36C24818Q9539-0001000.docx
DOCX document 30 KB Posted
- Solicitation number
- 36C24818Q9539
About this file
36C24818Q9539 0001 36C24818Q9539 0001.docx
View the file
Other files
| File | Type | Posted |
|---|---|---|
| 36C24818Q9539-000.docx | DOCX document | |
| 36C24818Q9539-001.docx | DOCX document |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
5. PROJECT NUMBER (if applicable)
CODE
7. ADMINISTERED BY
2.
AMENDMENT/MODIFICATION NUMBER
CODE
6. ISSUED BY
8. NAME AND ADDRESS OF CONTRACTOR
4. REQUISITION/PURCHASE REQ. NUMBER
3. EFFECTIVE DATE
9A. AMENDMENT OF SOLICITATION NUMBER
9B. DATED
PAGE
OF PAGES
10A. MODIFICATION OF
CONTRACT/ORDER NUMBER
10B. DATED
BPA NO.
1. CONTRACT ID CODE
FACILITY CODE
CODE
Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods:
The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers
E. IMPORTANT:
is extended,
(a) By completing Items 8 and 15, and returning __________ copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted; or (c) By separate letter or electronic communication which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY is not extended.
12. ACCOUNTING AND APPROPRIATION DATA
(REV.
11/2016) is required to sign this document and return ___________ copies to the issuing office.
is not, A. THIS CHANGE ORDER IS ISSUED PURSUANT TO:
Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT ORDER NO. IN ITE M 10A.
15C. DATE SIGNED
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES
SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR
43.103(b).
RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by letter or electronic communication, provided each letter or electronic communication makes r eference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
C. THIS SUPPLEMENTAL AGREEMENT IS
ENTERED INTO
PURSUANT TO AUTHORITY OF:
D. OTHER
BY
Contractor
16C. DATE SIGNED
14.
DESCRIPTION OF AMENDMENT/MODIFICATION
16B. UNITED STATES OF AMERICA
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15A. NAME
AND TITLE OF SIGNER
16A. NAME AND TITLE OF CONTRACTING OFFICER
15B. CONTRACTOR/OFFEROR
STANDARD FORM 30
PREVIOUS EDITION NOT USABLE
Prescribed by GSA - FAR (48 CFR) 53.243 (Type or print) (Type or print) (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
(Number, street, county, State and ZIP Code) (If other than Item 6) (Specify type of modification and authority) (such as changes in paying office, appropriation date, etc.)
(If required)
(SEE ITEM 11)
(SEE ITEM 13)
(X)
CHECK
ONE
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS,
IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
11. THIS ITEM ONLY APPLIES TO AMENDMENTS
OF SOLICITATIONS
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
(Signature of person authorized to sign) (Signature of Contracting Officer) 08-28-2018 none 36C248 Department of Veterans Affairs Network Contracting Office 8 (NCO 8) Miami VA Healthcare System 1201 NW 16th Street Miami FL 33125 36C546 Department of Veterans Affairs Network Contracting Office 8 (NCO 8) Miami VA Healthcare System 1201 NW 16th Street Miami FL 33125 To all Offerors/Bidders
36C24818Q9539 08-20-2018
X X X 08/29/2018 at 4:00pm EST X The purpose of this Amendment is to provide the Government's response to industry's questions. See Section A.1 of this Amendment.
The offer due date and time has been extended from: August 29,2018 at 11:00am EST, to: August 29, 2018 at 4:00pm EST.
Section A.1 Government Response.
QUESTION #1
Prior to the solicitation the safety test was being conducted ONCE per year. The solicitation states that it is to be conducted TWICE per year. Therefore, I just want to confirm if indeed it is now to be done twice per year as stated in the scope of work.
Response #1 All items will be tested and verified once per year.
QUESTION #2
The facility already has a boiler operator who does the following monthly tasks itemized in section 4.10.4 (listed here too). I also would like to confirm if we are still required to perform these too.
4.10.4 Operational Testing of Boiler Safety Devices:
· Low-water cutoff (slow drain) M
· Low-water cutoff shunt switch M
· Auxiliary low-water cutoff (slow drain) M
· Auxiliary low-water cutoff shunt switch M
· High-water alarm M
· Low-water alarm M
· Flame scanner M
· Deaerator high and low water alarms M
· Deaerator steam pressure/temperature control M
· Condensate storage tank high and low water alarms M
Response #2 All items will be tested and verified once per year.
Question #3
4.1 – This section doesn’t state the frequency, but VHA Directive 1810 states boiler tuning shall be twice annuals. Is this the frequency we are to bid?
Response #3 No. The task is to verify the testing is performed by the VAMC personnel once per year.
Question #4
4.4 - States contractor shall input the data into the EPA CDX, but this is a requirement we have never heard of. Usually this would be a client deliverable, not the contractor. Can you provide more information?
Response #4 The Vendor is required to upload information.
Question #5
4.8 - How many annual trips will be required to inspect the boilers? We expect both cannot be inspected on the same trip due to the cool down and clearance process.
Response #5 Two (2) trips are required to perform the boiler inspection and testing.
Question #6
4.9 – Does the DA need UT of the shell to predict remaining life, or only wet mag particle of the welds?
Response #6 Both of these tests are required.
Question #7
4.9 – Can/will the VA be responsible for draining, cleaning and flapper wheel cleaning of the welds? Inspectors typically will need this performed prior to their onsite arrival. If not, this will add cost to the proposal.
Response#7 No, the contractor is responsible for performing this task.
Question #8 4.8/4.9 – Can/will the VA provide LOTO, air clearance and hole watch for the inspection? If not, this will add cost to the proposal.
Response #8 The VAMC and the Contractor must apply separate LOTO. The Contractor is responsible for performing air monitoring.
Question #9 4.8/4.9 – Will the VA provide air monitoring of the vessels during inspection?
Response #9 No, the contractor is responsible for providing air monitoring.
Question #10
4.10 – States ONCE per year, then goes onto state different frequencies for various items. Please confirm all items shown to have frequencies other than one year, shall be tested YEARLY only.
Response #10 All items will be tested and verified once per year.
Question #11 Will badges be required for performance of any scope of work listed in this solicitation?
Response #11 No, badges are not required.
Question #12 Please clarify what controls you currently have on your boilers at your facility.
Response #12 Hayes Cleveland and Siemens Controls.
Question #13 Please clarify if there will be designated parking at the facility during the annual opening and closing of the boilers and DA tank.
Response #13 Yes, parking will be available.
File details come from the government source that posted it.