The file's text, extracted by GovTribe without its formatting.
PAGE 1 OF
1. REQUISITION NO.
2. CONTRACT NO.
3. AWARD/EFFECTIVE DATE
4. ORDER NO.
5. SOLICITATION NUMBER
6. SOLICITATION ISSUE DATE
a. NAME
b. TELEPHONE NO. (No Collect Calls)
8. OFFER DUE DATE/LOCAL
TIME
9. ISSUED BY
CODE
10. THIS ACQUISITION IS
UNRESTRICTED OR
SET ASIDE:
% FOR:
SMALL BUSINESS
HUBZONE SMALL
BUSINESS
SERVICE-DISABLED
VETERAN-OWNED
SMALL BUSINESS
WOMEN-OWNED SMALL BUSINESS
(WOSB) ELIGIBLE UNDER THE WOMEN-OWNED
SMALL BUSINESS PROGRAM
EDWOSB
8(A)
NAICS:
SIZE STANDARD:
11. DELIVERY FOR FOB DESTINA-
TION UNLESS BLOCK IS
MARKED
SEE SCHEDULE
12. DISCOUNT TERMS
13a. THIS CONTRACT IS A
RATED ORDER UNDER
DPAS (15 CFR 700)
13b. RATING
14. METHOD OF SOLICITATION
RFQ
IFB
RFP
15. DELIVER TO
CODE
16. ADMINISTERED BY
CODE
17a. CONTRACTOR/OFFEROR
CODE
FACILITY CODE
18a. PAYMENT WILL BE MADE BY
CODE
TELEPHONE NO.
DUNS:
DUNS+4:
PHONE:
FAX:
17b. CHECK IF REMITTANCE IS DIFFERENT AND PUT SUCH ADDRESS IN OFFER 18b. SUBMIT INVOICES TO ADDRESS SHOWN IN BLOCK 18a UNLESS BLOCK BELOW IS CHECKED
SEE ADDENDUM
19.
20.
21.
22.
23.
24.
ITEM NO.
SCHEDULE OF SUPPLIES/SERVICES
QUANTITY
UNIT
UNIT PRICE
AMOUNT
(Use Reverse and/or Attach Additional Sheets as Necessary)
25. ACCOUNTING AND APPROPRIATION DATA
26. TOTAL AWARD AMOUNT (For Govt. Use Only) 27a. SOLICITATION INCORPORATES BY REFERENCE FAR 52.212-1, 52.212-4. FAR 52.212-3 AND 52.212-5 ARE ATTACHED. ADDENDA
ARE
ARE NOT ATTACHED.
27b. CONTRACT/PURCHASE ORDER INCORPORATES BY REFERENCE FAR 52.212-4. FAR 52.212-5 IS ATTACHED. ADDENDA
ARE
ARE NOT ATTACHED
28. CONTRACTOR IS REQUIRED TO SIGN THIS DOCUMENT AND RETURN _______________
29. AWARD OF CONTRACT: REF. ___________________________________ OFFER
COPIES TO ISSUING OFFICE. CONTRACTOR AGREES TO FURNISH AND
DATED ________________________________. YOUR OFFER ON SOLICITATION
DELIVER ALL ITEMS SET FORTH OR OTHERWISE IDENTIFIED ABOVE AND ON ANY
(BLOCK 5), INCLUDING ANY ADDITIONS OR CHANGES WHICH ARE
ADDITIONAL SHEETS SUBJECT TO THE TERMS AND CONDITIONS SPECIFIED
SET FORTH HEREIN IS ACCEPTED AS TO ITEMS:
30a. SIGNATURE OF OFFEROR/CONTRACTOR 31a. UNITED STATES OF AMERICA (SIGNATURE OF CONTRACTING OFFICER) 30b. NAME AND TITLE OF SIGNER (TYPE OR PRINT) 30c. DATE SIGNED 31b. NAME OF CONTRACTING OFFICER (TYPE OR PRINT) 31c. DATE SIGNED
AUTHORIZED FOR LOCAL REPRODUCTION
(REV. 2/2012)
PREVIOUS EDITION IS NOT USABLE
Prescribed by GSA - FAR (48 CFR) 53.212
7. FOR SOLICITATION
INFORMATION CALL:
STANDARD FORM 1449
OFFEROR TO COMPLETE BLOCKS 12, 17, 23, 24, & 30
SOLICITATION/CONTRACT/ORDER FOR COMMERCIAL ITEMS
36C24819Q0940 07-20-2019 Ms. Rosetta Little
(407) 646-4014 08-16-2019 1pm (EST) Department of Veterans Affairs Network Contracting Office (NCO) 8 Orlando VA Medical Center 13800 Veterans Way Orlando FL 32827-7403
X X Z X
XX
X X
493110 $27.5 Million
N/A
Department of Veterans Affairs VA Caribbean Healthcare System Warehouse 10 Ave Jose Santana Carolina PR 00979 00675 Department of Veterans Affairs Network Contracting Office (NCO) 8 Orlando VA Medical Center 13800 Veterans Way Orlando FL 32827-7403
Department of Veterans Affairs Financial Services Center
P.O. Box 149971 Austin TX 78714-9971 877-353-9791 512-460-5221
See CONTINUATION Page Intent to solicit for Warehouse Equipment and Seismic Racks with customization for VA Caribbean Healthcare Warehouse Activation.
Pertinent Information:
Warehouse address: 10 Ave Jose Santana, Carolina, PR, 00979.
