36C24818R0742-00003001.docx

DOCX document 14 KB Posted

Attached to
Renovate Ward 3C for Cardiology Equipment
Solicitation number
36C24818R0742
Issued by

About this file

36C24818R0742 00003 AKEA Response to RFI 1.docx

View the file

Other files

File Type Posted
36C24818C0170-000.docx DOCX document
36C24818R0742-0004000.docx DOCX document
36C24818R0742-00003000.docx DOCX document
36C24818R0742-00003002.zip ZIP file
36C24818R0742-00002001.pdf PDF
36C24818R0742-00002000.docx DOCX document
36C24818R0742-00001001.zip ZIP file
36C24818R0742-00001000.docx DOCX document
36C24818R0742-002.docx DOCX document
36C24818R0742-004.zip ZIP file
36C24818R0742-005.zip ZIP file
36C24818R0742-003.pdf PDF
36C24818R0742-006.zip ZIP file
36C24818R0742-008.doc DOC document
36C24818R0742-007.pdf PDF
36C24818R0742-000.docx DOCX document
36C24818R0742-001.pdf PDF
Show all 17

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

AKEA Response to RFI 1

Who is the basis of design on the AHU?

The basis of design is a combination of Temtrol (Tom Barrow Co) and VTS (Nelson & Co).

Are the head walls under the plumbing contractor scope?

The headwalls are specified in Division 10 – Specialties. Base Bid will include “double tier” headwall units - horizontal headrail and bed locator. Deductive Alternate No 1 eliminates the bed locator, resulting in a “single tier” horizontal rail unit remaining.

On page A801 Typical Patient Headwall detail. Are the Air, Oxygen, And Vac. Outlets part of the headwall or are they wall outlets? If they are wall outlets please provide a med gas schedule.

The medical gas outlets are integral with the horizontal headwall rail unit – they are not individually wall mounted outlets.

On page PL202 shows ZCV-1 & MGAP-1. Please provide a med gas schedule.

ZCV (Zone Control Valve – Valve In Box) and MGAP (Med Gas Alarm Panel) nomenclature is indicated in Keynotes 2 and 3 on PL202. MV, MA, and O2 abbreviations are on drawing PL001. The abbreviation OX is synonymous with O2 – Oxygen.

Page PL200 shows a P-413 fixture, this fixture is not shown on the fixture schedule. The fixture schedule shows a P-528, this fixture is not shown on page PL200. Should the P-413 be labeled P-528?

Yes, this will be captured in an addendum to the bid construction documents.

Page PL700 shows a Backflow Preventer Piping Detail. Where is the backflow located on the floor plans?

This will be captured in an addendum to the bid construction documents.

Page MH701 shows a HHW Heat Exchanger Detail, the steam piping is not shown on the floor plans. Please show piping The pipe sizes are indicated in the Hot Water Converter Schedule, Sheet M601 (the high temp condensate line is ¾”). The general location of the heat exchanger and photos of the nearby existing steam lines (to tie into) are shown on Sheet MH701. The contractor shall provide means and methods to accomplish the heat exchanger within the space provided.