTED NATIONALLY RECOGNIZED CODES AND
STANDARDS; THE CONFLICT SHALL BE BROUGHT 70 THE ATTENTION OF
THE VA. THE RESOLUTION OF CONFLICT SHALL BE MADE BY THE
AUTHORITY HAVING JURISDICTION FOR VA TO ENSURE A CONSISTENCY
SYSTEM WIDE.
SPECIFICATIONS AND DRAWINGS FOR CONSTRUCTION
1. THE DRAWINGS ARE ARRANGED BY DESIGN DESCIPLINE FOR CLARITY.
THE GENERAL CONTRACTOR IS REQUIRED TO PROVIDE ALL OF THE WORK
SHOWN ON ALL OF THE DRAWINGS UNLESS SPECIFICALLY NOTED
OTHERWISE. ARRANGEMENT IS NOT TO DIVIDE THE WORK AMONG THE
TRADES. FOR EXAMPLE A CONDIUT MAY BE REQUIRED FOR MECHANICAL
EQUIPMENT, BUT PROVIDED BY AN ELECTRICIAN.
2. THE CONTRACTING OFFICER'S INTERPRETATION OF THE DRAWINGS AND
SPECIFICATIONS WILL BE FINAL, SUBJECT TO THE DISPUTES CLAUSE.
3. LARGE SCALE DRAWINGS SUPERSEDE SMALL SCALE DRAWINGS.
4. DIMENSIONS GOVERN IN ALL CASES. SCALING OF DRAWINGS MAY BE
DONE ONLY FOR GENERAL LOCATION AND GENERAL SIZE OF ITEMS.
5. DIMENSIONS SHOWN OF EXISTING WORK AND ALL DIMENSIONS REQUIRED
FOR WORK THAT IS TO CONNECT WITH EXISTING WORK SHALL BE
VERIFIED BY THE CONTRACTOR BY ACTUAL MEASUREMENT OF THE
EXISTING WORK. ANY WORK AT VARIANCE WITH THAT SPECIFIED OR
SHOWN IN THE DRAWINGS SHALL NOT BE PERFORMED BY THE
CONTRACTOR UNTIL APPROVED IN WRITING BY THE CONTRACTING
OFFICER.
6. ALL WORK TO BE CONSIDERED NEW CONSTRUCTION UNLESS NOTED
OTHERWISE
SPECIAL INSPECTIONS REQUIRED PER IBC 2018
SEE SPECIFICATION FOR SPECIAL TESTING AND INSPECTION EQUIREMENTS.
PROJECT SCHEDULE AND PHASING OF THE WORK
1. THE CONTRACTOR SHALL SUBMIT FOR APPROVAL BY VA COR AN INTERIM
PROJECT SCHEDULE OF HIS OPERATIONS WITH INTERIM PHASING PLANS
PRIOR TO NOTICE TO PROCEED. REFER TO SPECIFICATION SECTION: 01 32
16.15.
2. AREA OF WORK TO BE FULLY ABATED AND CLEAR OF HAZARDOUS
MATERIALS BEFORE PROCEEDING WITH CONSTRUCTION.
3. THE INTENT OF THE PROJECT IS TO PERMIT THE CONTINUOUS OPERATION
OF REQUIRED ACTIVITIES AT THE VA HEALTHCARE CENTER DURING
CONSTRUCTION. AT NO TIME SHALL ANY WORK INTERFERE WITH THE VA'S
NORMAL OPERATION WITHOUT ACCEPTANCE PRIOR TO START OF
CONSTRUCTION.
4. ALL WORK TO BE COMPLETED ON A PER PHASE BASIS.
5. THE CONTRACTOR SHALL DEVELOP A SCHEDULE OF CONSTRUCTION
WHICH INCLUDES THE NECESSARY ACTIONS TO MAINTAIN THE
OPERATION OF THE ADJACENT FUNCTION (INCLUDING ON THE FLOOR
ABOVE AND BELOW) DURING THE CONSTRUCTION PROCESS.