Site Visit - Book it between July 29 through August 2, 2019 by contacting Mr. Hector Lopez-Burgos at e-mail hector.lopez-burgos@va.gov
Technical Questions- Due to Ms. Rosetta Little by e-mail on August 5, 2019 no later than 1:00 p. m. (EST). Her e-mail is rosetta.little@va.gov
See CONTINUATION Page
Table of Contents
| SECTION A | 1 |
| A.1 SF 1449 SOLICITATION/CONTRACT/ORDER FOR COMMERCIAL ITEMS | 1 |
| SECTION B - CONTINUATION OF SF 1449 BLOCKS | 3 |
| B.1 CONTRACT ADMINISTRATION DATA | 3 |
| PERFORMANCE WORK STATEMENT (PWS) | 5 |
| B.2 PRICE/COST SCHEDULE | 24 |
| ITEM INFORMATION | 24 |
| B.3 DELIVERY SCHEDULE | 28 |
| SECTION C - CONTRACT CLAUSES | 29 |
| C.1 52.252-2 CLAUSES INCORPORATED BY REFERENCE (FEB 1998) | 29 |
| C.2 VAAR 852.203-70 COMMERCIAL ADVERTISING (MAY 2018) | 29 |
| C.3 VAAR 852.211-70 EQUIPMENT OPERATION AND MAINTENANCE MANUALS (NOV 2018) | 29 |
| C.4 VAAR 852.219-10 VA NOTICE OF TOTAL SERVICE-DISABLED VETERAN-OWNED SMALL BUSINESS SET-ASIDE (JUL 2016)(DEVIATION) | 30 |
| C.5 VAAR 852.219-11 VA NOTICE OF TOTAL VETERAN-OWNED SMALL BUSINESS SET-ASIDE (JUL 2016)(DEVIATION) | 30 |
| C.6 VAAR 852.219-74 LIMITATIONS ON SUBCONTRACTING—MONITORING AND COMPLIANCE (JUL 2018) | 31 |
| C.7 VAAR 852.219-75 SUBCONTRACTING COMMITMENTS MONITORING AND COMPLIANCE (JUL 2018) | 32 |
| C.8 VAAR 852.232-72 ELECTRONIC SUBMISSION OF PAYMENT REQUESTS (NOV 2018) | 32 |
| C.9 VAAR 852.237-70 CONTRACTOR RESPONSIBILITIES (APR 1984) | 33 |
| C.10 VAAR 852.246-71 REJECTED GOODS (OCT 2018) | 34 |
| C.11 VAAR 852.247-71 DELIVERY LOCATION (OCT 2018) | 34 |
| C.12 VAAR 852.247-74 ADVANCE NOTICE OF SHIPMENT (OCT 2018) | 34 |
| C.13 VAAR 852.270-1 REPRESENTATIVES OF CONTRACTING OFFICERS (JAN 2008) | 34 |
| C.14 52.212-5 CONTRACT TERMS AND CONDITIONS REQUIRED TO IMPLEMENT STATUTES OR EXECUTIVE ORDERS—COMMERCIAL ITEMS (MAY 2019) | 35 |
| SECTION D - CONTRACT DOCUMENTS, EXHIBITS, OR ATTACHMENTS | 42 |
| SECTION E - SOLICITATION PROVISIONS | 43 |
| E.1 52.209-7 INFORMATION REGARDING RESPONSIBILITY MATTERS (OCT 2018) | 45 |
| E.2 52.211-6 BRAND NAME OR EQUAL (AUG 1999) | 46 |
| E.3 52.216-1 TYPE OF CONTRACT (APR 1984) | 46 |
| E.4 52.233-2 SERVICE OF PROTEST (SEP 2006) | 47 |
| E.5 52.237-1 SITE VISIT (APR 1984) | 47 |
| E.6 52.252-1 SOLICITATION PROVISIONS INCORPORATED BY REFERENCE (FEB 1998) | 47 |
| E.7 VAAR 852.233-70 PROTEST CONTENT/ALTERNATIVE DISPUTE RESOLUTION (OCT 2018) | 48 |
| E.8 VAAR 852.233-71 ALTERNATE PROTEST PROCEDURE (OCT 2018) | 48 |
| E.9 52.212-2 EVALUATION—COMMERCIAL ITEMS (OCT 2014) (Tailored) | 49 |
| E.10 52.212-3 OFFEROR REPRESENTATIONS AND CERTIFICATIONS—COMMERCIAL ITEMS (OCT 2018) | 49 |
SECTION B - CONTINUATION OF SF 1449 BLOCKS
B.1 CONTRACT ADMINISTRATION DATA
1. Contract Administration: All contract administration matters will be handled by the following individuals:
| a. CONTRACTOR: | Contractor Name |
| POC Name |
| POC Email |
| POC Phone |
b. GOVERNMENT: Contracting Officer 36C248 CO: P. Catinchi; CS: R. Little Department of Veterans Affairs, Network Contracting Office (NCO) 8 Orlando VA Medical Center, 13800 Veterans Way, Orlando FL 32827-7403
2. CONTRACTOR REMITTANCE ADDRESS: All payments by the Government to the contractor will be made in accordance with:
| [X] |
| 52.232-33, Payment by Electronic Funds Transfer—System for Award Management, or |
| [] |
| 52.232-36, Payment by Third Party |
3. INVOICES: Invoices shall be submitted in arrears:
| a. Quarterly | [] |
| b. Semi-Annually | [] |
| c. Other | [X] Once items are received, inspected and accepted. |
4. GOVERNMENT INVOICE ADDRESS: All Invoices from the contractor shall be submitted electronically in accordance with VAAR Clause 852.232-72 Electronic Submission of Payment Requests.
Department of Veterans Affairs, Financial Services Center, P.O. Box 149971, Austin TX 78714-9971 ACKNOWLEDGMENT OF AMENDMENTS: The offeror acknowledges receipt of amendments to the Solicitation numbered and dated as follows:
PERFORMANCE WORK STATEMENT (PWS)
1.0 INTRODUCTION
1.1 The VA Caribbean Health Care System is in need to acquire a new Seismic Selective Racks 5 Levels height in conjunction with a new specialize Material Handling Equipment (MHE) to be use in the new VA Facility Warehouse. Both, the racks and the heavy equipment must be customized to be able to operate a high-level efficient warehouse that not only satisfies the storage requirements for the facility but is properly adjusted to the available space provided. The proper utilization of the Space Management Tool will not only maximize the storage capacity, but with this customized equipment the warehouse will be at a usable “Premium Level” by expanding the capacity for up to a 300%.
2.0 DESCRIPTION/SCOPE/OBJECTIVE
2.1 Contractor must furnish enough technical support and guidance to be able to manufacture and install the heavy equipment requested. The mentioned equipment must be specifically manufactured to operate in the available space provided in the aisles between the racks. The combination of both, racks and heavy equipment will provide the end user the requirement necessary tools needed to satisfy the warehouse utilization, resulting in a direct profit of storage capabilities by going higher and narrower.
3.0 APPLICABLE DOCUMENTS
3.1 References and resources to aid in the formulation and surveying of the facility for this service include, but are not limited to, the following.
| ADA |
| Americans with Disabilities Act |
| ANSI |
| American National Standards Institute |
| FAR |
| Federal Acquisition Regulation |
| Federal, State, Local, Industry, Manufacturer |
| All applicable federal, state, local, and industry: laws, codes, policies, procedures, standards, manufacturer’s specifications, and any other applicable doctrine for the intended performance of the equipment specified. |
| NEC |
| National Electric Code |
| NEMA |
| National Electrical Manufacturers Association |
| NFPA |
| National Fire Protection Association |
Other All equipment and installations/services must conform to the VA master specifications (issued upon request). All equipment and installation must conform to the recommendations of the National Fire Protection Association (NFPA), including the National Electrical Code (NEC). No departures from specification requirements will be permitted without written approval. All hardware should be installed in such a manner to minimize damage and maximize patient and employee safety. All equipment and procedures must conform to OSHA, NEMA, and ANSI Standards as well as conform to the Standard Building Code/Standard Mechanical Code.
| VAAR |
| Veterans Administration Acquisition Regulation |
| U.L. Standard 752 |
| Underwriter’s Laboratories Standard for Class III Ballistic |
1.0 2.0 3.0 3.1.
3.2. Glossary. Acronyms used in this PWS are listed below for easy reference:
| AQL | Acceptable Quality Level |
| CDR | Contractor Discrepancy Report |
| CO | Contracting Officer | |
| COR | Contracting Officer’s Representative | |
| EST | Eastern Standard Time | |
| FAR | Federal Acquisition Regulation |
| PMCS | Preventative Maintenance Checks Service |
| QASP | Quality Assurance Surveillance Plan |
4.0 PERFORMANCE REQUIREMENTS
Warehouse Heavy Equipment
4.1. Contractor must provide all labor, materials, equipment, transportation, supplies, and supervision necessary to customize and install the Heavy Equipment Table listed below:
4.1.1. Heavy Equipment Table
| Make |
| Model |
| Description |
| Quantity |
| CROWN |
| RR5725-45-341 |
| SINGLE REACH |
| 2 |
| CROWN |
| TSP6500-30-339 |
| TURRET TRUCK |
| 2 |
| CROWN |
| SP3520-30-312 |
| STOCKPICKER |
| 2 |
| CROWN |
| PE4500-60-48 |
| RIDER PALLET |
| 2 |
| CROWN |
| WAV-118 |
| PERSONAL LIFT |
| 1 |
| CROWN |
| CS7010 |
| SWEEPER SCRUBBER |
| 1 |
| CROWN |
| WRTA-10 |
| WRAPPER MACHINE |
| 1 |
4.1.1.1. Contractor must ensure (once rails are in place) the Heavy equipment can enter in the aisles and be auto positioned.
