36C24825R0010 0001.docx
DOCX document 31 KB Posted
- Solicitation number
- 36C24825R0010
About this file
This document is an amendment to Solicitation Number 36C24825R0010 for Design-Build (DB) Upgrade Lake Nona Endoscopy Rooms, Project Number 675-24-104. The amendment provides responses to requests for information (RFIs) from offerors. Key details include:
The project involves renovating six endoscopy rooms at the Orlando VA Medical Center, including replacing the cabinetry, flooring, walls, ceiling grid, and lighting. The contractor will be responsible for providing and installing the endoscopy booms. The contractor must follow QA/QC and commissioning requirements. Proposals are due November 6, 2024 at 1:00 PM EST. This is a 100% Service-Disabled Veteran-Owned Small Business (SDVOSB) set-aside contract with an estimated value between $2-5 million and a 420-calendar day period of performance.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| 36C24825R0010 0002.docx | DOCX document | |
| ATTACHMENT D - Experience Information Sheet.pdf | ||
| ATTACHMENT F - Limitation of Subcontracting Certificate.pdf | ||
| ATTACHMENT C - EMR.pdf | ||
| ATTACHMENT E - Past Performance Questionnaire.docx | DOCX document | |
| ATTACHMENT B - Contract Progress Schedule.docx | DOCX document | |
| Solicitation 36C24825R0010.pdf | ||
| ATTACHMENT A - Davis-Bacon Act Wage Determination.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
5. PROJECT NUMBER (if applicable)
CODE
7. ADMINISTERED BY
2. AMENDMENT/MODIFICATION NUMBER
CODE
6. ISSUED BY
8. NAME AND ADDRESS OF CONTRACTOR
4. REQUISITION/PURCHASE REQ. NUMBER
3. EFFECTIVE DATE
9A.
AMENDMENT OF SOLICITATION NUMBER
9B. DATED
PAGE OF PAGES
10A. MODIFICATION OF CONTRACT/ORDER NUMBER
10B. DATED
BPA NO.
1. CONTRACT ID CODE
FACILITY CODE
CODE
Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods:
The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers
E. IMPORTANT:
is extended,
(a) By completing Items 8 and 15, and returning __________ copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted; or (c) By separate letter or electronic communication which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY is not extended.
12. ACCOUNTING AND APPROPRIATION DATA
(REV.
11/2016) is required to sign this document and return ___________ copies to the issuing office.
is not, A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT ORDER NO. IN ITEM 10A.
15C. DATE SIGNED
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES
SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF
FAR 43.103(b).
RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by letter or electronic communication, provided each letter or electronic communication makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER
Contractor
16C. DATE SIGNED
14. DESCRIPTION OF AMENDMENT/MODIFICATION
16B. UNITED STATES OF AMERICA
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15A. NAME AND TITLE OF SIGNER
16A. NAME AND TITLE OF CONTRACTING OFFICER
15B. CONTRACTOR/OFFEROR
STANDARD FORM 30
PREVIOUS EDITION NOT USABLE
Prescribed by GSA - FAR (48 CFR) 53.243 (Type or print) (Type or print) (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
(Number, street, county, State and ZIP Code) (If other than Item 6) (Specify type of modification and authority) (such as changes in paying office, appropriation date, etc.)
(If required)
(SEE ITEM 11)
(SEE ITEM 13)
(X)
CHECK
ONE
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS,
IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
11.
THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
(Signature of person authorized to sign) (Signature of Contracting Officer) 10-30-2024 675-24-104 36C248 Department of Veterans Affairs Network Contracting Office 8 (NCO 8) Orlando VA Healthcare System 13800 Veterans Way Orlando FL 32827 36C248 Department of Veterans Affairs Network Contracting Office 8
(NCO 8)
Orlando VA Healthcare System 13800 Veterans Way Orlando FL 32827 To all Offerors/Bidders
36C24825R0010 10-21-2024
X X
X Project Title: Design-Build (DB) Upgrade Lake Nona Endoscopy Rooms Project Number: 675-24-104