6. THE CONTRACTOR SHALL SUBMIT FOR APPROVAL A SCHEDULE DETAILING
WORK PLANS, INCLUDING BUT NOT LIMITED TO, ACTIVATION PRIOR TO
STARTING ANY PHASE. THIS TIME SHALL BE COORDINATED WITH THE VA
COR AND BE INCLUDED IN THE OVERALL PROJECT CONSTRUCTION
SCHEDULE.
7. THE VA RESIDENT ENGINEER WILL REVIEW THE CONTRACTOR'S
SCHEDULE TO VERIFY MOST EFFICIENT TIMING OF THE CONTRACT WORK
TO AVOID CONFLICTS WITH THE CURRENT VA OPERATIONS.
8. CONTRACTOR SHOULD BE AWARE THAT IT IS POSSIBLE SCHEDULE
SIMULTANEOUS AND / OR STAGGERED SHUTDOWNS, HOWEVER EACH
WILL REQUIRE A SEPARATE IMPACT PERMIT AND WILL UNDERGO ITS OWN
DEDICATED PROCESS. AS SUCH, THERE ARE NO GUARANTEES WITH
REGARDS TO DATE OR DURATION OF THE SHUTDOWN.
9. ANY UTILITY SHUTDOWNS REQUIRED SHALL BE REVIEWED WITH THE VA
CONTRACTING OFFICER PRIOR TO PROPOSED SHUTDOWN..
10. NO DEMOLITION WILL BEGIN WITHOUT SHUTDOWN COORDINATION AND
WRITTEN AUTHORIZATION TO MOVE FORWARD FROM THE HOSPITAL
STAFF. THIS IS INTENDED TO MINIMIZE DISRUPTIONS IN AN ACTIVE
HOSPITAL, AND OUTAGES MUST BE COORDINATED AS THEY AFFECT
PATIENT CARE. FOR CLARITY: EMAIL TRAFFIC MAY BE CONSIDERED
"WRITTEN AUTHORIZATION," BUT ONLY IF IT ORIGINATES FROM A VA.GOV
EMAIL ADDRESS.
11. AS THIS IS AN ACTIVE HEALTHCARE FACILITY SEEING PATIENT ON LIFE-
SAFETYEQUIPMENT, THE CONTRACTOR UNDERSTANDS THAT IT MAY NOT
BE POSSIBLE TO WORK DURING STANDARD DUTY HOURS, AND THAT
THIRD-SHIFTLABOR IS EXPECTED IN ANY PATIENT CARE AREA SO AS TO
MINIMIZE DISRUPTION TO PATIENTS AND THE CARE THAT THEY RECEIVE.
12. UPON RECEIPT OF APPROPRIATE CONTACT INFORMATION AND
SHUTDOWN DATES, THE CONTRACTOR IS RESPONSIBLE FOR SCHEDULING
AND COORDINATING ACCESS TO AFFECTED AREAS BY WORKING WITH
THE COR AND THE VA POLICE.
SUBCONTRACTS & WORK COORDINATION
1. NOTHING CONTAINED IN THIS CONTRACT SHALL BE CONSTRUCTED AS
CREATING ANY CONTRACTUAL RELATIONSHIP BETWEEN ANY SUB
CONTRACTOR AND THE GOVERNMENT. DIVISIONS OR SECTIONS OF
SPECIFICATION S ARE NOT INTENDED TO CONTROL THE CONTRACTOR IN
DIVIDING WORK AMONG SUBCONTRACTORS, OR TO LIMIT WORK
PERFORMED BY ANY TRADE.
2. THE CONTRACTOR SHALL BE RESPONSIBLE TO THE GOVERNMENT FOR
ACTS AND OMISSIONS OF HIS/HER OWN EMPLOYEES, AND
SUBCONTRACTORS AND THEIR EMPLOYEES.THE CONTRACTOR SHALL
ALSO BE RESPONSIBLE FOR COORDINATION OF THE WORK OF THE
TRADES, SUBCONTRACTORS, AND MATERIAL SUPPLIERS.