4.1.1.2. The Contractor must ensure timely delivery of the Heavy Equipment as to not delay the installation of the Rack system.
4.1.1.3. The Contractor must work with the COR to ensure no damage to the floors for Heavy Equipment to operate.
4.2. The Contractor must customize equipment (listed above) to be operable with warehouse rack system while rack system is being installed.
4.2.1 The Contractor must design the customized equipment to meet the warehouse height/width based on the rack’s installation/positioning. This will assist with the automating the warehouse.
4.2.2 The Contractor must provide the necessary sensors required for the equipment to operate in between the aisles.
4.2.3 The equipment requested must include the FLEX Batteries.
4.2.3.1 Free maintenance with the Flex battery charger for up to 5 years.
4.2.4 The Contractor must provide the necessary operator training/basic PMCS to ensure the equipment is properly operated.
4.2.5 Contractor must coordinate with COR to ensure the equipment is operable with the rack system being installed.
4.3. Contractor must ensure equipment is under warranty for a minimum of 1 year; to include repairs.
4.3.1. In the event any of the equipment were to malfunction the Contractor must ensure repairs are to be done within 24hrs. All parts are to be available in Puerto Rico to ensure Contractor can provide services within 24hrs.
4.3.2 The Contractor must provide a basic 90-day warranty for ancillary parts to include but not limited to: brushes, contactor tips and switches.
4.4. The Contractor must provide operator training and certification for all requested equipment.
Warehouse Racks
4.5. Contractor must provide all labor, materials, equipment, transportation, supplies, and supervision necessary to install the seismic racks.
4.5.1. The Contractor must drill and secure the system to the warehouse floor and in between the racks to ensure distance of 12” IAW with the layout in Appendix A.
4.5.1.1. The Contractor must ensure that the distance between the racks is exactly based on the layout provide to ensure the specialize equipment requested will be able to operate.
4.5.1.2. The Contractor must install the correct weight capacity beams, upright pallets racks and wire decks that are in concurrence with the floor weight capacity and the warehouse height.
4.5.1.3. The Contractor must install the racks protectors in every corner of the upright rack’s frames.
4.5.1.4. Rail guidance for the auto positioning system must be installed at a perfect distance centered in between the aisles to ensure that when the Heavy equipment enters in the aisles auto positioning features of the equipment can function.
4.5.1.5. The Contractor must ensure that the floor is not drilled until all the equipment to be used is calculated to the appropriate width.
4.5.1.6. The Contractor must work very close with the COR to ensure no damage to the new floor constructed.
4.5.1.7. The Contractor must coordinate with COR and/or another Vendor to ensure the racks and equipment function in unison.
4.6. The Contractor, upon completion of the installation, must remove the work area of all debris and materials; this includes but is not limited to: sweeping, mopping, vacuuming and wiping down of all horizontal and vertical surfaces.
4.7. The Contractor must ensure the Warehouse meets current security access requirements at the end of each business day.
4.8. The Contractor must receive approval from the COR/CO before rendering services.
5.0 PERFORMANCE LOCATION AND HOURS
5.1 Installation is to be done during normal business hours which are from 7:30am (EST) -4:30pm (EST) and must be coordinated in advance with the COR prior to delivering.
5.2 Address: 10 Ave Jose Santa, Carolina, PR 00979.
6.0 DELIVERABLES:
6.1 The Contractors must include all relevant documents, manuals and service warranties for the End User VA Healthcare System Warehouse Chief/Supervisor.
6.2 Contractor must provide to the COR in writing a description of services & price before rendering services.
6.3 The Contractor must provide any additional documentation/ paperwork upon request from the COR.
7.0 Contractor Personnel and Management.
7.1. Contractor Personnel. The Contractor must be responsible for employing technically qualified personnel to perform the work specified in this PWS. The Contractor must maintain the personnel, organization and administrative control necessary to ensure that the work delivered meets the contract specifications and requirements.
7.2. Government Badges. The COR will coordinate the issuance of required access badges to Contractor personnel. Contract personnel must wear laminated identification badges provided by the Government at all times when performing. Badges must be worn on the outer garment, attached to the outer shirt or jacket pocket by a button or clip or worn around the neck secured by an appropriate identification card lanyard.
7.2.1. Government issued identification badge remains the property of the Government and must be returned to the issuing office or other designated Government personnel upon transfer of Contractor employees from the contract.
7.3. Contractor Badges. Notwithstanding the requirement to wear a Government furnished badge, Contractor personnel must also wear a laminated Contractor Identification Badge (CIB) at all times when performing services under this Contract, including when on Government directed travel. The CIB will contain a personal picture, name of employee, and Contractor's name. Badges must be worn on the outer garment attached to the outer shirt or jacket pocket by a button or clip or worn around the neck secured by an appropriate identification card lanyard.
7.4. All Contractor personnel attending meetings, answering Government telephones, and working in other situations where their Contractor status is not obvious to third parties are required to identify themselves as such to avoid creating an impression in the minds of members of the public or Congress that they are Government officials. They must also ensure that all documents or reports produced by Contractor personnel are suitably marked as Contractor products or that Contractor participation is appropriately disclosed.
1.0 2.0 3.0 4.0 5.0 6.0 7.0 7.1.
7.2.
7.3.
7.4.
7.5. Safety/Security Requirements. The Contractor must comply with all applicable federal, state and local laws and ensure performance is secure while protecting material, equipment, and supplies from damage and loss. Government security personnel must have the express right to inspect for security violations at any time during the term of the contract.
7.6. All information generated in performance of this contract becomes property of the Government and must be surrendered upon request and/or completion of the contract. The Contractor must protect against the destruction and/or misplacement of all information produced under this contract, unless directed under local policy to destroy. This includes both hard and soft copies of data.
7.7. The Contractor must not release any information (including photographs, files, public announcements, statements, denials, or confirmations) on any part of the subject matter of this contract or any phase of any program hereunder without the prior written approval of the COR.
7.8. Standards of Conduct
7.8.1. Conduct of Personnel. Contractor personnel must conduct themselves in a professional manner (i.e. timeliness, communication; spoken and written etc.). The Contracting Officer may require the Contractor to remove from the job site any employee working under this contract for reasons of suspected misconduct, a suspected security breach, or suspected to be under the influence of alcohol, drugs, or any other incapacitating agent. Contractor employees must be subject to dismissal from the premises upon determination by the Contracting Officer that such action is necessary in the interests of the Government. The hospital director or designated representative has the authority to bar individuals from the Government facility. The removal from the job site or dismissal from the premises must not relieve the Contractor of the requirement to provide sufficient personnel to perform the services as required by this performance work statement. The Government must not reimburse the Contractor for travel and other expenses associated with the removal of personnel.
7.8.2. Contractor personnel are not authorized to carry or possess personal weapons to include, but not limited to, firearms and knives with a blade length in excess of three inches, while assigned under this contract.
7.8.3. Working Attire and Appearance. Contractor personnel must present a professional appearance commensurate with standards delineated for Government civilian personnel acting in similar capacities.
7.8.4. The Government reserves the right to review Contractor personnel qualifications. Upon request, resumes must be provided to the Contracting Officer prior to clearance approval, for review and acceptance by the COR. The intent is verification purpose and not for the Government to become the hiring authority.
8.0 TRAVEL
8.1. Not Applicable.
9.0 NON-PERSONAL SERVICE STATEMENT
9.1 Contractor employees performing services under this order will be controlled, directed, and supervised at all times by management personnel of the Contractor. Contractor management will ensure that employees properly comply with the performance work standards outlined in the PWS. Contractor employees will perform their duties independent of, and without the supervision of, any Government official. The tasks, duties, and responsibilities set forth in the contract may not be interpreted or implemented in any manner that results in any Contractor employee creating or modifying Federal policy, obligating the appropriated funds of the United States Government, overseeing the work of Federal employees, providing direct personal services to any Federal employee, or otherwise violating the prohibitions set forth in Parts 7.5 and 37.1 of the Federal Acquisition Regulation (FAR). The Government will control access to the facility and will perform the inspection and acceptance of the completed work.
