S05_Attachment 9 Q_A RFIs Round 1 Answers.xlsx

XLSX spreadsheet 26 KB Posted

Attached to
Z1DA--Project: 673-105 Demo, Install electrical on 2 new guard shacks
Solicitation number
36C24822Q0753
Issued by

View the file

Other files

File Type Posted
36C24822Q0753 0001.pdf PDF
S02_36C24822Q0753 4_18.docx DOCX document
Wage Determination 2022.pdf PDF
S2104003 - DWG-SS.pdf PDF
36C24822Q0753.docx DOCX document

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

DIRECTIONS

TAILORED COMMENT MATRIX

THIS DOCUMENT MUST BE RETURNED IN A MICROSOFT EXCEL FILE FORMAT. DO NOT RETURN YOUR RESPONSES IN ANY DIFFERENT FILE FORMAT.

Directions & Explanation of TAILORED COMMENT MATRIX
This Tailored Comment Matrix is provided in order for potential offerors to provide feedback, comments, and ask questions with regard to the released RFP.

The sheet labeled "DIRECTIONS" explains this document, and provides directions for its use.

The sheet labeled "MATRIX" contains a table with all labeled and numbered elements from the RFP. This table is where potential offerors may respond to the Government with feedback, comments, or ask questions.

Directions and explanation of sheet labeled "MATRIX"
The MATRIX sheet can be reached by clicking the "MATRIX" Tab at the bottom of this spreadsheet. Add rows as necessary under the applicable item.
MATRIX COLUMN DESCRIPTIONS:
Column A:Contains the Item reference number for this item. This number is used for organizational purposes, when referring to this document only.

Column B: Contains the section number that each element is labeled, within their respective documents. The section number relates directly to the item's location in the RFP.

Column C: Contains the written title for the corresponding item/section number.

Column D:Contains a drop down box for selecting the type of comment. Available options are "Critical" "Substantive" or "Administrative".
Critical: Violations of law -or- Unnecessary risks to safety, life & limb, or VA Material; waste or abuse of VHA appropriations; unreasonable burden on resources.
Substantive: Appears or is potentially unnecessary, incorrect, misleading, confusing, or inconsistent with other sections; disagree with proposed responsibilities, requirements, and/or procedures.
Administrative: Address typographical, grammatical, and formatting errors (grammar, punctuation, style, etc.)

Column E: Contains recieved date of offerors' comments/questions/responses.

Column F: Contains space for potential offerors' comments/questions/responses.

Column G: Contains space for VHA comments/questions/responses.

Column H: Contains response date for VHA comments/questions/responses.

Column I: Contains VHA Section/ POC shop comments/questions/response

Column J: Contains Contractor Name requesting /questions/responses.

THIS DOCUMENT MUST BE RETURNED IN A MICROSOFT EXCEL FILE FORMAT. DO NOT RETURN YOUR RESPONSES IN ANY DIFFERENT FILE FORMAT.

MATRIX

ITEM #DOCUMENT NAMEReceived DateQUESTIONS / COMMENTS
(With justification of why considered source selection sensitive if applicable)VA Response
1wage determination4/21/22Please provide the Wage Determination for Hillsborough County as the one provided as part of the solicitation Pinellas Countyhttps://sam.gov/wage-determination/FL20220116/1
2SOW04/21/22Please confirm that due to the extensive work needed to bring the electrical to the guard shack in Freedom lot that the work can occur on multiple days vs 12 hours as stated in the SOW.Confirmed. Entirety of work to be completed within Contract Period of Performance.
3SOW04/21/22Please confirm that due to the extensive work needed to bring the electrical to the guard shack in Freedom lot that the work can occur on multiple days vs 12 hours as stated in the SOW.See response (2).
4SOW04/28/22The Statement of Work under 4.Scope states “Within one day (up to twelve continuous hours) the contractor is responsible to complete the work.” It was discussed during the site walk that this wasn’t believed to be the case and that additional time will be an option. Can the timetable for this project be confirmed?See response (2).
5SOW04/28/22Has it been established where power will be pulled from for new Freedom guard shack?Power Freedom Guard Shack fed from existing shed located near shack, NW of intended Guard Shack location. Add exterior enclosed sub-panel and disconnect to existing shed. Trench to Freedom Guard Shack. All electrical work must be completed in accordance with VA TIL standards and electrical requirments.
6SOW04/28/22What is the existing circuit feeding the existing Romeo shack? The existing breaker and wire size will need to be known.Fed by 60A Breaker. Panel located in Southside of Romeo parking lot near pedestrian walk-way.
7SOW04/28/22There are (2) ¾” seal tight conduits exiting the electrical panel on the existing Romeo shack, one seems to be feeding an existing light pole. What does the other conduit feed into?Unknown at this time.