3. THE CONTRACTOR SHALL, IN ADVANCE OF THE WORK, PREPARE
COORDINATION DRAWINGS SHOWING THE LOCATION OF OPENINGS
THROUGH SLABS, THE PIPE SLEEVES AND HANGER INSERTS, AS WELL AS
THE LOCATION AND ELEVATION OF UTILITY LINES, INCLUDING, BUT NOT
LIMITED TO, CONVEYOR SYSTEMS, PNEUMATIC TUBES, DUCTS, AND
CONDUITS AND PIPES 2 INCHES AND LARGER IN DIAMETER. THESE
DRAWINGS, INCLUDING PLANS, ELEVATIONS, AND SECTIONS AS
APPROPRIATE, SHALL CLEARLY SHOW THE MANNER IN WHICH THE
UTILITIES FIT INTO THE AVAILABLE SPACE AND RELATE TO EACH OTHER
AND TO EXISTING BUILDING ELEMENTS. DRAWINGS SHALL BE OF
APPROPRIATE SCALE TO SATISFY THE PREVIOUSLY STATED PURPOSES,
BUT NOT SMALLER THAN 3/8-INCH SCALE. DRAWINGS MAY BE COMPOSITE
(WITH DISTINCTIVE COLORS FOR THE VARIOUS TRADES) OR MAY BE
SEPARATE BUT FULLY COORDINATED DRAWINGS (SUCH AS SEPIAS OR
PHOTOGRAPHIC PAPER REPRODUCIBLE) OF THE SAME SCALE. SEPARATE
DRAWINGS SHALL DEPICT IDENTICAL BUILDING AREAS OR SECTIONS AND
SHALL BE CAPABLE OF BEING OVERLAID IN ANY COMBINATION. THE
SUBMITTED DRAWINGS FOR A GIVEN AREA OF THE PROJECT SHALL SHOW
THE WORK OF ALL TRADES THAT WILL BE INVOLVED IN THAT PARTICULAR
AREA. THE OBJECTIVES OF SUCH DRAWINGS ARE TO PROMOTE
CAREFULLY PLANNED WORK SEQUENCE AND PROPER TRADE
COORDINATION, IN ORDER TO ASSURE THE EXPEDITIOUS SOLUTIONS OF
PROBLEMS AND THE INSTALLATION OF LINES AND EQUIPMENTAS
CONTEMPLATED BY THE CONTRACT DOCUMENTS WHILE AVOIDING OR
MINIMIZING ADDITIONAL COSTS TO THE CONTRACTOR AND TO THE
GOVERNMENT. IN THE EVENT THE CONTRACTOR, IN COORDINATING THE
VARIOUS INSTALLATIONS AND IN PLANNING THE METHOD OF
INSTALLATION, FINDS A CONFLICT IN LOCATION OR ELEVATION OF ANY OF
THE UTILITIES WITH THEMSELVES, WITH STRUCTURAL ITEMS OR WITH
OTHER CONSTRUCTION ITEMS, HE/SHE SHALL BRING THIS CONFLICT TO
THE ATTENTION OF THE CONTRACTING OFFICER IMMEDIATELY. IN DOING
SO, THE CONTRACTOR SHALL EXPLAIN THE PROPOSED METHOD OF
SOLVING THE PROBLEM OR SHALL REQUEST INSTRUCTIONS AS TO HOW
TO PROCEED IF ADJUSTMENTS BEYOND THOSE OF USUAL TRADES
COORDINATION ARE NECESSARY. UTILITIES INSTALLATION WORK WILL
NOT PROCEED IN ANY AREA PRIOR TO THE SUBMISSION AND COMPLETION
OF THE GOVERNMENT REVIEW OF THE COORDINATED DRAWINGS FOR
THAT AREA, NOR IN ANY AREA IN WHICH CONFLICTS ARE DISCLOSED BY
THE COORDINATION DRAWINGS, UNTIL THE CONFLICTS HAVE BEEN
CORRECTED TO THE SATISFACTION OF THE CONTRACTING OFFICER. IT IS
THE RESPONSIBILITY OF THE CONTRACTOR TO SUBMIT THE REQUIRED
DRAWINGS IN A TIMELY MANNER CONSISTENT WITH THE REQUIREMENTS
TO COMPLETE THE WORK COVERED BY THIS CONTRACT WITHIN THE
PRESCRIBED CONTRACT TIME. SEE THE GOVERNMENT OR ITS
REPRESENTATIVES WILL NOT UNDER TAKE TO SETTLE ANY DIFFERENCES
BETWEEN THE CONTRACTOR AND SUBCONTRACTORS OR BETWEEN
SUBCONTRACTORS.