10.0 PERFORMANCE STANDARDS AND QUALITY MEASUREMENT
10.1 Performance standards define desired services. The Government performs surveillance to determine if the Contractor exceeds, meets, or does not meet these standards. The Government must use these standards to determine Contractor performance and must compare Contractor performance to the Acceptable Quality Level (AQL). The Quality Assurance Surveillance Plan (QASP) method of surveillance will be by random inspection.
10.2 The QASP and its performance objectives are as follows:
| PWS Para. |
| Performance Objective |
| Performance |
Standard
| Acceptable Quality Level (AQL) |
| Surveillance Method |
| Compliance |
4.0
The Contractor must ensure the Heavy Equipment is customized to meet the provided layout specifications aisle dimensions. This includes fitting Heavy Equipment to Rack System.
For all sections: Ensure the Heavy Equipment is delivered within the specified requirement. Ensure Heavy Equipment fits the Rack system being placed. Coordination with the COR.
Ensure all racks are installed properly to ensure and meet the warehouse layout without any diversion unless are approved by designer and end user. No work is to be conducted until Heavy Equipment is delivered. This is to ensure no unnecessary damage to the warehouse floor or delays during the installation phase
For all sections: Contractor must perform at 95% quality standard.
For all sections: Inspection conducted by the COR and/or customer comment.
For all sections: Below AQL, non-acceptance of services. A Contract Discrepancy Report (CDR), will be issued for performance below the AQL. The Contractor will have five workdays to provide a response that includes an improvement strategy for addressing the issues. 30 days after issuing the CDR, the Contractor will be re-rated. If performance does not comply with PWS. The Contract Officer (CO) will be notified, the performance record will be documented, and CO may pursue contract action.
6.0
Has Contractor provided all required documentation with signatures to the COR prior to rendering services.
APPENDIX A- AUTOCAD DRAWINGS/LAYOUT
Appendix A RR5725-45 4,500 lb. Capacity, 36 Volt, Reach Truck
| Configuration Type |
| RR5725-45 4,500 lb. Capacity, 36 Volt, Reach Truck |
| Mast |
| Triple Stage LH 341.0" FLH 101.0" OAH-C 149.0" OAH-EX 389.0" |
| Outrigger |
| Standard I.D. 42.0" 0.0. 53.0" |
| Sideshifter |
| 2” Each Direction |
| Fork Spread (Out-To-Out) |
| 30" |
| Forks |
| Standard Length 42.0" Width 4.0" Thick 1.75" |
| Load Backrest |
| 32.5" Wide x 48" High |
| Hydraulic Control |
| AC Hydraulics with Electronic Power Steering |
| Battery Dimensions |
| Code D24 -18.00" x 38.69" x 31.0" |
| Battery Connector |
| SB350 Gray |
| Overhead Guard Height |
| Standard 95.0" High |
| Overhead Guard Support |
| 3rd Post |
| lnfolink Ready |
| lnfolink System Ready- Advantage |
| Drive Tires |
| Poly Vulkollan -442 |
| Load Wheels |
| Tandem Articulating 6 x 4.1 (·302) (Wheel Factor 11) |
| Travel Alarm |
| Smart Alarm - Forward (Forks First) |
| Warning Device Light |
| LED Flashing Light· Amber |
| Work Assist Clamp |
| Clamp (Right Side) |
| Work Assist Tube |
| Right Side (Mast Mount) |
| Warranty |
| Standard - One Year/Unlimited Hours |
| Domestic Shipping |
| Skidding |
| Commodity Surcharge |
| Commodity Surcharge |
General Specifications
| Head Length |
| Compartment C |
| 53.67 |
| In. |
| Max Battery Size |
| Compartment C L x W xH |
| 38.38 X 16.25 X 31 |
| In. |
| Compartment D L x W xH |
| 38.69 X 18.00 X 31 |
| In. |
| Compartment E L x W |
| 38.69 X 20.75 X 31 |
| In. |
RR5725-45 4,500 lb. Capacity, 36 Volt, Reach Truck Performance Specifications
| Travel Speed |
| Power Unit First (Ell) |
| 8.0/7.2 |
| mph |
| Forks First (E/L) |
| 6.8/5.7 |
| mph |
| Lift Speed-DC |
| Empty |
| 127 |
| fpm |
| Lift Speed- AC |
| Empty |
| 153 |
| fpm |
| Lower Speed |
| Empty / Loaded |
| 110/110 |
| fpm |
Battery and Charger Specifications
| Make: |
| FLEX Industrial Power |
| Battery Connector |
| SB350 GRAY |
| Warranty |
| As per manufacturer |
| Make: |
| FLEX Industrial Power |
| 8 Hr Capacity |
| Amp Hour Capacity - 675 |
| Warranty |
| As per manufacturer |
TSP-6500 3,300 lb. Capacity, 48 Volt, Stockpicker, Turret Truck
| Configuration Type |
| TSP-6500 3,300 lb. Capacity, 48 Volt, Stockpicker, Turret Truck |
| Mast(TSP |
| TN -Standard -TSP-6500 LH 339.0" FLH 72.0" OAH-C 191.0" OAH-EX 381.0" |
| Fork Size |
| 2.25" x 5.9" Telescopic |
| Fork Length |
| 42.0" Telescopic |
| Fork Spread (Out-To-Out) |
| 30" |
| Fork Extension |
| 6.5" Telescopic |
| Maximum Battery Dimensions |
| Code AA Standard -21.38" x 41.61" x 31.00" |
| Battery Connector Color |
| Blue -SB350 |
| Overhead Guard Cover |
| Partial Plexiglass |
| Operator Compartment |
| 52"Wide |
| Lift |
| lift and Lower limits with Override |
| lnfolink Ready |
| lnfolink System Ready -Advantage |
| Drive Tires |
| Vulkollan Polyurethane -15" x 7" |
| Load Wheels |
| Non-Marking Polyurethane |
| Wire Guide System |
| Electronic Wire Guidance |
| Wire Guidance Sensors |
| Up to 200 mA line Current |
| Conditioning |
| Normal Operation and Coolers |
| Safety Harness |
| L/XL Safety Harness |
| Tether |
| Shock Absorbing Tether |
| Warning Device Light |
| Flashing LED -Amber |
| Domestic Shipping |
| Three Piece Shipping -Skidded |
| Commodity Surcharge |
| Commodity Surcharge |
TSP-6500 3,300 lb. Capacity, 48 Volt, Stock picker, Turret Truck
| Make: |
| FLEX Industrial Power |
| Battery Connector |
| SB350 GRAY |
| Warranty |
| As per manufacturer |
| Make: |
| FLEX Industrial Power |
| 8 Hr Capacity |
| Amp Hour Capacity - 750 |
| Warranty |
| As per manufacturer |
SP-3500 3,000 lb. Capacity, 24 Volt, Stockpicker
| Configuration Type |
| SP-3500 3,000 lb. Capacity, 24 Volt, Stockpicker |
