Q and A.pdf
PDF 133 KB Posted
- Solicitation number
- 36C24822Q0382
View the file
Other files
| File | Type | Posted |
|---|---|---|
| 36C24822Q0382 0002.docx | DOCX document | |
| DRAWINGS.pdf | ||
| 36C24822Q0382 0001.docx | DOCX document | |
| LOS CERTIFICATION SOLICITATION- ATTACHMENT E.pdf | ||
| 36C24822Q0382.docx | DOCX document | |
| MOPC RO DESIGNER REPORT- ATTACHMENT D.pdf | ||
| SCHEDULE AND DELIVERY-ATTACHMENT B.pdf | ||
| Scope Of Work - MOPC SPS Reverse Osmosis Upgrade- ATTACHMENT A.pdf | ||
| CLAUSES-ATTACHMENT C.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
• Is the RFQ for the Mayaquez VA Clinic located in Puerto Rico? Int. PR-No.2 and Algarrobos, K.M 149.9, Bo. Sabanetas, Mayaguez PR 00680 (18.236973, -67.159475)
• Are you having RO / DI water quality (purity degradation) issues? No, the existing system has not been started yet. The purpose of the project is to recondition/upgrade the described RO System to comply with AAMI TIR 34.
• Are you having RO / DI water contamination (CFU count) issues? No, the existing system has not been started yet. The purpose of the project is to recondition/upgrade the described RO System to comply with AAMI TIR 34.
• Does your 902 GETINGE unit require 9 GPM flow? Flow requirements need to be confirmed with the equipment manufacture’s specifications.
• Does your 904 RINSE/DRYER unit require 9 GPM flow? Flow requirements need to be confirmed with the equipment manufacture’s specifications.
• What is the GPM flow requirement for the 559 CART WASH unit? No Cart Wash unit on site. For list of equipment to be supplied, reference attached Drawings (3x Three Bay Sink, Rinse/Dryer 2460-RD, Ultrasonic Cleaner 2460-UC, 46-5 Getinge Washer/Disinfector Model 46 and AER Medivator Advantage Plus).
• Is the line pressure in your RO / DI piping between 65 - 85 PSI? System was never started. Line pressure need to be per the RO System Pump rating and/or RO Manufacturer’s Specifications
• Can you meet all required volumes / flows with your existing system? No, as such is stipulated in the attached report a change of pump and an addition of a second.
• Are you interested in ensuring Type-1 water quality at the point of service? Water Quality as per AAMI TIR 34, including the required lab testing to ensure that all parameters are as per the AAMI TIR 34.
Note: 1. RO Storage Tank may be needed to be increased in size. A inventory assessment, based on the listed equipment consumptions, is required to ensure that appropriate inventory volume is available. 2. Proposal shall include that the existing supply RO line might need to be modified to supply all the required points, as per Page 12 of attached Drawings.