SUBCONTRACTS & WORK COORDINATION CONTINUED
4. THE GOVERNMENT RESERVES THE RIGHT TO REFUSE TO PERMIT
EMPLOYMENT ON THE WORK OR REQUIRE DISMISSAL FROM THE WORK
OF ANY SUBCONTRACTOR WHO, BY REASON OF PREVIOUS
UNSATISFACTORY WORK ON DEPARTMENT OF VETERANS AFFAIRS
PROJECTS OR FOR ANY OTHER REASON, IS CONSIDERED BY THE
CONTRACTING OFFICER TO BE INCOMPETENT OR OTHER WISE
OBJECTIONABLE. THESE NOTES ARE INTENDED AS A GENERAL OUTLINE,
SPECIFIC AND ADDITIONAL REQUIREMENTS ARE INDICATED ON THE
DRAWINGS. THE CONTRACTOR SHOULD ALSO NOTE THAT NOT ALL OF THE
ITEMS MENTIONED BELOW MAY APPLY TO THIS PROJECT.
HAZARDOUS MATERIALS
1. THE CONSTRACTOR AND THE CONTRATOR'S SUBS SHALL HAVE
RESPONSIBILITY FOR THE DISCOVERY, PRESENCE, HANDLING REMOVAL
OR DISPOSAL OF OR EXPOSURE OF PERSONS TO HAZARDOUS MATERIALS
IN ANY FORM AT THE PROJECT SITE, INCLUDING BUT NOT LIMITED TO
ASBESTOS, ASBESTOS PRODUCTS, LEAD-BASED PAINTS,
POLYCHLORINATED BIPHENYL (PCB) OR OTHER TOXIC SUBSTANCES.
CONTRACTOR SHALL BE RESPONSIBLE FOR PROTECTION OF EXISTING
HVAC FILTERS WITHIN THE AREA OF WORK.
2. ALL PENETRATIONS IN GYPSUM WALL BOARD CEILINGS SHALL BE TIGHTLY
SEALED.
3. THE FOLLOWING SUSPECT MATERIALS ARE BASED ON INFORMATION
RECEIVED FROM THE OWNER REGARDING KNOWN HAZARDOUS
MATERIALS ON SITE & ASBESTOS / LEAD PAINT REPORT. SEE PROJECT
SPECIFICATION BOOK FOR COMPLETE REPORT.
4. APPROPRIATE PROTECTION OF THE PUBLIC AND WORKMEN SHALL BE
TAKEN REGARDING WORK INVOLVING SAID MATERIALS.
5. ADDITIONAL SUSPECT MATERIALS DISCOVERED ON SITE AND NOT
IDENTIFIED IN THIS REPORT, WHICH WILL BE DISTURBED BY THIS WORK,
SHALL BE BROUGHT TO THE ATTENTION OF THE ARCHITECT AND OWNER
FOR EVALUATION AND ADDITIONAL TESTING. SUSPECT MATERIALS SHALL
NOT BE DISTURBED. SUSPECT MATERIALS SHALL BE ISOLATED FROM THE
REMAINING WORK AREA BY APPROPRIATE MEMBRANE BARRIERS UNTIL
TESTING RESULTS ARE RECEIVED AND APPROPRIATE PROTECTION AND
REMEDIAL MEASURES CAN BE ASSESSED.
6. ASBESTOS-CONTAINING MATERIALS AFFECTED BY THIS WORK SHALL BE
REMOVED AND DISPOSED OF IN ACCORDANCE WITH 29 CFR 1926.1101
(OSHA) AND NESHAP's REGULATIONS.