| Mast |
| Triple Telescopic LH 312.0” FLH 44.0” OAH-C 131.0” OAH-EX 400.0” |
| Operator Compartment Depth |
| 27” Deep |
| Operator Compartment Height |
| 79” Standard |
| Operator Compartment Width |
| 54” Wide |
| Forks |
| Standard Length 42” Width 4” Thick 2” |
| Max Battery Dimensions |
| *Select Battery Spacers/Maximum Battery Size |
| Adjustable Fork Spread |
| 24”-30” |
| Battery Connector |
| SB350 Red |
| Lift |
| Programmable lift, Single Cutout |
| InfoLink Ready |
| InfoLink System Ready – Right Accessory Tube - Advantage |
| Drive Tires |
| Vulkollan-Cream Color |
| Load Wheel Compound |
| -302 Moderate Cut/tear Resistance Higher Capacity |
| Wire Guidance System |
| Electronic Wire Guidance – Up to 200 mA Line Current |
| Lights |
| Worklights – Dome Light and Two-Speed Fan |
| Safety Harness |
| L/XL Safety Harness |
| Tether |
| Retractable Tether |
| Pallet Clamp |
| Electric 1.5” to 6” Stringer |
| Travel Alarm |
| Reverse (Forks First) |
| Warning Device Light |
| LED Flashing Light – Amber |
| Work Assist Clamp |
| Clamp (Right Side) |
| Work Assist Option |
| Clip Board and Hook (Left Side) |
| Domestic Shipping |
| Skidding |
| Commodity Surcharge |
| Common |
SP-3500 3,000 lb. Capacity, 24 Volt, Stockpicker
| Make: |
| FLEX Battery Maintenance Free |
| Battery Connector |
| SB350 RED |
| Warranty |
| As per manufacturer |
| 8 Hr Capacity |
| Amp Hour Capacity - 640 |
| Warranty |
| As per manufacturer |
PE4500-60 6,000 lb. Capacity, AC Traction 24 Volt, End Control, Rider Pallet
| Configuration Type |
| PE4500-60 6,000 lb. Capacity, AC Traction 24 Volt, End Control, Rider Pallet Truck |
| Control Handle |
| Manual Steering |
| Forks |
| Standard Tip Length 48.0” Width 9.12” |
| Fork Spread (Out-To-Out) |
| 27” Outside (Standard Tip) |
| Load Backrest |
| 48” High-Bolt-On |
| Maximum Battery Height |
| 22.38” |
| Maximum Battery Size |
| 13.19”x 31.12” x23.38” |
| Traction Control |
| Access 1 2 3” R Controller |
| Battery Connector Type |
| SB-175 |
| Battery Connector Color |
| Gray |
| Battery Connector Side |
| Right |
| InfoLink Ready |
| InfoLink System Ready - Advantage |
| Drive Tires |
| Poly – Cream Color – Non-Marking |
| Casters |
| Standard Independent – Shim Free |
| Load Wheels |
| Polyurethane Single Wheel with Singe Axle |
| Load Wheel Compound |
| -302 Moderate Cut/Tear Resistance wit Higher Capacity |
| Battery Discharge Indicator |
| Crown Access 1 Display |
| Storage Module |
| Storage Module – Lead Backrest Mount |
| Work Assist Tube |
| Standard Length |
| Warranty |
| Standard – One Year/Unlimited Hours |
| Commodity Surcharge |
| Commodity Surcharge |
Additional Options Included Battery – Quick Disconnect Handle (Right Side Only)
| Maximum Battery Size |
| W x L x H Opt. 1/ Opt. 2 |
| 6.69x34.44x31.62/13.19x31.12x31.62 |
| In. |
| Head Length |
| Battery Opt.1/Opt.2 |
| 36.7/43.2 |
| In. |
Width Overall
| Maximum Travel Speed |
| Empty/Loaded – 8,000 lb. |
| 9.0/6.0 |
| mph |
| Battery Connector |
| SB175 GRAY |
| Warranty |
| As per manufacturer |
| 8 Hr Capacity |
| Amp Hour Capacity - 0 |
| Warranty |
| As per manufacturer |
WAV60-118 118” Lift Height, 24 Volt, Work Assist Vehicle
| Configuration Type |
| WAV60-118 118” Lift Height, 24 Volt, Work Assist Vehicle |
| Chassis |
| WAVE Work Assist Vehicle |
| Platform |
| 118” Lifting Height |
| Load Tray Type |
| Manual Adjustable |
| Load Tray Size |
| Stamped – 21.2” L x 27.00” W |
| Load Tray Insert |
| Plastic - ABS |
| Batteries |
| Maintenance Free 200 AH |
| InfoLink Ready |
| InfoLink System Ready - Advantage |
| Aisle Guide Roller Assembly |
| Standard Width – 35” |
| Bumpers |
| Front, Rear, and Side (Steel) |
| Travel Alarms |
| Adjustable Travel Alarm – (Selections below) |
| Key Switch |
| On/Off Key Switch |
| Operator Login Code Type |
| Access 1 2 3 |
| Warning Device Light |
| Strobe – Front/Rear |
| Work Assist Clip Board |
| Clip Board |
| Warranty |
| Standard – Six Months Parts and Labor, Additional Six Months Parts Only |
| Commodity Surcharge |
| Commodity Surcharge |
Additional Options Included Storage Tray
| Vehicle Capacities |
| Operator Compartment |
| 300 |
| lb. |
| Vehicle Weight |
| With Battery |
| 1420 |
| Ib. |
Platform
Work Height
Overall Collapsed Height
Vehicle Length
Vehicle Width
| Vehicle Width |
| With Rail Guide Rollers |
| 35 |
| in |
| Rail Guide Wheel Height |
| 2.5 |
| in |
| Rail Guide Wheel Diameter |
| 2.5 |
| in |
| Rail Guide Wheel Thickness |
| 1 |
| in |
Minimum Turning Radius
Grade Clearance
Lift Speeds
Lower Speeds
| Travel Speeds |
| See Chart Below |
Top Travel Speeds (mph)
| Platform Ht. |
| Gate Condition |
| -118 |
Forward
Reverse
| Below 20 |
| Open or Closed |
| 2 |
Advance CS7010”tm 48 Battery Hybrid Sweeper-Scrubber Technical Specification:
| Type: |
| Rider Sweeper and Scrubber |
Sweeping System
| Sweeping Path w/Dual Side Brooms: |
| 61 in – Squeegee path width is full swept |
| Main Broom: |
| 36 in x 12.2 in |
| Sweeping Coverage Rate Per Hour: |
| 146,400 sq. ft |
| Hooper Dump Height (Max): |
| 60 in |
| Hooper Capacity: |
| 7 ft cub/300 lbs. |
Scrubber and Recovery System
| Scrubbing Path and Brushes |
| 48in (3) x 17in disc |
| Scrubbing Coverage Rate per Hour |
| 118,600 sq. ft |
| Scrubb Pressure |
| Three scrub pressure setting up to 400 lb. of down force at max set |
| Recovery/Solution Tank Capacity |
| 75 gal each |
| Recovery Vaccum |
| Dual vac motor capable of 48 in waterlift |
| Power System |
| Industrial Battery 36V 770AH |
| Propulsion System: |
| Variable Speed brushless AC Drive |
| Propel Speed |
| Transp 5.5 mph Sweeping/scrubbing 3.5 mph |
Other Equipment & Accessories FLEX Industrial Battery Maintenance Free 36V 595AH Model 18-85-15 FLEX Battery Charger Maintenance Free 36V 600AH (208VAC 3PH) Model MP136-2
