PHASE ONE-RFIs Tracking Log 06.03.2022.pdf

PDF 118 KB Posted

Attached to
Y1AB--PROJ: 675-22-808, DB Police Upgrades at Viera & Lake Baldwin
Solicitation number
36C24822R0093
Issued by

About this file

This document is a request for information tracking log and related federal contract opportunity solicitation for design-build services for police upgrades at two Department of Veterans Affairs medical centers. The solicitation seeks proposals for renovations including a ballistic-rated pass-through window, holding cell, and armory at the Viera OPC as well as addressing HVAC access at Lake Baldwin. Proposals are due in two phases, with phase one evaluating offerors to invite to phase two. The period of performance is 292 calendar days with 142 days for design and 150 for construction. The magnitude is between $250,000 and $500,000. The contractor must be a verified Service-Disabled Veteran-Owned Small Business. The solicitation will use a two-phase design-build selection process and best value evaluation.

The tracking log contains 22 questions from potential offerors and responses from the contracting officer. Questions seek clarification on incumbent contractors, as-built drawings, finishes, security requirements, and more. The responses address these pre-solicitation inquiries.

View the file

Other files

Show all 16

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Request for Information (RFI) Tracking Log

Solicitation# 36C24822R0093 Project# 675-22-808

‘Design-Build (DB) Police Upgrades at Viera and Lake Baldwin’ Phase One – Questions and Answers

June 3, 2022

RFI Tracking Log – Amendment 0002

RFI

NBR. QUESTIONS & ANSWERS SUBMITTED

BY

DATE

RECEIVED

1. We would like to know if this is a brand-new contract OR if there is (was) an incumbent performing these services.

If not brand new, could you please provide the current / previous contract number?

Bloomberg Government

05/31/2022

VA

Response

This is a brand-new requirement. There is no incumbent.

2. We would like a chance to bid on your division 12 Furnishing if there is any and when it is ready to go out to bid. I wanted to know where you would be listing this bid and if there is anything else we can do to help you, with our in-house design capabilities we can do construction documents, floor pans renderings and more.

Interior Fusion 06/01/2022

VA

Response

This is a design-build that will be awarded to one contractor for construction and design.

3. Please clarify if a superintendent can be a triple hat to cover the requirements of SSHO and

QA/QC?

Blue Cord Design & Construction, LLC

06/03/2022

VA

Response

Provided the superintendent has the required minimum 30-hour OSHA training and certifications to meet this requirement, a dedicated SSHO on-site at all times will likely not be necessary. However, for large scale construction activities such as rigging and placement activities, the contractor’s full-time and dedicated SSHO shall be onsite for those activities.

4. If no to the question above, will the SSHO need to be full-time for this project?

Blue Cord Design & Construction, LLC

06/03/2022

VA

Response

See response to number 3.

Project# 675-22-808

‘Design-Build (DB) Police Upgrades at Viera and Lake Baldwin’ Phase One – Questions and Answers

June 3, 2022

RFI Tracking Log – Amendment 0002

5. Please provide electrical as-builts for the space. Blue Cord Design & Construction, LLC

06/03/2022

VA

Response

Refer to link below for drawings.

https://drive.max.gov/share/776c5af076e1c44c

6. Please provide plumbing as-builts for the space. Blue Cord

Construction, LLC

06/03/2022

VA

Response

7. Please provide mechanical as-builts for the space. Blue Cord

Construction, LLC

06/03/2022

VA

Response

8. Please provide the latest Asbestos survey for the area. Blue Cord

Construction, LLC

06/03/2022

VA

Response

Refer to link below for survey.

https://drive.max.gov/share/d44d4bd8cb7994ab

9. Please clarify if CPARs or PPQs can be used interchangeably to meet the requirements listed in Factor 3, subsections 3 and 4.

