Attachment - PHASE ONE-RFI Tracking Log.pdf
PDF 69 KB Posted
- Attached to
- Z2DB--PROJECT 675-23-102, Design-Build (DB) Renovate Building 500 Eye and Audiology Clinic
- Solicitation number
- 36C24823R0110
About this file
This document contains a request for information tracking log and related federal contract opportunity solicitation for design-build renovation services. The tracking log addresses six questions from an offeror relating to the scope of work, including confirmation that 120 calendar days are allotted for construction with the eye clinic to be completed within 60 days, flush installation of new audio booths with the existing floor, responsibility for relocating existing utilities, provision of as-built drawings via a shared link, and allowance for one individual to perform multiple construction roles. The federal contract opportunity solicitation seeks proposals for design and construction services at the Orlando VA Medical Center to renovate an eye and audiology clinic. The 100% SDVOSB set-aside has a magnitude between $2,000,000 to $5,000,000, NAICS 236220, and 314-day period of performance upon notice to proceed. Proposals are due for a two-phase evaluation and award under FAR Parts 15 and 36.
View the file
Other files
Show all 18
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Request for Information (RFI) Tracking Log
Solicitation# 36C24823R0110 Project# 675-23-102
‘Design-Build Renovate Building 500 Eye and Audiology Clinic’ Phase One – Questions and Answers
May 17, 2023
RFI Tracking Log – Amendment 0001
RFI
NBR. QUESTIONS & ANSWERS SUBMITTED
BY
DATE
RECEIVED
1. Will the VA have the resources to support an aggressive work schedule to meet the contract required 60-day time frame for specifically the “audiology” portion of this project?
CPS, Inc 05/17/2023
VA
Response
120 calendar days is allotted for construction. The Eye clinic is planned to be vacated prior to construction commencement. Both Eye and Audiology construction can both start at the same time. The Eye clinic must be completed within 60 calendar days. The contractor has 120 calendar days to complete the Audiology department if two (2) booths are to be replaced (165 calendar days if four (4) booths are to be replaced).
2. Is the intent of the VA for the audio booths to be flush with the existing deck/hallway flooring such that a removable ramp is not required for patients in wheelchairs or will the existing floor be raised to meet the new height requirements of the Audio booths.
CPS, Inc 05/17/2023
VA
Response
Flush with existing hallway.
3. Will contractor be required to relocate any existing utilities that may be in the recessed limits of construction?
CPS, Inc 05/17/2023
VA
Response
Yes.
4. Please provide as-built drawings for the existing area, utilities, concrete deck, and structural supports.
CPS, Inc 05/17/2023
VA
Response
Use link below. Link will expire 30 days from 05/18/2023 Link: https://drive.max.gov/share/79e7c1bd9b5c772b Password: 675-23-102
5. Will contractor be required to engage a CITP? CPS, Inc 05/17/2023 https://drive.max.gov/share/79e7c1bd9b5c772b
Request for Information (RFI) Tracking Log
Solicitation# 36C24823R0110 Project# 675-23-102
‘Design-Build Renovate Building 500 Eye and Audiology Clinic’ Phase One – Questions and Answers
May 17, 2023
RFI Tracking Log – Amendment 0001
VA
Response
Yes.
6. Can a qualified construction superintendent perform the Superintendent/QC/SSHO roles simultaneously?
CPS, Inc 05/17/2023
VA
Response
Yes.