The Following Standard Features may be Optional on Competitive Equipment Industrial Rider Sweeper and Scrubber LP Propane
Poly and Wire main broom
MidLite Grit 180 brushes
Disc Scrub Deck with integrated Edge Cleaning
Breakaway Squeegee
Ergonomic Operator Compartment
High-capacity 75-gallon tanks
Rear Wheel Steer
High-capacity Donalson PowerCore Ultraweb Nanofiber Sysnthetic Media Filter with MERV 13 rating
Intuitive Controls with One-Touch Operation
IP55-rated Electric Motors
Tilt-Out Recovery Tank
Exclusive Feature Included:
Smart Flow
Auto-Speed reduction in turns
MaxAccess
ClearView
Page 1 of Page 1 of
| Item Number |
| Qty. |
| Description |
| Color |
U0073445
Pallet Racks Warehouse
| VL-BEAM |
| 255 |
| Upright 079F 39700 Lbs @48VS42"x 32' x 42" |
| Blue |
| U0200388 |
| 1,810 |
| Beams IK40E, 94" |
| Orange |
| T0034139 |
| 420 |
| Beams IK45E, 108" |
| Orange |
| U0075046 |
| 1,020 |
| Anchors 4" 1/2" (Frame 32') |
| Orange |
| U0075884 |
| 1,020 |
| Shims IHASB |
| U0200438 |
| 351 |
| IK501 Row Spacers 12" |
| 96 |
| Beams IK65E, 144" |
| Orange |
| 2,230 |
| Wire Decking 42 x 46 |
| Gray |
U0200316
Picking Racks
| UL856967 |
| 280 |
| Beam 27E 2.5" x 96" |
| Orange |
| T0034139 |
| 30 |
| Frame IK70F 10' x 24" |
| Blue |
| U0075880 |
| 60 |
| Anchors 4" 1/2" for Upright 10' |
| Orange |
| UOO74365 |
| 60 |
| IK501 Row Spacers 6" |
| 1,120 |
| Shelving 1 5/8"x 24"x12" |
| Galva |
| 1 |
| (24ft) Rail Guidance for Picking Aisle 2.5" x 2.5" x .1.8" |
| 120 |
| Anchor Bolts for Rails Guide |
T0034147
Racks Protector
| T0034167 |
| 38 |
| Column Protector |
| Orange |
| T0060815 |
| 5 |
| End Aisle Protector 44 3/8 |
| Orange |
| VL679663 |
| 12 |
| End Aisle Protector 98 3/8 |
| Orange |
| T0034139 |
| 2 |
| End Aisle Protector 74 3/8 |
| Orange |
| 152 |
| Anchors 4" 1/2" (Coln Protector') |
Netting
| 1 |
| (112'L x 10'H) Netting Mesh area |
Seismic Selective Racks 5 Level for 2250 Pallet Position
B.2 PRICE/COST SCHEDULE / ITEM INFORMATION
| ITEM NUMBER |
| DESCRIPTION OF SUPPLIES/SERVICES |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| AMOUNT |
| 2.00 |
| EA |
| __________________ |
| __________________ |
SP3520-30-312 3,000 lb. Capacity, 24 Volt, Stockpicker Mast Triple Telescopic LH 312.0" FLH 44.0" OAH-C 131.0" OAH-EX 400.0” Flex Battery Maintenance Free Model: 12-FLX625-31 Amp Hour Capacity: 0 Voltage: 12 Volts Battery Connector: SB350 RED FLEX CHARGER Model: FXLPM3-48C120Y 8 Hr Capacity: Amp Hour Capacity 640 Line Voltage: 480 Volts LOCAL STOCK NUMBER: Crown SP3520-30-312
| 2.00 |
| EA |
| __________________ |
| __________________ |
PE4500-60 6,000 lb. Capacity, AC Traction 24 Volt, End Control, Rider Pallet FLEX BATTERY Model: 12-FLX500-25 Amp Hour Capacity: 0 Voltage: 12 Volts Battery Connector: SB175 GRAY FLEX CHARGER Model: FXLPM3-48C-120Y 8 Hr Capacity: Amp Hour Capacity 0 Line Voltage: 480 Volts LOCAL STOCK NUMBER: Crown PE4500-60-48
| 2.00 |
| EA |
| __________________ |
| __________________ |
RR5725-45 4,500 lb. Capacity, 36 Volt, Reach Truck Mast Triple Stage LH 341.0" FLH 101.0" OAH-C 149.0" OAH-EX 389.0" FLEX Industrial Power Model: 18-FLX625-31 Amp Hour Capacity: 675 Voltage: 36 Volts Battery Connector: SB350 GRAY Battery Weight: 2347 Warranty: 3 + 2 FLEX CHARGER Model: FXLPM3-48C-120Y 8 Hr Capacity: Amp Hour Capacity 675 Line Voltage: 480 Volts Phase: Three LOCAL STOCK NUMBER: Crown RR5725-45-341
| 2.00 |
| EA |
| __________________ |
| __________________ |
TSP-6500 3,300 lb. Capacity, 48 Volt, Stockpicker, Turret Truck Voltage 48 Volts Mast TN - Standard - TSP-6500 LH 339.0" FLH 72.0" OAH-C 191.0" OAH-EX 381.0" Flex Battery Maintenance Free Model: 24-FLX750-37 Amp Hour Capacity: 0 Voltage: 12 Volts Battery Connector: SB350 GRAY FLEX CHARGER Model: FXLPM3-48-240Y 8 Hr Capacity: Amp Hour Capacity 750 Line Voltage: 480 Volts Phase: Three LOCAL STOCK NUMBER: Crown TSP6500-30-339
| 1.00 |
| EA |
| __________________ |
| __________________ |
WAV60-118 118" Lift Height, 24 Volt, Work Assist Vehicle Chassis WAVE"r Work Assist Vehicle Platform 118" Lifting Height LOCAL STOCK NUMBER: Crown WAV-118
| 1.00 |
| EA |
| __________________ |
| __________________ |
Advance CS7010"T 48 Battery Hybrid Sweeper-Scrubber FLEX Industrial Battery Maintenance Free 36V 595AH Model 18-85-15 FLEX Battery Charger Maintenance Free 36V 600AH (208VAC 3PH) Model MP136-2 LOCAL STOCK NUMBER: CS7010 Sweeper/SCRUBBER
| 1.00 |
| EA |
| __________________ |
| __________________ |
WULFTEC WRTA-10 WITH CONTRAL PANEL PLUS
LOCAL STOCK NUMBER: WRTA-100
| 1.00 |
| EA |
| __________________ |
| __________________ |
DEWALT AIR COMPRESSOR WITH FILTER AND REGULATOR
| 1.00 |
| JB |
| __________________ |
| __________________ |
LABOR FOR INSTALLATION OF WULTEC WRTA-10
| 255.00 |
| EA |
| __________________ |
| __________________ |
NECESSARY PURCHASE OF SEISMIC SELECTIVE RACKS 5 LEVEL FOR 2250 PALLET POSITION FOR THE NEW WAREHOUSE. PALLET RACK WAREHOUSE UPRIGHT 079F 39700 LBS @ 48VS42"X32"X42" COLOR BLUE
LOCAL STOCK NUMBER: U0073445
| 1,810.00 |
| EA |
| __________________ |
| __________________ |
BEAMS IK40E,94" PALLET RACK WAREHOUSE COLOR ORANGE
LOCAL STOCK NUMBER: VL- BEAM
| 420.00 |
| EA |
| __________________ |
| __________________ |
BEAMS IK45E,108" pallet rack warehouse COLOR ORANGE
LOCAL STOCK NUMBER: U0200388
| 1,020.00 |
| EA |
| __________________ |
| __________________ |
ANCHORS 4" 1/2 (FRAME32) PALLET RACKS WAREHOUSE COLOR ORANGE
LOCAL STOCK NUMBER: T0034139
| 1,020.00 |
| EA |
| __________________ |
| __________________ |
SHIMS IHASB PALLET RACK WAREHOUSE
LOCAL STOCK NUMBER: U0075046
| 351.00 |
| EA |
| __________________ |
| __________________ |
IK501 ROW SPACERS 12"PALLET RACKS WAREHOUSE
LOCAL STOCK NUMBER: U0075884
| 96.00 |
| EA |
| __________________ |
| __________________ |
BEAMS IK 65E, 144"PALLET RACK WAREHOUSE COLOR ORANGE