7. ASBESTOS REMOVAL SHALL BE PERFORMED BY A LICENSED ASBESTOS
ABATEMENT CONTRACTOR.
8. THE OWNER SHALL BE PROVIDED WITH COPIES OF ALL NOTIFICATIONS,
PERMITS, AIR SAMPLING RESULTS, DISPOSAL MANIFESTS AND ANY OTHER
PAPER WORK GENERATED IN THE ABATEMENT PROCESS.
9. 'WARNING' ASBESTOS PRESENT IN INTERSTITIAL AREAS AND MAY BE
LOCATED IN AREAS SUCH AS: FIRE PROOFING ON STRUCTURAL STEEL
OVERSPRAY ON 4" IBEAMS, CONCRETE DECKS, AND PIPING INSULATION
TO NAME A FEW. CONTRACTOR TO DISPOSE OF ALL HAZARDOUS WASTE
IN ACCORDANCE WITHV LOCAL, STATE AND FEDERAL REGULATIONS.
CONTRACTOR TO WEAR PROPER PROTECTIVE GEAR ACTING IN
ACCORDANCE WITH LOCAL, STATE AND FEDERAL REGULATIONS. REFER
TO SPECIFICATION SECTION 02 82 13.
10. 'WARNING' ASBESTOS MAY BE PRESENT IN EXTERIOR WALL TRANSITE
PANELS, AS WELL AS, TRANSITE PIPES. CONTRACTOR TO DISPOSE OF ALL
HAZARDOUS WASTE IN ACCORDANCE WITH LOCAL, STATE AND FEDERAL
REGULATIONS. CONTRACTOR TO WEAR PROPER PROTECTIVE GEAR
ACTING IN ACCORDANCE WITH LOCAL, STATE AND FEDERAL
REGULATIONS. REFER TO SPECIFICATION SECTION 02 82 13.13.
11. 'WARNING' ASBESTOS PRESENT IN VINYL COMPOSITION TILE AND MASTIC.
CONTRACTOR TO DISPOSE OF ALL HAZARDOUS WASTE IN ACCORDANCE
WITH LOCAL, STATE AND FEDERAL REGULATIONS. CONTRACTOR TO WEAR
PROPER PROTECTIVE GEAR ACTING IN ACCORDANCE WITH LOCAL, STATE
AND FEDERAL REGULATIONS.REFER TO SPECIFICATION SECTION 02 82
13.19.
12. 'WARNING' LEAD MAY BE PRESENT IN STRUCTURAL STEEL PAINT AND
OTHER PAINTED SURFACES. CONTRACTOR TO DISPOSE OF ALL
HAZARDOUS WASTE IN ACCORDANCE WITH LOCAL, STATE AND FEDERAL
REGULATIONS. CONTRACTOR TO WEAR PROPER PROTECTIVE GEAR
ACTING IN ACCORDANCE WITH LOCAL, STATE AND FEDERAL
REGULATIONS.
13. REMOVE ALL ASBESTOS CONTAINING MATERIALS IDENTIFIED INCLUDING,
BUT NOT LIMITED TO, VCT FLOORING, CEILING TILES, FIREPROOFING AND
EXTERIOR PANELS AFFECTING BY SCOPE OF WORK.
14. ALL MATERIAL QUANTITIES, LOCATIONS DO NOT PRESENT ACTUAL
CONDITIONS AND SIZES NOTED IN CONTRACT DOCUMENTS, REFERENCE
DRAWINGS, AND REFERENCE DOCUMENTS ARE APPROXIMATE.
15. CONTRACTOR SHALL REMOVE ENVIRONMENTALLY REGULATED
MATERIALS INCLUDING BUT NOT LIMITED TO, ASBESTOS (TSI ELBOW,
SPRAY-APPLIED ACOUSTIC CEILING COVERING, 12"X12" FLOOR TILE AND
ASSOCIATE MASTIC, VINYL SHEET FLOORING, BASE COVE AND ADHESIVE,
SHEETROCK WALLS AND JOINT COMPOUND, 12"X12" ACOUSTIC WALL TILE
AND ADHESIVE, 2'X4' LAY-IN CEILING PANELS, FIREPROOFING AND DEBRIS).