Blue Cord Design & Construction, LLC

06/03/2022 https://gcc02.safelinks.protection.outlook.com/?url=https%3A%2F%2Fdrive.max.gov%2Fshare%2F776c5af076e1c44c&data=05%7C01%7C%7Cc65b39fb36244647c4f708da4ee07690%7Ce95f1b23abaf45ee821db7ab251ab3bf%7C0%7C0%7C637909023208947394%7CUnknown%7CTWFpbGZsb3d8eyJWIjoiMC4wLjAwMDAiLCJQIjoiV2luMzIiLCJBTiI6Ik1haWwiLCJXVCI6Mn0%3D%7C3000%7C%7C%7C&sdata=lfvJAjjA0ICbEHEbSBqmElXelaN4UOqfZ7jXun4M0eI%3D&reserved=0 https://gcc02.safelinks.protection.outlook.com/?url=https%3A%2F%2Fdrive.max.gov%2Fshare%2F776c5af076e1c44c&data=05%7C01%7C%7Cc65b39fb36244647c4f708da4ee07690%7Ce95f1b23abaf45ee821db7ab251ab3bf%7C0%7C0%7C637909023208947394%7CUnknown%7CTWFpbGZsb3d8eyJWIjoiMC4wLjAwMDAiLCJQIjoiV2luMzIiLCJBTiI6Ik1haWwiLCJXVCI6Mn0%3D%7C3000%7C%7C%7C&sdata=lfvJAjjA0ICbEHEbSBqmElXelaN4UOqfZ7jXun4M0eI%3D&reserved=0 https://gcc02.safelinks.protection.outlook.com/?url=https%3A%2F%2Fdrive.max.gov%2Fshare%2F776c5af076e1c44c&data=05%7C01%7C%7Cc65b39fb36244647c4f708da4ee07690%7Ce95f1b23abaf45ee821db7ab251ab3bf%7C0%7C0%7C637909023208947394%7CUnknown%7CTWFpbGZsb3d8eyJWIjoiMC4wLjAwMDAiLCJQIjoiV2luMzIiLCJBTiI6Ik1haWwiLCJXVCI6Mn0%3D%7C3000%7C%7C%7C&sdata=lfvJAjjA0ICbEHEbSBqmElXelaN4UOqfZ7jXun4M0eI%3D&reserved=0 https://gcc02.safelinks.protection.outlook.com/?url=https%3A%2F%2Fdrive.max.gov%2Fshare%2Fd44d4bd8cb7994ab&data=05%7C01%7C%7Cc65b39fb36244647c4f708da4ee07690%7Ce95f1b23abaf45ee821db7ab251ab3bf%7C0%7C0%7C637909023208947394%7CUnknown%7CTWFpbGZsb3d8eyJWIjoiMC4wLjAwMDAiLCJQIjoiV2luMzIiLCJBTiI6Ik1haWwiLCJXVCI6Mn0%3D%7C3000%7C%7C%7C&sdata=oQ%2BMhENotymHnD33kG8DOU2X7aVGnWvlPjyRfRphBDU%3D&reserved=0

Project# 675-22-808

‘Design-Build (DB) Police Upgrades at Viera and Lake Baldwin’ Phase One – Questions and Answers

June 3, 2022

RFI Tracking Log – Amendment 0002

VA

Response

CPARs evaluation are acceptable but it should not replace the Contractor’s Past Performance Questionnaire. Submission of PPQ is optional but highly recommended for each Past Performance project. Refer to subsections 6 for instruction.

10. Please clarify the magnitude of the project. There are conflicting magnitudes of $250,000-$500,000 and $500,000-$1,000,000 listed in the solicitation.

Blue Cord Design & Construction, LLC

06/03/2022

VA

Response

IAW FAR 36.204(d), the magnitude of the project is between $250,000 and $500,000.

11. Please identify the total calendar day duration for the project as there is conflicting information.

210 days is listed on the cover page and 142 Days Design + 150 Days Construction is listed within the statement of work.

Blue Cord Design & Construction, LLC

06/03/2022

VA

Response

SF1442, block 11 is incorrect. The period of performance is 292-calendar days for design/construction. Design Phase: 142-calendar days from Government issuance of Notice to Proceed (NTP); Construction Phase: 150-calendar days from Design completion and Government acceptance.