LOCAL STOCK NUMBER: U0200438
| 2,230.00 |
| EA |
| __________________ |
| __________________ |
WIRE DECKING 42X46 PALLET RACK WAREHOUSE COLOR GRAY
| 280.00 |
| EA |
| __________________ |
| __________________ |
BEAM 27E 2.5 X 96" PICKING RACKS COLOR ORANGE
LOCAL STOCK NUMBER: U0200316
| 30.00 |
| EA |
| __________________ |
| __________________ |
FRAME IK70F 10'X24" PICKING RACKS COLOR BLUE
LOCAL STOCK NUMBER: UL856967
| 60.00 |
| EA |
| __________________ |
| __________________ |
ANCHORS 4" 1/2 FOR UPRIGHT 10'PICKING RACKS COLOR ORANGE
| 60.00 |
| EA |
| __________________ |
| __________________ |
IK501 ROW SPACERS 6" PICKING RACKS
LOCAL STOCK NUMBER: U0075880
| 1,120.00 |
| EA |
| __________________ |
| __________________ |
SHELVING 1 5/8"X24"X12" PICKING RACKS COLOR GALVA
LOCAL STOCK NUMBER: U0074365
| 1.00 |
| EA |
| __________________ |
| __________________ |
(24ft) RAIL GUIDANCEFOR PICKING AISLE 2.5"X2.5"X1.8"
| 120.00 |
| EA |
| __________________ |
| __________________ |
ANCHOR BOLTS FOR RAILS GUIDE PICKING RACKS
| 38.00 |
| EA |
| __________________ |
| __________________ |
COLUMN PROTECTOR RACK PROTECTOR COLOR ORANGE
LOCAL STOCK NUMBER: T0034147
| 5.00 |
| EA |
| __________________ |
| __________________ |
END AISLE PROTECTOR 44 3/8 RACKS PROTECTOR COLOR ORANGE
LOCAL STOCK NUMBER: T0034167
| 12.00 |
| EA |
| __________________ |
| __________________ |
END AISLE PROTECTOR 98 3/8 RACK PROTECTOR COLOR ORANGE
LOCAL STOCK NUMBER: T0060815
| 2.00 |
| EA |
| __________________ |
| __________________ |
END AISLE PROTECTOR 74 3/8 RACK PROTECTOR COLOR ORANGE
LOCAL STOCK NUMBER: VL679663
| 152.00 |
| EA |
| __________________ |
| __________________ |
ANCHORS 4"1/2" (COIN PROTECTOR) RACK PROTECTOR
| 18.00 |
| EA |
| __________________ |
| __________________ |
RACK SIGN
| 1.00 |
| EA |
| __________________ |
| __________________ |
(112'L X 10'H) NETTING MESH AREA NETTING
| 1.00 |
| MO |
| __________________ |
| __________________ |
MONTHLY RENT AND DELIVERY OF FORKLIFT FOR INSTALATION OF NEW EQUIPMENT.
| 1.00 |
| MO |
| __________________ |
| __________________ |
MONTHLY RENT AND DELIVERY OF SCISSORS LIFT 30"FOR INSTALATION OF NEW EQUIPMENT.
| 1.00 |
| JB |
| __________________ |
| __________________ |
LABOR OF INSTALLATION Q480
| 1.00 |
| EA |
| __________________ |
| __________________ |
ESTIMATED SHIPPING & HANDLING:
| GRAND TOTAL |
| __________________ |
B.3 DELIVERY SCHEDULE
| ITEM NUMBER |
| QUANTITY |
| DELIVERY DATE |
10 Ave Jose Santana, Carolina, PR, 00979.
| Same as above |
| 2.00 |
| 60 days ARO |
| Same as above |
| 2.00 |
| 60 days ARO |
| Same as above |
| 2.00 |
| 60 days ARO |
| Same as above |
| 1.00 |
| 60 days ARO |
| Same as above |
| 1.00 |
| 60 days ARO |
| Same as above |
| 1.00 |
| 60 days ARO |
| Same as above |
| 1.00 |
| 60 days ARO |
| Same as above |
| 1.00 |
| 60 days ARO |
| Same as above |
| 255.00 |
| 60 days ARO |
| Same as above |
| 1,810.00 |
| 60 days ARO |
| Same as above |
| 420.00 |
| 60 days ARO |
| Same as above |
| 1,020.00 |
| 60 days ARO |
| Same as above |
| 1,020.00 |
| 60 days ARO |
| Same as above |
| 351.00 |
| 60 days ARO |
| Same as above |
| 96.00 |
| 60 days ARO |
| Same as above |
| 2,230.00 |
| 60 days ARO |
| Same as above |
| 280.00 |
| 60 days ARO |
| Same as above |
| 30.00 |
| 60 days ARO |
| Same as above |
| 60.00 |
| 60 days ARO |
| Same as above |
| 60.00 |
| 60 days ARO |
| Same as above |
| 1,120.00 |
| 60 days ARO |
| Same as above |
| 1.00 |
| 60 days ARO |
| Same as above |
| 120.00 |
| 60 days ARO |
| Same as above |
| 38.00 |
| 60 days ARO |
| Same as above |
| 5.00 |
| 60 days ARO |
| Same as above |
| 12.00 |
| 60 days ARO |
| Same as above |
| 2.00 |
| 60 days ARO |
| Same as above |
| 152.00 |
| 60 days ARO |
| Same as above |
| 18.00 |
| 60 days ARO |
| Same as above |
| 1.00 |
| 60 days ARO |
| Same as above |
| 1.00 |
| 60 days ARO |
| Same as above |
| 1.00 |
| 60 days ARO |
| Same as above |
| 1.00 |
| 60 days ARO |
| Same as above |
| 1.00 |
| 60 days ARO |
SECTION C - CONTRACT CLAUSES
ADDENDUM to FAR 52.212-4 CONTRACT TERMS AND CONDITIONS—COMMERCIAL ITEMS Clauses that are incorporated by reference (by Citation Number, Title, and Date), have the same force and effect as if they were given in full text. Upon request, the Contracting Officer will make their full text available.
The following clauses are incorporated into 52.212-4 as an addendum to this contract:
| 52.203-17 |
| CONTRACTOR EMPLOYEE WHISTLEBLOWER RIGHTS AND REQUIREMENT TO INFORM EMPLOYEES OF WHISTLEBLOWER RIGHTS |
| APR 2014 |
| 52.204-4 |
| PRINTED OR COPIED DOUBLE-SIDED ON POSTCONSUMER FIBER CONTENT PAPER |
| MAY 2011 |
| 52.204-16 |
| COMMERCIAL AND GOVERNMENT ENTITY CODE REPORTING |
| JUL 2016 |
| 52.204-18 |
| COMMERCIAL AND GOVERNMENT ENTITY CODE MAINTENANCE |
| JUL 2016 |
| 52.212-4 |
| CONTRACT TERMS AND CONDITIONS—COMMERCIAL ITEMS |
| OCT 2018 |
| 52.232-40 |
| PROVIDING ACCELERATED PAYMENTS TO SMALL BUSINESS SUBCONTRACTORS |
| DEC 2013 |
C.1 52.252-2 CLAUSES INCORPORATED BY REFERENCE (FEB 1998)
This contract incorporates one or more clauses by reference, with the same force and effect as if they were given in full text. Upon request, the Contracting Officer will make their full text available. Also, the full text of a clause may be accessed electronically at this/these address(es):
http://www.acquisition.gov/far/index.html http://www.va.gov/oal/library/vaar/
(End of Clause)
C.2 VAAR 852.203-70 COMMERCIAL ADVERTISING (MAY 2018)
The Contractor shall not make reference in its commercial advertising to Department of Veterans Affairs contracts in a manner that states or implies the Department of Veterans Affairs approves or endorses the Contractor’s products or services or considers the Contractor’s products or services superior to other products or services.