LEAD-CONTAINING PAINTS AND SHIELDING, PCBS / BEHP AND UNIVERSAL
WASTES IN ACCORDANCE WITH THE DRAWINGS, SPECIFICATIONS AND
NOTES. IT SHALL BE THE CONTRACTOR'S OBLIGATION TO UNDERSTAND
TO THE NATURE, CHARACTER, QUALITY AND SIZES OF MATERIALS LIKELY
TO BE ENCOUNTERS AND IMPACTED BY THE PROJECT. FAILURE TO BE SO
DOES NOT RELIEVE THE CONTRACTOR FROM THE OBLIGATION TO
FURNISH ALL MATERIALS AND LABOR TO CARRY OUT THE PROVISIONS OF
THIS CONTRACT.
16. CONTRACTOR IS SOLELY RESPONSIBLE FOR COORDINATING WORK
ACTIVITIES THAT MAY IMPACT ENVIRONMENTALLY-REGULATED MATERIALS
WITH WORK SPECIFIED IN OTHER CONTRACT DOCUMENT SECTIONS.
17. CONTRACTOR SHALL BE RESPONSIBLE FOR ADEQUATELY PROTECTING
ANY ITEMS TO REMAIN INCLUDING, RETAINING WALLS, MECHANICAL,
ELECTRICAL, PLUMBING AND OTHER UTILITIES NOT SPECIFIED TO BE
DEMOLISHED. REFER TO SPECIFICATIONS, ARCHITECTURAL, DEMOLITION
AND MEP DRAWINGS.
18. ENERGIZED EQUIPMENT AND UTILITIES (ELECTRICAL TRANSFORMERS AND
MECHANICAL, ELECTRICAL AND PLUMBING SYSTEMS) AS TAGGED BY THE
OWNERS REPRESENTATIVE MUST REMAIN ENERGIZED DURING
ABATEMENT ACTIVITIES. CONTRACTOR SHALL ADEQUATELY PROTECT
EQUIPMENT AND UTILITIES AND TAKE APPROPRIATE PRECAUTIONS TO
PREVENT PERSONNEL INJURIES OR DAMAGE TO THE STRUCTURE.
19. SEAL ALL AREAS. FLOOR PENETRATIONS WITH PLASTIC, TAPE, EPOXY OR
FOAM OR A COMBINATION THEREOF TO PREVENT MIGRATION OF LIQUID
OR DEBRIS FROM THE WORK.
20. INSTALL VISIBLE WARNING PLACARDS ON STATIONARY EQUIPMENT TO
REMAIN ENERGIZED. PLACARDS SHALL MEET OSHA REQUIREMENTS
INCLUDING, BUT NOT LIMITED TO CFR 1926.416-1926.417, AND BE
SUFFICIENTLY SIZED, COLORED AND WORDED TO WARN PERSONNEL
ENTERING THE AREA TO ITS PRESENCE. AT A MINIMUM THE SIGNS SHALL
BE 8.5"X11" IN SIZE AND CONTAIN THE LANGUAGE "HIGH VOLTAGE" IN
BLACK ON A YELLOW BACKGROUND.
21. ALL LEAD-RELATED REMOVAL AND DEMOLITION WORK SHALL BE
PERFORMED BY CALIFORNIA DEPARTMENT OF PUBLIC HEALTH (CDPH)
CERTIFIED SUPERVISORS AND WORKERS.
22. CONTRACTOR SHALL DISMANTLE FLUORESCENT LIGHT FIXTURES AND
CONTAINERIZE FIXTURE BALLASTS FOR DISPOSAL BY OWNER.
