36C24818Q9573-003.docx
DOCX document 22 KB Posted
- Solicitation number
- 36C24818Q9573
About this file
36C24818Q9573 Quality Assurance Surveillance Plan (QASP).docx
View the file
Other files
| File | Type | Posted |
|---|---|---|
| 36C24818Q9573-008.docx | DOCX document | |
| 36C24818Q9573-007.xlsx | XLSX spreadsheet | |
| 36C24818Q9573-004.docx | DOCX document | |
| 36C24818Q9573-005.docx | DOCX document | |
| 36C24818Q9573-006.docx | DOCX document | |
| 36C24818Q9573-000.docx | DOCX document | |
| 36C24818Q9573-001.docx | DOCX document | |
| 36C24818Q9573-002.xlsx | XLSX spreadsheet |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
D.2 QUALITY ASSURANCE SURVEILLANCE PLAN (QASP)
The contractor shall be evaluated in accordance with the following QASP.
1. PURPOSE
This Quality Assurance Surveillance Plan (QASP) provides a systematic method to evaluate performance for the stated contract. This QASP explains the following:
a. What shall be monitored.
b. How monitoring shall take place.
c. Who shall conduct the monitoring.
d. How monitoring efforts and results shall be documented.
This QASP does not detail how the contractor accomplishes the work. Rather, the QASP is created with the premise that the contractor is responsible for management and quality control actions to meet the terms of the contract. It is the Government’s responsibility to be objective, fair, and consistent in evaluating performance.
This QASP is a “living document” and the Government may review and revise it on a regular basis. However, the Government shall coordinate changes with the contractor. Copies of the original QASP and revisions shall be provided to the contractor and Government officials implementing surveillance activities.
2. GOVERNMENT ROLES AND RESPONSIBILITIES
The following personnel shall oversee and coordinate surveillance activities.
Contracting Officer (CO) - The CO shall ensure performance of all necessary actions for effective contracting, ensure compliance with the contract terms, and shall safeguard the interests of the Department of Veteran Affairs (VA) in the contractual relationship. The CO shall also assure that the contractor receives impartial, fair, and equitable treatment under this contract. The CO is ultimately responsible for the final determination of the adequacy of the contractor’s performance.
Assigned Contracting Officer: Steven Scharlow Contracting Officer’s Representative (COR) - The COR is responsible for technical administration of the contract and shall assure proper Government surveillance of the contractor’s performance. The COR shall keep a quality assurance file. The COR is not empowered to make any contractual commitments or to authorize any contractual changes on the Government’s behalf.
Assigned COR: Judith Jackson
3. CONTRACTOR REPRESENTATIVES
The following employees of the contractor serve as the contractor’s program manager for this contract.
1. Program Manager - ___________________________
2. Other Contractor Personnel - ______________________________
4. PERFORMANCE STANDARDS:
Performance standards define desired services. The Government performs surveillance to determine if the contractor exceeds, meets, or does not meet these standards.
The Performance Requirements are listed below. The Government shall use these standards to determine contractor performance and shall compare contractor performance to the Acceptable Quality Level (AQL).
| ID |
| Performance Standard |
| Quality Standard |
| Method of Surveillance |
| Incentives |
| 1 |
| The Contractor shall meet the General Requirement of the Performance Work Statement (PWS) |
| Contractor must meet the requirements as outlined in the PWS 98% of the time |
| Chaplain Feedback and Direct Observation by COR |
| · Incentives: Favorable contactor performance evaluation |
· Disincentive: Unfavorable contractor performance evaluation
· Repeated violation (more than three instances during a period of performance) may result in termination of services
| 2 |
| The Contractor shall punctually meet the timeline delivery of the service as stated in the (PWS) |
| Contractor must meet the timeline requirements as outlined in the PWS 98% of the time |
| Chaplain Feedback and Direct Observation by COR |
| · Incentives: Favorable contactor performance evaluation |
· Disincentive: Unfavorable contractor performance evaluation
· Repeated violation (more than three instances during a period of performance) may result in termination of services
| 3 |
| The Contractor shall comply with the Data Rights as stated in Section VIII in the Performance Work Statement (PWS) |
| Contractor must comply with the Data Rights requirements as outlined in the PWS 100% of the time |
| Chaplain Feedback and Direct Observation by COR |
| · Incentives: Favorable contactor performance evaluation |
· Disincentive: Unfavorable contractor performance evaluation
· One (1) violation may result in termination of services
5. INCENTIVES/DISINCENTIVES
The Government shall use favorable contractor performance evaluations as incentives. Incentives/Disincentives shall be based on exceeding, meeting, or not meeting performance standards.
6. PROCEDURES/METHODS OF QA SURVEILLANCE
Various methods exist to monitor performance. The COR shall use the surveillance methods listed below in the administration of this QASP.
a. Direct Observation. Direct observation can be performed periodically or through 100% surveillance.
b. Chaplain Feedback. Any complaint data is reviewed by the CO/COR and any validated complaints against a contractor will be further investigated.
7. RATINGS
Metrics and methods are designed to determine if performance exceeds, meets, or does not meet a given standard and acceptable quality level. A rating scale shall be used to determine a positive, neutral, or negative outcome. The number of incidents per task order will be used a metric as every task order could represent a is critical compliance issue. The following ratings shall be used:
Positive Outcome: No more than 1 incident of not meeting the performance standard per period of performance.
Neutral Outcome: No more than 3 incidents of not meeting the performance standard during the standard per period of performance.
Negative Outcome: More than 3 incidents of not meeting the performance standard during the standard per period of performance.
8. DOCUMENTING PERFORMANCE
a. ACCEPTABLE PERFORMANCE The Government shall document positive performance. Any report may become a part of the supporting documentation for any contractual action.
b. UNACCEPTABLE PERFORMANCE When unacceptable performance occurs, the COR shall inform the Contracting Officer (CO). This shall normally be in writing unless circumstances necessitate verbal communication. In any case the COR shall document the discussion and place it in their respective file.
When the COR determines formal written communication is required, the COR shall prepare a Contract Discrepancy Report (CDR), and present it to the CO. The CO will in turn review and submit to the contractor’s program manager for corrective action.
The contractor shall acknowledge receipt of the CDR in writing. The CDR shall specify if the contractor is required to prepare a corrective action plan to document how the contractor shall correct the unacceptable performance and avoid a recurrence. The CDR shall also state how long after receipt the contractor has to present this corrective action plan to the COR. The Government shall review the contractor's corrective action plan to determine acceptability.
Any CDRs may become a part of the supporting documentation for any contractual action deemed necessary by the CO.
9. FREQUENCY OF MEASUREMENT
a. Frequency of Measurement.
The COR will monitor contractor compliance by direct observation either periodically or through 100% surveillance, along with investigating any complaints that may be received. During contract performance, the COR will periodically analyze whether the frequency of surveillance is appropriate for the work being performed.
b. Frequency of Performance Assessment Meetings.
The COR shall conduct a progress meeting with the contractor annually.