(End of Clause)
C.3 VAAR 852.211-70 EQUIPMENT OPERATION AND MAINTENANCE MANUALS (NOV 2018)
The Contractor shall follow standard commercial practices to furnish manual(s), handbook(s) or brochure(s) containing operation, installation, and maintenance instructions, including pictures or illustrations, schematics, and complete repair/test guides, as necessary, for technical medical equipment and devices, and/or other technical and mechanical equipment provided per CLIN(s) ALL. The manuals, handbooks or brochures shall be provided in hard copy, soft copy or with electronic access instructions, consistent with standard industry practices for the equipment or device. Where applicable, the manuals, handbooks or brochures will include electrical data and connection diagrams for all utilities. The documentation shall also contain a complete list of all replaceable parts showing part number, name, and quantity required.
(End of Clause) C.4 VAAR 852.219-10 VA NOTICE OF TOTAL SERVICE-DISABLED VETERAN-OWNED SMALL BUSINESS SET-ASIDE (JUL 2016)(DEVIATION)
(a) Definition. For the Department of Veterans Affairs, “Service-disabled veteran-owned small business concern or SDVSOB”:
(1) Means a small business concern:
(i) Not less than 51 percent of which is owned by one or more service-disabled veterans or, in the case of any publicly owned business, not less than 51 percent of the stock of which is owned by one or more service-disabled veterans or eligible surviving spouses (see VAAR 802.201 Surviving Spouse definition);
(ii) The management and daily business operations of which are controlled by one or more service-disabled veterans (or eligible surviving spouses) or, in the case of a service-disabled veteran with permanent and severe disability, the spouse or permanent caregiver of such veteran;
(iii) The business meets Federal small business size standards for the applicable North American Industry Classification System (NAICS) code identified in the solicitation document;
(iv) The business has been verified for ownership and control pursuant to 38 CFR 74 and is so listed in the Vendor Information Pages database, (https://www.vip.vetbiz.gov); and
(v) The business will comply with subcontracting limitations in 13 CFR 125.6, as applicable
(2) “Service-disabled veteran” means a veteran, as defined in 38 U.S.C. 101(2), with a disability that is service-connected, as defined in 38 U.S.C. 101(16).
(b) General.
(1) Offers are solicited only from verified service-disabled veteran-owned small business concerns. Offers received from concerns that are not verified service-disabled veteran-owned small business concerns shall not be considered.
(2) Any award resulting from this solicitation shall be made to a verified service-disabled veteran-owned small business concern.
(c) Agreement. A service-disabled veteran-owned small business concern agrees that in the performance of the contract, the concern will comply with the limitation on subcontracting requirements in 13 CFR §125.6.
(d) A joint venture may be considered a service-disabled veteran owned small business concern if the joint venture complies with the requirements in 13 CFR 125.15, provided that any reference therein to SDVO SBC is to be construed to apply to a VA verified SDVOSB as appropriate.
(e) Any service-disabled veteran-owned small business concern (non-manufacturer) must meet the requirements in FAR 19.102(f) of the Federal Acquisition Regulation to receive a benefit under this program.
(End of Clause) C.5 VAAR 852.219-11 VA NOTICE OF TOTAL VETERAN-OWNED SMALL BUSINESS SET-ASIDE (JUL 2016)(DEVIATION)
(a) Definition. For the Department of Veterans Affairs, “Veteran-owned small business or VOSB.”—
(1) Means a small business concern—
(i) Not less than 51 percent of which is owned by one or more veterans or, in the case of any publicly owned business, not less than 51 percent of the stock of which is owned by one or more veterans;
(ii) The management and daily business operations of which are controlled by one or more veterans;
(iii) The business meets Federal small business size standards for the applicable North American Industry Classification System (NAICS) code identified in the solicitation document;
(iv) The business has been verified for ownership and control pursuant to 38 CFR 74 and is so listed in the Vendor Information Pages database, (https://www.vip.vetbiz.gov): and
(v) The business will comply with subcontracting limitations in 13 CFR 125.6, as applicable
(2) “Veteran” is defined in 38 U.S.C. 101(2).
(b) General.
(1) Offers are solicited only from verified veteran-owned small business concerns. All service-disabled veteran-owned small businesses are also determined to be veteran-owned small businesses if they meet the criteria identified in paragraph (a)(1) of this section. Offers received from concerns that are not veteran-owned small business concerns shall not be considered.
(2) Any award resulting from this solicitation shall be made to a verified veteran-owned small business concern.
(c) Agreement. A veteran-owned small business concern agrees that in the performance of the contract, the concern will comply with the limitation on subcontracting requirements in 13 CFR §125.6.
(d) A joint venture may be considered a veteran-owned small business concern if the joint venture complies with the requirements in 13 CFR 125.15, provided that any reference therein to SDVO SBC is to be construed to apply to a VA verified SDVOSB and/or VOSB as appropriate.
(e) Any veteran-owned small business concern (non-manufacturer) must meet the requirements in 19.102(f) of the Federal Acquisition Regulation to receive a benefit under this program.
(End of Clause) C.6 VAAR 852.219-74 LIMITATIONS ON SUBCONTRACTING—MONITORING AND COMPLIANCE (JUL 2018)
(a) This solicitation includes VAAR 852.219-10 VA Notice of Total Service- Disabled Veteran-Owned Small Business Set-Aside.
(b) Accordingly, any contract resulting from this solicitation is subject to the limitation on subcontracting requirements in 13 CFR 125.6, or the limitations on subcontracting requirements in the FAR clause, as applicable. The Contractor is advised that in performing contract administration functions, the Contracting Officer may use the services of a support contractor(s) retained by VA to assist in assessing the Contractor's compliance with the limitations on subcontracting or percentage of work performance requirements specified in the clause. To that end, the support contractor(s) may require access to Contractor's offices where the Contractor's business records or other proprietary data are retained and to review such business records regarding the Contractor's compliance with this requirement.
(c) All support contractors conducting this review on behalf of VA will be required to sign an “Information Protection and Non-Disclosure and Disclosure of Conflicts of Interest Agreement” to ensure the Contractor's business records or other proprietary data reviewed or obtained in the course of assisting the Contracting Officer in assessing the Contractor for compliance are protected to ensure information or data is not improperly disclosed or other impropriety occurs.
(d) Furthermore, if VA determines any services the support contractor(s) will perform in assessing compliance are advisory and assistance services as defined in FAR 2.101, Definitions, the support contractor(s) must also enter into an agreement with the Contractor to protect proprietary information as required by FAR 9.505-4, Obtaining access to proprietary information, paragraph (b). The Contractor is required to cooperate fully and make available any records as may be required to enable the Contracting Officer to assess the Contractor's compliance with the limitations on subcontracting or percentage of work performance requirement.
(End of Clause) C.7 VAAR 852.219-75 SUBCONTRACTING COMMITMENTS MONITORING AND COMPLIANCE (JUL 2018)
(a) This solicitation includes the clause: 852.215-70…
This is the start of the file's text. The full file is on GovTribe.