This document contains a request for quotations for demolition services. The Department of Veterans Affairs is seeking quotes to demolish the Cancer Infusion Treatment Center and provide site security and safety at the C.W. Bill Young VA Medical Center in Bay Pines, Florida. Quotes are due by August 31, 2022. The work includes deconstructing and removing all materials from the existing structure with the exception of cement storm drain piping, which should be neatly stacked on site. This procurement is set aside for Service-Disabled Veteran Owned Small Businesses. The associated NAICS code is 238910 for site preparation contracting.
View the file
Other files
Show all 18
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
COMMENT TYPE
(Select from drop down)
QUESTIONS / COMMENTS
(With justification of why considered source selection sensitive if applicable)
VA Response Company Name
Substantive Please provide the structural drawings, specifically the foundations drawins will be supplied Please note these are not redlines or As-Builts.
Only 60% of the work required in the drawings had been accomplished.
CPS
Substantive Please provide the pre demolition asbestos survey. there is no ACM in the constructed building CPS
Substantive Which materials/equipment will be returned to the VA facilities, and which will be demolished and trashed?
everything will be decontructed and removed by the contractor. The one exception will be the cement storm drain piping. It will be moved and stacked neatly and remain on the site.
CPS
Substantive Please furnish copies of civil, electrical, mechanical, and structural design documents.
Please note alll specs and drawings are for reference and are intended for the originalg contract build these are not redlines or As-Builts. Only 60% of the work required in the drawings had been accomplished.
CPS
Substantive If any materials or equipment are to be retained by the Government will the Government remove those items from the work site prior to demolition?
everything will be decontructed and removed by the contractor. And disposed recycled or reused see details in the original specs provided for the demolition portion of this project.The one exception will be the cement storm drain piping It will be moved and stacked neatly and remain on the
CPS
Substantive Are utilities currently connected and live? It so please clarify any utilities that are to remain active after demolition and required demarcation points for all utilities.
there are no utilities live that are attached to the building. However, a mentioned in the scope of work, a water main tie-in will need to be made before the building is demolished.
CPS
Substantive Please clarify any materials recycling requirements.
reference waste management division Specs for the demolition these were provided in original solicitation documents
CPS
Substantive Can superintendent also perform safety and QC functions?
This is a Service Contract no, QC must be a separate person, but can be the PM in this instance
CPS
Substantive Please confirm that there are no assets belonging to any other contractor remaining on site.
Items on the site have been abandoned and should be considered property of the government. The exception to this is the dumpster which belongs to Waste Management and its return should be coordinated.
CPS
Substantive We were told drawings of the existing structure were available. We do not see them in any of the attachment
Drawings and SPECS provided (Only Providing for reference the required Drawings that pertain to the demolition of this property.)
Vortex LLC
Substantive
They stated that everything inside the existing construction fence is included(including Conex) Since they want to save certain MEP equipment, do you have a list of what the Gov't wants us to save. What are they salvaging beforehand and what does the contractor needs to save?
everything will be decontructed and removed by the contractor and considered the contractors property. The one exception will be the cement storm drain piping. It will be moved and stacked neatly and remain on the site.
Vortex LLC
Substantive
The site is heavily overgrown and will need to be bush hogged. The Sow did not mention anything about how the site is to be left. After foundation removal, do we need to bring in fill to backfill voids? No way to know what the existing grade is due to the overgrowth.
Backfill is neccesary and original Civil Drawings attached for reference to show exsisting grade
Vortex LLC
Substantive
For the Salvage of the Structural Steel (Sect.1.1.4 page 4 of 10 of RFQ) Need to clarify this requirement as they said that they likely would want some of the MEP equipment on site and mentioned the Structural Steel to salvage. Which structural steel(steel tube columns/beams.i-beams, bar joist, etc.) is to be salvaged and is it to be demolished and stockpiled on site as scrap metal or dismantled for reuse? Some of the steel tube columns are quite tall (30+'). This makes a huge difference in cost.
There is also quite a bit of metal studs, door frames, window frames, etc. stored in the building. Is any of this to be saved?
everything will be decontructed and removed by the contractor and considered the contractors property. All materials will be salvaged or recycled by the contractor. The one exception will be the cement storm drain piping. It will be moved and stacked neatly and remain on the site.
Vortex LLC
Substantive There are no categories for construction operators/laborers/drivers in the Wage Determination document provided. Where can we find the appropriate wages for this project?
This is a service contract and subject to SCLS Service Contract Act.
based on Far 37.3 dismantling, demolition, or removal of improvements falls under the Service Contract Labor Standards not Davis Bacon Wage Rates.
Vortex LLC
Substantive Will there be any applicable state or county contractor's licensing requirements? Only what is required by the state.
Substantive Will the Solicitation be extended Extended to 09/06/2022 @ 1:00 PM