23. CONTRACTOR SHALL REMOVE AND RECYCLE ALL MERCURY-CONTAINING
AMPOULES IN SWITCHBOARDS, PNEUMATIC CONTROLS, WALL
RECEPTACLES, EXIT SIGNS, FIRE DETENTION / ALARM DEVICES, AND
THERMOSTATS. SUBMIT FOR APPROVAL TO THE GOVERNMENT'S
REPRESENTATIVE, THE NAME OF THE CALIFORNIA EPA DEPARTMENT OF
TOXIC SUBSTANCES AND CONTROL (CAL/EPA DTSC) RECYCLE CENTER TO
BE UTILIZED. PACKAGE AMPOULES IN ORDER TO PREVENT DAMAGE FROM
THE TIME OF REMOVAL, DURING TEMPORARY ON SITE STORAGE, AND
TRANSPORT TO THE RECYCLE CENTER.
24. CONTRACTOR SHALL REMOVE AND RECYCLE OZONE DEPLETING
SUBSTANCES (ODS) SUCH AS CHLOROFLUOROCARBONS (CFCS) AND
HYDROCHLOROFLUOROCARBONS (HCFCS), AS WELL AS HALON, SULFUR
DIOXIDE (SO2) AND AMMONIA (NH3) FROM SYSTEMS, EQUIPMENT AND
COMPONENTS.
HAZARDOUS MATERIALS CONTINUED
25. CONTRACTOR SHALL REMOVE AND DISPOSE OF ASBESTOS IN
ACCORDANCE WITH SAN DIEGO AIR POLLUTION CONTROL DISTRICT
RULES 361.145 & 361.150.
26. CONTRACTOR SHALL KEEP ASBESTOS, LEAD, PCBS, METALS AND ETC.
WASTES IN SEPARATE CONTAINERS.
27. CONTRACTOR SHALL PROVIDE ALL WASTE CHARACTERIZATION / TESTING
AND PROFILES FOR DISPOSAL OF ALL REMOVED AND DEMOLISHED
BUILDING MATERIALS AND EQUIPMENT COATED WITH LEAD PAINT OR
CONTAMINATED WITH LEAD AND METALS. COLLECT CHARACTERIZATION
SAMPLES WITH GOVERNMENT REPRESENTATIVE.
28. LEAD-CONTAINING PAINTS, COATINGS AND GLAZING ARE KNOWN TO BE
PRESENT ON THE PROJECT SITE. THE GOVERNMENT HAS A ZERO-
TOLERANCEPOLICY FOR UNCONTROLLED LEAD RELEASES DURING LEAD
RELATED CONSTRUCTION ACTIVITIES. AT NO ADDS COST TO THE
GOVERNMENT, ALL PROJECT SITE TRADES SHALL ENSURE COMPLIANCE
WITH CALIFORNIA CODE OF REGULATIONS TITLE 8 SECTION 1531.1 LEAD.
EACH EMPLOYER WHO HAS A WORKPLACE OR OPERATION COVERED BY
THIS STANDARD SHALL INITIALLY DETERMINE IF ANY EMPLOYEE MAY BE
EXPOSED TO LEAD AT OR ABOVE THE ACTION LEVEL AND TAKE ALL
NECESSARY STEPS TO COMPLY WITH THE REGULATIONS.
29. GENERAL WORK SEQUENCE:
A. REMOVE NON-FIXED ITEMS FROM THE WORK AREA TO A LOCATION
DESIGNATED BY THE GOVERNMENT OR DISPOSE.
B. COVER ALL REMAINING NON-REMOVABLE ITEMS AND SURFACES IN THE
WORK AREA WITH TWO LAYERS OF 6-MIL POLYETHYLENE SHEETING
SECURELY TAPED. THIS SHALL INCLUDE NON-POROUS ITEMS SUCH AS
DUCT INSULATION FACINGS AND PIPE INSULATION NOT REMOVED AS PART
OF THE SCOPE OF WORK.