12. If the total calendar day duration of the project is indeed to be 210 days, please outline the period of performance for both design and construction.

Blue Cord Design & Construction, LLC

06/03/2022

VA

Response

Refer to SOW for the correct period of performance.

13. Based on the provided armory and holding cell sketch at Viera OPC and review of the SOW, will the new design need to meet the necessary ADA compliance and clear floor clearances?

Construction, LLC

06/03/2022

VA

Response

The VA strives to meet Architectural Barriers Act (ABA) requirements for all its spaces. ABA applies to the holding cell and armory.

Project# 675-22-808

‘Design-Build (DB) Police Upgrades at Viera and Lake Baldwin’ Phase One – Questions and Answers

June 3, 2022

RFI Tracking Log – Amendment 0002

14. Will the VA provide the Interior Design standard finishes for both buildings as it pertains to the scope of work (vinyl flooring, paint, and ceiling to match)?

Blue Cord Design & Construction, LLC

06/03/2022

VA

Response

The Facility standard finishes for both facilities are:

• Carpet – Interface Raw

• Cove Base – Johnsonite

• LVT - EF Contract

• Paint- Sherman Williams

15. Can the VA confirm that there will be no need for bullet resistant transaction windows?

Construction, LLC

06/03/2022

VA

Response

The Viera Police Operations renovation shall include a ballistic rated pass-through window with one way visibility glass. The interior of the VA Police Operations area shall not be visible from the other side of the window. VA police space shall follow requirements of the PSRDM. All walls, windows, and doors for operations area are required to be ballistic resistant.

16. Does the VA anticipate any main HVAC infrastructure outside of ductwork above the scope of work area requiring modification to meet current VA TIL requirements?

Blue Cord Design & Construction, LLC

06/03/2022

VA

Response

For Lake Baldwin, the contractor shall address the up and over access while not adversely affecting the HAVC system. For Viera, it is a full renovation of the space which includes HVAC ductwork and any other components required to comply with design requirements for the space.

17. Does the VA anticipate any main electrical power infrastructure outside of new branch circuiting withing the scope of work area is anticipated to be updated/upgraded?

Blue Cord Design & Construction, LLC

06/03/2022

VA

No.

Project# 675-22-808

‘Design-Build (DB) Police Upgrades at Viera and Lake Baldwin’ Phase One – Questions and Answers

June 3, 2022

RFI Tracking Log – Amendment 0002

18. Please confirm performance-based fire protection design is acceptable, as typical. Blue Cord Design & Construction, LLC

06/03/2022

VA

Response

Yes.

19. Please confirm that existing data, access control and CCTV systems are to remain, and any new devices will be tied into them.

Blue Cord Design & Construction, LLC

06/03/2022

VA

Response

Yes. Existing security systems are to remain. New devices as outlined in the SOW must be tied into existing systems. New data drops and cabling are required.

20. If no to above, please confirm if systems will be all new or standalone type systems. Blue Cord

Construction, LLC

06/03/2022

VA

Response

Existing security systems are to remain.

21. Please clarify if intrusion detection systems are part of the scope. Blue Cord Design & Construction, LLC

06/03/2022

VA

Response

Yes. All requirements of the PSRDM must be followed. Refer to PSRDM Appendix B - Security System Application Matrix.

22. Please confirm that there will be no plumbing related scope. Blue Cord

Construction, LLC

06/03/2022

VA

No plumbing.

Project# 675-22-808

‘Design-Build (DB) Police Upgrades at Viera and Lake Baldwin’ Phase One – Questions and Answers

June 3, 2022

RFI Tracking Log – Amendment 0002

23. Please identify if schematic based are acceptable or if full design low voltage plans are required. Blue Cord

Construction, LLC

06/03/2022

VA

Full design low voltage plans are required in the design drawings.

File details come from the government source that posted it. Updated .