1. The purpose of this amendment 0001 is to provide RFI responses, refer to page 2.
2. Submission due date and time is NOVEMBER 6, 2024 at 1:00 PM EST, attention to elizabeth.romero@va.gov.
3. All Offerors are required to acknowledge receipt of this amendment.
Elizabeth Romero Contracting Officer
VA-VHA-RPOE-2022-365342
CONTINUATION PAGE
Solicitation Number: 36C24825R0010 Project Title: Design-Build (DB) Upgrade Lake Nona Endoscopy Rooms Project Number: 675-24-104
| RFI NBR. |
| QUESTIONS & ANSWERS |
| 1. |
| Please clarify whether the Booms are VA-furnished or contractor-furnished. |
| VA Response |
| Booms are contractor-furnished. The contractor will be responsible for supplying the booms and installing them. Steris is the preferred manufacturer. |
| 2. |
| If Booms are not VA furnished, please provide the boom manufacturer name, make, and model number. |
| VA Response |
| See RFI response # 1. |
| 3. |
| Please specify which systems are required to be commissioned under the 3rd party commissioning agent, if any |
| VA Response |
| The new endoscopy booms and installations are required to be commissioned in addition to the other required systems as specified by the VA Technical Information Library (TIL). It must be ensured that the endoscopy room work is in compliance with the VA’s standards. |
| 4. |
| Please clarify whether the design is required to have a 3rd party independent review (CITP). |
| VA Response |
| The Contractor’s design-build team must follow the QA/QC requirements in the solicitation. Refer to section X of the SOW in the solicitation. |
| 5. |
| Can the Superintendent, QC, and SSHO be covered by the same person? |
| VA Response |
| For general construction, this should be acceptable. However, note that for special inspections (under specific trades including those for the booms) or tasks requiring specialized safety knowledge, the tasks of QC (including QA) and the SSHO will need to be covered by separate individuals. |
| 6. |
| Please clarify if a superintendent can be a dual hat to cover the requirements of SSHO. |
| VA Response |
| Yes, the superintendent may be dual hats. However, if there’s a specific task that requires work such as excavation, crane lifting, or requires specialized safety knowledge then a dedicated SSHO must be provided by the Contractor to ensure safety at all times. Also note that the site superintendent’s duties as SSHO (if appointed to that role) cannot be delegated to another site superintendent if the site superintendent must be offsite. The other individual temporarily serving as site superintendent would need to have the same level of training, experience, and the OHSA 30 certification as the primary site superintendent. |
| 7. |
| If no to the question above, will the SSHO need to be full-time for this project? |
| VA Response |
| Refer to RFI response #6. |
| 8. |
| Please clarify if a superintendent can be a dual hat to cover the requirements of QA/QC. |
| VA Response |
| Refer to RFI response #5. |
| 9. |
| If no to the question above, will the QA/QC need to be full-time for this project? |
| VA Response |
| Refer to RFI response #5. |
| 10. |
| Can a superintendent be a triple hat to cover the requirements of SSHO and QA/QC? |
| VA Response |
| Refer to RFI response #5. |
| 11. |
| Past Performance: If we have a PPQ that is less than 12 months old, can we use it within our proposal? Or will a new PPQ need to be requested? |
| VA Response |
| Yes. PPQ within 12 months of the solicitation issuance date will be acceptable. |
| 12. |
| Is the use of temporary plastic wall panels (such as STARC panels) acceptable? |
| VA Response |
| Hard barriers appropriate for healthcare settings will need to be used. Ensure that there are access doors that are lockable. |
| 13. |
| Who is responsible for the terminal cleaning of the project area? |
| VA Response |
| Refer to the SOW in the solicitation. |
| 14. |
| Who is responsible for contracting the commissioning agent? |
| VA Response |
| The Contractor is responsible. Refer to the SOW in the solicitation. |
| 15. |
| The SOW indicates that the contractor is to “Renovate walls, flooring ceiling grid, lighting, and any other needed items to bring the room up to code and standards.” If the existing walls, grid, and lighting are deemed to be up to current standards is the expectation that these items will be left in place? Or is it the VA’s intention to replace all of these elements as part of this contract? |
| VA Response |
| Refer to the SOW in the solicitation. |
| 16. |
| Please clarify if the VA intends to replace all the flooring in each endoscopy room. Patching the flooring may not match due to the age and wear of the existing floor. |
| VA Response |
| Refer to the SOW in the solicitation. |
| 17. |
| Please confirm that all cabinetry is to be replaced as part of this project. |
| VA Response |
| Remove all cabinets from the room, service will be replaced with rolling cabinets. |
| 18. |
| Is it the intent of the VA for all existing room finishes (cabinetry, flooring, drywall, acoustical ceiling) to be replaced during this project? |
| VA Response |
| Refer to the SOW in the solicitation. For cabinetry, refer to RFI response #17. |
| 19. |
| Will the contractor be required to replace the doors leading into the endoscopy rooms as part of this project? |
| VA Response |
| Refer to the SOW in the solicitation. |
| 20. |
| What is the minimum number of endoscopy rooms that will be taken down at one time? |
| VA Response |
| Refer to the SOW in the solicitation. |
| 21. |
| How many days between phases does the VA require? |
| VA Response |
| It is the Contractor’s responsibility to properly phase the project and complete the project within the allotted timeframe. Refer to the solicitation. |
| 22. |
| Please confirm there is no scope of work outside of the (6) endoscopy rooms aside from the MedGas connections. |
| VA Response |
| The scope of work is primarily taking place inside each endoscopy room. However, this does not mean that there might not be related work taking placing outside of the rooms to complete the work inside each endoscopy room. It will be the contractor’s responsibility to confirm this. |
| 23. |
| Is the MedGas system currently up to date on its certification? |
| VA Response |
| Refer to the SOW in the solicitation. |
| 24. |
| Has the VA evaluated whether the existing above-ceiling brackets/ supports are compatible with the new Steris units, or should the contractor assume, they shall be replaced? |
| VA Response |
| No. The VA has not evaluated the existing above-ceiling brackets. Refer to SOW in solicitation. |
| 25. |
| Does the contractor need to meet the receptacle count requirements of a surgical suite? |
| VA Response |
| Refer to the SOW in the solicitation. |