C. PRE-CLEAN ALL FIXED OBJECTS, INCLUDING MACHINERY, GRILLES,
DIFFUSERS AND HORIZONTAL SURFACES SUCH AS PIPES AND DUCTS TO
REMOVE FIRE PROOFING OVERSPRAY IN THE WORK AREA USING
HEPAFILDERTED VACUUMS AND WE CLEANING METHODS AS
APPROPRIATE. ALL CLEANED FIXED OBJECTS SHALL BE COVERED WITH
ONE LAYER OF 6-MILPOLYETHYLENE SHEETING AND SEALED WITH TAPE.
THIS SHALL INCLUDE ITEMS SUCH AS FIBERGLASS AND DUCT INSULATION
FACINGS AND PIPE INSULATION NOT REMOVED AS A PART OF THE SCOPE
OF WORK.
D. FURNISH AND INSTALL TWO LAYERS OF 6-MIL POLYETHYLENE SHEETING
"PONY WALLS" BETWEEN SUSPENDED CEILINGS AND THE KICKING WHERE
SPRAY-APPLIEDFIREPROOFING IS TO BE REMOVED. SECURE
POLYETHYLENE SHEETING SO AS TO PREVENT IT FROM FALLING AWAY
FROM WALLS. THIS MAY REQUIRE ADDITIONAL SUPPORT / ATTACHMENTS
WHEN NEGATIVE PRESSURE VENTILATION SYSTEMS ARE TURNED ON.
TIGHTLY SEAL POLYETHYLENE SHEETING AT BOTH DECK AND CEILING
LINE.
E. MAINTAIN PONY WALLS IN PLACE AFTER COMPLETION OF ASBESTOS
REMOVAL TO SEGREGATE THE ABOVE CEILING CLEARED WORK AREAS
FROM ABOVE CEILING NON-CLEARED WORK AREAS TO ALLOW FOR
UNTRAINED TRADES TO PERFORM THEIR WORK.
F. DEMOLISH AND REMOVE ALL NON-ASBESTOS-CONTAINING MATERIALS
AND NON-LEAD CONTAINING COMPONENTS.
G. PROVIDE WORKER/WASTE DECONTAMINATION FACILITIES.
H. ISOLATE HVAC SUPPLY AIR SYSTEMS.
I. ISOLATE AND TAG ELECTRICAL SYSTEMS IN THE WORK AREA AND
PROVIDE TEMPORARY POWER.
J. PROVIDE NEGATIVE PRESSURE VENTILATION IN THE WORK AREA.
K. PRE-CLEAN AND DECONTAMINATE ALL SURFACES IN THE WORK AREA.
L. REMOVE AND DISPOSE OF MISCELLANEOUS HAZARDOUS MATERIALS
(LIGHT BALLAST AND LIGHT TUBES).
M. REMOVE LEAD BASED PAINT COMPONENTS (WALLS CEILINGS DOORS AND
DOOR FRAMES).
N. REMOVE ASBESTOS CONTAINING MATERIALS.
O. SEGREGATE WASTE STREAMS AS SPECIFIED.
P. CONDUCT WASTE CHARACTERIZATION FOR DEMOLISHED HAZARDOUS
MATERIALS.
Q. PERFORM DETAILED CLEANINGS OF WORK AREA.
R. AFTER SUCCESSFUL ASBESTOS AIR SAMPLE AND LEAD WIPE SAMPLE
CLEARANCE COMPLETE REMAINING DEMOLITION.
S. AFTER CONSTRUCTION IS COMPLETE DUST PARTITIONS MAY BE
REMOVED AT THE OWNERS DISCRETION.
DEFERRED APPROVALS
INSTALLATION OF DEFERRED APPROVAL ITEMS SHALL NOT BE STARTED UNTIL
DETAILED PLANS, SPECIFICATIONS, AND ENGINEERING CALCULATIONS HAVE
BEEN ACCEPTED AND SIGNED BY THE ARCHITECT OR ENGINEER IN GENERAL
CHARGE OF DESIGN AND SIGNED BY THE ARCHITECT OR PROFESSIONAL
ENGINEER WHO HAS BEEN DELEGATED RESPONSIBILITY COVERING THE WORK
SHOWN ON A PARTICULAR PLAN OR SPECIFICATION AND APPROVED BY VA COR.
DEFERRED ITEMS…